CN209351558U - A kind of shipbuilding Cargo Oil Pump installation tool - Google Patents

A kind of shipbuilding Cargo Oil Pump installation tool Download PDF

Info

Publication number
CN209351558U
CN209351558U CN201822261431.XU CN201822261431U CN209351558U CN 209351558 U CN209351558 U CN 209351558U CN 201822261431 U CN201822261431 U CN 201822261431U CN 209351558 U CN209351558 U CN 209351558U
Authority
CN
China
Prior art keywords
steel wire
limit plate
oil pump
cargo oil
oil pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822261431.XU
Other languages
Chinese (zh)
Inventor
刁贵洋
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822261431.XU priority Critical patent/CN209351558U/en
Application granted granted Critical
Publication of CN209351558U publication Critical patent/CN209351558U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model proposes a kind of shipbuilding Cargo Oil Pump installation tools, limit plate including hanger and for limiting oil pipe, the bottom end of hanger is fixed above deck, the top of hanger is equipped with pulley, the lower side of hanger is equipped with hoist engine, one steel wire winds around pulley on hoist engine, the lower end of steel wire connects Cargo Oil Pump, the limit plate is divided into the part of left and right two of capable assembling, limit plate is equipped with the oil pipe limit hole that the steel wire perforation passed through for steel wire is passed through with fuel feed pump, steel wire perforation and oil pipe limit hole are divided into two parts and are located on left and right two parts of limit plate, two parts limit plate, which uses to be detachably connected, is fixed on Cargo Oil Pump installation Jing Shangbukaikouchu on deck.Cargo Oil Pump stable can be lifted into installation position by the utility model, and can make and limit the oil pipe of more Cargo Oil Pumps in order in dropping process, avoid oil pipe from being squeezed by Cargo Oil Pump bad, reduce Cargo Oil Pump installation difficulty and workload, improve tanker construction efficiency.

Description

A kind of shipbuilding Cargo Oil Pump installation tool
Technical field
The utility model relates to shipbuilding apparatus field, especially a kind of shipbuilding Cargo Oil Pump installation tool.
Background technique
For mammoth tanker as the large carried of crude oil tool in main sea, building course is complicated, and it is big, all to build project amount Phase is long.The construction of one oil tanker is related to the installation of a variety of equipment, and wherein Cargo Oil Pump is exactly one of.Cargo Oil Pump is as oil The important equipment of unloading is taken turns, the usual position of installation site is relatively low, and oil pipe is relatively more on Cargo Oil Pump, itself quality Bigger, installing Cargo Oil Pump at present does not have a special installation tool, and oil pipe is at random when installation is easy to be squeezed bad, installation behaviour by pump case Make very time-consuming and laborious.
Utility model content
Purpose of the utility model is to overcome the deficiencies of the above prior art and provide a kind of shipbuildings with Cargo Oil Pump erector Tool, can greatly reduce Cargo Oil Pump installation workload for Cargo Oil Pump hanging belt designated position.
To achieve the above object, the utility model adopts the following technical solutions: a kind of shipbuilding Cargo Oil Pump installation tool, packet Hanger and the limit plate for limiting oil pipe are included, the bottom end of hanger is fixed above deck, and the top of hanger is equipped with pulley, hanger Lower side is equipped with hoist engine, and a steel wire winds around pulley on hoist engine, and the lower end of steel wire connects Cargo Oil Pump, the limit Plate is divided into the part of left and right two of capable assembling, and limit plate is equipped with the oil pipe that the steel wire perforation passed through for steel wire is passed through with fuel feed pump Limit hole, steel wire perforation and oil pipe limit hole are divided into two parts and are located on left and right two parts of limit plate, two parts Limit plate, which uses to be detachably connected, is fixed on Cargo Oil Pump installation Jing Shangbukaikouchu, shape after two parts split of limit plate on deck At the perforation of complete steel wire and oil pipe limit hole.
Further, two parts limit plate is fixed by bolt and deck.
Further, the steel wire perforation and oil pipe limit hole can be one of circular hole, square hole, elliptical aperture, and divide For symmetrical two parts, and it is respectively arranged on two parts of limit plate.
In use, hanger bottom end is bolted on deck, by the free end of steel wire and it is fixed on Cargo Oil Pump pump case On special hanger connection, hoist engine rotation Cargo Oil Pump is sling is put into Cargo Oil Pump installation well head, be put into certain depth to the pump housing After make oil pipe in order, two parts of limit plate are fixed on deck, and make two parts and be combined, distinguish oil pipe and steel wire It is included in corresponding steel wire perforation and oil pipe limit hole, with the decline of Cargo Oil Pump, oil pipe is made in order from oil pipe limit hole and enters goods Oil pump installs well;Steel wire is unlocked after being installed and limit plate and hanger are removed.
The beneficial effects of the utility model are: Cargo Oil Pump stable can be lifted into installation position, and energy by the utility model Enough oil pipes for making and limiting more Cargo Oil Pumps in order in dropping process, avoid oil pipe from being squeezed by Cargo Oil Pump bad, are that Cargo Oil Pump was installed Journey becomes stable and simply, reduces Cargo Oil Pump installation difficulty and workload, improves tanker construction efficiency.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, is also possible to obtain other drawings based on these drawings.
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is to limit hardened structure schematic diagram.
It is as shown in the figure: 1, hanger, 2, oil pipe, 3, limit plate, 4, deck, 5, pulley, 6, hoist engine, 7, steel wire, 8, Cargo Oil Pump, 9, steel wire perforation, 10, oil pipe limit hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of shipbuilding Cargo Oil Pump installation tool as depicted in figs. 1 and 2, the limit including hanger 1 and for limiting oil pipe 2 Position plate 3, the bottom end of hanger 1 are fixed on deck 4, and the top of hanger 1 is equipped with pulley 5, and the lower side of hanger 1 is equipped with hoist engine 6, a steel wire 7 winds around pulley 5 on hoist engine 6, and the lower end of steel wire 7 connects Cargo Oil Pump 8, the limit by Special sling The semicircular part in left and right two that plate 3 is divided to for capable assembling, limit plate 3 are equipped with the steel wire perforation 9 passed through for steel wire 7 and fuel feeding The oil pipe limit hole 10 that pipe 2 passes through, steel wire perforation 9 and oil pipe limit hole 10 are divided into two parts and are located at limit plate 3 On the two parts of left and right, two parts limit plate 3 is bolted on Cargo Oil Pump on deck 4 and installs Jing Shangbukaikouchu, limit plate 3 Two parts split after form complete steel wire perforation 9 and oil pipe limit hole 10.
Steel wire perforation 9 and oil pipe limit hole 10 are preferably circular hole, naturally it is also possible to for square hole, elliptical aperture etc., and are divided into pair Two parts of title, and be respectively arranged on two parts of limit plate 3.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (3)

1. a kind of shipbuilding Cargo Oil Pump installation tool, it is characterized in that: including hanger and the limit plate for limiting oil pipe, hanger Bottom end is fixed above deck, and the top of hanger is equipped with pulley, and the lower side of hanger is equipped with hoist engine, and a steel wire is around pulley receipts It rolls up on hoist engine, the lower end of steel wire connects Cargo Oil Pump, and the part of left and right two of capable assembling, limit plate are divided on the limit plate Equipped with the oil pipe limit hole that the steel wire perforation passed through for steel wire and fuel feed pump pass through, steel wire perforation and oil pipe limit hole are divided into two It partially and is located on left and right two parts of limit plate, two parts limit plate, which uses to be detachably connected, is fixed on Cargo Oil on deck Pump installation Jing Shangbukaikouchu forms complete steel wire perforation and oil pipe limit hole after two parts split of limit plate.
2. shipbuilding according to claim 1 Cargo Oil Pump installation tool, it is characterised in that: two parts limit plate passes through Bolt is fixed with deck.
3. shipbuilding according to claim 1 Cargo Oil Pump installation tool, it is characterised in that: the steel wire perforation and oil pipe limit Position hole can be one of circular hole, square hole, elliptical aperture, and be divided into symmetrical two parts, and be respectively arranged on two of limit plate On point.
CN201822261431.XU 2018-12-30 2018-12-30 A kind of shipbuilding Cargo Oil Pump installation tool Expired - Fee Related CN209351558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822261431.XU CN209351558U (en) 2018-12-30 2018-12-30 A kind of shipbuilding Cargo Oil Pump installation tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822261431.XU CN209351558U (en) 2018-12-30 2018-12-30 A kind of shipbuilding Cargo Oil Pump installation tool

Publications (1)

Publication Number Publication Date
CN209351558U true CN209351558U (en) 2019-09-06

Family

ID=67802091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822261431.XU Expired - Fee Related CN209351558U (en) 2018-12-30 2018-12-30 A kind of shipbuilding Cargo Oil Pump installation tool

Country Status (1)

Country Link
CN (1) CN209351558U (en)

Similar Documents

Publication Publication Date Title
CN106438212A (en) Bent and spliced type bucket-shaped tower barrel
CN209351558U (en) A kind of shipbuilding Cargo Oil Pump installation tool
CN204960030U (en) A wall structure for reasonable in design of villa
CN204386878U (en) A kind of screw pump and screw rod
CN206092292U (en) Roll over and piece together a formula tubbiness tower section of thick bamboo
CN202182259U (en) Environment-friendly multiple-unit tube capable of changing lining pipe
CN202073568U (en) Vertical shaft pipeline fixing device
CN105649085B (en) Cast-in-situ bored pile hole cleaning device
CN205762086U (en) A kind of accumulating oiling station of drilling rod
CN204826625U (en) Circular post job -specific formwork of minor diameter
CN202834403U (en) Integral stamping protruding and stretching type tubular guide plate cable bracket
CN209776741U (en) Assembled improves torpedo anchor
CN204163280U (en) A kind of crossbeam
CN203740916U (en) Standard knot for tower crane
CN208833321U (en) A kind of mounting structure of speed reducer and oil level indicator
CN201245926Y (en) I-shaped beam fastener
CN207348577U (en) A kind of dismountable torch tower structure
CN207609099U (en) A kind of bolt sphere connection envelope eaves supportive structure system
CN208739908U (en) A kind of torpedo anchor with weight body
CN202447841U (en) Tool for fixing winch connecting plates for marine crane
CN202247893U (en) Novel steel sheet pile
CN206259883U (en) A kind of double glass photovoltaic component mounting structures for suspension cable
CN206099187U (en) Fixing device of oil field networking wiring usefulness
CN209227574U (en) A kind of pile foundation reinforcement device
CN202414108U (en) Counterweight for mooring anchor chain of marine floating type oil tanker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906

Termination date: 20211230

CF01 Termination of patent right due to non-payment of annual fee