CN209368309U - A kind of furnace roof nitrogen system - Google Patents

A kind of furnace roof nitrogen system Download PDF

Info

Publication number
CN209368309U
CN209368309U CN201822013746.2U CN201822013746U CN209368309U CN 209368309 U CN209368309 U CN 209368309U CN 201822013746 U CN201822013746 U CN 201822013746U CN 209368309 U CN209368309 U CN 209368309U
Authority
CN
China
Prior art keywords
box
butterfly valve
pressure
parallel
restriction orifice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822013746.2U
Other languages
Chinese (zh)
Inventor
同国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Xian Machinery Co Ltd
Original Assignee
Sinosteel Xian Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Xian Machinery Co Ltd filed Critical Sinosteel Xian Machinery Co Ltd
Priority to CN201822013746.2U priority Critical patent/CN209368309U/en
Application granted granted Critical
Publication of CN209368309U publication Critical patent/CN209368309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses a kind of furnace roof nitrogen systems, including main line, clack box for air circuit, pressure box for air circuit, the pressure box and clack box of nitrogen are provided for furnace top equipment, pressure box is connected to pressure box for air circuit, clack box is connected to clack box and supplies circuit, and main line is divided into two-way and is respectively communicated with pressure box and clack box;Clack box is provided with volume control device in three parallel pipelines and three regulation pipelines for three parallel pipelines are arranged in air circuit;A pressure transmitter is provided in main line, main line is divided into the first branch and second branch in the exit of pressure transmitter, the first branch is connected to clack box, second branch is connected to pressure box to be arranged three parallel pipelines and pressure box in clack box gas supply circuit and effectively can adjust and control nitrogen supply (NS) amount for three regulation pipelines in parallel being arranged in air circuit, and the air demand for adjusting pressure box and clack box can be separated, realize on-demand supply, gas consumption is saved under the premise of not influencing equipment performance, avoids energy waste.

Description

A kind of furnace roof nitrogen system
Technical field
The utility model belongs to field of metallurgical machine, and in particular to a kind of furnace roof nitrogen system.
Background technique
Nitrogen is that maximum inert gas is consumed in blast furnace ironmaking process, and clack box and pressure box are the key that roof material distributing is set It is standby, it is required to consume a large amount of nitrogen during the work time for cooling down and sealing, clack box and pressure box can be reduced by being passed through nitrogen Operating temperature, improve the stability and service life of equipment, while nitrogen is also possible to prevent dust and high-temperature gas enters biography Dynamic component leads to air-tight box device card resistance and damage, but is influenced by smelting process and device structure, and different furnace roofs use nitrogen amount Difference, and control difficult, is passed through that nitrogen amount is excessive to will lead to nitrogen waste and energy consumption increases, and is passed through that nitrogen amount is too small then Lead to equipment fault.
The clack box and pressure box that usual nitrogen system divides three tunnels to enter furnace top equipment by intermediate gas tank, by pressure reducing valve, Flowmeter, pressure transmitter and temperature transmitter carry out the inspection and control of nitrogen.
Conventional furnace roof nitrogen system includes gas tank, motor-driven valve, filter, pressure gauge, pressure reducing valve, check-valves, temperature pick-up Device, pressure transmitter, flowmeter, butterfly valve, blower, ball valve, restriction orifice.Nitrogen is depressurized by gas tank through motor-driven valve, filter Valve, check-valves, tri- tunnel flowmeter butterfly valve Hou Fen are entered clack box and pressure box, and structure is as shown in Figure 1.Prior art nitrogen system is asked It inscribes more:
1, nitrogen usage amount is big, and pressure box and clack box nitrogen not can be effectively controlled.
2, measurement accuracy is low, and clack box and pressure box nitrogen merge measurement, is unable to get the nitrogen consumption of each equipment.
3, nitrogen adjustment is difficult, and nitrogen use level can only be adjusted by the way that main pipeline is unified to clack box and pressure box, accurate to adjust It is difficult.
4, maintenance replacement is difficult, can not replace online after Causing Flowmeter Damages, can only damping down halt production replacement.
5, furnace top gas discharge amount is big, and a large amount of nitrogen being passed through in equipment eventually enter into installation for blast furnace gas discharge, and dosage is greatly then Discharge amount is big.
6, energy waste, a large amount of processing for discharging nitrogen increase the energy consumption of processing links.
7, high failure rate, the impurity that a large amount of nitrogen are brought into increase the failure rate of equipment, reduce the steady of equipment operation Property.
Utility model content
The purpose of this utility model is to provide a kind of furnace roof nitrogen systems, and pressure box is for being provided with three in air circuit Regulation pipeline in parallel is provided with volume control device in described three regulation pipelines in parallel;Clack box in air circuit for setting Setting three parallel pipelines and pressure box effectively can adjust and control for three regulation pipelines in parallel being arranged in air circuit Nitrogen supply (NS) amount, and the air demand for adjusting pressure box and clack box can be separated, it realizes on-demand supply, saves the energy.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of furnace roof nitrogen system, including supervisor Road, clack box, for air circuit, provide the pressure box and clack box of nitrogen for air circuit, pressure box for furnace top equipment, pressure box is connected to gas Close case is connected to clack box and supplies circuit for air circuit, clack box, and main line is divided into two-way and is respectively communicated with pressure box and clack box;
Clack box is provided with flow control dress for three parallel pipelines are arranged in air circuit in three parallel pipelines It sets;Pressure box is respectively provided in described three regulation pipelines in parallel for being provided with three regulation pipelines in parallel in air circuit There is volume control device;A pressure transmitter is provided in main line, main line is divided into first in the exit of pressure transmitter Branch and second branch, the first branch are connected to clack box, and second branch is connected to pressure box.
The first branch is disposed with first butterfly valve, first flowmeter and second butterfly valve, second butterfly valve along airflow direction Outlet be respectively communicated with clack box for three parallel pipelines and pressure box in air circuit;
Second branch is disposed with the 4th butterfly valve, second flowmeter and the 5th butterfly valve, the 5th butterfly valve along airflow direction Three gentle close casees of regulation pipeline in parallel being respectively communicated in pressure box circuit of outlet.
Pressure box is also connected with fresh air line for air circuit, and the inlet of the 4th butterfly valve is connected to fresh air line, Blower and third butterfly valve is arranged in fresh air tube curb gas flow.
On main line along nitrogen flow direction be also disposed between gas source and pressure transmitter motor-driven valve, filter, First pressure gauge, pressure reducing valve, check-valves, second pressure gauge and temperature transmitter.
Enterprising port is arranged in the top of pressure box;Along airflow direction, enterprising port and the first branch and clack box are supplied back The 9th butterfly valve, third restriction orifice and the first ball valve are disposed between the junction on road.
Along airflow direction, enterprising port and second branch and pressure box are for setting gradually first between air circuit tie point Ball valve and third restriction orifice.
Pressure box is divided into the first regulation pipeline, the second regulation pipeline and for the regulation pipeline in parallel of three articles in air circuit Three regulation pipelines, along airflow direction, the volume control device in the first regulation pipeline includes the 5th metering hole set gradually Plate and the second ball valve, the second volume control device regulated and controled in pipeline includes the 4th restriction orifice set gradually and the 11st butterfly Valve, the volume control device that third regulates and controls in pipeline includes the first electric butterfly valve and the tenth butterfly valve set gradually.
Flow area of the flow area of third restriction orifice less than the 5th restriction orifice, the through-flow face of the 5th restriction orifice Flow area of the product less than the 4th restriction orifice.
Clack box is divided into the first parallel pipeline, the second parallel pipeline and third parallel transistor for three parallel pipelines in air circuit Road, along airflow direction, the volume control device in the first parallel pipeline includes the second restriction orifice and the 6th set gradually Butterfly valve;Volume control device in second parallel pipeline includes the first restriction orifice and the 7th butterfly valve set gradually;Third is simultaneously Volume control device in union road includes the second electric butterfly valve and the 8th butterfly valve set gradually, the second restriction orifice it is through-flow Flow area of the area less than the first restriction orifice.
Lower air inlet is arranged in the middle part of pressure box, and lower air inlet is connected to three regulation pipelines in parallel.
Furnace top equipment pressure box is related to blast furnace charge level central temperature to the nitrogen use level of clack box, blast furnace charge level central temperature When higher, furnace roof ascending air is larger, and the nitrogen for sealing is larger, while the temperature of clack box and pressure box is higher, for cold But the reason of nitrogen is larger, and charge level central temperature when furnace roof nitrogen use level and blast furnace process is directly related, influences the temperature There are many factors such as smelting process, smelting mode, ore structures, conditions of blast furnace, wherein temperature can under central coke smelting mode To rise to conventional 1.5 to 2.5 times
The nitrogen circuit of nitrogen system clack box and pressure box described in the utility model is separately controlled, and clack box gas supply can choose Only the controlled gas circuit of the second restriction orifice, only the controlled gas circuit of the first restriction orifice and the first restriction orifice and the second restriction orifice institute It controls gas circuit and supplies three kinds of plenum systems simultaneously, the furnace roof operating condition that can follow up different selects optimal clack box nitrogen supply (NS) amount;
Pressure box gas supply can following four plenum system realize: by only restriction orifice gas circuit gas supply, pass through restriction orifice It is supplied with the 4th restriction orifice gas circuit gas supply, by third restriction orifice and the 5th restriction orifice gas circuit and by third current limliting Orifice plate, the 4th restriction orifice and the 5th restriction orifice gas circuit supply simultaneously, can be selected according to different operating conditions in use best airtight Case nitrogen use level reduces unnecessary nitrogen supply, reduces the nitrogen consumption of furnace top equipment.
Conventional nitrogen system pressure box nitrogen only opens and closes selection, can only select to be passed through when top temperature is higher Quantity-unlimiting nitrogen, and clack box and pressure box use same flowmeter pipeline, generation interferes with each other, and pressure box temperature can only when higher Opening quantity-unlimiting valve causes entire pipe-line system pressure to decline, and pressure decline will lead to clack box nitrogen supply (NS) amount and become smaller, at this time The opening degree that motor-driven valve can only be improved increases the nitrogen supply (NS) of whole system, further increases nitrogen consumption, the utility model Different nitrogen supply (NS) amounts is chosen according to device temperature difference, using separated nitrogen pipeline and measurement, reduces the total of nitrogen Body consumption.
Using the nitrogen use level of first flowmeter measurement clack box, the nitrogen use level of pressure box is measured using second flowmeter, The nitrogen use level of clack box and the nitrogen use level of pressure box separately measure, and data are more accurate.
Nitrogen supply amount is easy to adjust, only needs when adjusting the gentle close case nitrogen amount of clack box by opening or closing nitrogen flow Control device selects different supply air lines protection equipment safeties, and the system nitrogen is easy to adjust, reduce clack box nitrogen and Pressure box nitrogen is interfered with each other and is influenced.
It is able to achieve on-line maintenance and the replacement of first flowmeter and second flowmeter, when maintenance replacement flowmeter, opens the Nine butterfly valves are closed second butterfly valve and first butterfly valve, main line gas and are supplied simultaneously to clack box circuit and pressure box circuit, by the Two flowmeters measure air demand, do not influence nitrogen use, realize that line repairs replacement to first flowmeter;Second The 4th butterfly valve and the 5th butterfly valve are closed when meter maintenance or replacement, the 9th butterfly valve is opened and carries out on-line maintenance replacement, do not influence nitrogen Gas is persistently supplied and is used.
Flow is calculated as precision element, is influenced in furnace roof high altitude platform by adverse circumstances such as dust, vibration, coal gas, high temperature It being easily damaged, moisture and the larger also container damage flowmeter of impurity content, flow are calculated as the vulnerable part in nitrogen system in nitrogen, Causing Flowmeter Damages, which need to terminate blast furnace process, in conventional nitrogen system can repair replacement, and cost is huge.
It selects and adjusts by a variety of nitrogen use levels, can effectively reduce clack box and the unnecessary nitrogen of pressure box disappears Consumption, lumps together with installation for blast furnace gas after eventually entering into blast furnace due to furnace roof nitrogen, so reducing nitrogen use level can be reduced simultaneously Installation for blast furnace gas discharge.
By the gas consumption control to clack box and pressure box, reduces the furnace roof nitrogen consumption in blast furnace ironmaking process, subtract The discharge for having lacked installation for blast furnace gas saves production nitrogen and handles the energy consumption of blast furnace discharge gas.
The system reduces nitrogen input, reduces damage of the long-term big flow nitrogen to nitrogen system element, reduces Clack box and pressure box failure caused by the dust and impurities accumulation that bulk gas is brought into, it is cold to pressure box to reduce a large amount of nitrogen But the impulse fault of water system increases the stability of equipment operation.
The utility model at least has the advantages that compared with prior art reduces nitrogen consumption, controls airtight The consumption of case and clack box nitrogen, reduces nitrogen use level;Measurement accuracy is high, and pressure box and clack box nitrogen separately measure, and improves The measurement accuracy of system;Nitrogen is easy to adjust, and pressure box and clack box nitrogen use level are separately adjustable, adjusts more easy to be reliable; On-bne repair, flowmeter can realize online replacement maintenance, reduce unplanned halt production and improve productivity;Discharge is reduced, it is effective to control The usage amount for having made nitrogen reduces exhaust gas discharge;The energy is saved, nitrogen consumption and discharge is reduced, reduces production nitrogen With the energy consumption of processing discharge gas;Failure is reduced, reducing nitrogen reduces gaseous impurity to the pollution of equipment and water cooling The impact of system improves stabilization of equipment performance.
Detailed description of the invention
Fig. 1 is prior art nitrogen system schematic diagram.
Fig. 2 is the utility model furnace roof nitrogen system schematic diagram.
In attached drawing, 1- gas tank, 2- motor-driven valve, 3 filters, 4- pressure gauge, 5- pressure reducing valve, 6- check-valves, 7- pressure gauge, 8- Temperature transmitter, 9- pressure transmitter, 10- first butterfly valve, 11- first flowmeter, 12- second butterfly valve, 13- blower, 14- third Butterfly valve, the 4th butterfly valve 16- second flowmeter of 15-, the 5th butterfly valve of 17-, the second electric butterfly valve of 18-, the first restriction orifice of 19-, 20- Second restriction orifice, the 6th butterfly valve of 21-, the 7th butterfly valve of 22-, the 8th butterfly valve of 23-, 24- third restriction orifice, the first ball valve of 25-, The 9th butterfly valve of 26-, the tenth butterfly valve of 27-, the first electric butterfly valve of 28-, the 11st butterfly valve of 29-, the 4th restriction orifice of 30-, 31- Five restriction orifices, the second ball valve of 32-, 33- pressure box, 34- clack box, 35- clack box air inlet, the enterprising port of 36- pressure box, 37- Air inlet under pressure box, 38- pipeline.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
The nitrogen circuit of the nitrogen system clack box 34 and pressure box 33 is separately controlled, and the gas supply of clack box 34 can choose second 20 gas circuit of restriction orifice, 19 gas circuit of the first restriction orifice, the first restriction orifice 19 and 20 gas circuit of the second restriction orifice supply simultaneously Three kinds of plenum systems, the furnace roof operating condition that can follow up different select optimal 34 nitrogen supply (NS) amount of clack box;
Pressure box 33, which supplies, may be selected 24 gas circuit of third restriction orifice, the gas circuit of third restriction orifice 24 and 31, third current limliting 30 gas circuit of orifice plate 24 and the 4th restriction orifice, third restriction orifice 24, the 4th restriction orifice 30 and the 5th restriction orifice gas circuit four 33 plenum system of pressure box is planted, best 33 nitrogen use level of pressure box can be selected according to different operating conditions in use, reduced unnecessary Nitrogen supply reduces the nitrogen consumption of furnace top equipment.
Main line nitrogen enters pressure reducing valve 5 by gas tank 1, motor-driven valve 2, filter 3, according to first pressure gauge 4 and second The data of pressure gauge 7 adjust pressure reducing valve 5, and second pressure gauge 7 is made to reach the pressure of system design, and temperature transmitter 8 and pressure become Send device 9 by after decompression nitrogen temperature value and pressure value be respectively transmitted to blast furnace central control system, be divided by the nitrogen of main line Two-way enters clack box 34 and pressure box 33 through first butterfly valve 10 and pipeline 38 respectively, third butterfly valve 14 and the when system worked well Nine butterfly valves 26 are closed, and first flowmeter 11 measures 34 gas consumption of clack box, and second flowmeter 16 measures 33 gas consumption of pressure box.
The utility model is preferred, and system pressure supply range is 0.3MPa-0.8MPa.
The gas supply of clack box 34 enters clack box nitrogen through first butterfly valve 10, flowmeter 11, second butterfly valve 12 by main pipeline nitrogen and returns Road, three parallel pipelines are arranged in clack box nitrogen circuit, and the second restriction orifice 20 and the 6th butterfly valve 21 are the first metering hole all the way Plate 19 and the 7th butterfly valve 22 are that all the way, the second electric butterfly valve 18 and the 8th butterfly valve 23 are that all the way, nitrogen converges in three parallel pipelines The General Logistics Department cools down it into clack box 34 by air inlet 35, and the nitrogen use level of clack box 34 uses different first of through-flow parameter Restriction orifice 19 and the selection of the second restriction orifice 20 are adjusted, and butterfly valve gas circuit is opened after opening restriction orifice, after closing restriction orifice Butterfly valve gas circuit is closed, any gas circuit in openable first restriction orifice 19 and the second restriction orifice 20, can also both open simultaneously, There are three types of flows to select altogether, is set as 100Nm3/h-1800Nm to 34 nitrogen supply (NS) amount of clack box3/ h, only beats at conventional temperatures The 6th butterfly valve 21 is opened, is the gas supply of clack box 34 by small the second restriction orifice of flow 20, that is, passes through the first parallel pipeline to clack box 34 Gas supply;It is the gas supply of clack box 34 that the 7th butterfly valve 22 is only opened when medium temperature by the first restriction orifice of intermediate flow 19, that is, passes through second Parallel pipeline is supplied to clack box 34;The 6th butterfly valve 21 is opened when high temperature and the 7th butterfly valve 22 passes through the first parallel pipeline and second simultaneously Union road is that clack box 34 supplies simultaneously, automatically opens the second electric butterfly valve 18 by automatic control system under emergency episode state Unlimited circulate of nitrogen cools down it into clack box 34, and fail manually adjustable 8th butterfly valve 23 of the second electric butterfly valve 18 carries out valve The urgent cooling of case 34, i.e., simultaneously from three parallel pipelines to the quantity-unlimiting gas supply of clack box 34.
Pressure box 33 divides two-way through the 4th butterfly valve 15, flowmeter 16, the 5th butterfly valve 17 by pipeline 38 by main pipeline nitrogen It is cooled down and is sealed into pressure box 33, be that enterprising port 36 is entered by third restriction orifice 24, the first ball valve 25 all the way, Another way is to enter lower air inlet 37 by three regulation pipelines in parallel in parallel, and three regulation pipelines in parallel are installed respectively 4th restriction orifice 30, the 5th restriction orifice, the first electric butterfly valve 28 and corresponding controlled valve use gas need according to different It asks, only third restriction orifice 24 is ventilated for selection, i.e., by being supplied for air circuit to pressure box 33 where third restriction orifice 24, the Three restriction orifices, 24 place is normally opened for air circuit for air circuit;It is ventilated by third restriction orifice 24 and the 5th restriction orifice, Supplied by normally opened for air circuit and the first regulating tube road direction pressure box 33;Open third restriction orifice 24 and the 4th current limliting Orifice plate 30 is ventilated, i.e., is supplied by normally opened for air circuit and the second regulating tube road direction pressure box 33;Open third restriction orifice 24, the 4th restriction orifice 30 and the 5th restriction orifice are ventilated simultaneously, i.e., by normally opened for air circuit and three tune in parallel The quantity-unlimiting gas supply of keyholed back plate road direction pressure box 33,33 nitrogen amount of pressure box are set as 100Nm3/h-3000Nm3/h。
Wherein, flow area of the flow area of third restriction orifice 24 less than the 5th restriction orifice, the 5th restriction orifice Flow area less than the 4th restriction orifice 30 flow area, corresponding smaller flow described in the utility model, intermediate flow and The restriction orifice of big flow.
Under equipment normal temperature only by small flow third restriction orifice 24 be pressure box 33 supply;Is opened when medium temperature Two ball valves 32 are that pressure box 33 supplies by smaller flow third restriction orifice 24 and the 5th restriction orifice of intermediate flow simultaneously, The 11st butterfly valve 29 is opened when higher temperature, simultaneously by small flow third restriction orifice 24 and the 4th restriction orifice 30 of big flow For the gas supply of pressure box 33, when high temperature, opens the second ball valve 32 and the 11st butterfly valve 29, passes through third restriction orifice 24, metering hole 30 and metering hole 31 feed a large amount of nitrogen simultaneously for pressure box 33, the first electric butterfly valve 28 and the tenth butterfly can be opened under the state of emergency Valve 27 carries out quantity-unlimiting gas supply to pressure box 33.
When first flowmeter 11 needs to overhaul or replace, the 9th butterfly valve 26 is opened, closes second butterfly valve 12 and first butterfly valve 10, main line persistently supplies clack box circuit and pressure box circuit by second branch, is carried out by second flowmeter 16 to nitrogen Metering, does not influence normal use, and realization repairs replacement to first flowmeter 11 online;Second flowmeter 16 need overhaul or When replacement, the 4th butterfly valve 15 and the 5th butterfly valve 17 are closed, the 9th butterfly valve 26 is opened and carries out on-line maintenance replacement.
When clack box 34 and pressure box 33 need manually to overhaul, closes motor-driven valve 2 and cut off nitrogen, open third butterfly valve 14, open Dynamic blower 13, to a large amount of fresh airs are passed through in equipment, fresh air is sent for air circuit to equipment from pressure box, to nitrogen and After high-temperature gas is dispersed, clack box 34 and pressure box 33 are manually overhauled.

Claims (10)

1. a kind of furnace roof nitrogen system, which is characterized in that including main line, clack box for air circuit, pressure box for air circuit, for furnace It pushes up equipment and the pressure box (33) and clack box (34) of nitrogen is provided, pressure box (33) is connected to pressure box for air circuit, and clack box (34) is even For air circuit, main line is divided into two-way and is respectively communicated with pressure box (33) and clack box (34) port valve case;
Clack box is provided with volume control device in three parallel pipelines for three parallel pipelines are arranged in air circuit;Gas Close case is provided with flow in described three regulation pipelines in parallel for being provided with three regulation pipelines in parallel in air circuit Control device;A pressure transmitter (9) are provided in main line, main line is divided into first in the exit of pressure transmitter (9) Branch and second branch, the first branch are connected to clack box (34), and second branch is connected to pressure box (33).
2. furnace roof nitrogen system according to claim 1, which is characterized in that the first branch is set gradually along airflow direction There are first butterfly valve (10), first flowmeter (11) and second butterfly valve (12), the outlet of second butterfly valve (12) is respectively communicated with clack box confession Three parallel pipelines and pressure box (33) in air circuit;
Second branch is disposed with the 4th butterfly valve (15), second flowmeter (16) and the 5th butterfly valve (17) along airflow direction, The gentle close case (33) of three articles of regulation pipelines in parallel that the outlet of 5th butterfly valve (17) is respectively communicated in pressure box circuit.
3. furnace roof nitrogen system according to claim 1, which is characterized in that pressure box is also connected with fresh sky for air circuit Air pipe, the inlet of the 4th butterfly valve (15) are connected to fresh air line, and blower is arranged in fresh air tube curb gas flow (13) and third butterfly valve (14).
4. furnace roof nitrogen system according to claim 1, which is characterized in that on main line along nitrogen flow to gas source with Motor-driven valve (2), filter, first pressure gauge (4), pressure reducing valve (5), check-valves are also disposed between pressure transmitter (9) (6), second pressure gauge (7) and temperature transmitter (8).
5. furnace roof nitrogen system according to claim 1, which is characterized in that enterprising port is arranged in the top of pressure box (33) (36);Along airflow direction, enterprising port (36) and the first branch and clack box between the junction of air circuit for being disposed with 9th butterfly valve (26), third restriction orifice (24) and the first ball valve (25).
6. furnace roof nitrogen system according to claim 5, which is characterized in that along airflow direction, enterprising port (36) with Second branch and pressure box are for setting gradually the first ball valve (25) and third restriction orifice (24) between air circuit tie point.
7. furnace roof nitrogen system according to claim 6, which is characterized in that pressure box is for three in air circuit in parallel Regulation pipeline is divided into the first regulation pipeline, the second regulation pipeline and third regulation pipeline, along airflow direction, the first regulation pipeline In volume control device include the 5th restriction orifice and the second ball valve (32) set gradually, the flow in the second regulation pipeline Control device includes the 4th restriction orifice (30) and the 11st butterfly valve (29) set gradually, and third regulates and controls the flow control in pipeline Device processed includes the first electric butterfly valve (28) and the tenth butterfly valve (27) set gradually.
8. furnace roof nitrogen system according to claim 7, which is characterized in that the flow area of third restriction orifice (24) is small In the flow area of the 5th restriction orifice, the through-flow face of the flow area of the 5th restriction orifice less than the 4th restriction orifice (30) Product.
9. furnace roof nitrogen system according to claim 1, which is characterized in that clack box is for three parallel pipelines in air circuit It is divided into the first parallel pipeline, the second parallel pipeline and third parallel pipeline, the flow along airflow direction, in the first parallel pipeline Control device includes the second restriction orifice (20) and the 6th butterfly valve (21) set gradually;Flow control in second parallel pipeline Device includes the first restriction orifice (19) and the 7th butterfly valve (22) set gradually;Volume control device in third parallel pipeline Including the second electric butterfly valve (18) and the 8th butterfly valve (23) set gradually, the flow area of the second restriction orifice (20) is less than The flow area of one restriction orifice (19).
10. described in any item furnace roof nitrogen systems according to claim 1~9, which is characterized in that pressure box is set in the middle part of (33) It sets lower air inlet (37), lower air inlet (37) is connected to three regulation pipelines in parallel.
CN201822013746.2U 2018-12-03 2018-12-03 A kind of furnace roof nitrogen system Active CN209368309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822013746.2U CN209368309U (en) 2018-12-03 2018-12-03 A kind of furnace roof nitrogen system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822013746.2U CN209368309U (en) 2018-12-03 2018-12-03 A kind of furnace roof nitrogen system

Publications (1)

Publication Number Publication Date
CN209368309U true CN209368309U (en) 2019-09-10

Family

ID=67834818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822013746.2U Active CN209368309U (en) 2018-12-03 2018-12-03 A kind of furnace roof nitrogen system

Country Status (1)

Country Link
CN (1) CN209368309U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487025A (en) * 2018-12-03 2019-03-19 中钢集团西安重机有限公司 A kind of furnace roof nitrogen system
CN113339490A (en) * 2021-06-29 2021-09-03 马鞍山钢铁股份有限公司 System for automatically adjusting nitrogen consumption of furnace top gear box

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487025A (en) * 2018-12-03 2019-03-19 中钢集团西安重机有限公司 A kind of furnace roof nitrogen system
CN109487025B (en) * 2018-12-03 2023-12-19 中钢集团西安重机有限公司 Furnace top nitrogen system
CN113339490A (en) * 2021-06-29 2021-09-03 马鞍山钢铁股份有限公司 System for automatically adjusting nitrogen consumption of furnace top gear box

Similar Documents

Publication Publication Date Title
CN100453430C (en) Energy saving method of granular material pneumatic conveying system and its device
CN209368309U (en) A kind of furnace roof nitrogen system
CN100395164C (en) Large falling head pneumatic material conveying system
CN201203351Y (en) Automatic distributing control system of sintering machine
CN105177200B (en) A kind of bf coal injection system and its control method
CN109487025A (en) A kind of furnace roof nitrogen system
CN107955848B (en) Oxygen enrichment device in front of blast furnace machine
CN104988262B (en) Blast furnace balanced pressure system and blast furnace roof loading method
CN207811782U (en) A kind of furnace roof cooling device
CN201890887U (en) Oxygen enriched board-width flow adjusting supply device
CN110469775B (en) Furnace top nitrogen automatic control gas supply system
CN113091460A (en) Sintering machine waste heat monitoring and adjusting method
CN219526556U (en) BGL gasifier nitrogen gas feed system
CN207330974U (en) A kind of flow regulator of blast furnace material distribution chute controller nitrogen-sealed system
CN203960246U (en) The top hot blast air-supply arrangement of blast furnace iron notch
CN208583408U (en) A kind of coal pulverizer and its enclosed air system
CN213253871U (en) Gas mixing device
CN215811463U (en) Leakage detection device of primary dust removal cooling system for dry quenching
CN210601048U (en) Nitrogen gas feeding device
CN213932699U (en) Fine tuning type micro-positive pressure anti-blocking guarantee device
CN211782650U (en) Pipeline dew point control system
CN1854314A (en) Cooled dripping fixed pressure differential sealing system and its controlling method for blast-furnace distributor
CN208621312U (en) A kind of pressure regulator Performance Test System
CN205974575U (en) Unloading pipe nitrogen air valve device
CN220665360U (en) Furnace top low-temperature nitrogen system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant