CN209366399U - Buoyant tower platform - Google Patents

Buoyant tower platform Download PDF

Info

Publication number
CN209366399U
CN209366399U CN201821180923.XU CN201821180923U CN209366399U CN 209366399 U CN209366399 U CN 209366399U CN 201821180923 U CN201821180923 U CN 201821180923U CN 209366399 U CN209366399 U CN 209366399U
Authority
CN
China
Prior art keywords
tower body
level
order
cylinder
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821180923.XU
Other languages
Chinese (zh)
Inventor
潘徐杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wison Nantong Heavy Industry Co Ltd
Original Assignee
Wison Nantong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wison Nantong Heavy Industry Co Ltd filed Critical Wison Nantong Heavy Industry Co Ltd
Priority to CN201821180923.XU priority Critical patent/CN209366399U/en
Application granted granted Critical
Publication of CN209366399U publication Critical patent/CN209366399U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses buoyant tower platforms, including suction pile, first order tower body, the first order tower body includes at least one cylinder, the bottom of first order tower body is arranged in the suction pile, it further include second level tower body, the cylinder of the second level tower body is corresponding with the cylinder of first order tower body, the cylinder top center of the first order tower body is equipped with recessed groove, recessed groove section specification and the pole section of second level tower body match, the cylinder lower part of the second level tower body is correspondingly embedded in the recessed groove on the cylinder of first order tower body, the top of the second level tower body is provided with superstructure.The more existing buoyant tower platform of the buoyant tower platform of the utility model is adapted to the operation of different water depth sea area.

Description

Buoyant tower platform
Technical field
The utility model relates to a kind of buoyant tower platforms, belong to ocean engineering field.
Background technique
Buoyant tower platform is the platform for being used for acquisition and storage condensate or crude oil, and buoyant tower platform shape is similar In SPAR platform, but what is be different from is that buoyant tower platform section structure extends to sea bed and by included shallow foundation The suction pile of cylindrical type is fixed in seabed and with wave motion, and the big advantage of the one of buoyant tower platform is to be able to achieve from peace Dress does not need auxiliary and transportation and erection equipment, easy for installation and disassembly, and transition may be implemented and reapply, but current buoyancy Tower platform be it is a kind of fix total high platform, such as the platform that patent 2011800612002 and 2013104737690 is related to, such Platform is applicable in the depth of water and cannot adjust, and transition, which reapplies, requires the depth of water to keep almost the same, and application range greatly suffers restraints, such as Fruit adjusts the applicable depth of water using similar jack up equipment, this meeting so that platform cost leap, it is honest and clean to change buoyant tower platform The original intention of valence.
Summary of the invention
Technical problem to be solved in the utility model is to solve existing buoyant tower platform only to adapt to single depth of water disadvantage.
To solve the above-mentioned problems, the buoyant tower platform of the utility model, including suction pile, first order tower body, described Level-one tower body includes at least one cylinder, and it further includes second level tower body, institute that the bottom of first order tower body, which is arranged in, in the suction pile The cylinder for stating second level tower body is corresponding with the cylinder of first order tower body, and the cylinder top center of the first order tower body is equipped with recessed Slot is fallen into, recessed groove section specification and the pole section of second level tower body match, the cylinder lower part of the second level tower body It is correspondingly embedded in the recessed groove on the cylinder of first order tower body, the top of the second level tower body is provided with superstructure.
Above-mentioned technical proposal advanced optimizes, and the first order tower body and second level tower body are single-column body or cylinders, The cylinders is that at least two same specification single-column bodies are arranged in parallel and upper and lower side is in same level.
Above-mentioned technical proposal advanced optimizes, and the second level tower body is detachable, by replace different height second Grade tower body can realize the change for being applicable in the depth of water.
Above-mentioned technical proposal advanced optimizes, and the second level tower body height is no more than 5 times of groove depth of recess.
Buoyant tower stage+module method, comprises the following steps described in above scheme, and first order tower body is lauched, by first Grade tower body water filling, makes first order tower body sink, it is ensured that more than seawater surface, mobile first order tower body makes on first order tower body top Its close to semi-submerged ship, by first order tower body be placed in semi-submerged ship go on board outboard bracket second level tower body underface, by first Grade tower body draining, makes first order tower body float, recessed groove on first order tower body and second level tower body is embedded in and docked, then by buoyancy Tower water filling makes second level tower body upper end to installation upper layer building height, installs superstructure in second level tower body upper end.
In above scheme, second level tower body height can be selected according to construction sea area depth.
The reverse process of above-mentioned installation method is exactly platform disassembling method.
The more existing buoyant tower platform of the buoyant tower platform of the utility model is adapted to the operation of different water depth sea area.
Detailed description of the invention
Fig. 1 is the utility model buoyant tower platform structure schematic diagram;
Fig. 2 is the comparison that existing buoyant tower platform and the utility model buoyant tower platform use different size second level tower body Figure;
Fig. 3 to Figure 12 is the utility model buoyant tower stage+module process schematic.
Specific embodiment
The utility model buoyant tower platform embodiment is illustrated below with reference to Fig. 1, Fig. 2:
Existing buoyant tower tower body is made of single or multiple cylinders, is typically four column buoyant tower platforms, buoyant tower tower body circle Rod structure is higher than Free Surface, that is, sea level 5, has lifted superstructure, but existing buoyant tower is a kind of total high platform of fixation, fits The depth of water is not adjustable, and limits the range that transition reapplies.
As shown in Figure 1, buoyant tower platform, including suction pile 1, first order tower body 2, the suction pile 1 are arranged in the first order The bottom of tower body 2, the first order tower body are four column structures, four cylinder be arranged in parallel by four same specification cylindrical bodies and At, it is ensured that four cylindrical end faces are in same level.
It further include second level tower body 3, the second level tower body 3 is also four column structures, and four cylinder is also by four Same specification cylindrical body is arranged in parallel, and ensures four cylindrical end faces in same level.
Four cylindrical body top centers of the first order tower body 2 are equipped with recessed groove, recessed groove section specification and the The cylinder section of second level tower body 3 matches, and four cylindrical body lower parts of the second level tower body 3 are correspondingly embedded in first order tower In recessed groove on four cylindrical bodies of body 2, the top of the second level tower body 3 is provided with superstructure 4.
As shown in Fig. 2, the adjusting for being applicable in the depth of water may be implemented by the second level tower body 3 of replacement different height, and not It needs by expensive from liter system, this reapplies positive meaning in the transition of marginal oil field sea area for buoyant tower platform Justice.
Referring to Fig. 3 to Figure 12, buoyant tower stage+module method:
A. buoyant tower and its superstructure 4 are by Ship Transportation partly latent, and wherein first order tower body 2 couches in boat deck partly latent On, and second level tower body 3 and superstructure 4 are successively placed on a bracket 6, and can be slided on bracket 6,6 one sections of bracket It extends on the outside of ship side;
B. semi-submerged ship dive, first order tower body 2 float, and towboat drags first order tower body 2 away from semi-submerged ship;
C. by 2 bottom water injection of first order tower body, first order tower body 2 is made to sink, pays attention to ensuring 2 top of first order tower body certainly By 5 or more surface;
D. first order tower body 2 is pushed towards into semi-submerged ship, is placed in and is extended on semi-submerged ship under the bracket 6 on the outside of ship side;
E., second level tower body 3 is slid onto the surface of first order tower body 2 on bracket 6;
F. first order tower body 2 is drained and is floated, first order tower body 2 is docked with second level tower body 3 at this time, second level tower body 3 It is embedded in first order tower body 2, riveting is fixed;
G. first order tower body 2 is filled the water again, first order tower body 2 sinks at this time, pays attention to ensuring that tower body 3 top in the second level exists 5 or more Free Surface;
H., superstructure 4 is slid onto the surface of second level tower body 3 on bracket 6;
I. first order tower body 2 is drained and is floated, second level tower body 3 is docked with superstructure 4 at this time, and riveting is fixed;
J. entire buoyant tower is dragged to target water installation.
And the demolishing process of buoyant tower is exactly the inverse process of above-mentioned installation process, can facilitate realization transition by the above method It installs again.
The limiting length of second level tower body 3 depends on structural strength and second level tower body 3 is embedded in first order tower body 2 Depth, the general total length for recommending second level tower body 3 are no more than 5 times of embedded length.

Claims (4)

1. buoyant tower platform, including suction pile, first order tower body, the first order tower body include at least one cylinder, the suction The bottom of first order tower body is arranged in power stake, it is characterised in that: further include second level tower body, the cylinder of the second level tower body with The cylinder of first order tower body is corresponding, and the cylinder top center of the first order tower body is equipped with recessed groove, the recess slot cross-section Specification and the pole section of second level tower body match, and the cylinder lower part of the second level tower body is correspondingly embedded in first order tower body Cylinder on recessed groove in, the top of the second level tower body is provided with superstructure.
2. buoyant tower platform as described in claim 1, it is characterised in that: the first order tower body and second level tower body are single-column Body or cylinders, the cylinders are that at least two same specification single-column bodies are arranged in parallel and upper and lower side is in same level.
3. buoyant tower platform as claimed in claim 1 or 2, it is characterised in that: the second level tower body is detachable.
4. buoyant tower platform as claimed in claim 3, it is characterised in that: the second level tower body height is no more than recess groove depth 5 times of degree.
CN201821180923.XU 2018-07-25 2018-07-25 Buoyant tower platform Active CN209366399U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821180923.XU CN209366399U (en) 2018-07-25 2018-07-25 Buoyant tower platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821180923.XU CN209366399U (en) 2018-07-25 2018-07-25 Buoyant tower platform

Publications (1)

Publication Number Publication Date
CN209366399U true CN209366399U (en) 2019-09-10

Family

ID=67822918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821180923.XU Active CN209366399U (en) 2018-07-25 2018-07-25 Buoyant tower platform

Country Status (1)

Country Link
CN (1) CN209366399U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109094746A (en) * 2018-07-25 2018-12-28 惠生(南通)重工有限公司 Buoyant tower platform and the stage+module method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109094746A (en) * 2018-07-25 2018-12-28 惠生(南通)重工有限公司 Buoyant tower platform and the stage+module method
CN109094746B (en) * 2018-07-25 2023-09-29 惠生(南通)重工有限公司 Buoyancy tower platform and installation method thereof

Similar Documents

Publication Publication Date Title
US10087915B1 (en) Self-installing column stabilized offshore wind turbine system and method of installation
EP2251254A1 (en) Installation vessel for offshore wind turbines
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
TW201910207A (en) Semi-submersible support platform and positioning method thereof making the center of gravity lowered below the sea surface after water to be poured
CN109094746A (en) Buoyant tower platform and the stage+module method
CN209366399U (en) Buoyant tower platform
EP2465764A3 (en) Spar hull load out method
CN204589969U (en) Be applicable to the small modular jack-up unit of greater coasting area operation
CN202610780U (en) Movable self-installing platform
US10024015B2 (en) Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
CN202072417U (en) Semi-submersible type hoisting operation platform
US10415204B1 (en) Multi-environment self-elevating drilling platform
WO2010120186A1 (en) Floating windmill and method of installation, intervention or decommissioning
CN201258082Y (en) Split jack-up platform butted by external guide rope
US8398338B2 (en) Method for installing a topside module on an offshore support structure
CN203698617U (en) Movable self-mounting-type drilling and production processing oil storage platform
KR101254973B1 (en) Floating Platform
CN104554644A (en) Water surface floating body platform
US7762744B2 (en) Method and vessel for removing offshore structures
WO2014039466A1 (en) Platform deck installation and removal method and apparatus
CN203473217U (en) Supporting rod of offshore platform positioning column
CN112814015A (en) Combined structure system of multi-pile foundation and floating type fan and single-ship installation method
CN202609028U (en) Catamaran for oceanographic engineering
AU2021202442B2 (en) Gravity-Based Structure For Off-Shore Structures
CN215761499U (en) Suction section of thick bamboo little waterline face type offshore drilling basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant