CN209339401U - A kind of new steel structure building curtain wall system - Google Patents
A kind of new steel structure building curtain wall system Download PDFInfo
- Publication number
- CN209339401U CN209339401U CN201821814562.XU CN201821814562U CN209339401U CN 209339401 U CN209339401 U CN 209339401U CN 201821814562 U CN201821814562 U CN 201821814562U CN 209339401 U CN209339401 U CN 209339401U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel column
- column
- curtain wall
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of new steel structure building curtain wall systems, including the first steel column, second steel column, third steel column and the 4th steel column, the third steel column is mounted on the top of the first steel column, 4th steel column is mounted on the top of the second steel column, it is connected between first steel column and third steel column and the second steel column and the 4th steel column by girder steel, curtain wall panel is installed between the girder steel and girder steel, first steel column, second steel column, third steel column and the 4th steel column are by upper flange, web and lower wing plate composition, upper flange is connect by web with lower wing plate, and upper flange, web and lower wing plate use integrated design, the two sides of web are welded with girder steel fixed plate, and the surface of girder steel fixed plate offers the first fixation hole and the second fixation hole.The utility model passes through the cooperation of girder steel, curtain wall panel, upper flange, web and lower wing plate, solves existing steel construction curtain wall installation process complexity, leads to the problem that installation effectiveness is low.
Description
Technical field
The utility model relates to steel structure technology field, specially a kind of new steel structure building curtain wall system.
Background technique
With the fast development of Building technology, more and more steel houses start to come into operation.Steel house is
It is interconnected to form the braced frame in house using more steel constructions, will form during steel construction is connected with each other several rectangular
Shape frame, after installing curtain wall panel in rectangle frame, steel house is built and is finished, and can start to come into operation.But at present
The curtain wall panel installation process used is complicated, during installation, needs using to a large amount of auxiliary tool, and entire curtain wall
The fastness of installation is poor, and installs rear surface out-of-flatness, and the installation part that can be accidentally raised in use process is damaged, therefore
Safety in utilization is poor.
The utility model of Patent No. CN206956999U proposes a kind of steel construction curtain wall, including steel structure beam and perpendicular
The curtain wall frame (1) that beam is constituted, and the curtain wall panel (4) being mounted in curtain wall frame (1), the curtain wall frame (1) are rectangle, special
Sign is: one piece of positioning gear frame (2) and decoration gear frame (3), the decoration gear are fixedly installed at the top of the curtain wall frame (1)
Frame (3) is located at the side of curtain wall frame (1) close to outside, is uniformly equipped with a circle positioning bolt (5) around positioning gear frame (2).
It needs four sides to every piece of curtain wall panel to be fixed in the utility model installation process, causes installation process complicated, installation effectiveness
It is low, for this purpose, it is proposed that a kind of new steel structure building curtain wall system.
Utility model content
The purpose of this utility model is to provide a kind of new steel structure building curtain wall system, it is simple to have a mounting process,
The advantages of improving installation effectiveness solves existing steel construction curtain wall installation process complexity, leads to the problem that installation effectiveness is low.
To achieve the above object, the utility model provides the following technical solutions: a kind of new steel structure building curtain wall system,
Including the first steel column, the second steel column, third steel column and the 4th steel column, the third steel column is mounted on the top of the first steel column, institute
The top that the 4th steel column is mounted on the second steel column is stated, between first steel column and third steel column and the second steel column and the 4th steel column
It is connected by girder steel, curtain wall panel is installed between the girder steel and girder steel.
Preferably, first steel column, the second steel column, third steel column and the 4th steel column are by upper flange, web and bottom wing
Board group is at the upper flange is connect by web with lower wing plate, and upper flange, web and lower wing plate use integrated design.
Preferably, the two sides of the web are welded with girder steel fixed plate, and the surface of girder steel fixed plate offers first
Fixation hole and the second fixation hole.
Preferably, the surface of the girder steel is provided with the first fixed screw and the second fixed screw, passes through the first fixed spiral shell
Girder steel is fixed in the first fixation hole and the second fixation hole of the fixed plate surface of girder steel by silk and the second fixed screw, the girder steel
Using one of U-steel, I-steel and H profile steel.
Preferably, the bottom of first steel column, the second steel column, third steel column and the 4th steel column is provided with the first connection
It holds, is provided with second connection end at the top of first steel column, the second steel column, third steel column and the 4th steel column.
Preferably, first connecting pin and the surface of second connection end offer connecting hole, and the inside of connecting hole
It is provided with the first connecting screw.
Preferably, the first connecting pin of the third steel column pass through connecting hole and the first connecting screw and the first steel column the
Two connecting pins are fixedly connected, and the first connecting pin of the 4th steel column passes through connecting hole and the first connecting screw and the second steel column
Second connection end is fixedly connected.
Preferably, the girder steel fixed plate of the third steel column passes through the second connecting screw and third connecting screw and the first steel
The girder steel fixed plate of column is fixedly connected, and the girder steel fixed plate of the 4th steel column passes through the second connecting screw and third connecting screw
It is fixedly connected with the girder steel fixed plate of the second steel column, and girder steel is arranged between girder steel fixed plate and girder steel fixed plate.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model is by being provided with the first steel column, the second steel column, third steel column and the 4th steel column, so that work people
Each steel column is attached, curtain wall panel is directly placed at steel by member according to the radical of the size Control steel column of curtain wall by girder steel
Liang Shang, and the two sides of curtain wall panel are stuck between the upper flange of steel column and lower wing plate, when girder steel uses I-steel or H profile steel, curtain
The top and bottom of wallboard are stuck between the upper flange of girder steel and lower wing plate, no longer need to consolidate curtain wall panel by bolt
It is fixed, so that technique is simpler, improve installation effectiveness, and the first steel column, the second steel column, third steel column, the 4th steel column, girder steel
It is designed according to demand with the size of curtain wall panel, passes through the cooperation of girder steel, curtain wall panel, upper flange, web and lower wing plate, solution
Existing steel construction curtain wall installation process of having determined is complicated, leads to the problem that installation effectiveness is low.
2, the utility model can be fixed girder steel, by being provided with girder steel fixed plate to play to curtain wall panel
Supporting role, while ensure that the stability between each steel column, by being provided with the first connecting pin and second connection end, side
Just the connection between vertical steel column, is attached by the second connecting screw and third connecting screw, plays the role of reinforcing.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the first steel column structure of the utility model schematic diagram;
Fig. 3 is the first steel column of the utility model and third steel column scheme of installation.
In figure: 1 first steel column, 2 second steel columns, 3 third steel columns, 4 the 4th steel columns, 5 girder steels, 6 curtain wall panels, 7 upper flanges, 8
Web, 9 lower wing plates, 10 girder steel fixed plates, 11 first fixation holes, 12 second fixation holes, 13 first fixed screws, 14 second are fixed
Screw, 15 first connecting pins, 16 second connection ends, 17 connecting holes, 18 first connecting screws, 19 second connecting screws, 20 thirds
Connecting screw.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, a kind of new steel structure building curtain wall system, including the first steel column 1, the second steel column 2, third steel
Column 3 and the 4th steel column 4, third steel column 3 are mounted on the top of the first steel column 1, and the 4th steel column 4 is mounted on the top of the second steel column 2
Portion is connected between the first steel column 1 and third steel column 3 and the second steel column 2 and the 4th steel column 4 by girder steel 5, girder steel 5 and girder steel 5
Between curtain wall panel 6 is installed, the first steel column 1, the second steel column 2, third steel column 3 and the 4th steel column 4 are by upper flange 7,8 and of web
Lower wing plate 9 forms, and upper flange 7 is connect by web 8 with lower wing plate 9, and upper flange 7, web 8 and lower wing plate 9 are using integration
Design, the two sides of web 8 are welded with girder steel fixed plate 10, and the surface of girder steel fixed plate 10 offers 11 He of the first fixation hole
Second fixation hole 12 can be fixed girder steel 5, by being provided with girder steel fixed plate 10 to play the branch to curtain wall panel 6
Support effect, while ensure that the stability between each steel column, it is solid that the surface of girder steel 5 is provided with the first fixed screw 13 and second
Determine screw 14, girder steel 5 is fixed on the of 10 surface of girder steel fixed plate by the first fixed screw 13 and the second fixed screw 14
In one fixation hole 11 and the second fixation hole 12, girder steel 5 is using one of U-steel, I-steel and H profile steel, the first steel column 1, the
The bottom of two steel columns 2, third steel column 3 and the 4th steel column 4 is provided with the first connecting pin 15, the first steel column 1, the second steel column 2,
The top of three steel columns 3 and the 4th steel column 4 is provided with second connection end 16, the surface of the first connecting pin 15 and second connection end 16
Offer connecting hole 17, and connecting hole 17 is internally provided with the first connecting screw 18, the first connecting pin 15 of third steel column 3
It is fixedly connected by connecting hole 17 and the first connecting screw 18 with the second connection end 16 of the first steel column 1, the first of the 4th steel column 4
Connecting pin 15 is fixedly connected by connecting hole 17 and the first connecting screw 18 with the second connection end 16 of the second steel column 2, third steel
The girder steel fixed plate 10 of column 3 passes through the girder steel fixed plate 10 of the second connecting screw 19 and third connecting screw 20 and the first steel column 1
It is fixedly connected, the girder steel fixed plate 10 of the 4th steel column 4 passes through the second connecting screw 19 and third connecting screw 20 and the second steel column
2 girder steel fixed plate 10 is fixedly connected, and girder steel 5 is arranged between girder steel fixed plate 10 and girder steel fixed plate 10, passes through setting
First connecting pin 15 and second connection end 16, facilitate the connection between vertical steel column, pass through the second connecting screw 19 and third
Connecting screw 20 is attached, and plays the role of reinforcing, by being provided with the first steel column 1, the second steel column 2, third steel column 3 and the
Four steel columns 4, so that each steel column, is attached by radical of the staff according to the size Control steel column of curtain wall by girder steel 5,
Curtain wall panel 6 is directly placed on girder steel 5, and the two sides of curtain wall panel 6 are stuck between the upper flange 7 of steel column and lower wing plate 9, work as girder steel
When 5 use I-steel or H profile steel, the top and bottom of curtain wall panel 6 are stuck between the upper flange 7 of girder steel 5 and lower wing plate 9, nothing
Curtain wall panel 6 need to be fixed by bolt again, so that technique is simpler, improve installation effectiveness, and the first steel column 1, the
Two steel columns 2, third steel column 3, the 4th steel column 4, girder steel 5 and curtain wall panel 6 size design according to demand, by girder steel 5,
The cooperation of curtain wall panel 6, upper flange 7, web 8 and lower wing plate 9 solves existing steel construction curtain wall installation process complexity, causes to pacify
The problem of filling low efficiency.
In use, by being provided with the first steel column 1, the second steel column 2, third steel column 3 and the 4th steel column 4, so that work people
Each steel column is attached, curtain wall panel 6 is directly placed at by member according to the radical of the size Control steel column of curtain wall by girder steel 5
On girder steel 5, and the two sides of curtain wall panel 6 are stuck between the upper flange 7 of steel column and lower wing plate 9, when girder steel 5 uses I-steel or H-type
When steel, the top and bottom of curtain wall panel 6 are stuck between the upper flange 7 of girder steel 5 and lower wing plate 9, are no longer needed to through bolt to curtain
Wallboard 6 is fixed, so that technique is simpler, improves installation effectiveness, and the first steel column 1, the second steel column 2, third steel column
3, the size of the 4th steel column 4, girder steel 5 and curtain wall panel 6 designs according to demand, by girder steel 5, curtain wall panel 6, upper flange 7,
The cooperation of web 8 and lower wing plate 9 solves existing steel construction curtain wall installation process complexity, leads to the problem that installation effectiveness is low.
In summary: the new steel structure building curtain wall system, by the first steel column 1, the second steel column 2, third steel column 3,
The cooperation of 4th steel column 4, girder steel 5, curtain wall panel 6, upper flange 7, web 8 and lower wing plate 9, by solving existing steel construction curtain wall
Installation process is complicated, leads to the problem that installation effectiveness is low.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (8)
1. a kind of new steel structure building curtain wall system, including the first steel column (1), the second steel column (2), third steel column (3) and
Four steel columns (4), it is characterised in that: the third steel column (3) is mounted on the top of the first steel column (1), the 4th steel column (4) peace
Mounted in the top of the second steel column (2), first steel column (1) and third steel column (3) and the second steel column (2) and the 4th steel column (4)
Between by girder steel (5) connect, curtain wall panel (6) are installed between the girder steel (5) and girder steel (5).
2. a kind of new steel structure building curtain wall system according to claim 1, it is characterised in that: first steel column
(1), the second steel column (2), third steel column (3) and the 4th steel column (4) are made of upper flange (7), web (8) and lower wing plate (9),
The upper flange (7) is connect by web (8) with lower wing plate (9), and upper flange (7), web (8) and lower wing plate (9) use one
Bodyization design.
3. a kind of new steel structure building curtain wall system according to claim 2, it is characterised in that: the web (8)
Two sides are welded with girder steel fixed plate (10), and the surface of girder steel fixed plate (10) offers the first fixation hole (11) and second and consolidates
Determine hole (12).
4. a kind of new steel structure building curtain wall system according to claim 3, it is characterised in that: the girder steel (5)
Surface is provided with the first fixed screw (13) and the second fixed screw (14), passes through the first fixed screw (13) and the second fixed spiral shell
Girder steel (5) is fixed in first fixation hole (11) and the second fixation hole (12) on girder steel fixed plate (10) surface by silk (14), institute
Girder steel (5) are stated using one of U-steel, I-steel and H profile steel.
5. a kind of new steel structure building curtain wall system according to claim 1, it is characterised in that: first steel column
(1), the bottom of the second steel column (2), third steel column (3) and the 4th steel column (4) is provided with the first connecting pin (15), and described first
Second connection end (16) are provided at the top of steel column (1), the second steel column (2), third steel column (3) and the 4th steel column (4).
6. a kind of new steel structure building curtain wall system according to claim 5, it is characterised in that: first connecting pin
(15) it is offered connecting hole (17) with the surface of second connection end (16), and connecting hole (17) is internally provided with the first connection
Screw (18).
7. a kind of new steel structure building curtain wall system according to claim 6, it is characterised in that: the third steel column
(3) the first connecting pin (15) passes through the second connection end of connecting hole (17) and the first connecting screw (18) and the first steel column (1)
(16) it is fixedly connected, the first connecting pin (15) of the 4th steel column (4) passes through connecting hole (17) and the first connecting screw (18)
It is fixedly connected with the second connection end (16) of the second steel column (2).
8. a kind of new steel structure building curtain wall system according to claim 6, it is characterised in that: the third steel column
(3) girder steel fixed plate (10) passes through the girder steel of the second connecting screw (19) and third connecting screw (20) and the first steel column (1)
Fixed plate (10) is fixedly connected, and the girder steel fixed plate (10) of the 4th steel column (4) passes through the second connecting screw (19) and third
Connecting screw (20) is fixedly connected with the girder steel fixed plate (10) of the second steel column (2), and girder steel (5) is arranged in girder steel fixed plate
(10) between girder steel fixed plate (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821814562.XU CN209339401U (en) | 2018-11-06 | 2018-11-06 | A kind of new steel structure building curtain wall system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821814562.XU CN209339401U (en) | 2018-11-06 | 2018-11-06 | A kind of new steel structure building curtain wall system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209339401U true CN209339401U (en) | 2019-09-03 |
Family
ID=67747220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821814562.XU Active CN209339401U (en) | 2018-11-06 | 2018-11-06 | A kind of new steel structure building curtain wall system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209339401U (en) |
-
2018
- 2018-11-06 CN CN201821814562.XU patent/CN209339401U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587647B (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
CN201809973U (en) | Detachable template support system for floor plate | |
CN101949212A (en) | Slabform detachable support system and construction method thereof | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN202467187U (en) | Adjustable tool air-conditioning plate template bracket | |
CN102535830B (en) | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building | |
CN209339401U (en) | A kind of new steel structure building curtain wall system | |
CN202577956U (en) | Early dismounted template system for pouring buildings with beams, plates and columns | |
CN208473060U (en) | A kind of metal curtain wall | |
CN209509165U (en) | A kind of Novel layered assembled architecture | |
CN205242628U (en) | Plug -in type activity board house | |
CN206681220U (en) | Lift installing type corner connecting device for curtain walls | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN208965744U (en) | For the steel roof truss of single story building and the connecting node of reinforced column | |
CN208486369U (en) | A kind of construction steel structure support base | |
CN208501912U (en) | A kind of modular cabinet bottom beam mounting structure | |
CN207846788U (en) | A kind of fixing device of aluminum veneer | |
CN207260626U (en) | The extending old building steelframe structure of energy-efficient environment-friendly multifunctional | |
CN207260650U (en) | Energy-saving and environment-friendly Multifunctional laminated building iron framework | |
CN201588357U (en) | Weldless exterior wall structure | |
CN205976216U (en) | A steel structrual concrete supporting beam | |
CN204609291U (en) | Formwork system | |
CN205116516U (en) | Roof purlin arrangement structure | |
CN220908827U (en) | Concave corridor department curtain mounting system | |
CN221118896U (en) | Elastic steel beam installation node suitable for curtain wall installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: Room 1907, building 11, phase II (plot 02-08), Tianan cloud Valley Industrial Park, Gangtou community, Bantian street, Longgang District, Shenzhen, Guangdong 518000 Patentee after: Shenzhen Yiqiao Decoration Design Engineering Co.,Ltd. Address before: No. 603, 604, 6th floor, building 830, Sungang warehouse district, Baoan North Road, Luohu District, Shenzhen, Guangdong 518000 Patentee before: Shenzhen Yiqiao Decoration Design Engineering Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |