CN209365052U - A kind of building engineering construction perforating device - Google Patents

A kind of building engineering construction perforating device Download PDF

Info

Publication number
CN209365052U
CN209365052U CN201821083534.5U CN201821083534U CN209365052U CN 209365052 U CN209365052 U CN 209365052U CN 201821083534 U CN201821083534 U CN 201821083534U CN 209365052 U CN209365052 U CN 209365052U
Authority
CN
China
Prior art keywords
installs case
hole
engineering construction
perforating device
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821083534.5U
Other languages
Chinese (zh)
Inventor
郭玉贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangye Zhicheng Building Decoration Engineering Co Ltd
Original Assignee
Zhangye Zhicheng Building Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangye Zhicheng Building Decoration Engineering Co Ltd filed Critical Zhangye Zhicheng Building Decoration Engineering Co Ltd
Priority to CN201821083534.5U priority Critical patent/CN209365052U/en
Application granted granted Critical
Publication of CN209365052U publication Critical patent/CN209365052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building engineering construction perforating devices, including installs case, the inside of the installs case 1 is disposed with perforating mechanism and dedusting mechanism from top to bottom, and the side of installs case is provided with positioning mechanism, is provided with bottom plate below the installs case.The utility model is moved with perforating device by the way that the universal wheel and push rod of setting are convenient to building engineering construction, and it is convenient to use by the height that the second pneumatic cylinder can adjust punch position, and it is hand-held not need construction personnel, it can be worked with perforating device using building engineering construction for a long time, improve working efficiency, be placed on the ground to build engineering construction perforating device more steady, and drill bit and eyelet verticality are preferable, the dust generated in drill process can be collected by the dedusting mechanism of setting, influence of the dust to staff's health is reduced at work.

Description

A kind of building engineering construction perforating device
Technical field
The utility model relates to building engineering field, specially a kind of building engineering construction perforating device.
Background technique
Currently, in architectural engineering, worker's punching is mainly crossed position line with elder generation on workpiece, then electric hand drill carries out The mode of punching carries out eyelet processing, and this processing method has the following aspects, first is that only individually leaning on cross hairs Easily are there is deviation in punching by positioning in drill bit end and reticle alignment;It is directly punched second is that holding electric drill, eyelet hangs down Straight degree is poor, and builds the heavier long-time that is unfavorable for of engineering construction perforating device and hold;Third is that can be produced when being punched to metope Raw a large amount of dusts can cause damages to the health of construction personnel if do not cleared up in time it.
Utility model content
The purpose of this utility model is to provide a kind of building engineering construction perforating devices, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of building engineering construction perforating device, Including installs case, the inside of the installs case is disposed with perforating mechanism and dedusting mechanism, and the one of installs case from top to bottom Side is provided with positioning mechanism, bottom plate is provided with below the installs case, and the top four corners of bottom plate are all provided with telescopic rod, And the top of telescopic rod all extends to the four corners of installs case bottom, the middle position above the bottom plate is provided with the second gas Cylinder pressure, and the output end of the second pneumatic cylinder is connected to the bottom of installs case, the side setting of the remotely located mechanism of installs case There is push rod.
Preferably, the positioning mechanism includes damping spring, support plate, first through hole and locating piece, the installs case Side is provided with two groups of damping springs, and one end of damping spring is all connected to the side of support plate, the support plate other side Above and below be all provided with locating piece.
Preferably, the installs case is provided with the second through-hole close to the side of positioning mechanism, and first through hole and second is led to Hole is circle, and the first through hole is identical with the diameter of the second through-hole, and the diameter of first through hole and the second through-hole is greater than drill bit Diameter.
Preferably, the perforating mechanism includes the first pneumatic cylinder, mounting box, motor and drill bit, the installs case side Top is equipped with the first pneumatic cylinder, and the output end of the first pneumatic cylinder is connected with mounting box, and the inside of the mounting box is equipped with Motor, and the output end of motor is equipped with the drill bit extended on the outside of first through hole.
Preferably, the dedusting mechanism includes air blower, disposal box, collection bucket and ventilation duct, inside the installs case Lower section is disposed with air blower and disposal box from left to right, and the air inlet of the air blower extends to the inside of disposal box, and The other side of disposal box is provided with ventilation duct, and the ventilation duct is connected with far from one end of disposal box and extends to outside installs case Collection bucket, and collection bucket is funnel-shaped.
Preferably, street is provided with universal wheel at the bottom four corners of the bottom plate, and brake apparatus is all provided on universal wheel.
Compared with prior art, the utility model has the beneficial effects that this kind builds engineering construction perforating device, by setting The positioning mechanism set can position drill bit by locating piece, and can prevent drill bit from producing at work by first through hole Raw displacement can reduce drill bit by the damping spring of setting and generate vibration during the work time, to make to deviate It is more preferable to punch effect, is moved with perforating device by the way that the universal wheel and push rod of setting are convenient to building engineering construction, and pass through The height that second pneumatic cylinder can adjust punch position is convenient to use, and does not need construction personnel and hold, and can utilize for a long time It builds engineering construction to be worked with perforating device, improves working efficiency, what is be placed on the ground builds engineering construction perforating device It is more steady, and drill bit and eyelet verticality are preferable, the dust that can will be generated in drill process by the dedusting mechanism of setting It is collected, reduces influence of the dust to staff's health at work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the side view of the utility model;
Fig. 3 is the structural schematic diagram of the utility model positioning mechanism.
In figure: 1, installs case;101, the second through-hole;2, perforating mechanism;201, the first pneumatic cylinder;202, mounting box;203, Motor;204, drill bit;3, dedusting mechanism;301, air blower;302, disposal box;303, collection bucket;304, ventilation duct;4, localization machine Structure;401, damping spring;402, support plate;403, first through hole;404, locating piece;5, bottom plate;6, universal wheel;7, telescopic rod; 8, the second pneumatic cylinder;9, push rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, a kind of embodiment provided by the utility model: a kind of building engineering construction perforating device, packet Including installs case 1, the inside of the installs case 1 is disposed with perforating mechanism 2 and dedusting mechanism 3 from top to bottom, and installs case 1 Side is provided with positioning mechanism 4, and the lower section of the installs case 1 is provided with bottom plate 5, and the top four corners of bottom plate 5 are all provided with Telescopic rod 7, and the top of telescopic rod 7 all extends to the four corners of 1 bottom of installs case, the middle position of 5 top of bottom plate It is provided with the second pneumatic cylinder 8, and the output end of the second pneumatic cylinder 8 (model DEM) is connected to the bottom of installs case 1, the installation The side of the remotely located mechanism 4 of case 1 is provided with push rod 9.
The utility model can be punched and be produced when perforating mechanism 2 punches metope by the dedusting mechanism 3 being arranged Dust is drawn into collection bucket 303 by raw dust by air blower 301 (model C X-125), using 303 side of collection bucket Ventilation duct 304 enter disposal box 302 inside, dust is collected, reduce in the construction process dust to construction personnel's body Body damages, and the positioning mechanism 4 of setting locating piece 404 can be contacted when perforating mechanism 2 punches metope with metope, Prevent punching from deviation occur, and damping spring 404 can reduce the vibration that punching generates, the first through hole 403 of setting also can It prevents drill bit from deviation occur, can be improved the quality of punching, the pneumatic cylinder 8 and telescopic rod 7 of setting by the perforating mechanism 2 of setting The height of drill bit 204 can be adjusted, the drilling of different height is conveniently got.
Fig. 1 and Fig. 3 are please referred to, the positioning mechanism 4 includes damping spring 401, support plate 402, first through hole 403 and determines Position block 404, the side of the installs case 1 is provided with two groups of damping springs 401, and one end of damping spring 401 is all connected to branch The side of fagging 402 is all provided with locating piece 404 above and below 402 other side of support plate.
The positioning mechanism 4 of the perforating device can increase the contact surface of perforating device and metope by fixed block 404, thus Make perforating mechanism 2 not allow to be also easy to produce deviation when drilling to metope, can be reduced by the damping spring 401 of setting because of shake The raw offset of movable property.
The installs case 1 is provided with the second through-hole 101 close to the side of positioning mechanism 4, and first through hole 403 and second is led to Hole 101 is circle, and the first through hole 403 is identical with the diameter of the second through-hole 101, and first through hole 403 and the second through-hole 101 Diameter be greater than drill bit 204 diameter.
The first through hole 403 of perforating device setting is identical with the diameter of the second through-hole 101, and first through hole 403 and the The diameter of two through-holes 101 is greater than the diameter of drill bit 204, can be logical from first through hole 403 and the second through-hole 101 convenient for drill bit 204 It crosses.
The perforating mechanism 2 includes the first pneumatic cylinder 201 (model DEM), mounting box 202, motor 203 (model 90YYJT) With drill bit 204, the first pneumatic cylinder 201 is installed above 1 side of installs case, and the output end of the first pneumatic cylinder 201 connects It is connected to mounting box 202, the inside of the mounting box 202 is equipped with motor 203, and the output end of motor 203 is equipped with and extends to Drill bit 204 on the outside of first through hole.
The perforating device punches metope by the first pneumatic cylinder 201, motor 203 and the drill bit 204 being arranged.
The dedusting mechanism 3 includes air blower 301, disposal box 302, collection bucket 303 and ventilation duct 304, the installs case 1 Internal lower section is disposed with air blower 301 and disposal box 302 from left to right, and the air inlet of the air blower 301 extends to The inside of disposal box 302, and the other side of disposal box 302 is provided with ventilation duct 304, the ventilation duct 304 is far from disposal box One end is connected with the collection bucket 303 extended to outside installs case 1, and collection bucket 303 is funnel-shaped.
The perforating device can pass through ventilation duct 304 for collection bucket by air blower 301 by the dedusting mechanism 3 of setting Dust in 303 is collected into disposal box 302, is reduced dust in the construction process and is damaged to construction personnel's body.
Street is provided with universal wheel 6 at the bottom four corners of the bottom plate 5, and is all provided with brake apparatus on universal wheel 6.
6 push rod 9 of universal wheel of perforating device setting can move perforating device, and staff is facilitated to apply Work.
Working principle: building engineering construction is pushed into handle 9 by construction personnel with perforating device, utilizes bottom setting After building engineering construction is moved to the metope punched with perforating device by universal wheel 6, building engineering construction is used and is beaten Aperture apparatus powers on, and after carrying out punching label to metope as needed, building engineering construction is moved to perforating device and is beaten Hole metope, it is by the second pneumatic cylinder 8 that drill bit 204 is vertical with the mark point that metope needs to punch according to the position of metope punching, Then it utilizes and contacts the locating piece 404 of positioning mechanism 4 with metope, prevent drill bit 204 from shifting in the course of rotation, make At punch position inaccuracy, drill bit 204 is pushed by the first pneumatic cylinder 201, and drive drill bit 204 to rotate by motor 203, energy It is enough to drill to metope, the vibration generated when drill bit 204 drills can be reduced by the damping spring 401 of positioning mechanism 4, together When the second through-hole 101 and first through hole 403 drill bit 204 can be limited, can be produced when drill bit 204 drills to metope Raw a large amount of dust can bore the dust generated using 303 pairs of collection bucket by the dedusting mechanism 3 of setting and receive Collection, then sucked the dust in collection bucket 303 in disposal box 302 by air blower 301 and ventilation duct 304, to dust into Row is collected and is collected, and can be reduced the dust in drilling and be impacted to the health of staff.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of building engineering construction perforating device, including installs case (1), it is characterised in that: the inside of the installs case (1) It is disposed with perforating mechanism (2) and dedusting mechanism (3) from top to bottom, and the side of installs case (1) is provided with positioning mechanism (4), it is provided with bottom plate (5) below the installs case (1), and the top four corners of bottom plate (5) are all provided with telescopic rod (7), And the top of telescopic rod (7) all extends to the four corners of installs case (1) bottom, the middle position above the bottom plate (5) is set It is equipped with the second pneumatic cylinder (8), and the output end of the second pneumatic cylinder (8) is connected to the bottom of installs case (1), the installs case (1) The side of remotely located mechanism (4) is provided with push rod (9).
2. a kind of building engineering construction perforating device according to claim 1, it is characterised in that: the positioning mechanism It (4) include damping spring (401), support plate (402), first through hole (403) and locating piece (404), the one of the installs case (1) Side is provided with two groups of damping springs (401), and one end of damping spring (401) is all connected to the side of support plate (402), described Locating piece (404) are all provided with above and below support plate (402) other side.
3. a kind of building engineering construction perforating device according to claim 1, it is characterised in that: the installs case (1) Side close to positioning mechanism (4) is provided with the second through-hole (101), and first through hole (403) and the second through-hole (101) are circle Shape, the first through hole (403) is identical with the diameter of the second through-hole (101), and first through hole (403) and the second through-hole (101) Diameter be greater than drill bit (204) diameter.
4. a kind of building engineering construction perforating device according to claim 1, it is characterised in that: the perforating mechanism (2) include the first pneumatic cylinder (201), mounting box (202), motor (203) and drill bit (204), installs case (1) side it is upper Side is equipped with the first pneumatic cylinder (201), and the output end of the first pneumatic cylinder (201) is connected with mounting box (202), the mounting box (202) inside is equipped with motor (203), and the output end of motor (203) is equipped with the drill bit extended on the outside of first through hole (204)。
5. a kind of building engineering construction perforating device according to claim 1, it is characterised in that: the dedusting mechanism It (3) include air blower (301), disposal box (302), collection bucket (303) and ventilation duct (304), under the installs case (1) is internal Side is disposed with air blower (301) and disposal box (302) from left to right, and the air inlet of the air blower (301) extends to collection The inside of dirt case (302), and the other side of disposal box (302) is provided with ventilation duct (304), the ventilation duct (304) is far from collection One end of dirt case, which is connected with, extends to the external collection bucket (303) of installs case (1), and collection bucket (303) is funnel-shaped.
6. a kind of building engineering construction perforating device according to claim 1, it is characterised in that: the bottom plate (5) Street is provided with universal wheel (6) at bottom four corners, and is all provided with brake apparatus on universal wheel (6).
CN201821083534.5U 2018-07-10 2018-07-10 A kind of building engineering construction perforating device Active CN209365052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821083534.5U CN209365052U (en) 2018-07-10 2018-07-10 A kind of building engineering construction perforating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821083534.5U CN209365052U (en) 2018-07-10 2018-07-10 A kind of building engineering construction perforating device

Publications (1)

Publication Number Publication Date
CN209365052U true CN209365052U (en) 2019-09-10

Family

ID=67811324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821083534.5U Active CN209365052U (en) 2018-07-10 2018-07-10 A kind of building engineering construction perforating device

Country Status (1)

Country Link
CN (1) CN209365052U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111890570A (en) * 2020-08-06 2020-11-06 赵艳妍 Dustless drilling equipment
CN112428444A (en) * 2020-11-03 2021-03-02 湖南迈辉环保材料有限公司 Positioning and drilling device for constructional engineering
CN113146861A (en) * 2021-04-19 2021-07-23 何远兵 Wall body perforating device for interior decoration

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111890570A (en) * 2020-08-06 2020-11-06 赵艳妍 Dustless drilling equipment
CN112428444A (en) * 2020-11-03 2021-03-02 湖南迈辉环保材料有限公司 Positioning and drilling device for constructional engineering
CN113146861A (en) * 2021-04-19 2021-07-23 何远兵 Wall body perforating device for interior decoration

Similar Documents

Publication Publication Date Title
CN209365052U (en) A kind of building engineering construction perforating device
CN109227965B (en) Efficient wall body puncher
CN205468186U (en) Wood -worker engraving machine
CN109014290A (en) Drilling equipment is used in a kind of processing of wearability construction material
CN109227962A (en) A kind of perforating device for building decoration and fitment
CN109013858A (en) A kind of robot punching common apparatus
CN206493394U (en) A kind of drilling dust-removing apparatus produced for thing to sit on
CN207824018U (en) A kind of top plate punching support
CN209903126U (en) Dust collecting device of electric hammer
CN109057702B (en) Down-the-hole drill with dustproof function and use method thereof
CN103418817A (en) Scrap collecting device
CN204735750U (en) Electric drill strikes to bore uses vertical bracing bracket
CN207177732U (en) Environment friendly road drilling construction equipment assembly
CN207431889U (en) A kind of rapid drilling machine
CN203526631U (en) Waste chip collecting device
CN206085364U (en) Special puncher of marble component
CN210190180U (en) Architectural decoration engineering is with dust keeper that punches
CN208728728U (en) A kind of drilling machine
CN205995617U (en) A kind of puncher with tail gas recycle function
CN213290871U (en) Perforating device is used in hydraulic engineering construction
CN205464431U (en) Three -dimensional porous drilling machine of motormeter crossbeam
CN203062741U (en) Novel percussion drill
CN211334073U (en) Efficient ceramic tile cutting equipment in building field
CN209698073U (en) A kind of automobile manufacture workpiece perforating device
CN214819789U (en) Perforating device is used to building wall fitment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant