CN209340725U - A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device - Google Patents
A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device Download PDFInfo
- Publication number
- CN209340725U CN209340725U CN201920004348.6U CN201920004348U CN209340725U CN 209340725 U CN209340725 U CN 209340725U CN 201920004348 U CN201920004348 U CN 201920004348U CN 209340725 U CN209340725 U CN 209340725U
- Authority
- CN
- China
- Prior art keywords
- rubber
- tube body
- square frame
- oil
- caching box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a kind of Oil & Gas Storage gas pipeline pressure sealing repairing devices, including tube body and square frame, fitting is provided with rubber caching box on the outer wall of the tube body, the both ends of the rubber caching box, which join, rubber bandage and rubber bandage is around the outer wall for being bonded tube body, the end of the rubber bandage is connected with connecting cylinder, mouth hanging is offered on the connecting cylinder side wall, the square frame is looped around on the outside of tube body, the lower end midpoint of the square frame joins vertically sliding sleeve, and the sliding sleeve inboard, upright activity has inserted threaded rod.The utility model passes through starting atmospheric pressure pole, so that atmospheric pressure pole passes through pressing plate compressing rubber caching box, and in compression process, open the bleed valve on rubber caching box side wall, the oil gas of caching is conveniently excreted, and is caught with container, avoids wasting, and rubber caching box is then tightly attached to tube body leak position by pressing plate, to realize that provisionally leak stopping is repaired.
Description
Technical field
The utility model relates to transportation pipe pipeline leakage stopping repairing device technical field, specially a kind of Oil & Gas Storage is with defeated
Feed channel pressure sealing repairing device.
Background technique
Oil & Gas Storage pipeline is exactly to carry out storage transmission to the oil gas raw material come out from underground mining, general oil-gas mining
Local all remoter and position is fewer, so need to be laid with very long pipeline, by oil gas material transport to many places,
And leakage once occurs and needs repairing in time;
Be disadvantageous in that existing for general transportation pipe pipeline leakage stopping repairing device: general leak stopping repairing device be all by
The leak position that device rapid link is enclosed in tube body is filled up, but leak position is still leaking in bonding closed process,
And directly excretion continues to cause waste in exterior space.
Utility model content
The purpose of this utility model is to provide a kind of Oil & Gas Storage gas pipeline pressure sealing repairing devices, to solve
It is proposed that general leak stopping repairing device is all the leak position that will be filled up device rapid link and be enclosed in tube body in above-mentioned background technique,
But leak position is still leaking in bonding closed process, and directly excretion continues to cause waste in exterior space
Problem.
To achieve the above object, the utility model provides the following technical solutions: a kind of Oil & Gas Storage gas pipeline is with pressure
Leak stopping repairing device, including tube body and square frame, fitting is provided with rubber caching box on the outer wall of the tube body, and the rubber is slow
The both ends for depositing box, which join, rubber bandage and rubber bandage is around the outer wall for being bonded tube body, and the end of the rubber bandage is equal
It is connected with connecting cylinder, mouth hanging is offered on the connecting cylinder side wall, the square frame is looped around on the outside of tube body, the square frame
Lower end midpoint joins vertically sliding sleeve, and the sliding sleeve inboard, upright activity has inserted threaded rod, and the threaded rod upper end is solid
It is connected to support plate and support plate contradicts on tube wall, the bottom side cross bar left and right ends of the square frame are connected with extension vertically
Bar and hanging rod snap onto the mouth hanging on connecting cylinder side wall, have nut by screw thread handover on the threaded rod and nut contradicts
On sliding sleeve, cross bar center is connected with the telescopic end of atmospheric pressure pole and atmospheric pressure pole straight down vertically on the upside of the square frame, institute
The lower end for stating atmospheric pressure pole is connected with pressing plate and pressing plate is in the upside of rubber caching box, on the front-rear side walls of the rubber caching box
It is provided with bleed valve.
Preferably, the square frame is formed by the docking of upper and lower two U-frame bodies and the docking point of square frame is connected by bolt
Connect block activity handover.
Preferably, the upper end face of support plate fitting is connected with magnetite and magnetite adsorbs tube wall.
Preferably, have to embrace ring and embrace ring movable end by articulate handover on the outer edge of the mouth hanging position and pass through
Bolt joins on connecting cylinder.
Preferably, there is top bolt by the handover of screw thread level on described square frame or so side lever and push up bolt close to tube body
End point is connected with top plate, and top plate contradicts in rubber bandage.
Preferably, the external port of the bleed valve passes through screw thread and is socketed with sealing shroud.
Compared with prior art, the utility model has the beneficial effects that
1, the utility model rubber caching box is for covering on tube wall leak position, and makes rubber caching box two sides
Rubber bandage encircle on tube body, then will with support plate threaded rod pass through square frame on sliding sleeve, then make
Square frame frame is obtained on the outside of tube body, and the support plate of threaded rod end point is contradicted by magnetite absorption in tube wall
On, so that at the mouth hanging that the connecting cylinder side-walls that existing hanging rod buckles into rubber bandage end in pairs on square frame open up, along
Threaded rod moving in rotation nut contradicts sliding sleeve, so that square frame drives hanging rod to tense connecting cylinder, so that rubber bandage and rubber
Glue caching box is tightly attached on tube wall, and the leakproofness in the space that enhancing rubber caching box is irised out on tube wall is conveniently robbed
The oil gas leaked during repairing is stored in time in rubber caching box;
2, the utility model so that atmospheric pressure pole passes through pressing plate compressing rubber caching box, and is being pressed by starting atmospheric pressure pole
In compression process, the bleed valve on rubber caching box side wall is opened, the oil gas of caching is conveniently excreted, and caught with container, keeps away
Exempt to waste, and rubber caching box is then tightly attached to tube body leak position by pressing plate, to realize that provisionally leak stopping is repaired.
Detailed description of the invention
Fig. 1 is a kind of Oil & Gas Storage gas pipeline pressure sealing repairing device overall structure diagram of the utility model;
Fig. 2 is connecting cylinder and an armful ring in a kind of Oil & Gas Storage gas pipeline pressure sealing repairing device of the utility model
The face upwarding assumption diagram of connection;
Fig. 3 is the rubber caching box in a kind of Oil & Gas Storage gas pipeline pressure sealing repairing device of the utility model
Overlooking structure figure;
Fig. 4 is the vertical view knot of support plate in a kind of Oil & Gas Storage gas pipeline pressure sealing repairing device of the utility model
Composition.
In figure: 1- tube body;2- rubber bandage;3- connecting cylinder;4- hanging rod;5- top plate;6- pushes up bolt;7- square frame;8- connection
Block;9- support plate;10- magnetite;11- nut;12- sliding sleeve;13- threaded rod;14- bleed valve;15- rubber caching box;16- pressure
Plate;17- atmospheric pressure pole;18- embraces ring;19- mouth hanging;20- sealing shroud.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of Oil & Gas Storage gas pipeline pressure sealing
Repairing device, including tube body 1 and square frame 7, fitting is provided with rubber caching box 15, the rubber on the outer wall of the tube body 1
The both ends of caching box 15, which join, rubber bandage 2 and rubber bandage 2 is around the outer wall for being bonded tube body 1, the rubber bandage 2
End be connected with connecting cylinder 3, mouth hanging 19 is offered on 3 side wall of connecting cylinder, the square frame 7 is looped around outside tube body 1
Side, the lower end midpoint of the square frame 7 joins vertically sliding sleeve 12, and the 12 inboard, upright activity of sliding sleeve has inserted screw thread
Bar 13,13 upper end of threaded rod is connected with support plate 9 and support plate 9 contradicts the bottom of the square frame 7 on 1 outer wall of tube body
Side cross bar left and right ends are connected with hanging rod 4 vertically and hanging rod 4 snaps onto the mouth hanging 19 on 3 side wall of connecting cylinder, the screw thread
There is nut 11 by screw thread handover on bar 13 and nut 11 contradicts the 7 upside cross bar center of square frame on sliding sleeve 12
Be connected with the telescopic end of atmospheric pressure pole 17 and atmospheric pressure pole 17 vertically straight down, the lower end of the atmospheric pressure pole 17 be connected with pressing plate 16 and
Pressing plate 16 is in the upside of rubber caching box 15, is provided with bleed valve 14 on the front-rear side walls of the rubber caching box 15.
The square frame 7 is formed by the docking of upper and lower two U-frame bodies and block 8 is bolted in the docking point of square frame 7
Activity handover, facilitates and carries out splicing fractionation;9 upper surface of the support plate fitting is connected with magnetite 10 and magnetite 10 adsorbs tube body
1 outer wall, magnetite 10 are used to enhance the conflict of support plate 9 in the stability of 1 outer wall of tube body;On the 19 position outer edge of mouth hanging
Have by articulate handover and embrace ring 18 and embrace 18 movable end of ring through bolt handover on connecting cylinder 3, armful ring 18 is for guaranteeing
Hanging rod 4 is firm in mouth hanging 19;There is top bolt 6 by the handover of screw thread level on 7 or so the side lever of square frame and top bolt 6 exists
It is connected with top plate 5 close to the end point of tube body 1, top plate 5 contradicts in rubber bandage 2, and top bolt 6 passes through the sidespin into square frame 7
Transfer is dynamic, so that top plate 5 further compresses rubber bandage 2;The external port of the bleed valve 14 passes through screw thread and is socketed with sealing
Set 20, sealing shroud 20 facilitate the oil gas cached in discharge rubber caching box 15.
Working principle: the rubber caching box 15 of the utility model makes rubber for covering on 1 sidewall leakage position of tube body
The rubber bandage 2 of 15 two sides of glue caching box is encircled on tube body 1, and the threaded rod 13 with support plate 9 is then passed through square frame 7
On sliding sleeve 12, then make 7 frame of square frame in the outside of tube body 1, and make the support plate 9 of 13 end point of threaded rod logical
It crosses the absorption of magnetite 10 to contradict on 1 side wall of tube body, so that existing hanging rod 4 buckles into 2 end of rubber bandage in pairs on square frame 7
At the mouth hanging 19 that 3 side-walls of connecting cylinder open up, along 13 moving in rotation nut 11 of threaded rod, sliding sleeve 12 is contradicted, so that side
Shape frame 7 drives hanging rod 4 to tense connecting cylinder 3, so that rubber bandage 2 and rubber caching box 15 are tightly attached on 1 side wall of tube body, enhances rubber
The leakproofness in the space that glue caching box 15 is irised out on 1 side wall of tube body facilitates the oil gas leaked during repairing to be stored in time
In rubber caching box 15, while starting atmospheric pressure pole 17, so that atmospheric pressure pole 17 is by 16 compressing rubber caching box 15 of pressing plate, and
In compression process, the bleed valve 14 on 15 side wall of rubber caching box is opened, conveniently excretes the oil gas of caching, and connect with container
Firmly, it avoids wasting, and rubber caching box 15 is then tightly attached to 1 leak position of tube body by pressing plate 16, to realize that provisionally leak stopping is robbed
It repairs.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of Oil & Gas Storage gas pipeline pressure sealing repairing device, including tube body (1) and square frame (7), feature exists
In: fitting is provided with rubber caching box (15) on the outer wall of the tube body (1), and the both ends of the rubber caching box (15) join
There is rubber bandage (2) and rubber bandage (2) is around the outer wall for being bonded tube body (1), the end of the rubber bandage (2) is affixed
Having connecting cylinder (3), is offered mouth hanging (19) on connecting cylinder (3) side wall, the square frame (7) is looped around on the outside of tube body (1),
The lower end midpoint of the square frame (7) joins vertically to be had sliding sleeve (12), and sliding sleeve (12) the inboard, upright activity has inserted
Threaded rod (13), threaded rod (13) upper end is connected with support plate (9) and support plate (9) contradicts the institute on tube body (1) outer wall
The bottom side cross bar left and right ends for stating square frame (7) are connected with hanging rod (4) vertically and hanging rod (4) snaps onto connecting cylinder (3) side wall
On mouth hanging (19) in, on the threaded rod (13) by screw thread handover have nut (11) and nut (11) conflict in sliding sleeve (12)
On, cross bar center is connected with atmospheric pressure pole (17) vertically on the upside of the square frame (7) and the telescopic end of atmospheric pressure pole (17) is vertical
Downwards, the lower end of the atmospheric pressure pole (17) is connected with pressing plate (16) and pressing plate (16) is in the upside of rubber caching box (15), institute
It states and is provided with bleed valve (14) on the front-rear side walls of rubber caching box (15).
2. a kind of Oil & Gas Storage according to claim 1 gas pipeline pressure sealing repairing device, it is characterised in that: institute
State square frame (7) by upper and lower two U-frame bodies docking form and the docking point of square frame (7) be bolted block (8) activity
Handover.
3. a kind of Oil & Gas Storage according to claim 1 gas pipeline pressure sealing repairing device, it is characterised in that: institute
It states the fitting of support plate (9) upper surface and is connected with magnetite (10) and magnetite (10) adsorbs tube body (1) outer wall.
4. a kind of Oil & Gas Storage according to claim 1 gas pipeline pressure sealing repairing device, it is characterised in that: institute
It states to have to embrace ring (18) and embrace ring (18) movable end by articulate handover on the outer edge of mouth hanging (19) position and passes through bolt
Handover is on connecting cylinder (3).
5. a kind of Oil & Gas Storage according to claim 1 gas pipeline pressure sealing repairing device, it is characterised in that: institute
Stating has top bolt (6) by the handover of screw thread level on the side lever of square frame (7) left and right and pushes up bolt (6) in the end close to tube body (1)
Place is connected with top plate (5), and top plate (5) contradicts on rubber bandage (2).
6. a kind of Oil & Gas Storage according to claim 1 gas pipeline pressure sealing repairing device, it is characterised in that: institute
The external port for stating bleed valve (14) passes through screw thread and is socketed with sealing shroud (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920004348.6U CN209340725U (en) | 2019-01-03 | 2019-01-03 | A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920004348.6U CN209340725U (en) | 2019-01-03 | 2019-01-03 | A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209340725U true CN209340725U (en) | 2019-09-03 |
Family
ID=67760826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920004348.6U Expired - Fee Related CN209340725U (en) | 2019-01-03 | 2019-01-03 | A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209340725U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111120774A (en) * | 2020-01-15 | 2020-05-08 | 郑成新 | Natural gas line mending leakage device |
-
2019
- 2019-01-03 CN CN201920004348.6U patent/CN209340725U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111120774A (en) * | 2020-01-15 | 2020-05-08 | 郑成新 | Natural gas line mending leakage device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209340725U (en) | A kind of Oil & Gas Storage gas pipeline pressure sealing repairing device | |
CN207634848U (en) | A kind of natural gas transportation connection multi-stage sealed device of end surfaces | |
CN204587584U (en) | A kind of Novel chemical packing barrel | |
CN108414157A (en) | A kind of vacuum helium inspection equipment for detecting products air tightness | |
CN213084026U (en) | Heat preservation leak protection type cold chain foamed plastic packing carton | |
CN206580773U (en) | A kind of one-component silicone sealant continuous production device | |
CN202733319U (en) | Sealing device of the free end of channel | |
CN208140317U (en) | A kind of vacuum helium inspection equipment for testing product air-tightness | |
CN206801560U (en) | A kind of antipriming during hydrogeologic prospecting bailing test | |
CN207961901U (en) | Pipeline provided with pressure plugging device | |
CN202972370U (en) | Device for plugging leaking holes of pipeline for leakage stoppage | |
CN202388768U (en) | Lower sealer | |
CN214274909U (en) | Leaking stoppage repairing device for pressurized oil and gas gathering and transportation pipeline | |
CN109353605B (en) | Chemical industry liquid raw materials closing device in bags | |
CN208761191U (en) | A kind of kit for storing a variety of base fluids | |
CN207278900U (en) | A kind of high leakproofness and shut-off valve easy to repair | |
CN220032733U (en) | Biological medicine cold transport device | |
CN215102048U (en) | Packed tower for sewage treatment | |
CN210913354U (en) | Sealed storage device of loquat sugar | |
CN205956641U (en) | A ready -package blind plate for in liquid conveying equipment | |
CN111102428A (en) | Novel pipeline leaking stopper | |
CN204610854U (en) | A kind of dispensing valve and comprise its reactor | |
CN209725517U (en) | A kind of complex thin-wall precision aluminium-alloy structural member | |
CN221024567U (en) | Environment-friendly and energy-saving dry powder mortar split charging device | |
CN219770570U (en) | Composite bag based on medical instrument package |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20210103 |
|
CF01 | Termination of patent right due to non-payment of annual fee |