CN209353704U - Casing direct-burried mould bases - Google Patents
Casing direct-burried mould bases Download PDFInfo
- Publication number
- CN209353704U CN209353704U CN201821847918.XU CN201821847918U CN209353704U CN 209353704 U CN209353704 U CN 209353704U CN 201821847918 U CN201821847918 U CN 201821847918U CN 209353704 U CN209353704 U CN 209353704U
- Authority
- CN
- China
- Prior art keywords
- vertical pole
- crossbar
- cross bar
- casing
- burried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model provides a kind of casing direct-burried mould bases, including mold frame, casing horizontal fixture and cannula tip press device, the fixed device lateral of casing level is removably set in mold frame, cannula tip press device is vertically removably set in mold frame, the bottom surface of cannula tip press device is horizontal bottom, horizontal bottom is located at the top of casing horizontal fixture, sleeve position is adjusted by casing horizontal fixture when use and is fixed, casing verticality is adjusted by cannula tip press device.The casing direct-burried mould bases of the utility model can guarantee that casing is accurately positioned, and really realize casing directly buried technology, achieve the purpose that the save the cost duration, ingenious in design, simple for structure, and manufacture is easy, at low cost, be suitable for large-scale promotion application.
Description
Technical field
The utility model relates to technical field of building construction, in particular to casing directly buried technology field, in particular to one kind
Casing direct-burried mould bases.
Background technique
For current building trade tube well construction situation, prevailing paradigm proposes casing directly buried technology, can save pipe well two
Secondary casting, to achieve the purpose that the save the cost duration.But often due to position inaccurate cannot achieve in specific operation process, into
The secondary cutting of row, increases the cost duration instead.
The main reason for through deep study and analysis position inaccurate are as follows:
1, structure construction inaccuracy, casing direct-burried is based on structure positioning, therefore can not be accurately positioned;
2, worker, which measures, not can avoid error;
3, reinforcing bar binding and concrete construction in deviation caused by sleeve position;
4, the in-depth of piping shaft construction drawing is not in place.
Accordingly, it is desirable to provide a kind of casing direct-burried mould bases, can guarantee that casing is accurately positioned, really realize casing direct-burried
Technology achievees the purpose that the save the cost duration.
Utility model content
In order to overcome the disadvantages of the prior art mentioned above, one of the utility model is designed to provide a kind of casing direct-burried
Mould bases can guarantee that casing is accurately positioned, really realize casing directly buried technology, achieve the purpose that the save the cost duration, be suitable for
Large-scale promotion application.
The another object of the utility model is to provide a kind of casing direct-burried mould bases, ingenious in design, simple for structure, manufacture
Simplicity, it is at low cost, it is suitable for large-scale promotion application.
To achieve the above objectives, the utility model provides a kind of casing direct-burried mould bases, its main feature is that, including mold frame,
Casing horizontal fixture and cannula tip press device, described sleeve pipe horizontal fixture transverse movable are arranged in the mould
Have in frame, press device is vertically removably set in the mold frame at the top of described sleeve pipe, pressing at the top of described sleeve pipe
The bottom surface of device is horizontal bottom, and the horizontal bottom is located at the top of described sleeve pipe horizontal fixture.
Preferably, the mold frame includes the first vertical pole and the second vertical pole, first vertical pole and second vertical pole
Horizontal parallel setting, described sleeve pipe horizontal fixture are between first vertical pole and second vertical pole and laterally removable
It is dynamic to be arranged in first vertical pole and second vertical pole.
Preferably, the mold frame includes that first crossbar, second crossbar, third vertical pole, the first fixing piece and second are solid
Determine part, the first crossbar and second crossbar horizontal parallel setting, the both ends of the third vertical pole are located at described the
The top of one cross bar is connected with the top of the second crossbar and respectively by first fixing piece with second fixing piece
The first crossbar and the second crossbar, described sleeve pipe top press device are located under the third vertical pole and vertically move
It is arranged in the third vertical pole.
More preferably, the mold frame further includes the first stabilizer blade, the second stabilizer blade, third stabilizer blade and the 4th stabilizer blade, and described
One stabilizer blade and second stabilizer blade are located under the both ends of the first crossbar and are separately connected the two of the first crossbar
End, the third stabilizer blade and the 4th stabilizer blade are located under the both ends of the second crossbar and are separately connected described second
The both ends of cross bar.
Preferably, described sleeve pipe horizontal fixture includes third cross bar, the 4th cross bar and holding card, the third cross bar and
4th cross bar is arranged in line and transverse movable is arranged in the mold frame respectively, and the holding card is located at described
Between third cross bar and the 4th cross bar and it is separately connected the third cross bar and the 4th cross bar, the horizontal bottom position
In the top of the holding card.
More preferably, the mold frame includes the first vertical pole and the second vertical pole, first vertical pole and second vertical pole
Horizontal parallel setting, the holding card is between first vertical pole and second vertical pole, the third cross bar and described the
Four cross bars are distinguished transverse movable and are arranged in first vertical pole and second vertical pole.
More preferably, the third cross bar and the 4th cross bar are laterally plugged in the mold frame respectively.
Preferably, press device includes vertical compression bar, the 5th cross bar and the 4th vertical pole, the vertical pressure at the top of described sleeve pipe
Bar is vertically removably set in the mold frame, and the 5th cross bar and the 4th vertical pole interconnection form cross
Frame, the lower end of the vertical compression bar connect the crosspoint of the cross, and the bottom surface of the cross is the horizontal bottom.
More preferably, the mold frame includes that first crossbar, second crossbar, third vertical pole, the first fixing piece and second are solid
Determine part, the first crossbar and second crossbar horizontal parallel setting, the both ends of the third vertical pole are located at described the
Described in the top of one cross bar is connected by first fixing piece and the second fixing piece with the top of the second crossbar and respectively
First crossbar and the second crossbar, the cross are located under the third vertical pole, and the vertical compression bar is vertically moved and set
It sets in the third vertical pole.
More preferably, the vertical compression bar is vertically plugged in the mold frame.
The beneficial effects of the utility model essentially consist in:
1, the casing direct-burried mould bases of the utility model includes mold frame, casing horizontal fixture and cannula tip pressing
Device, the fixed device lateral of casing level are removably set in mold frame, and cannula tip press device is vertically moved and set
It sets in mold frame, the bottom surface of cannula tip press device is horizontal bottom, and horizontal bottom is located at casing horizontal fixture
Top, sleeve position is adjusted by casing horizontal fixture when use and is fixed, cannula tip press device is passed through
Casing verticality is adjusted, therefore, can guarantee that casing is accurately positioned, really realize casing directly buried technology, reach save the cost
The purpose of duration is suitable for large-scale promotion application.
2, the casing direct-burried mould bases of the utility model includes mold frame, casing horizontal fixture and cannula tip pressing
Device, the fixed device lateral of casing level are removably set in mold frame, and cannula tip press device is vertically moved and set
It sets in mold frame, the bottom surface of cannula tip press device is horizontal bottom, and horizontal bottom is located at casing horizontal fixture
Top, sleeve position is adjusted by casing horizontal fixture when use and is fixed, cannula tip press device is passed through
Casing verticality is adjusted, therefore, ingenious in design, simple for structure, manufacture is easy, and it is at low cost, it is suitable for large-scale promotion application.
The these and other objects of the utility model, feature and advantage are wanted by following detailed descriptions, attached drawing and right
It acquires to fully demonstrate, and can be achieved by means, device and the their combination specially pointed out in appended claims.
Detailed description of the invention
Fig. 1 is the three-dimensional signal using the first specific embodiment fixed sleeving of the casing direct-burried mould bases of the utility model
Figure.
(symbol description)
1 mold frame;2 casing horizontal fixtures;3 cannula tip press devices;4 first vertical poles;5 second vertical poles;6
One cross bar;7 second crossbars;8 third vertical poles;9 first fixing pieces;10 second fixing pieces;11 first stabilizer blades;12 second stabilizer blades;13
Third stabilizer blade;14 the 4th stabilizer blades;15 third cross bars;16 the 4th cross bars;17 holding cards;18 vertical compression bars;19 the 5th cross bars;20 the 4th
Vertical pole;21 to direct-burried casing.
Specific embodiment
In order to be more clearly understood that the technology contents of the utility model, spy lifts following embodiment and is described in detail.
It is shown in Figure 1, in a specific embodiment of the utility model, the casing direct-burried mould bases packet of the utility model
Mold frame 1, casing horizontal fixture 2 and cannula tip press device 3 are included, described sleeve pipe horizontal fixture 2 laterally can
Mobile to be arranged in the mold frame 1, press device 3 is vertically removably set on the mold frame 1 at the top of described sleeve pipe
In, the bottom surface of press device 3 is horizontal bottom at the top of described sleeve pipe, and the horizontal bottom is located at described sleeve pipe horizontal fixture
2 top.
The mold frame 1 can have any suitable structure, shown in Figure 1, in a tool of the utility model
In body embodiment, the mold frame 1 includes the first vertical pole 4 and the second vertical pole 5, first vertical pole 4 and second vertical pole 5
Horizontal parallel setting, described sleeve pipe horizontal fixture 2 are between first vertical pole 4 and second vertical pole 5 and lateral
It is removably set in first vertical pole 4 and second vertical pole 5.
The mold frame 1 can have any suitable structure, preferably, the mold frame 1 includes first crossbar
6, second crossbar 7, third vertical pole 8, the first fixing piece 9 and the second fixing piece 10, the first crossbar 6 and the second crossbar 7
Horizontal parallel setting, the both ends of the third vertical pole 8 are located at top and the second crossbar 7 of the first crossbar 6
Top simultaneously connects the first crossbar 6 and second cross by first fixing piece 9 and second fixing piece 10 respectively
Bar 7, described sleeve pipe top press device 3 are located under the third vertical pole 8 and are vertically removably set on the third vertical pole 8
In.It is shown in Figure 1, it include 4 He of the first vertical pole in the mold frame 1 in a specific embodiment of the utility model
In the case where second vertical pole 5, the both ends of first vertical pole 4 are separately connected the first crossbar 6 and the second crossbar 7, institute
The both ends for stating the second vertical pole 5 are separately connected the first crossbar 6 and the second crossbar 7.
First fixing piece 9 and second fixing piece 10 can be any suitable fixing piece, referring to Figure 1 institute
Show, in a specific embodiment of the utility model, first fixing piece 9 and second fixing piece 10 are vertical bar
Part.
The mold frame 1 can also have any suitable structure, shown in Figure 1, the one of the utility model
In specific embodiment, the mold frame 1 further includes the first stabilizer blade 11, the second stabilizer blade 12, third stabilizer blade 13 and the 4th stabilizer blade 14,
First stabilizer blade 11 and second stabilizer blade 12 are located under the both ends of the first crossbar 6 and are separately connected described the
The both ends of one cross bar 6, the third stabilizer blade 13 and the 4th stabilizer blade 14 are located under the both ends of the second crossbar 7 and divide
The both ends of the second crossbar 7 are not connected.
Described sleeve pipe horizontal fixture 2 can have any suitable structure, preferably, the fixed dress of described sleeve pipe level
Setting 2 includes third cross bar 15, the 4th cross bar 16 and holding card 17, and the third cross bar 15 and the 4th cross bar 16 are set in line
It sets and distinguishes transverse movable and be arranged in the mold frame 1, the holding card 17 is located at the third cross bar 15 and described the
Between four cross bars 16 and it is separately connected the third cross bar 15 and the 4th cross bar 16, the horizontal bottom is located at the holding card
17 top.It is shown in Figure 1, it include first vertical in the mold frame 1 in a specific embodiment of the utility model
In the case where bar 4 and the second vertical pole 5, the holding card 17 is between first vertical pole 4 and second vertical pole 5, and described
Three cross bars 15 and the 4th cross bar 16 difference transverse movable are arranged in first vertical pole 4 and second vertical pole 5.
The third cross bar 15 and the 4th cross bar 16 difference transverse movable are arranged in the mold frame 1 can be with
Using any suitable structure, more preferably, the third cross bar 15 and the 4th cross bar 16 are laterally plugged in the mould respectively
Have in frame 1.It is shown in Figure 1, it include first in the mold frame 1 in a specific embodiment of the utility model
In the case where vertical pole 4 and the second vertical pole 5, the third cross bar 15 and the 4th cross bar 16 are laterally plugged in described first respectively
In vertical pole 4 and second vertical pole 5.
Press device 3 can have any suitable structure at the top of described sleeve pipe, preferably, by press fitting at the top of described sleeve pipe
Setting 3 includes vertical compression bar 18, the 5th cross bar 19 and the 4th vertical pole 20, and the vertical compression bar 18 is vertically removably set on the mould
Have in frame 1, the 5th cross bar 19 and 20 interconnection of the 4th vertical pole formation cross, under the vertical compression bar 18
End connects the crosspoint of the cross, and the bottom surface of the cross is the horizontal bottom.It is shown in Figure 1, in this reality
With in a novel specific embodiment, include first crossbar 6, second crossbar 7, third vertical pole 8, first in the mold frame 1
In the case where fixing piece 9 and the second fixing piece 10, the cross is located under the third vertical pole 8, and the vertical compression bar 18 is perpendicular
To being removably set in the third vertical pole 8.
The vertical compression bar 18, which is vertically removably set in the mold frame 1, can use any suitable structure,
More preferably, the vertical compression bar 18 is vertically plugged in the mold frame 1.It is shown in Figure 1, the one of the utility model
It include first crossbar 6, second crossbar 7, third vertical pole 8, the first fixing piece 9 and the in the mold frame 1 in specific embodiment
In the case where two fixing pieces 10, the vertical compression bar 18 is vertically plugged in the third vertical pole 8.
In use, will fix to direct-burried casing 21 by casing horizontal fixture 2 and adjust position, pass through cannula tip
The horizontal bottom of press device 3 presses the top to direct-burried casing 21, adjusts to 21 verticality of direct-burried casing.
Specifically, fixed to direct-burried casing 21 by holding card 17, it is moved by third cross bar 15 and the lateral of the 4th cross bar 16
Position of the dynamic adjustment to direct-burried casing 21, by the horizontal bottom of cross against the top to direct-burried casing 21, by vertical
The vertically movable pressing of compression bar 18 is adjusted to direct-burried casing 21 to 21 verticality of direct-burried casing.
Compared with prior art, the advantages of casing direct-burried mould bases of the utility model, essentially consists in:
1) casing direct-burried mould bases realizes pipeline casing one-time-concreting in place, avoids later-stage secondary and hangs mould and closure,
It solves the quality problems of ferrule boot leak from the root, achievees the purpose that cost efficiency, saves duration, green construction.
2) casing direct-burried mould bases reduces the error source of set pipe construction, changes previous set by calibration sleeve position
It is the shortcomings that pipe position inaccurate, easy to assembly quick, it can repeatedly utilize, the save the cost duration.
3) traditional construction process has been overturned using the construction method of casing direct-burried mould bases, has avoided electromechanical installation set pipe construction
The middle common quality defect for destroying, cutting reinforcing bar.
4) preferable particularly with application in tall buildings effect, cost duration Benefit.
To sum up, the casing direct-burried mould bases of the utility model can guarantee that casing is accurately positioned, and really realize casing direct-burried skill
Art achievees the purpose that the save the cost duration, ingenious in design, simple for structure, and manufacture is easy, at low cost, answers suitable for large-scale promotion
With.
It can be seen that the purpose of this utility model completely and is effectively achieved.The function of the utility model and
Structural principle is shown and is illustrated in embodiment, and under without departing substantially from the principle, embodiment can make any modification.Institute
With the utility model includes all variant embodiments based on claim spirit and scope of the claims.
Claims (10)
1. a kind of casing direct-burried mould bases, which is characterized in that pressed including mold frame, casing horizontal fixture and cannula tip
Device, described sleeve pipe horizontal fixture transverse movable are arranged in the mold frame, press device at the top of described sleeve pipe
It is vertically removably set in the mold frame, the bottom surface of press device is horizontal bottom, the level at the top of described sleeve pipe
Bottom surface is located at the top of described sleeve pipe horizontal fixture.
2. casing direct-burried mould bases as described in claim 1, which is characterized in that the mold frame includes the first vertical pole and second
Vertical pole, first vertical pole and the second vertical pole horizontal parallel setting, described sleeve pipe horizontal fixture are located at described first
Between vertical pole and second vertical pole and transverse movable is arranged in first vertical pole and second vertical pole.
3. casing direct-burried mould bases as described in claim 1, which is characterized in that the mold frame includes first crossbar, second
Cross bar, third vertical pole, the first fixing piece and the second fixing piece, the first crossbar and second crossbar horizontal parallel setting,
The both ends of the third vertical pole are located at the top of the first crossbar and the top of the second crossbar and pass through institute respectively
It states the first fixing piece and connects the first crossbar and the second crossbar with second fixing piece, press press fitting at the top of described sleeve pipe
Setting under the third vertical pole and being vertically removably set in the third vertical pole.
4. casing direct-burried mould bases as claimed in claim 3, which is characterized in that the mold frame further includes the first stabilizer blade,
Two stabilizer blades, third stabilizer blade and the 4th stabilizer blade, first stabilizer blade and second stabilizer blade are located at the two of the first crossbar
End is lower and is separately connected the both ends of the first crossbar, and the third stabilizer blade and the 4th stabilizer blade are located at described second
Under the both ends of cross bar and it is separately connected the both ends of the second crossbar.
5. casing direct-burried mould bases as described in claim 1, which is characterized in that described sleeve pipe horizontal fixture includes third cross
Bar, the 4th cross bar and holding card, the third cross bar and the 4th cross bar are arranged in line and transverse movable setting respectively
In the mold frame, the holding card is between the third cross bar and the 4th cross bar and is separately connected the third
Cross bar and the 4th cross bar, the horizontal bottom are located at the top of the holding card.
6. casing direct-burried mould bases as claimed in claim 5, which is characterized in that the mold frame includes the first vertical pole and second
Vertical pole, first vertical pole and the second vertical pole horizontal parallel setting, the holding card are located at first vertical pole and described the
Between two vertical poles, the third cross bar and the 4th cross bar difference transverse movable setting are in first vertical pole and described the
In two vertical poles.
7. casing direct-burried mould bases as claimed in claim 5, which is characterized in that the third cross bar and the 4th cross bar difference
Laterally it is plugged in the mold frame.
8. casing direct-burried mould bases as described in claim 1, which is characterized in that press device includes vertical pressure at the top of described sleeve pipe
Bar, the 5th cross bar and the 4th vertical pole, the vertical compression bar are vertically removably set in the mold frame, the 5th cross bar
Cross is formed with the 4th vertical pole interconnection, the lower end of the vertical compression bar connects the crosspoint of the cross, institute
The bottom surface for stating cross is the horizontal bottom.
9. casing direct-burried mould bases as claimed in claim 8, which is characterized in that the mold frame includes first crossbar, second
Cross bar, third vertical pole, the first fixing piece and the second fixing piece, the first crossbar and second crossbar horizontal parallel setting,
The both ends of the third vertical pole are located at the top of the first crossbar and the top of the second crossbar and pass through institute respectively
It states the first fixing piece and the second fixing piece connects the first crossbar and the second crossbar, the cross are located at the third
Under vertical pole, the vertical compression bar is vertically removably set in the third vertical pole.
10. casing direct-burried mould bases as claimed in claim 8, which is characterized in that the vertical compression bar is vertically plugged in the mould
Have in frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821847918.XU CN209353704U (en) | 2018-11-09 | 2018-11-09 | Casing direct-burried mould bases |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821847918.XU CN209353704U (en) | 2018-11-09 | 2018-11-09 | Casing direct-burried mould bases |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209353704U true CN209353704U (en) | 2019-09-06 |
Family
ID=67783257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821847918.XU Active CN209353704U (en) | 2018-11-09 | 2018-11-09 | Casing direct-burried mould bases |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209353704U (en) |
-
2018
- 2018-11-09 CN CN201821847918.XU patent/CN209353704U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209353704U (en) | Casing direct-burried mould bases | |
CN105092166A (en) | Cyclone three-way drainpipe member water and pressure test device | |
CN203992111U (en) | A kind of lathe automatic material connection device | |
CN203956463U (en) | Flexible pipe automatic pipe insertion device | |
CN203125082U (en) | Extruding, positioning and clamping tool | |
CN203473395U (en) | Special placing rack for construction site pipeline | |
CN205134952U (en) | Complicated node concrete placement instrument of building structure | |
CN204339702U (en) | With the table meter of automatic positioning and mounting structure | |
CN203129578U (en) | Building template | |
CN208289992U (en) | A kind of connecting tube quantitatively measures cutter device | |
CN203452394U (en) | Special support for line snapping for building wall construction | |
CN205699269U (en) | A kind of new mobile type volleyball net frame | |
CN204152856U (en) | A kind of guide pump assembling set | |
CN205476442U (en) | A wall pouring mode structure is led to anti - L shape concrete | |
CN204944761U (en) | A kind of eddy flow T-joint water discharging pipe fitting examination water pressure testing device | |
CN204036089U (en) | A kind of processing hub workpiece clamping device used | |
CN203579744U (en) | Vacuum sucker type crawl drilling machine | |
CN204552045U (en) | A kind of novel building support | |
CN203531141U (en) | Perforated connecting piece | |
CN203985385U (en) | Water-cultivated flower planting frame | |
CN204027772U (en) | Single-phase basin shape insulator tightness test frock | |
CN203808487U (en) | Construction wall-attached scaffold cantilever device | |
CN203891439U (en) | Building construction beam frame | |
CN203475856U (en) | Calibration support for wall building | |
CN205414744U (en) | Remove welding slag device based on guide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |