CN209339964U - A kind of hanging basket for shield tunnel forced centering - Google Patents

A kind of hanging basket for shield tunnel forced centering Download PDF

Info

Publication number
CN209339964U
CN209339964U CN201822078861.8U CN201822078861U CN209339964U CN 209339964 U CN209339964 U CN 209339964U CN 201822078861 U CN201822078861 U CN 201822078861U CN 209339964 U CN209339964 U CN 209339964U
Authority
CN
China
Prior art keywords
shield tunnel
strip hole
riser
hanging basket
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822078861.8U
Other languages
Chinese (zh)
Inventor
徐鑫
侯力
潘家奎
韩久春
李开星
边靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Province Traffic Navigational Matters Engineering Co Ltd
Original Assignee
Anhui Province Traffic Navigational Matters Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Province Traffic Navigational Matters Engineering Co Ltd filed Critical Anhui Province Traffic Navigational Matters Engineering Co Ltd
Priority to CN201822078861.8U priority Critical patent/CN209339964U/en
Application granted granted Critical
Publication of CN209339964U publication Critical patent/CN209339964U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to shield tunnel technical field, more particularly to a kind of hanging basket for shield tunnel forced centering, including constituting the fixed part detachably cooperated with the prefabricated bolt hole of shield tunnel on piece, the hanging basket further includes the instrument installation section for fixation measuring instrument, and the fixed part, instrument installation section are connected with each other.The beneficial effects of the utility model are: being equipped with prefabricated bolt hole on existing section of jurisdiction, laterally adjacent two panels section of jurisdiction is equipped with the prefabricated bolt hole of multiple groups, by installing segment bolt in the prefabricated bolt hole of multiple groups, laterally adjacent two panels section of jurisdiction is made to connect into an entirety;The hanging basket of the utility model includes fixed part and instrument installation section, fixed part directly constitutes detachable cooperation with the prefabricated bolt hole of shield tunnel on piece, the punching setting setscrew on section of jurisdiction is avoided, whether the measuring instrument of centering operation is fixed on instrument installation section for measuring shield machine.

Description

A kind of hanging basket for shield tunnel forced centering
Technical field
The utility model belongs to shield tunnel technical field, and in particular to a kind of hanging for shield tunnel forced centering Basket.
Background technique
In the prior art, it during tunneling shield is constructed, in order to guarantee the accuracy in shield going-forward direction, needs Measuring instrument is set in tunnel, the posture of shield machine is detected by measuring instrument, is adjusted in time by measurement structure The preceding line direction of shield machine.
Currently, measuring instrument is generally fixed on section of jurisdiction in order to not influence the safety for measuring and guaranteeing measuring instrument, lead to It crosses to drill on section of jurisdiction and setscrew is set, then weld one block of steel plate on screw and with fixation measuring instrument and keep measuring instrument The level of device.Using this kind of mode, labour's consumption is big, and when installation fee is inconvenient, and can cause to damage to section of jurisdiction.
Utility model content
To solve the above-mentioned problems, the purpose of the utility model is to provide a kind of hanging for shield tunnel forced centering Basket, the hanging basket complete the steady fixation of measuring instrument using prefabricated bolt hole on section of jurisdiction on the basis of not destroying tunnel segment structure.
The utility model provides the following technical solution:
A kind of hanging basket for shield tunnel forced centering, can including constituting with the prefabricated bolt hole of shield tunnel on piece The fixed part of cooperation is dismantled, the hanging basket further includes the instrument installation section for fixation measuring instrument, the fixed part, Instrument installation section is connected with each other.
Preferably, the fixed part includes the riser being connected with instrument installation section, and the riser top extends outwardly Bent plate compatible with duct pieces of shield tunnel crooked radian out, the bent plate are equipped with the prefabricated bolt with shield tunnel on piece Hole constitutes the installing port detachably cooperated.
Preferably, the instrument installation section includes bottom plate, and support plate, the support are extended in the bottom plate both ends upward Plate is connected with riser, and the bottom plate is equipped with the mounting hole for fixation measuring instrument.
Preferably, the riser is provided along its length the first strip hole, and the support plate is provided along its length With mutually matched second strip hole of the first strip hole, be equipped in first strip hole, the second strip hole jointly fastener and The relative movement for making riser, support plate that position can occur along the first strip hole direction by adjusting fastener.
Preferably, the riser is provided along its length the first strip hole, and the support plate positioned at bottom plate one end is along its length Spend direction be equipped with mutually matched second strip hole of the first strip hole, set in first strip hole, the second strip hole jointly The opposite shifting for having fastener and making riser, support plate that position can occur along the first strip hole direction by adjusting fastener Dynamic, the support plate positioned at the bottom plate other end is integrally formed part with riser.
Preferably, the bottom plate is equipped with reinforcing rib, and the support plate two sides, which are equipped with, reinforces floor.
The beneficial effects of the utility model are:
1, prefabricated bolt hole is equipped on existing section of jurisdiction, laterally adjacent two panels section of jurisdiction is equipped with the prefabricated bolt of multiple groups Hole makes laterally adjacent two panels section of jurisdiction connect into an entirety by installing segment bolt in the prefabricated bolt hole of multiple groups;This reality Include fixed part and instrument installation section with novel hanging basket, fixed part directly with the prefabricated bolt of shield tunnel on piece Hole constitutes detachable cooperation, avoid the punching setting setscrew on section of jurisdiction, for measure shield machine whether centering operation Measuring instrument is fixed on instrument installation section.
2, fixed part includes riser, and riser is equipped with bent plate compatible with section of jurisdiction crooked radian, and bent plate is equipped with peace Mouth is filled, fastener (generally bolt) passes through installing port, prefabricated bolt hole links together riser and section of jurisdiction, and it is simple, effective, It is not broken to change section of jurisdiction original structure.
3, riser is equipped with the first strip hole, and support plate is equipped with the second strip hole, in the first strip hole, the second strip hole The common phase for making riser, support plate that position can occur along the first strip hole direction equipped with fastener and by adjusting fastener To movement, Field Force can according to the actual use situation of measuring instrument, by adjusting the relative position of riser, support plate, And then adjust the height of measuring instrument on bottom plate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that hanging basket is fixed on shield tunnel on piece;
Fig. 2 is the corresponding barrel structure schematic diagram of embodiment 4;
Fig. 3 is the corresponding barrel structure schematic diagram of embodiment 5;
Fig. 4 is the front view of riser and bent plate;
Fig. 5 is the front view of support plate.
Attached meaning marked in the figure is as follows:
The section of jurisdiction 10- 20- fixed part 21- riser 211- the first strip hole 22- bent plate 23- installing port 30- instrument Installation section 31- bottom plate 32- support plate the second strip hole of 321- 33- mounting hole 34- reinforcing rib 34- reinforces floor
Specific embodiment
The utility model is illustrated combined with specific embodiments below.
Embodiment 1
A kind of hanging basket for shield tunnel forced centering, including being constituted with the prefabricated bolt hole on duct pieces of shield tunnel 10 The fixed part 20 detachably cooperated, the hanging basket further includes the instrument installation section 30 for fixation measuring instrument, described solid Determine part 20, instrument installation section 20 is connected with each other.
Embodiment 2
On the basis of embodiment 1, the fixed part 20 includes the riser 21 being connected with instrument installation section 30, described 21 top of riser extends outwardly out bent plate 22 compatible with 10 crooked radian of duct pieces of shield tunnel, the bent plate 22 be equipped with Prefabricated bolt hole on duct pieces of shield tunnel 10 constitutes the installing port 23 detachably cooperated.
Embodiment 3
On the basis of embodiment 2, the instrument installation section 30 includes bottom plate 31, and 31 both ends of bottom plate extend upward Support plate 32 out, the support plate 32 are connected with riser 21, and the bottom plate 31 is equipped with the mounting hole for fixation measuring instrument 33。
Embodiment 4
On the basis of embodiment 2, the riser 21 is provided along its length the first strip hole 211, the support plate 32 are provided along its length and mutually matched second strip hole 321 of the first strip hole 211, first strip hole 211, It is equipped with fastener 40 jointly in two strip holes 321 and makes riser 21, support plate 32 can be along first by adjusting fastener 40 The relative movement of 211 direction of strip hole generation position.
The fastener of the present embodiment is preferably bolt.
Embodiment 5
On the basis of embodiment 2, the riser 21 is provided along its length the first strip hole 211, is located at bottom plate 31 The support plate 32 of one end be provided along its length with mutually matched second strip hole 321 of the first strip hole 211, described first It is equipped with fastener 40 jointly in strip hole 211, the second strip hole 321 and makes riser 21, support plate by adjusting fastener 40 32 can occur the relative movement of position along 211 direction of the first strip hole, positioned at the support plate 32 and riser of 31 other end of bottom plate 21 are integrally formed part.
The fastener of the present embodiment is preferably bolt.
Embodiment 6
On the basis of embodiment 4 or 5, the bottom plate 31 is equipped with reinforcing rib 34, and 21 two sides of support plate, which are equipped with, to be added Gu floor 35.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, although ginseng The utility model is described in detail according to previous embodiment, it for those skilled in the art, still can be with It modifies the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.It is all Within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in practical Within novel protection scope.

Claims (6)

1. a kind of hanging basket for shield tunnel forced centering, which is characterized in that including with it is pre- on duct pieces of shield tunnel (10) Bolt hole processed constitutes the fixed part (20) detachably cooperated, and the hanging basket further includes the instrument installation for fixation measuring instrument Partially (30), the fixed part (20), instrument installation section (30) are connected with each other.
2. a kind of hanging basket for shield tunnel forced centering according to claim 1, which is characterized in that the fixed part Dividing (20) includes the riser (21) being connected with instrument installation section (30), and riser (21) top extends outwardly out and shield tunnel The compatible bent plate (22) of road section of jurisdiction (10) crooked radian, the bent plate (22) be equipped with it is pre- on duct pieces of shield tunnel (10) Bolt hole processed constitutes the installing port (23) detachably cooperated.
3. a kind of hanging basket for shield tunnel forced centering according to claim 2, which is characterized in that the instrument peace Dress part (30) include bottom plate (31), bottom plate (31) both ends are extended support plate (32) upward, the support plate (32) with Riser (21) is connected, and the bottom plate (31) is equipped with the mounting hole (33) for fixation measuring instrument.
4. a kind of hanging basket for shield tunnel forced centering according to claim 3, which is characterized in that the riser (21) it is provided along its length the first strip hole (211), the support plate (32) is provided along its length and the first strip Mutually matched second strip hole (321) in hole (211), first strip hole (211) are set jointly in the second strip hole (321) There is fastener (40) and makes riser (21), support plate (32) can be along the first strip hole (211) by adjusting fastener (40) The relative movement of direction generation position.
5. a kind of hanging basket for shield tunnel forced centering according to claim 3, which is characterized in that the riser (21) the first strip hole (211) are provided along its length, are located at the support plate (32) of bottom plate (31) one end along its length Equipped with mutually matched second strip hole (321) of the first strip hole (211), first strip hole (211), the second strip hole (321) fastener (40) are equipped in jointly and make riser (21), support plate (32) can be along the by adjusting fastener (40) The relative movement of position occurs for one strip hole (211) direction, is located at the support plate (32) and riser (21) of bottom plate (31) other end It is integrally formed part.
6. a kind of hanging basket for shield tunnel forced centering according to claim 4 or 5, which is characterized in that the bottom Plate (31) is equipped with reinforcing rib (34), and support plate (32) two sides, which are equipped with, reinforces floor (35).
CN201822078861.8U 2018-12-12 2018-12-12 A kind of hanging basket for shield tunnel forced centering Expired - Fee Related CN209339964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822078861.8U CN209339964U (en) 2018-12-12 2018-12-12 A kind of hanging basket for shield tunnel forced centering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822078861.8U CN209339964U (en) 2018-12-12 2018-12-12 A kind of hanging basket for shield tunnel forced centering

Publications (1)

Publication Number Publication Date
CN209339964U true CN209339964U (en) 2019-09-03

Family

ID=67756675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822078861.8U Expired - Fee Related CN209339964U (en) 2018-12-12 2018-12-12 A kind of hanging basket for shield tunnel forced centering

Country Status (1)

Country Link
CN (1) CN209339964U (en)

Similar Documents

Publication Publication Date Title
CN205919827U (en) Intelligent surveying instrument
CN209339964U (en) A kind of hanging basket for shield tunnel forced centering
CN206803994U (en) A kind of laser range finder of mapping
CN205032612U (en) Bar straightener's meter rice ware
CN204286407U (en) A kind of profile tolerance pick-up unit for turbine blade
CN108896266A (en) A kind of method for arranging of balance measurement route
CN206479183U (en) Shield measures hanging basket
CN208765712U (en) A kind of horizontal ruler
CN207487675U (en) A kind of total station prism connector
CN208187332U (en) A kind of large scale structure deflection test device
CN209141128U (en) Bracket is used in a kind of binding of prefabricated small box girder reinforcing bar
CN209528057U (en) Balanced adjustment formula shoes support
CN207211722U (en) A kind of wall form system with back cord
CN207472185U (en) A kind of roadway surrounding rock displacement direction measuring device
CN204535589U (en) A kind of chi hook structure of tape measure
CN206426016U (en) A kind of embroidery machine positioning tool
CN206051933U (en) A kind of coke oven SCP all-in-ones track installation alignment device
CN206581088U (en) A kind of movable rail supporting arrangement of multi-state
CN216477361U (en) Model test device for measuring shield tunnel segment floating amount
CN208845188U (en) Assembled grid tunnel double-lining bar reinforcement positioning device
CN209370793U (en) A kind of database computing device of the geotechnical engineering improvement convenient for fixation
CN109869092A (en) Angle adjustable foot pedal
CN204036422U (en) The assembled frock of marking time in column crane mast section
CN207526084U (en) A kind of civil engineering hanger
CN207317703U (en) A kind of circuit boring depth measurement device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903

Termination date: 20201212