CN209338987U - It puts up a bridge on a kind of new type water dedicated buoyancy tank - Google Patents
It puts up a bridge on a kind of new type water dedicated buoyancy tank Download PDFInfo
- Publication number
- CN209338987U CN209338987U CN201821901127.0U CN201821901127U CN209338987U CN 209338987 U CN209338987 U CN 209338987U CN 201821901127 U CN201821901127 U CN 201821901127U CN 209338987 U CN209338987 U CN 209338987U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- fixedly installed
- buoyancy tank
- bridge
- new type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses dedicated buoyancy tanks of putting up a bridge on a kind of new type water, including the first cabinet and the second cabinet, the back side of second cabinet is fixedly installed with connection kelly, second cabinet is clamped by connection kelly and the first cabinet, it is offered on the front of first cabinet and connect the compatible connection hole slot of kelly, the first link block is fixedly installed on the side wall of first cabinet, the second link block is fixedly installed on the side wall of second cabinet, first link block is fixedly connected by the first anchorage bar with the second link block.The utility model, the installation process of entire buoyancy tank is very simple, greatly reduce the labor intensity of installation personnel, improve the working efficiency of installation personnel, make the personnel to walk on buoyancy tank more safe by setting installation straight-bar and fender rod, it is not in cause walking person to fall to the security risk in water because buoyancy tank shakes, the practicability of buoyancy tank entirety is high, is worthy to be popularized.
Description
Technical field
The utility model relates to dedicated buoyancy tanks of putting up a bridge on buoyancy tank field more particularly to a kind of new type water.
Background technique
With the development of China's economic, the industries such as heavy industry, ocean, hydraulic engineering have obtained faster development, ocean and water
The sharp commonly used equipment of construction industry has buoyancy tank, is transported using the buoyancy that buoyancy tank generates, is applied as immobilization carrier, sea
The operation such as work is very common.
Bridging waterborne in the prior art is typically both provided with installation part in the surrounding of buoyancy tank with buoyancy tank, then by one
Four identical buoyancy tanks of four installation parts and other of a buoyancy tank are fixedly connected, so that bridging buoyancy tank waterborne
Installment work it is very troublesome, increase the labor intensity of installation personnel significantly, while also reducing the work of installation personnel
Efficiency.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and take on a kind of new type water proposed
The dedicated buoyancy tank of bridge.
To achieve the goals above, the utility model adopt the technical scheme that put up a bridge on a kind of new type water it is dedicated floating
Case, including the first cabinet and the second cabinet, the back side of second cabinet are fixedly installed with connection kelly, and second cabinet is logical
It crosses connection kelly and the first cabinet is clamped, offered on the front of first cabinet and connect the compatible connecting hole of kelly
Slot is fixedly installed with the first link block on the side wall of first cabinet, is fixedly installed on the side wall of second cabinet
Two link blocks, first link block are fixedly connected by the first anchorage bar with the second link block, first cabinet and second
The bottom of cabinet is fixedly installed with connection inserted link, and the bottom of the connection inserted link is plugged with rectangle kickboard, the connection inserted link
Side wall on be fixedly installed with fixed block, the fixed block is fixedly connected by the second anchorage bar with the upper surface of rectangle kickboard.
It is as above-mentioned technical proposal to further describe:
The top of first cabinet and the second cabinet is fixedly installed with grafting block, and the top of the grafting block is fixed
Installation straight-bar is installed, and is fixedly installed with fender rod between the side wall of two installation straight-bars.
It is as above-mentioned technical proposal to further describe:
The inside of first cabinet and the second cabinet offers several lightening holes, and the inside of the lightening hole is fixed
Reinforcing rib is installed.
It is as above-mentioned technical proposal to further describe:
One layer of anti-slip layer is fixedly installed on the surface of first cabinet and the second cabinet.
It is as above-mentioned technical proposal to further describe:
First cabinet and the second cabinet are at horizontally disposed, and the thickness of the first cabinet and the second cabinet is 40cm.
It is as above-mentioned technical proposal to further describe:
Mounting groove compatible with the first anchorage bar is offered on first link block and the side wall of the second link block.
The utility model has the following beneficial effects: dedicated buoyancy tank of putting up a bridge on the new type water, the company that the first cabinet is opened up
It connects the connection kelly that hole slot is fixedly mounted with the second cabinet to be mutually clamped, at this time makes be fixedly connected on the first wall box
One link block also can be mutually clamped with the second link block being fixedly connected on the second wall box, then again with the first anchorage bar by
One link block is fixed up with the second link block, so that the first cabinet and the second cabinet are also fixed up, and then again will
The upper surface grafting of the connection inserted link and rectangle kickboard of first cabinet and second bottom of box is got up, and will be consolidated using the second anchorage bar
Determine block to be fixedly connected with the upper surface of rectangle kickboard, the installation process of entire buoyancy tank is very simple, greatly reduces peace
The labor intensity of dress personnel improves the working efficiency of installation personnel, is made by setting installation straight-bar and fender rod floating
The personnel to walk on case are more safe, be not in because buoyancy tank shakes and to cause walking person to fall to the safety in water hidden
Suffer from, the practicability of buoyancy tank entirety is high, is worthy to be popularized.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of new type water on put up a bridge the overall schematic of dedicated buoyancy tank;
Fig. 2 be the utility model proposes a kind of new type water on put up a bridge the side view of dedicated buoyancy tank;
Fig. 3 be the utility model proposes a kind of new type water on put up a bridge the connection hole slot schematic diagram of dedicated buoyancy tank;
Fig. 4 be the utility model proposes a kind of new type water on put up a bridge the connection kelly schematic diagram of dedicated buoyancy tank;
Fig. 5 be the utility model proposes a kind of new type water on put up a bridge the lightening hole schematic diagram of dedicated buoyancy tank.
Marginal data:
1, the first cabinet;2, the second cabinet;3, hole slot is connected;4, kelly is connected;5, the first link block;6, the second connection
Block;7, the first anchorage bar;8, inserted link is connected;9, fixed block;10, the second anchorage bar;11, rectangle kickboard;12, grafting block;13, pacify
Fill straight-bar;14, fender rod;15, lightening hole;16, reinforcing rib.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular
Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention;Term " first ", " the
Two ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance, in addition, unless otherwise specific
Regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to
It is detachably connected, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also lead to
It crosses intermediary to be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be with
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Referring to Fig.1-3, it puts up a bridge on a kind of new type water provided by the utility model dedicated buoyancy tank: including the first cabinet 1 and
Two cabinets 2, the back side of the second cabinet 2 are fixedly installed with connection kelly 4, and the second cabinet 2 passes through connection kelly 4 and the first cabinet 1
It is clamped, offers and connect the compatible connection hole slot 3 of kelly 4 on the front of the first cabinet 1, consolidate on the side wall of the first cabinet 1
Dingan County is equipped with the first link block 5, is fixedly installed with the second link block 6 on the side wall of the second cabinet 2, and the first link block 5 passes through the
One anchorage bar 7 is fixedly connected with the second link block 6, and the bottom of the first cabinet 1 and the second cabinet 2 is fixedly installed with connection inserted link
8, the bottom of connection inserted link 8 is plugged with rectangle kickboard 11, connects and is fixedly installed with fixed block 9, fixed block 9 on the side wall of inserted link 8
It is fixedly connected by the second anchorage bar 10 with the upper surface of rectangle kickboard 11.
The top of first cabinet 1 and the second cabinet 2 is fixedly installed with grafting block 12, the fixed peace in the top of grafting block 12
It is fixedly installed with fender rod 14 equipped with installation straight-bar 13, and between the side wall of two installation straight-bars 13, it is straight by the installation of setting
Bar 13 and fender rod 14 make the personnel to walk on buoyancy tank more safe, are not in cause to go because buoyancy tank shakes
The personnel of walking fall to the security risk in water, and the inside of the first cabinet 1 and the second cabinet 2 offers several lightening holes 15,
The inside of lightening hole 15 is fixedly installed with reinforcing rib 16, and the lightening hole 15 of setting can reduce the weight of buoyancy tank itself, so that floating
Case has bigger buoyancy, and the pressure that can bear is also bigger, and reinforcing rib 16 can allow inside buoyancy tank the lightening hole 15 opened up
Crushing resistance is stronger, and one layer of anti-slip layer is fixedly installed on the surface of the first cabinet 1 and the second cabinet 2, and anti-slip layer is capable of increasing
The frictional force of walking person and buoyancy tank surface avoid the water stain hidden danger that walking person is fallen down being likely to occur on buoyancy tank,
First cabinet 1 and the second cabinet 2 are at horizontally disposed, and the thickness of the first cabinet 1 and the second cabinet 2 is 40cm, the first connection
Mounting groove compatible with the first anchorage bar 7 is offered on block 5 and the side wall of the second link block 6.
Working principle: when installation, by the connection hole slot 3 that the first cabinet 1 opens up and the connection card that the second cabinet 2 is fixedly mounted
4 phase of bar clamping, at this time make the first link block 5 being fixedly connected on 1 side wall of the first cabinet also can on 2 side wall of the second cabinet
6 phase of the second link block clamping being fixedly connected, it is then with the first anchorage bar 7 that first link block 5 and the second link block 6 is fixed again
Get up, so that the first cabinet 1 and the second cabinet 2 are also fixed up, then again by 2 bottom of the first cabinet 1 and the second cabinet
The connection inserted link 8 in portion and the upper surface grafting of rectangle kickboard 11 are got up, using the second anchorage bar 10 by fixed block 9 and rectangle kickboard
11 upper surface is fixedly connected, and buoyancy tank waterborne entire so just installs.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (6)
1. dedicated buoyancy tank of putting up a bridge on a kind of new type water, including the first cabinet (1) and the second cabinet (2), it is characterised in that: described
The back side of two cabinets (2) is fixedly installed with connection kelly (4), and second cabinet (2) passes through connection kelly (4) and the first cabinet
(1) it is clamped, offers on the front of first cabinet (1) and connect the compatible connection hole slot (3) of kelly (4), described the
It is fixedly installed on the side wall of one cabinet (1) the first link block (5), is fixedly installed on the side wall of second cabinet (2)
Two link blocks (6), first link block (5) are fixedly connected by the first anchorage bar (7) with the second link block (6), and described the
The bottom of one cabinet (1) and the second cabinet (2) is fixedly installed with connection inserted link (8), the bottom grafting of connection inserted link (8)
Have rectangle kickboard (11), is fixedly installed with fixed block (9) on the side wall of connection inserted link (8), the fixed block (9) passes through the
Two anchorage bars (10) are fixedly connected with the upper surface of rectangle kickboard (11).
2. dedicated buoyancy tank of putting up a bridge on a kind of new type water according to claim 1, it is characterised in that: first cabinet (1)
It is fixedly installed with grafting block (12) with the top of the second cabinet (2), the top of the grafting block (12) is fixedly installed with peace
It fills straight-bar (13), and is fixedly installed with fender rod (14) between the side wall of two installations straight-bar (13).
3. dedicated buoyancy tank of putting up a bridge on a kind of new type water according to claim 1, it is characterised in that: first cabinet (1)
Several lightening holes (15) are offered with the inside of the second cabinet (2), the inside of the lightening hole (15), which is fixedly installed with, to be added
Strengthening tendons (16).
4. dedicated buoyancy tank of putting up a bridge on a kind of new type water according to claim 1, it is characterised in that: first cabinet (1)
One layer of anti-slip layer is fixedly installed with on the surface of the second cabinet (2).
5. dedicated buoyancy tank of putting up a bridge on a kind of new type water according to claim 1, it is characterised in that: first cabinet (1)
With the second cabinet (2) at horizontally disposed, and the thickness of the first cabinet (1) and the second cabinet (2) is 40cm.
6. dedicated buoyancy tank of putting up a bridge on a kind of new type water according to claim 1, it is characterised in that: first link block
(5) and the compatible mounting groove with the first anchorage bar (7) is offered on the side wall of the second link block (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821901127.0U CN209338987U (en) | 2018-11-19 | 2018-11-19 | It puts up a bridge on a kind of new type water dedicated buoyancy tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821901127.0U CN209338987U (en) | 2018-11-19 | 2018-11-19 | It puts up a bridge on a kind of new type water dedicated buoyancy tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209338987U true CN209338987U (en) | 2019-09-03 |
Family
ID=67748604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821901127.0U Expired - Fee Related CN209338987U (en) | 2018-11-19 | 2018-11-19 | It puts up a bridge on a kind of new type water dedicated buoyancy tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209338987U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472279A (en) * | 2020-04-06 | 2020-07-31 | 武汉理工大学 | Floating bridge installation ship and installation method |
-
2018
- 2018-11-19 CN CN201821901127.0U patent/CN209338987U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472279A (en) * | 2020-04-06 | 2020-07-31 | 武汉理工大学 | Floating bridge installation ship and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209338987U (en) | It puts up a bridge on a kind of new type water dedicated buoyancy tank | |
CN109113744B (en) | A kind of external supporting substituted room formula pillar recovery method | |
CN204588418U (en) | Aluminum alloy step | |
CN207705734U (en) | A kind of separate type mounting cable ditch | |
CN206090462U (en) | Quick -mounting formula flood control counter dam ware | |
CN205209584U (en) | Square structure groundwater on -line monitoring all -in -one | |
CN204875921U (en) | Excavator counter weight | |
CN209443382U (en) | A kind of construction fall arrest external basket | |
CN207295671U (en) | One kind suspension floatation type sewage blocking device | |
CN215817397U (en) | Reinforced compression-resistant cable well structure | |
CN204899264U (en) | Take building construction protection fence of protection network | |
CN111287068A (en) | Substitute bridge lap joint device for road construction capable of being completed quickly | |
CN105951854B (en) | It can be from floating both arms steel cofferdam device and its method for dismounting during for removing | |
CN209556431U (en) | A kind of adjacent building external wall construction support device | |
CN211872865U (en) | A protector for hydraulic and hydroelectric engineering side slope | |
CN204938629U (en) | A kind of to pouring weight and counterweight | |
CN208803722U (en) | U-shaped safe hoisting ring needed for diaphram wall reinforcing bar cage hoisting | |
CN208136836U (en) | A kind of hydraulic engineering flood control plate | |
CN204456216U (en) | A kind of steel fibre well lid | |
CN204552707U (en) | A kind of two sufficient Split type novel subsea manifold operator guards | |
CN208363798U (en) | A kind of Petroleum Production safety device | |
CN206859505U (en) | A kind of walkway board | |
CN206827891U (en) | Urea synthesizer hoisting appliance | |
CN208701497U (en) | A kind of flood fighting bridge pad structure | |
CN207700177U (en) | A kind of civil grille |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20201119 |