CN209368600U - Modern tram railway roadbed - Google Patents
Modern tram railway roadbed Download PDFInfo
- Publication number
- CN209368600U CN209368600U CN201821582381.9U CN201821582381U CN209368600U CN 209368600 U CN209368600 U CN 209368600U CN 201821582381 U CN201821582381 U CN 201821582381U CN 209368600 U CN209368600 U CN 209368600U
- Authority
- CN
- China
- Prior art keywords
- layer
- bed
- concrete
- concrete road
- road bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to urban rail transit technology fields, provide a kind of modern tram railway roadbed, comprising: subgrade bed, reinforced concrete bed course, left side is concrete road bed and right side is concrete road bed;It is equipped with the reinforced concrete bed course on the subgrade bed, is provided with that the concrete road bed and described right side in the left side is concrete road bed, and the concrete road bed and described right side in the left side is concrete road bed is arranged in parallel along the length direction of the reinforced concrete bed course;The left side is concrete road bed, the concrete road bed outside in the right side and is provided with plantation green layer between the two.Track structure is organically combined the space together made full use of between track structure by the modern tram railway roadbed with plant landscape, rationally distributed;City's green areas is increased, city space has been beautified.
Description
Technical field
The utility model relates to urban rail transit technology fields, more particularly to a kind of modern tram railway roadbed.
Background technique
Modern tram system is the novel mass rapid transit system to grow up on the basis of traditional tramcar
System, compared with bus, its freight volume is big, speed is fast, pollution is small, comfortable, safe, the service life is longer;Compared with subway, it
Construction investment saves, and construction speed is fast, and running cost is low, easy to maintenance.Therefore, modern tram system be " harmonious traffic " and
The important embodiment of " benefit traffic ", for improving urban traffic environment, alleviating urban traffic pressure, promotion city image with weight
Want meaning.In recent years, modern tram is gradually used in cities such as Dalian, Shenyang, Tianjin, Suzhou, and in other cities
City is also rapidly developed and promotes.
Modern tram track uses buried groove profile rail structure, according to the functional requirement of different sections, using lawn,
The forms such as pitch and footpath ground tile carry out laying solid concrete roabed.Therefore, the track demand of modern tram and existing railway
Or underground railway track, there are difference, original solid concrete roabed cannot adapt to the requirement of modern tram very well.
Existing modern tram uses tunneling boring integral concrete railway roadbed, and line appearance is single, influences urban landscape,
And there are concrete masonries to measure deficiency big, that cost is high, and roadbed, bridge and tunnel location ballast bed structure disunity, makes
It must construct and conserve and is many and diverse.
Utility model content
(1) technical problems to be solved
The purpose of the utility model is to provide a kind of modern tram railway roadbeds, it is intended at least the solution prior art or correlation
One of technical problem present in technology.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides a kind of modern tram railway roadbed, comprising: roadbed base
Bed, reinforced concrete bed course, left side is concrete road bed and right side is concrete road bed;The reinforced concrete is equipped on the subgrade bed
It is concrete road bed to be provided with the concrete road bed and described right side in the left side along the length direction of the reinforced concrete bed course for bed course,
The concrete road bed and described right side in the left side is concrete road bed to be arranged in parallel;The left side is concrete road bed, the right side is mixed
It is provided on the outside of solidifying dirt road bed and between the two plantation green layer.
Wherein, it includes the desk-top whole road of multiple support rails that the concrete road bed and described right side in the left side is concrete road bed
Bed.
Wherein, through-thickness is sequentially arranged at intervals with upper layer steel wire, transverse direction from top to bottom in the reinforced concrete bed course
Steel bar layer, longitudinal reinforcement layer and lower layer's steel wire;Reinforcing bar in the longitudinal reinforcement layer is along reinforced concrete bed course length side
To extension, the reinforcing bar in the transverse steel layer extends along the reinforced concrete bed course width direction.
Wherein, the plantation green layer successively includes drainage blanket, sandy soil layer, water conservation layer, garden mould layer, grid layer from lower to upper
And lawn layer.
Wherein, the drainage blanket is filled with gravel particle, and the partial size of the gravel particle is set as 1~5cm.
Wherein, the garden mould layer includes organic matter 30%~50%, garden mould 20%~30% and coarse sand 15%~20%,
The diameter of soil pellet of the garden mould layer is less than or equal to 3cm.
Wherein, the thickness of the drainage blanket be more than or equal to 10cm, the sandy soil layer with a thickness of 9~11cm, the water conservation
Layer with a thickness of 1~3cm, the garden mould layer with a thickness of 18~22cm, the grid layer with a thickness of 2~3cm, the lawn
Layer with a thickness of 3~5cm.
Wherein, the grid layer includes glass fiber grid grid layer or the hollow clathrum of plastic honeycomb.
(3) beneficial effect
Compared with prior art, the utility model has the advantage that
A kind of modern tram railway roadbed provided by the utility model, to guarantee the steady of modern tram ballast bed structure
It is fixed, in one layer of reinforced concrete bed course of subgrade bed arrangement above, to meet the requirement of settlement of subgrade, along reinforced concrete bed course
Length direction is provided with that the concrete road bed and right side in left side is concrete road bed, and left side is concrete road bed and right side is concrete road bed flat
Row arrangement.The modern tram ballast bed structure is slim and graceful, self weight is lighter, can reduce track structure dead load, reduces modern rail electricity
The concrete amount of lane bed.Also, left side is concrete road bed, the concrete road bed outside in right side and is provided with kind between the two
Green layer is planted, which is organically combined track structure together with plant landscape, makes full use of rail
Space between road structure, it is rationally distributed;City's green areas is increased, city space has been beautified.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of modern tram railway roadbed of the utility model embodiment;
Fig. 2 is a kind of schematic cross-sectional view of modern tram railway roadbed of the utility model embodiment;
Fig. 3 is a kind of partial enlarged view figure of modern tram railway roadbed of the utility model embodiment;
In figure: the layer of the lawn 1-;2- grid layer;3- garden mould layer;4- is retained layer;5- sandy soil layer;6- drainage blanket;7- reinforced concrete pad
Layer;8- rail;It is concrete road bed on the right side of 9-.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below
Example is not intended to limit the scope of the present invention for illustrating the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width
Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable
The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure
Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or
Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model
System.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include at least one this feature.The meaning of " plurality " is at least two, such as two in the description of the present invention,
It is a, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be
Mechanical connection is also possible to be electrically connected or can communicate each other;It can be directly connected, the indirect phase of intermediary can also be passed through
Even, the connection inside two elements or the interaction relationship of two elements be can be, unless otherwise restricted clearly.For this
For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
Fig. 1 is a kind of structural schematic diagram of modern tram railway roadbed of the utility model embodiment, as shown in Figure 1, comprising:
Subgrade bed (not shown), reinforced concrete bed course 7, the concrete road bed (not shown) in left side and right side are concrete road bed
9;Wherein, the thickness of subgrade bed and reinforced concrete bed course 7 is chosen all in accordance with actual needs, does not do specific limit in the present embodiment
It is fixed.The upper surface of subgrade bed is equipped with reinforced concrete bed course 7, and the length direction of reinforced concrete bed course 7 is provided with left side concrete
Railway roadbed and right side concrete road bed 9, left side is concrete road bed and concrete road bed 9 parallel arrangement in right side, left side are concrete road bed
It chooses with right side concrete road bed the distance between 9, is not specifically limited in the present embodiment according to actual needs.And it is left
The concrete road bed height with right side concrete road bed 9 in side is chosen all in accordance with actual needs, does not do specific limit in the present embodiment
It is fixed.Left side is concrete road bed, the concrete road bed outside in right side and is provided with plantation green layer between the two.
Fig. 2 is a kind of schematic cross-sectional view of modern tram railway roadbed of the utility model embodiment, as shown in Fig. 2, steel
Rail 8 is fixedly installed in concrete road bed, right side concrete road bed 9 the top in left side by fastener respectively, and rail 8 is respectively along left side
The length direction setting concrete road bed, right side is concrete road bed.
In the present embodiment, calculating subgrade bed thickness according to load generally uses 1.2m that can meet bearing capacity demand
(except Special Roadbed section);For guarantee modern tram ballast bed structure stabilization, in one layer of steel of subgrade bed arrangement above
Muscle concrete bed course, to meet the requirement of settlement of subgrade, thickness is calculated according to load and is determined, under normal circumstances with a thickness of 0.2m
It can satisfy the use demand;The modern tram ballast bed structure is slim and graceful, self weight is lighter, can reduce track structure dead load, reduces existing
For tramcar railway roadbed concrete dosage.Also, left side is concrete road bed, the concrete road bed outside in right side and is provided between the two
Green layer is planted, which is organically combined together with plant landscape by track structure, made full use of
Space between track structure, it is rationally distributed;City's green areas is increased, city space has been beautified.
In addition, embodiment according to the present utility model, left side is concrete road bed and right side concrete road bed 9 includes multiple
The desk-top solid concrete roabed of support rail.
It is illustrated so that left side is concrete road bed as an example in the present embodiment, concrete road bed left side includes multiple tracks
Formula solid concrete roabed, multiple desk-top solid concrete roabeds of support rail are arranged along the length direction interval of reinforced concrete bed course 7.It is desk-top whole using support rail
Body railway roadbed, concrete masonry's amount is small, is conducive to lower project cost.
In addition, embodiment according to the present utility model, successively interval is set through-thickness from top to bottom in reinforced concrete bed course 7
It is equipped with upper layer steel wire, transverse steel layer, longitudinal reinforcement layer and lower layer's steel wire;
Reinforcing bar in longitudinal reinforcement layer extends along 7 length direction of reinforced concrete bed course, and the reinforcing bar in transverse steel layer is along reinforcing bar
7 width direction of concrete bed course extends.
In the present embodiment, the neutralization axial symmetry water of longitudinal reinforcement layer and transverse steel layer about 7 section of reinforced concrete bed course
Flat setting, upper and lower layer steel wire are horizontally disposed about the neutralization axial symmetry in 7 section of reinforced concrete bed course;Transverse steel layer and longitudinal direction
The reinforcing bar of steel bar layer is deformed bar.In each fixed one layer of minor diameter spacer bar layer in the upside of upper and lower layer steel wire, two
Reinforcing bar in spacer bar layer is deformed bar, and the spacing of reinforcement in two lateral minor diameter spacer bar layers is side by side and in parallel
In reinforced concrete bed course 7 plate face be arranged, between interval be greater than adjacent reinforcing bar distance.Reinforcing bar both ends in spacer bar layer are stretched out
7 peripheral end surface of reinforced concrete bed course, when producing reinforced concrete bed course 7, spacer bar layer can be convenient for positioning to upper and lower steel wire.Upper,
Lower layer's steel wire end is located within 7 peripheral end surface of reinforced concrete bed course, i.e., upper and lower layer steel wire does not stretch out reinforced concrete bed course 7 weeks
Side end face;Reinforcing bar in upper and lower layer steel wire is coated reinforcement.
Transverse steel layer can increase reinforced concrete bed course 7 in the width direction on use intensity.Longitudinal reinforcement layer and lateral steel
Muscle layer is horizontally disposed about the neutralization axial symmetry in 7 section of reinforced concrete bed course, and upper and lower layer steel wire is about 7 section of reinforced concrete bed course
Neutralization axial symmetry it is horizontally disposed, it is structurally reasonable, while improving the intensity of reinforced concrete bed course 7, reinforced concrete pad is effectively reduced
The buckling deformation of layer 7.Upper and lower layer steel wire can be used as nonprestressed reinforcement use.In this way, when reinforced concrete bed course 7 does not crack,
Deformed bar can provide prestressing force and increase 7 intensity of reinforced concrete bed course, prevents reinforced concrete bed course 7 from cracking, opens in reinforced concrete bed course 7
When splitting, upper and lower layer steel wire, which can be used as nonprestressed reinforcement, prevents track plates from continuing to crack.And upper and lower layer steel wire is not stretched
7 peripheral end surface of reinforced concrete bed course out keeps 7 surface texture of reinforced concrete bed course more complete, is hardly damaged, improves service life.?
On longitudinal prestressing reinforcing bar, meets technique manufacture and require, longitudinal reinforcement layer, transverse steel interlayer are every setting, and in steel bar layer
Reinforcing bar be also spaced setting so that the reinforcing bar of steel bar layer every is not in contact with each other, upper and lower layer steel wire uses coating insulation steel bar,
It can completely avoid the formation metallic closed circuit in reinforced concrete bed course 7.Reinforcing bar in transverse steel layer is arranged side by side in groups, group
Interior reinforcing bar is no less than three, and compared with single steel bar, no less than 3 reinforcing bars, which are arranged in groups, can reduce deformed bar to concrete
The stress of application.
Fig. 3 is a kind of partial enlarged view of modern tram railway roadbed of the utility model embodiment, as shown in figure 3, plantation
Green layer successively includes drainage blanket 6, sandy soil layer 5, water conservation layer 4, garden mould layer 3, grid layer 2 and lawn layer 1 from lower to upper.
In one embodiment, in order to drain extra infiltration in time, it is provided with drainage blanket 6.Drainage blanket 6 is filled with broken
The partial size of stone particle, gravel particle is set as 1~5cm.The thickness of drainage blanket is more than or equal to 10cm, and drainage blanket 6 can play secretly
The effect of ditch.
In one embodiment, it is seeped in order to ensure infiltration energy and at present, and the particulate matter of garden mould layer 3 can be filtered, be provided with
Sandy soil layer 5.Wherein, sandy soil layer 5 with a thickness of 9~11cm.
In one embodiment, to prevent 3 moisture of garden mould layer rapidly losing, moisture is persistently provided for garden mould layer 3, it is ensured that table
The moisture supply of layer vegetation, while preventing from seeping under the soil body, is provided with water conservation layer 4, water conservation layer 4 with a thickness of 1~3cm.
In one embodiment, garden mould layer 3 with a thickness of 18~22cm, garden mould layer 3 includes organic matter 30%~50%, garden
The diameter of soil pellet of soil 20%~30% and coarse sand 15%~20%, garden mould layer 3 is less than or equal to 3cm.Garden mould layer 3 can be
Upper layer, which is planted, is provided continuously nutrient, and has certain water storage, water retaining function.
In one embodiment, in order to ensure lawn layer 1 it is smooth, it is ensured that 3 surfacing of garden mould layer facilitates personnel in-orbit
The traveling of row area carries out current check and maintenance work, and personnel's in-orbit row area traveling when avoiding rainy day and rainy season is safeguarded
Saturated yielding garden mould layer 3 when operation, is provided with grid layer 2, and grid layer 2 includes glass fiber grid grid layer or the hollow grid of plastic honeycomb
Layer.Grid layer with a thickness of 2~3cm.
In one embodiment, lawn layer 1 with a thickness of 3~5cm, lawn layer 1 can choose Evergreen lawn or class of crawling
Vegetation is not especially limited in the present embodiment.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection scope within.
Claims (8)
1. a kind of modern tram railway roadbed characterized by comprising subgrade bed, reinforced concrete bed course, left side are concrete road bed
And right side is concrete road bed;
The reinforced concrete bed course is equipped on the subgrade bed, the length direction along the reinforced concrete bed course is provided with the left side
The concrete road bed and described right side in side is concrete road bed, and the left side is concrete road bed concrete road bed with the right side parallel to be set
It sets;The left side is concrete road bed, the concrete road bed outside in the right side and is provided with plantation green layer between the two.
2. modern tram railway roadbed as described in claim 1, which is characterized in that the concrete road bed and described right side in the left side
Concrete road bed side includes the desk-top solid concrete roabed of multiple support rails.
3. modern tram railway roadbed as described in claim 1, which is characterized in that through-thickness in the reinforced concrete bed course
It is sequentially arranged at intervals with upper layer steel wire, transverse steel layer, longitudinal reinforcement layer and lower layer's steel wire from top to bottom;The longitudinal direction
Reinforcing bar in steel bar layer extends along the reinforced concrete bed course length direction, and the reinforcing bar in the transverse steel layer is along the reinforced concrete
Bed course width direction extends.
4. modern tram railway roadbed as described in any one of claims 1 to 3, which is characterized in that the plantation green layer by
Under up successively include drainage blanket, sandy soil layer, water conservation layer, garden mould layer, grid layer and lawn layer.
5. modern tram railway roadbed as claimed in claim 4, which is characterized in that the drainage blanket is filled with gravel particle,
The partial size of the gravel particle is set as 1~5cm.
6. modern tram railway roadbed as claimed in claim 4, which is characterized in that the diameter of soil pellet of the garden mould layer is small
In equal to 3cm.
7. modern tram railway roadbed as claimed in claim 4, which is characterized in that the thickness of the drainage blanket is more than or equal to
10cm, the sandy soil layer with a thickness of 9~11cm, the water conservation layer with a thickness of 1~3cm, the garden mould layer with a thickness of 18
~22cm, the grid layer with a thickness of 2~3cm, the lawn layer with a thickness of 3~5cm.
8. modern tram railway roadbed as claimed in claim 4, which is characterized in that the grid layer includes fiberglass grid
Layer or the hollow clathrum of plastic honeycomb.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821582381.9U CN209368600U (en) | 2018-09-27 | 2018-09-27 | Modern tram railway roadbed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821582381.9U CN209368600U (en) | 2018-09-27 | 2018-09-27 | Modern tram railway roadbed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209368600U true CN209368600U (en) | 2019-09-10 |
Family
ID=67837917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821582381.9U Active CN209368600U (en) | 2018-09-27 | 2018-09-27 | Modern tram railway roadbed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209368600U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208403A (en) * | 2018-09-27 | 2019-01-15 | 中铁四院集团西南勘察设计有限公司 | Modern tram railway roadbed |
-
2018
- 2018-09-27 CN CN201821582381.9U patent/CN209368600U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208403A (en) * | 2018-09-27 | 2019-01-15 | 中铁四院集团西南勘察设计有限公司 | Modern tram railway roadbed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9222225B2 (en) | Pre-stressed concrete track slab of slab-type ballast-less track | |
CN101634126A (en) | Ground-road combined comprehensive tunnel for underground pipeline and trolley bus | |
CN204959479U (en) | Embedded frame track board and track structure thereof | |
CN108755284A (en) | Reduce the railway bed structure of subgrade settlement deformation to lacing wire material U-type groove | |
CN201406629Y (en) | Railroad bridge wind shield | |
CN209368600U (en) | Modern tram railway roadbed | |
CN203613426U (en) | Groove-shaped embankment structure | |
CN104947566A (en) | Assembled grade crossing | |
CN101311413A (en) | Process for using underground passage combined with roads on ground as passage of trolley bus | |
CN207419173U (en) | A kind of composite road bed structure of lightweight | |
CN203546517U (en) | Green ballast bed for modern trams | |
CN201610649U (en) | Ground network type integrated road bridge parking platform made of irons | |
CN208415004U (en) | A kind of pair of lacing wire material U-type groove reduces the railway bed structure of subgrade settlement deformation | |
CN107988854B (en) | Later-stage reservation structure of subway upper cover vehicle base parking train inspection warehouse | |
CN109208403A (en) | Modern tram railway roadbed | |
CN104264707A (en) | Elevated road ramp approach section retaining structure | |
CN207143613U (en) | For afforesting the rail traffic road bed structure of section | |
CN209307804U (en) | In conjunction with the anti-waterlogging construction of tramcar vehicle base of sponge the idea of the city | |
CN101372825A (en) | Method for using underground passage combined with ground road as trolley bus passage | |
CN202416940U (en) | Integrated steel-structure three-dimension parking lot | |
CN204898501U (en) | Arch bridge structure | |
CN108923344B (en) | Comprehensive pipeline arrangement structure based on energy storage type tramcar engineering | |
CN202194061U (en) | Combined bridge | |
CN207919284U (en) | A kind of sponge city, which can ooze, can store water-permeable pavement | |
CN205420952U (en) | Guarantee smooth -going road surface structure of hall's main -inlet road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |