CN209339523U - Subsided rest room floor panel structure - Google Patents

Subsided rest room floor panel structure Download PDF

Info

Publication number
CN209339523U
CN209339523U CN201822118939.4U CN201822118939U CN209339523U CN 209339523 U CN209339523 U CN 209339523U CN 201822118939 U CN201822118939 U CN 201822118939U CN 209339523 U CN209339523 U CN 209339523U
Authority
CN
China
Prior art keywords
standpipe
screw rod
support
rest room
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822118939.4U
Other languages
Chinese (zh)
Inventor
汤华杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING MINGHUA JIEXIN EXPORT AND IMPORT TRADE Co Ltd
Original Assignee
BEIJING MINGHUA JIEXIN EXPORT AND IMPORT TRADE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING MINGHUA JIEXIN EXPORT AND IMPORT TRADE Co Ltd filed Critical BEIJING MINGHUA JIEXIN EXPORT AND IMPORT TRADE Co Ltd
Priority to CN201822118939.4U priority Critical patent/CN209339523U/en
Application granted granted Critical
Publication of CN209339523U publication Critical patent/CN209339523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of subsided rest room floor panel structure, comprising: how many adjustable trestle, the lower part of each adjustable trestle are fixed on the toilet structure sheaf with draining gradient;And multiple floor boards, by bearing height of the upper support of each adjustable trestle above toilet structure sheaf, so that each floor board is contour and horizontal and limits caisson space;Wherein, each adjustable trestle includes: pedestal, the standpipe upwardly extended by pedestal;Cooperate with standpipe threaded upper ends and screws in the screw rod in standpipe from standpipe upper end;The top plate carried by screw rod upper end, is used to support floor board;And the nut by screw rod relative to standpipe upper end locking;Wherein, it is configured to relatively rotate and adjust the bearing height between the screw rod and standpipe.The subsided rest room floor panel structure of the application is easy to construct and accurate leveling.

Description

Subsided rest room floor panel structure
Technical field
This application involves a kind of subsided rest room floor panel structures, wherein supporting bathroom floor using adjustable trestle.
Background technique
Subsided rest room becomes more and more popular in building at home.It is built as shown in Figure 1, subsided rest room refers in main body When toilet structure sheaf A formed into caisson relative to corresponding flooring B sinking certain altitude, bathroom floor C makes somebody a mere figurehead in toilet Above structure sheaf A.Drainage conduit of toilet D accesses main drainage pipeline E in caisson.In this way, when repairing drainage pipeline, it is not necessary to It is operated in other to lower layer, avoids interfering other people.
Caisson space F between toilet structure sheaf A and bathroom floor C is usually backfilled with light material.However, backfill Material may cause to damage to pipeline, so backfilling material often uses circular granular.In addition, backfill after backfilling material may under It falls into, it is therefore necessary to reinforce bathroom floor C.Steel mesh is usually added in the concrete structure of bathroom floor C.In addition, hygienic Between the formation of floor C belong to live wet construction, long period and not environmentally.In addition, in use, if you need to repair, it is necessary to Plane opens bathroom floor C and backfilling material, takes a lot of work laborious and is easy to injure pipeline.
The method of another kind building bathroom floor C is support column or wall stand to be erect on toilet structure sheaf A, then Block-shaped floor plate is laid on support column or wall stand.In the prior art, support column or wall stand are usually to have regular length Material block, such as the brick of superposition.Since the ground of toilet structure sheaf A is not usually contour everywhere, such as with certain Gradient is in favor of secondary drainage, it is therefore desirable to the bearing height of support column or wall stand is adjusted with modes such as sawing, addition cushion block pieces, So that each support column or wall stand have roughly equal bearing height.This operation is very troublesome.Also, this support is high Degree adjusts and still falls within coarse adjustment, cannot achieve the accurate adjustment of bearing height.
Utility model content
The application is intended to provide a kind of subsided rest room floor panel structure, can be avoided existing subsided rest room and exists Aforesaid drawbacks.
For this purpose, the application provides a kind of subsided rest room floor panel structure in terms of one comprising: it is how many adjustable Formula bracket, the lower part of each adjustable trestle are fixed on the toilet structure sheaf with draining gradient;And multiple floor panels Material, by bearing height of the upper support of each adjustable trestle above toilet structure sheaf, so that each floor board is contour And it is horizontal and limit caisson space;Wherein, each adjustable trestle includes: pedestal, the standpipe upwardly extended by pedestal; Cooperate with standpipe threaded upper ends and screws in the screw rod in standpipe from standpipe upper end;The top plate carried by screw rod upper end, for branch Support floor board;And the nut by screw rod relative to standpipe upper end locking;Wherein, it is configured between the screw rod and standpipe It relatively rotates and adjusts the bearing height.
Optionally, the top plate of each adjustable trestle is fixed on the upper end of the screw rod, the top plate by with support Billot is fixedly connected, and corresponding floor board is supported on the support billot.
Optionally, the upper end of the screw rod of each adjustable trestle be equipped with protrusion or it is recessed screw portion, it is described to screw Portion is configured to be suitable for being driven the screw rod to rotate by tool drives from top;And the top plate is fixed on stop sleeve, The stop sleeve and the screw flight cooperate;Or the top plate is fixed on stop sleeve, the stop sleeve is set in It non-threaded axle portion on the screw rod and is supported by the shoulder on the screw rod.
Optionally, the top plate of each adjustable trestle is suitable for supporting the corner of more than one floor board, each floor Plate forms chamfering by the corner of the top plate supporting, forms space between each chamfering, institute is received in fill block in space.
Optionally, the standpipe of each adjustable trestle is riveted on the pedestal in lower end, and the standpipe is opposite It can be rotated in the pedestal.
Optionally, the cooperation between the lower end and pedestal of the standpipe of each adjustable trestle in standpipe so that be screwed To overcome the range of 0~10 N of rice could be selected from relative to base rotation, the turning torque after a turning torque.
Optionally, another screw rod of each adjustable trestle and lower riser end are threadedly engaged and screw in from lower riser end vertical The pedestal is fixed in Guan Zhong, the lower end of another screw rod, and another screw rod is by another nut check in lower riser end.
Optionally, at least a pair of of clamping plane is formed on the periphery of the standpipe of each adjustable trestle.
Optionally, the floor board adjacent with toilet wall its with the close position of toilet wall by adjustable branch Frame support or the additional support element by being fixed on toilet wall support, with it position separate with toilet wall by Adjustable trestle support.
Optionally, the subsided rest room floor panel structure further include be attached to dicoration above floor board and/or Functional surface layer.
According to the application, bathroom floor plate, energy are supported using adjustable trestle in subsided rest room floor panel structure Enough by the bearing height of the adjusting adjusting bracket of bracket itself, to easily and quickly realize the smooth of each plate surface Degree, improves speed of application.The subsided rest room floor panel structure of the application will not damage pipeline, use for a long time will not under It falls into.Also, the building of the subsided rest room floor panel structure of the application belongs to dry construction, short construction period, pollution-free.This Outside, in use, if you need to repair, it is only necessary to which prying open one or a few floor board can be operated, therefore easy to operate and will not hurt And pipeline.
Detailed description of the invention
Fig. 1 is the schematic diagram of subsided rest room.
Fig. 2 is the schematic diagram according to the subsided rest room of the application building.
Fig. 3, Fig. 4 are a kind of adjustable trestle that can be used in the subsided rest room floor panel structure of the application respectively Cross-sectional view and front view.
Fig. 5, Fig. 6 are the preliminary and accurate schematic diagram for adjusting operation of the height of the adjustable trestle in Fig. 3, Fig. 4 respectively.
Fig. 7 is the schematic plan of operation when constructing subsided rest room using the adjustable trestle in Fig. 3, Fig. 4.
Fig. 8 is the schematic cross sectional views that fill block is inserted in space between floor board corner.
Fig. 9 is the schematic cross sectional views that surface layer is added on floor board.
Figure 10-Figure 13 is the adjustable branch of other examples that can be used in the subsided rest room floor panel structure of the application The diagram of frame.
Figure 14, Figure 15 are the diagrams of operation when constructing subsided rest room using the adjustable trestle in Figure 11.
Figure 16 is the schematic diagram of the subsided rest room constructed using various forms of adjustable trestles of the application.
Specific embodiment
Some embodiments possibles of the application are described with reference to the accompanying drawings.It may be noted that each figure is not necessarily drawn to scale 's.Certain details may be enlarged clearly to show, be omitted there are also some inessential details shown.
Present invention relates generally to a kind of subsided rest room floor panel structures, wherein easily being constructed using adjustable trestle Subsided rest room out.
According to the subsided rest room of the application it is shown in fig. 2, wherein, in the toilet knot to sink relative to flooring B On structure layer A, adjustable trestle 100 is installed at predetermined intervals, is then mated formation on adjustable trestle 100 suitable for the pre- of toilet The floor panels of the materials such as floor board 200, such as ceramics, composite material, plastics, anticorrosive wood processed are fast.Floor board 200 can be with It is multilayer, the different function of every layer of tool, for example, outer layer provides water-fast function, internal layer provides structural strength, damping sound insulation function Deng, and can have and the upper decorative layer of aesthetic appearance is provided.The application is constructed by adjustable trestle 100 and floor board 200 Subsided rest room floor panel structure.Bathroom floor C is constructed in each combination of floor board 200.Each floor board 200 is in block Shape, outer contour shape can be square, rectangle, hexagon, triangle etc., as long as can pass through split muti-piece floor panel Material 200 and form complete bathroom floor C.
For floor board 200 not adjacent with toilet wall G, each corner is supported by adjustable trestle 100. For the floor board 200 adjacent with toilet wall G in Fig. 2, the edge adjacent with toilet wall G (or angle Portion) it can be (or other by the supporting block being spaced apart being fixed on toilet wall G or the support billot 300 being extended continuously The support component of form) support, the corner adjacent with toilet wall G is not supported by adjustable trestle 100.
Bathroom floor C limits caisson space F, and filling backfilling material is not needed in the F of caisson space, thus toilet is arranged The part that waterpipe D and main drainage pipeline E is located in the F of caisson space will not be done as the prior art by backfilling material It disturbs.
After each floor board 200 paves, also one or more faces may be laid with or installed on each floor board 200 Layer 210, such as cosmetic finish and/or functional surface layer.Sexual function surface layer as an example, upper part or lower part have The groove of predetermined distribution, for arranging functional materials or the devices such as steam heating pipe, electric wiring in a groove.
It may be noted that being usually required before installing each adjustable trestle 100, on the ground of toilet structure sheaf A preparatory Processing, such as with certain gradient to realize secondary drainage, and may need to do waterproof to toilet structure sheaf A Processing.After pre-processing, each position height in ground of toilet structure sheaf A is not identical, and therefore, it is necessary to bases can Bearing height (the ground that adjustable trestle 100 supports of the height adjustment adjustable trestle 100 of the specific location of mode bracket 100 The distance between the ground of the lower surface of plate plate and toilet structure sheaf A) so that each adjustable trestle 100 is by each floor panel Material 200 is supported on isometry position.For this purpose, the adjustable trestle 100 of the application, which is configured to itself, has adjustable bearing height. Adjustable trestle can be provided with plurality of specifications, and each specification has corresponding adjustable bearing height range.Being described below can Some feasible configurations of mode bracket 100.
Firstly, as shown in Figure 3, Figure 4, a kind of embodiments possible of adjustable trestle 100 specifically includes that pedestal 1;Standpipe 2, lower end is riveted on pedestal 1 and has an ability around the center axis thereof relative to pedestal 1, in 2 upper end of standpipe It is formed with internal screw thread;Screw rod 3 has along the whole or the overwhelming majority of height (i.e. length) and is suitable for nibbling with the internal screw thread of standpipe 2 The external screw thread of conjunction enables screw rod 3 to screw in standpipe 2 from 2 upper end of standpipe, and by opposite between screw rod 3 and standpipe 2 The height that rotation adjusting screw rod 3 exposes from standpipe 2;Nut 4 has elastic washer, is screwed together in screw rod 3, vertical for abutting against 2 upper end of pipe screws and locks screw rod 3 relative to standpipe 2;Stop sleeve 5 is screwed together in screw rod 3 above nut 4, passes through branch Support set cylinder 5 is rotated relative to screw rod 3, axial position (i.e. height) of the adjustable support sleeve 5 on screw rod 3;Support plate 6, It is supported by stop sleeve 5 and is fixed on stop sleeve 5;Nut 7 has elastic washer and plain washer, is screwed together in screw rod 3, uses It is axially locked between nut 7 and stop sleeve 5 in by support plate 6, and stop sleeve 5 is fixed on screw rod 3.
Pedestal 1 is suppressed by metal sheet, suitable for passing through adhesive or fastener or being mounted on toilet structure sheaf A's On ground, can have various is suitable for the shape for supporting and arranging on the ground of toilet structure sheaf A, such as round, rectangular, Polygon etc..Pedestal 1 is swelled at middle part and is riveted with 2 lower end of standpipe.
In order to avoid damage to the waterproof of toilet structure sheaf A as far as possible, adhesive mounting seat 1 can be used.
It when conditions permit, can be around riveting in pedestal 1 it is also contemplated that using fastener mounting seat 1 Position is formed with several mounting holes.Mounting hole can have different sizes, for different size cement nail/expansion bolt/ The fasteners such as screw are connected with the ground of toilet structure sheaf A.
Standpipe 2 can process (including extrusion process) by metal pipe material and form.Standpipe 2 may include multiple diameter change portions Position, this can be realized by squeezing.The lower part of standpipe 2 or other positions are pressed to form circumferentially distributed at least one in periphery The clamping plane 21 opposite to position each other.Operator (or can simply use hand in clamping plane 21 with tool cards such as spanners Catch clamping plane 21) on standpipe 2 to be rotated relative to pedestal 1.
It is matched between standpipe 2 and pedestal 1 at riveting position, which allows mutually to turn between standpipe 2 and pedestal 1 It is dynamic.To rotate standpipe 2 relative to pedestal 1, need to screw standpipe 2 to overcome a turning torque.The size of the turning torque Can the factors such as specification, application based on adjustable trestle 100 and select.For example, the turning torque can be in 0-10 ox rice Between, preferably between 0-5 ox rice.
The main part of screw rod 3 is formed with external screw thread, and is formed on main part upper end for tool cards such as spanners That holds outstanding screws portion 31, such as four angle heads, turret head etc..Operator can be stuck in the portion of screwing 31 with by screw rod with spanner 3 rotate relative to standpipe 2.It can be by the recessed of the tools such as plug-type spanner insertion alternatively, can be formed in main part upper end What is entered screws portion, such as four chamfered grooves, hex slot, flat recess etc..Plug-type spanner can be inserted by operator screw in portion to incite somebody to action Screw rod 3 is rotated relative to standpipe 2.
Stop sleeve 5 includes flat support lugn and the canister portion by upwardly extending in the middle part of support lugn.It is formed in canister portion There is internal screw thread, for engaging with the external screw thread of screw rod 3.Screw hole can be formed in support lugn, for passing through spiral shell using screw Support lugn is tightened together (and/or utilizing adhesive) by nail hole with support plate 6.
Support plate 6 is wooden/metal/resin/other materials plate body with certain thickness and length and width (radial direction) size, in Portion is formed with aperture to be sleeved in the canister portion of stop sleeve 5, and support plate 6 is supported flange support.Support plate 6 Outer contour shape can be circle, square, hexagon etc..The upper surface of support plate 6 is suitable for support floor board 200.
As a kind of alternative couplings between stop sleeve 5 and support plate 6, stop sleeve 5 can be directly embedded in It is fixed in support plate 6, or is secured the two together using the fit structure between stop sleeve 5 and support plate 6, without Screw must be used.
When constructing subsided rest room, Fig. 3, adjustable trestle shown in Fig. 4 100 can be installed as follows.Firstly, will respectively may be used Mode bracket 100 is fixed on the ground of toilet structure sheaf A at pedestal 1.Then utilize nut 4 by screw rod 3 relative to vertical Pipe 2 is locked.
Then if it is necessary, pinning support plate 6, be stuck in clamping plane 21 by spanner (or it is flat with hand grasping clamping Face 21) standpipe 2 to be rotated with screw rod 3 relative to pedestal 1, quickly to adjust stop sleeve 5 and support plate 6 and standpipe 2 Between axial distance, thus realize by the bearing height of adjustable trestle 100 quickly adjusts arrive predetermined value.As shown in Figure 5.
Next, can be in 6 upper berth installed floor plate 200 of support plate.Mat formation in whole or a certain number of floor boards 200 After good, the surface smoothness of the floor board 200 paved is integrally measured.If it is necessary, can be by utilizing spanner in protrusion It screws and screws screw rod 3 relative to stop sleeve 5 and support plate 6 at portion 31 (or recessed screw portion 31), precisely to adjust Axial distance between stop sleeve 5 and support plate 6 and standpipe 2, as shown in fig. 6, to realize adjustable trestle 100 Bearing height precisely adjust to need/horizontal fine height.Then, support plate 6 is locked relative to screw rod 3 using nut 7 Tightly.
In order to concede adjustable trestle 100 screw rod 3 upper end, the corner of floor board 200 is processed chamfering, thus Space 201 is generated between the corner for being laid with each floor board 200.For the floor board 200 adjacent with toilet wall G It says, they are not required to process chamfering with the corner of toilet wall G arranged adjacent.
As being shown schematically in Fig. 7, each adjustable trestle 100 is distributed on the ground of toilet structure sheaf A in matrix. For the floor board 200 adjacent with toilet wall G, the edge adjacent with toilet wall G (or corner) can be by The support billot 300 being fixed on toilet wall G supports, not to the adjacent edge toilet wall G by corresponding adjustable branch The support plate 6 of frame 100 supports.For floor board 200 not adjacent with toilet wall G, each corner is respectively by can The support plate 6 of mode bracket 100 supports.The upper surface of the upper surface and each support plate 6 that support billot 300 is contour, and all horizontal.
In this way, floor board 200 is all paved in entire toilet.Later, as shown in figure 8, in floor panel Fill block 202 is inserted in space 201 between 200 corner of material, to close the space 201.
Then, if it is necessary, then as shown in figure 9, being laid with or installing surface layer 210 on the floor board 200 paved (not required under all situations), such as cosmetic finish and/or functional surface layer.If necessary in bathroom floor structure Arrange functional materials or the devices such as steam heating pipe, electric wiring, then functional surface layer top or lower part open up or formed predetermined point The groove (not shown) of cloth, these functional materials or device can be arranged in a groove.Surface layer above floor board 200 In the case where being disposed with steam heating pipe in 210, since steam heating pipe is closer apart from bathroom floor surface, it can provide preferably Radiating efficiency.
After surface layer 210 is laid or installs, just constructed overhead bathroom floor C.If you do not need to surface layer 210, then it is paved and accurate adjustment and after inserting fill block 202 in whole floor boards 200, it is just constructed aerial Bathroom floor C.After bathroom floor C is constructed, water-proofing treatment can be carried out to it.
The adjustable trestle 100 of the application can have other structures.For example, in the example shown in Fig. 10, Ke Yi 31 upper end of main part of screw rod 3 is formed relative to reducing the diameter with externally threaded main part and not threaded tube reducing axle portion 32, not tapped stop sleeve 5, which is set in, to be generated in tube reducing axle portion 32 and between tube reducing axle portion 32 and main part Shoulder support.32 upper end of tube reducing axle portion is formed with relative to its swedged threaded portion 33, for engaging with nut 7.Screw thread Portion 33 can form protrusion above or recessed screw portion 31.In the other aspects and Fig. 3, Fig. 4 of adjustable trestle 100 in Figure 10 It is same or similar, be not discussed herein.
For adjustable trestle 100 shown in Fig. 10, when constructing subsided rest room, first by adjustable trestle 100 It is installed on the ground of toilet structure sheaf A.It is then possible to pass through 21 rotational stem 2 of clamping part of standpipe 2 or pass through screw rod 3 The portion 31 that screws rotate screw rod 3 to realize the preliminary adjusting of the bearing height of adjustable trestle 100.Later, locking nut 4, and And floor board of mating formation.After floor board of having mated formation, if you need to the flatness of accurate adjustment floor board, it can be realized by the portion of screwing 31 Accurate adjustment.It may be noted that if it is necessary, if the adjustable trestle 100 is not yet all surrounded by floor board, it can also be from can The not yet besieged side of mode bracket 100 protrudes into spanner and carries out accurate adjustment;Even if it is necessary, even if the adjustable trestle 100 are all surrounded by floor board 200, can also raise floorboard plate, then protrude into spanner and carry out accurate adjustment.
Figure 11 illustrates another embodiments possible of adjustable trestle 100, wherein in the upper end of screw rod 3, riveting is big Cause flat support plate (top plate) 8.Support plate 8 can be metalwork.In the assembled state, support plate 8 is perpendicular to adjustable trestle 100 central axis.The upper surface of support plate 8 is suitable for installation support billot 220.Screw hole can be formed in support plate 8, for benefit Billot 220 will be supported to be fastened in support plate 8 (and/or utilizing adhesive) with screw.Adjustable trestle 100 in Figure 11 Other aspects with it is same or similar in Fig. 3, Fig. 4, be not discussed herein.
Figure 12 illustrates another embodiments possible of adjustable trestle 100, wherein rivets angle in the upper end of screw rod 3 Shape support plate 9 (top plate).Angular supporting plate 9 can be metalwork, have and be mutually perpendicular to lateral part 91 and longitudinal portion 92.? Under assembled state, central axis of the lateral part 91 perpendicular to adjustable trestle 100.The upper surface and longitudinal direction portion of lateral part 91 Points 92 inner surface be suitable for being supported respectively billot 220 bottom surface and a side against.For this purpose, lateral part 91 and longitudinal direction portion Screw hole can be formed in points 92, for that billot 220 will be supported to be fastened on angular supporting plate 9 (and/or using viscous using screw Mixture).The other aspects of adjustable trestle 100 in Figure 12 with it is same or similar in Fig. 3, Fig. 4, be not discussed herein.
Figure 13 illustrates another embodiments possible of adjustable trestle 100, mainly includes pedestal 101;First screw rod 102, lower end is fixed on pedestal 101;Support plate 8 is similar in Figure 12 similar in Figure 11 or angular supporting plate 9 's;Support plate 8 (or angular supporting plate 9) is fixed in second screw rod 103, the upper end;Standpipe 104, with lower end internal screw thread and Upper end internal screw thread, the upper portion of the first screw rod 102 screw in standpipe 104 and engage with its lower end internal screw thread, the second screw rod 103 lower portion screws in standpipe 104 and engages with the upper end internal screw thread.The external screw thread and standpipe of first screw rod 102 The rotation direction of 104 lower end internal screw thread and the external screw thread of the second screw rod 103 and the upper end internal screw thread of standpipe 104 it is oppositely oriented.The One nut 105, the second nut 106 are respectively used to the first screw rod 102 and the second screw rod 103 locking onto standpipe 104.
104 periphery of standpipe is formed at least a pair of opposite clamping plane 21 in position each other.Operator can use the works such as spanner Tool be stuck on clamping plane 21 (or simply holding clamping plane 21) with by standpipe 104 relative to pedestal 101 and branch Fagging 8 (or angular supporting plate 9) rotation, that is, may make support plate 8 (or angular supporting plate 9) to move up and down, to adjust adjustable The bearing height of formula bracket 100.
The operation of subsided rest room is constructed using the adjustable trestle 100 in Figure 11 referring to Figure 14, Figure 15 introduction.
Firstly, according to the spacer support frame of design, the support plate 8 of each adjustable trestle 100 screw (and/or is utilized Adhesive) it is fastened on a support billot 220, afterwards turning over will be at pedestal 1 with screw (and/or utilizing adhesive) It is fixed on the ground of toilet structure sheaf A.Be stuck in clamping plane 21 by spanner (or grasping clamping plane 21 with hand) with Standpipe 2 is rotated relative to pedestal 1, so as to quick and accurately support billot 220 levelness and each support billot Consistent levelness between 220.More support billots 220 are distributed in toilet structure with scheduled distribution pattern as a result, Layer A is above the ground.Alternatively, can also the installation along the position of each row distribution first on the ground of toilet structure sheaf A it is each Then adjustable trestle 100 adjusts the bearing height of each adjustable trestle 100, so that the support plate 8 of each adjustable trestle 100 Substantially contour.Then, corresponding support billot 220 is installed on the adjustable trestle 100 of every row.In this way, also can be by more branch Stay material 220 is distributed in toilet structure sheaf A above the ground with scheduled distribution pattern.
Later, in each 220 upper berth installed floor plate 200 (usually not chamfering) of support billot.It may be noted that if any must Want, can also on toilet wall G fixed support block or support billot 300, to support the ground adjacent with toilet wall G 200 edge of plate plate.Certainly, if it is possible to, can also close to toilet wall G installation adjustable trestle 100 and support billot 220 Not have to the support component that supporting block or support billot 300 etc. are fixed on toilet wall G, and all floor boards 200 are all It is supported by support billot 220 and corresponding adjustable trestle 100.
After paving whole or a certain number of floor boards, the flatness and if necessary between floor board is measured Accurate adjustment (unclamping nut 4, recycle the clamping plane 21 on its standpipe 2) is carried out to some or certain support billots 220, is realized each The leveling of floor board and then tightening nut 4.About accurate adjustment, it should be pointed out that, if the adjustable trestle 100 is not yet by ground Plate plate 200 all surrounds, then can protrude into spanner from the not yet besieged side of adjustable trestle 100 and carry out accurate adjustment;If should Adjustable trestle 100 is all surrounded by floor board 200, then can raise floorboard plate 200, then protrude into spanner into Row accurate adjustment.When standpipe 2 is rotated, screw rod 3 and the support plate 6 being fixed thereon holding are not rotated, to will not influence The position all around for the floor board 200 mated formation.
After whole floor boards 200 are all paved, if it is necessary, can be laid on these floor boards 200 or Surface layer 210 is installed.After surface layer 210 is laid or installs, just constructed overhead bathroom floor C.If you do not need to Surface layer 210, then paved in whole floor boards 200 and after accurate adjustment, just constructed overhead bathroom floor C.Constructed bathroom floor C needs to do water-proofing treatment.
Using in Figure 12 adjustable trestle 100 construct subsided rest room operation with utilization Figure 11 in it is adjustable Bracket 100 constructs the operation of subsided rest room similar to (it is solid in its bottom surface and a side that difference essentially consists in support billot 220 Due to angular supporting plate 9), therefore no longer describe.
Using in Figure 13 adjustable trestle 100 construct subsided rest room operation with utilization Figure 11 in it is adjustable Bracket 100 constructs the operation of subsided rest room similar to (difference is essentially consisted in through standpipe 104 relative to 102 He of the first screw rod Second screw rod 103 rotates to adjust bearing height), therefore no longer describe.
The adjustable trestle 100 in the portion that screws is had (such as shown in Fig. 2, Fig. 3 referring to the upper end for introducing the application Figure 16 Adjustable trestle 100 or adjustable trestle 100 shown in Fig. 10) with upper end be equipped with support plate 8 or 9 adjustable trestle 100 (such as adjustable trestles 100 shown in Figure 11-Figure 13) are combined a kind of embodiment of building subsided rest room.Its In, for the floor board 200 adjacent with toilet wall G, close edge (containing corner) is by upper with toilet wall G End be equipped with support plate 8 or 9 adjustable trestle 100 support (support in support plate support billot 220, floor board 200 with Mat formation on support billot 220 at toilet wall G adjacent edge), the corner adjacent with toilet wall G is not had by upper end The adjustable trestle 100 for screwing portion supports.For floor board 200 not adjacent with toilet wall G, whole corners are by upper Adjustable trestle 100 of the end with the portion that screws supports.
The mode that is applied in combination of various various forms of adjustable trestles 100 of the application is contemplated that out.
The component part of the various adjustable trestles 100 of the application is made of corrosion resistant metal such as steel mostly, therefore With high structural strength and durability.
According to the basic principle of the application and specific needs, the adjustable trestle of other patterns can be constructed, and is set Count out the mode of operation of other utilization adjustable trestle and floor board building subsided rest room.
It may be noted that a kind of preferable embodiment of the application is, using having top shown in Fig. 3, Fig. 4, Figure 10 The adjustable trestle in portion is screwed, there are two height adjusting parts for this adjustable trestle tool, wherein the first height adjusting part is to be formed At least a pair of of clamping plane on standpipe periphery, is used to support the preliminary adjusting of height, and the second height adjusting part is to be formed in The protrusion of screw rod upper end or it is recessed screw portion, be used to support the accurate adjusting of height.Since the portion of screwing can be from top spanner It screws, therefore this adjustable trestle can be referred to as mode bracket.Using this upper mode bracket, even on floor of having mated formation After plate, still screw rod can be rotated from the top through the portion of screwing, realize the accurate adjusting of bearing height.This has greatly facilitated paving The flatness of floor board after dress is adjusted.
It can be seen that according to the application, in subsided rest room floor panel structure using adjustable trestle support toilet Plate plate, can by the adjusting of bracket itself before mounting bracket, be mounted with after bracket and some or complete being laid with The bearing height of adjusting bracket after portion's plate, so that the flatness of each plate surface is easily and quickly realized, with using fixation The prior art of height stand column or wall stand is compared, and speed of application is improved.
In addition, adjustable trestles various forms of for the application, can keep not turning in the top plate of pedestal and upper end In the case of dynamic, bearing height accurate adjustment is realized by going to height adjusting part, the plate mated formation will not be wrong due to accurate adjustment Position (even small changing of the relative positions).Specifically, the accurate adjustment for upper mode bracket, does not need to remove plate accurate adjustment can be realized. For the accurate adjustment realized using standpipe, only when needing lower section operating space after whole plates pave, one block of plate is raised i.e. Accurate adjustment can be carried out from below.
In addition, the subsided rest room floor panel structure of the application does not use backfilling material, therefore will not be as using backfill material There is the situation of backfilling material damage pipeline like that in the prior art of material.And floor board is supported by bracket, is used for a long time It will not sink as the prior art because of backfilling material.
In addition, the building of the subsided rest room floor panel structure of the application belongs to dry construction, do not need as using backfill The prior art of material constructs bathroom floor by concrete like that, therefore short construction period, pollution-free.
In addition, it is in use according to the subsided rest room that the application constructs, if you need to repair, it is only necessary to pry open one or a few Floor board can be operated.It has been repaired that, former floor board (if lossless) or new floor board are installed into back original again Position, thus it is easy to operate, pipeline will not be injured.
Although describing the application herein with reference to specific embodiment, scope of the present application is not limited to shown Details.Without departing from the basic principle of the application, various modifications can be made for these details.

Claims (10)

1. a kind of subsided rest room floor panel structure characterized by comprising
Multiple adjustable trestles, the lower part of each adjustable trestle are fixed on the toilet structure sheaf with draining gradient;With And
Multiple floor boards, by bearing height of the upper support of each adjustable trestle above toilet structure sheaf, so that Each floor board is contour and horizontal and limits caisson space;
Wherein, each adjustable trestle includes: pedestal, the standpipe upwardly extended by pedestal;With standpipe threaded upper ends cooperation and The screw rod in standpipe is screwed in from standpipe upper end;The top plate carried by screw rod upper end, is used to support floor board;And by screw rod phase For the nut of standpipe upper end locking;Wherein, it is configured to relatively rotate and adjust the support between the screw rod and standpipe Highly.
2. subsided rest room floor panel structure as described in claim 1, which is characterized in that the top of each adjustable trestle Plate is fixed on the upper end of the screw rod, and the top plate is fixedly connected with support billot, and corresponding floor board is supported on institute It states on support billot.
3. subsided rest room floor panel structure as described in claim 1, which is characterized in that the spiral shell of each adjustable trestle The upper end of bar be equipped with protrusion or it is recessed screw portion, the portion of screwing is configured to be suitable for driving institute from top by tool drives State screw rod rotation;And
The top plate is fixed on stop sleeve, and the stop sleeve and the screw flight cooperate;Or the top plate is fixed on Stop sleeve, the stop sleeve are set in the non-threaded axle portion on the screw rod and are supported by the shoulder on the screw rod.
4. subsided rest room floor panel structure as claimed in claim 3, wherein the top plate of each adjustable trestle is suitable for Support the corner of more than one floor board, each floor board forms chamfering by the corner of the top plate supporting, each chamfering it Between form space, institute is received in fill block in space.
5. subsided rest room floor panel structure according to any one of claims 1 to 4, which is characterized in that each adjustable The standpipe of bracket is riveted on the pedestal in lower end, and the standpipe can be rotated relative to the pedestal.
6. subsided rest room floor panel structure as claimed in claim 5, which is characterized in that the described of each adjustable trestle stands Cooperation between the lower end and pedestal of pipe so that be screwed in standpipe with overcome after a turning torque could relative to base rotation, The turning torque is selected from the range of 0~10 N of rice.
7. subsided rest room floor panel structure according to any one of claims 1 to 4, which is characterized in that each adjustable Another screw rod and lower riser end of bracket are threadedly engaged and screw in standpipe from lower riser end, and the lower end of another screw rod is solid Due to the pedestal, another screw rod is by another nut check in lower riser end.
8. subsided rest room floor panel structure according to any one of claims 1 to 4, which is characterized in that each adjustable At least a pair of of clamping plane is formed on the periphery of the standpipe of bracket.
9. subsided rest room floor panel structure according to any one of claims 1 to 4, which is characterized in that with toilet wall The adjacent floor board of wall is supported by adjustable trestle at its position close with toilet wall or by being fixed on toilet wall Additional support element support on wall, position separate with toilet wall is supported by adjustable trestle with it.
10. subsided rest room floor panel structure according to any one of claims 1 to 4, which is characterized in that the sunk type Bathroom floor structure further includes the decorative and/or functional surface layer being attached to above floor board.
CN201822118939.4U 2018-12-17 2018-12-17 Subsided rest room floor panel structure Active CN209339523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822118939.4U CN209339523U (en) 2018-12-17 2018-12-17 Subsided rest room floor panel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822118939.4U CN209339523U (en) 2018-12-17 2018-12-17 Subsided rest room floor panel structure

Publications (1)

Publication Number Publication Date
CN209339523U true CN209339523U (en) 2019-09-03

Family

ID=67757484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822118939.4U Active CN209339523U (en) 2018-12-17 2018-12-17 Subsided rest room floor panel structure

Country Status (1)

Country Link
CN (1) CN209339523U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518911A (en) * 2019-01-10 2019-03-26 国网青海省电力公司经济技术研究院 A kind of height-adjustable retractility antistatic floor
CN115009546A (en) * 2022-08-08 2022-09-06 银河航天(北京)网络技术有限公司 Pressing force adjusting mechanism, system and method for stacking satellite solar wings

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518911A (en) * 2019-01-10 2019-03-26 国网青海省电力公司经济技术研究院 A kind of height-adjustable retractility antistatic floor
CN115009546A (en) * 2022-08-08 2022-09-06 银河航天(北京)网络技术有限公司 Pressing force adjusting mechanism, system and method for stacking satellite solar wings
CN115009546B (en) * 2022-08-08 2022-11-04 银河航天(北京)网络技术有限公司 Pressing force adjusting mechanism, system and method for stacking satellite solar wings

Similar Documents

Publication Publication Date Title
US9637933B2 (en) Systems and methods for installing cladding panels
CN209339523U (en) Subsided rest room floor panel structure
US10119265B2 (en) Building frame connector and method of use
CN109518989B (en) Multifunctional supporting jacking device for assembled building
US11927016B2 (en) Combined anchor and fastener assembly especially intended for concrete structures and method employing same
US20150033661A1 (en) Staging system and method
CA2602765C (en) Permanent standardised pre-fastening system for civil construction
US8763328B2 (en) Slab based modular building system
US6564524B1 (en) Modular construction system
CN209339524U (en) Indoor raised flooring structure
JP6202331B2 (en) Floor structure and construction method of floor structure
CN211396423U (en) Leveling structure
CN111321868A (en) Indoor raised floor structure
US20040163339A1 (en) Masonry control joint guide
CN111321867A (en) Open-air floor structure
NO20210291A1 (en) Combined anchor and fastener assembly intended for concrete structures and methold employing same
CN216340631U (en) Modular passing-through stone structure
CN112982916A (en) Paving method of overhead ground heating floor
JP5296397B2 (en) Foundation structure of concrete foundation
CN209277474U (en) Open floor structure
CN111321865A (en) Sinking type toilet floor structure
KR101018353B1 (en) A support for architectural panel that the high and low control is possible
CN209277473U (en) Adjustable plate support
CN215054894U (en) Leveling foot margin
JP2020045700A (en) Floor post material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant