CN209335590U - A kind of Hydroelectric Project Construction kit - Google Patents
A kind of Hydroelectric Project Construction kit Download PDFInfo
- Publication number
- CN209335590U CN209335590U CN201822220219.9U CN201822220219U CN209335590U CN 209335590 U CN209335590 U CN 209335590U CN 201822220219 U CN201822220219 U CN 201822220219U CN 209335590 U CN209335590 U CN 209335590U
- Authority
- CN
- China
- Prior art keywords
- backpack body
- fixing seat
- main backpack
- hydroelectric project
- project construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Portable Outdoor Equipment (AREA)
Abstract
The utility model discloses a kind of Hydroelectric Project Construction kit, including main backpack body, the bottom end of the main backpack body is fixedly installed with fixing seat, and the surface and its inside of the fixing seat are equipped with measuring mechanism;The measuring mechanism includes fitting groove and tape measure disk, the surface of fixing seat is arranged in fitting groove, and the surface activity of fitting groove is equipped with protection door-plate, and tape measure disk is mounted on the inside of fixing seat by axis body, the surface of tape measure disk is provided with folding and unfolding mouth, and the inside of main backpack body is equipped with partition;The partition includes that seal cavity and plastic cement separate.The utility model is by being provided with a series of structure, so that the kit, can classify carry a variety of Hydroelectric Project Constructions tool carry out using, itself has the length or height measurement function to components such as tubing, auxiliary construction and installation operation, while extension is using function, meet practice of construction use demand.
Description
Technical field
The utility model relates to Hydroelectric Project Construction technical field, specially a kind of Hydroelectric Project Construction kit.
Background technique
Hydroelectric Project Construction is the general name of building water supply and drainage construction and electrical construction, is that house decoration is most basic, is also simultaneously
Concerning an important link of house decoration quality, construction wrong, it is understood that there may be certain hidden danger causes during use,
There is the failure of water power.
Since Hydroelectric Project Construction is a comprehensive work progress, used tool is more, such as tape measure, cutting machine, electric drill
Deng to carry out unified storage and use to tool, staff can be equipped with a corresponding kit, this is general work
It is relatively simple to have pack arrangement, is only able to achieve storage function, storage box storage is carried out to tool, does not have any other auxiliary function
Can, when such as constructing, the dimensional measurement etc. to pipeline is unable to satisfy the use demand of Hydroelectric Project Construction process complexity.
Utility model content
The purpose of this utility model is to provide a kind of Hydroelectric Project Construction kits, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of Hydroelectric Project Construction kit, including master
Backpack body, the bottom end of the main backpack body are fixedly installed with fixing seat, and the surface and its inside of the fixing seat are equipped with measuring mechanism;
The measuring mechanism includes fitting groove and tape measure disk, and the surface of fixing seat, the surface activity installation of fitting groove is arranged in fitting groove
There is protection door-plate, tape measure disk is mounted on the inside of fixing seat by axis body, and the surface of tape measure disk is provided with folding and unfolding mouth, and folding and unfolding mouth
It extends to inside fitting groove.
Preferably, laser designator is installed inside the primary fixing seat of the tape measure disk, and laser designator extends to
The inside of fitting groove.
Preferably, the bottom end of the fixing seat is equipped with non-slip mat.
Preferably, the surface of the main backpack body is provided with opening, and the surface being open is equipped with zipper, the master of zipper two sides
Package surface is equipped with frenulum, and the main package surface below frenulum is equipped with sleeve.
Preferably, the both side surface of the main backpack body is all equipped with the storage string bag.
Preferably, partition is installed in the inside of main backpack body;The partition includes seal cavity and plastic cement point
Partition, plastic cement demarcation plate are fixedly mounted on the inside of main backpack body, and seal cavity is arranged in the main backpack body of plastic cement demarcation plate side
The top in portion, seal cavity is movably installed with drop cloth.
Preferably, rotating mechanism is installed in the junction of non-slip mat and fixing seat;The rotating mechanism include shaft and
Support plate, shaft are mounted on the gap location of fixing seat and non-slip mat, and support plate is fixedly mounted on the bottom end of shaft, the bottom of support plate
End is fixedly connected with non-slip mat, and the outer surface fixing sleeve of support plate is connected to dust board.
Compared with prior art, the utility model has the beneficial effects that
1, this Hydroelectric Project Construction kit can be limited and be fixed to elongated tool by sleeve, such as screwdriver,
In use convenient for staff, it takes, by the storage string bag, it can be achieved that the small-sized and easy storage for losing component,
Such as bolt facilitates and actually stores and take.
2, this Hydroelectric Project Construction kit is used in combination, so that tape measure is fixedly mounted on by tape measure disk, and with folding and unfolding mouth
While kit bottom end, it can be pullled during practical Hydroelectric Project Construction, length is measured, and rely on kit
The gravitational effects of itself are in the detection process fixed one end, facilitate practical single use, by non-slip mat, can be improved
The coefficient of friction of fixing seat bottom end, prevents in use process, and the accidents such as skidding occur and occur.
3, this Hydroelectric Project Construction kit can under specific circumstances, as heat supply insulation board is installed by laser designator
When, laser designator radiates light beam, and rough detection is carried out to the component level degree of installation and is operated, and by fitting groove, and
Protective door plate is used in combination, and while being sealed protection to laser designator and tape measure Pan Shoufangkou, facilitates unlatching and makes
With.
4, this Hydroelectric Project Construction kit can be separated the space inside main backpack body by plastic cement demarcation plate, flexible
Property it is preferable, convenient for being stored classifiedly to multiple types of tools, and be used in combination by seal cavity and drop cloth, can be real inside main backpack body
An existing individual parking space carries out package and fixed placement to specific tool.
5, this Hydroelectric Project Construction kit can drive main backpack body integrally to carry out rotation fortune under external force by shaft
It is dynamic, to realize the effect of angular adjustment, tape measure disk is carried out using leading to and convenient for taking to the component inside main backpack body
Dust board is crossed, dust etc. in external environment is can avoid directly and shaft contacts, extends the service life of shaft.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment 1;
Fig. 2 is the schematic diagram of internal structure of embodiment 1;
Fig. 3 is the structural schematic diagram of embodiment 2.
In figure: 1, fixing seat;2, door-plate is protected;3, sleeve;4, main backpack body;5, non-slip mat;6, fitting groove;7, net is stored
Pocket;8, zipper;9, frenulum;10, tape measure disk;11, laser designator;12, plastic cement demarcation plate;13, folding and unfolding mouth;14, seal cavity;
15, drop cloth;16, dust board;17, shaft;18, support plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after
The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition,
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect
It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through
Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition
Understand the concrete meaning of above-mentioned term in the present invention.
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment Hydroelectric Project Construction kit, including main backpack body 4, it is whole by general fiber
Cloth is made, and flexibility is preferable, and the bottom end of main backpack body 4 is fixedly installed with fixing seat 1, and fixing seat 1 is hard plastic material
It is made, hardness is increased, and in actual use, with ground face contact, support, fixing seat is fixed to entire kit
1 bottom end is fixedly installed with non-slip mat 5, and the coefficient of friction of 1 bottom end of the fixing seat that can go directly realizes certain antiskid effect, fixed
The surface and its inside of seat 1 are equipped with measuring mechanism;Measuring mechanism includes fitting groove 6 and tape measure disk 10, can be in Hydroelectric Project Construction mistake
Cheng Zhong, the measurement for size operate, and the surface of fixing seat 1 is arranged in fitting groove 6, and the surface of fitting groove 6 passes through hinge activity
Protection door-plate 2 is installed, the other end is buckled by card slot and is flexibly connected with fitting groove 6 so that protect door-plate 2 to fitting groove 6 into
Row sealing, tape measure disk 10 are mounted on the inside of fixing seat 1 by rotatable axis body, and there is tape band in inside by spring wrap, roll up
The surface of ruler disk 10 is provided with folding and unfolding mouth 13, and folding and unfolding mouth 13 extends to inside fitting groove 6, in actual use, tape measure
Band can export outward through folding and unfolding mouth 13, overcome spring torque convenient for staff, pull out tape band and carry out dimension measuring operation,
And one end of tape measure can be fixed in the detection process by the gravitational effects of kit itself, convenient single use.
Specifically, being mounted inside the primary fixing seat 1 of tape measure disk 10 has laser designator 11, i.e. laser pen, it can
See that the pen type transmitter that laser is designed to that portable, hand is easily held, mode of laser group is processed into, projection go out an extremely apparent light beam,
And laser designator 11 extends to the inside of fitting groove 6, and a small-sized key is additionally provided with inside practical set slot 6, it can be with
Elastic switch in laser designator 11 is in contact, can under specific circumstances, when such as heat supply insulation board installation, laser designator 11
Horizontal and rectilinear direction light beam is radiated, rough detection is carried out to the component level degree of installation and is operated, real work is met
Demand.
Further, the surface of main backpack body 4 is provided with opening, can open to entire backpack body, and the surface seam being open
It is formed with zipper 8, zipper 8 extends to both ends, pulls slider of zipper fastener thereon, can be sealed to opening or opening operation, 8 liang of zipper
4 surface of main backpack body of side is fixedly installed with frenulum 9, holds frenulum 9, whole to main backpack body 4 can apply active force, drive its progress
Mobile, 4 surface of main backpack body of 9 lower section of frenulum is fixedly installed with sleeve 3, and about 3 sleeve is connected, in actual use, can be by screw
The long rod tools such as knife are inserted into inside sleeve 3, are limited by sleeve 3 to tool, are easy to use, the both side surface of main backpack body 4 is all
The storage string bag 7 is installed, can be used for storing small parts, such as screw.
Further, the inside of main backpack body 4 is equipped with partition;Partition includes seal cavity 14 and plastic cement point
Partition 12, the fixed inside for being bonded in main backpack body 4 of plastic cement demarcation plate 12, is made for the good plastic material of flexibility, can be right
Main 4 inner space of backpack body is separated, and convenient for separately storing multiple types of tools, seal cavity 14 is arranged in 12 side of plastic cement demarcation plate
Main backpack body 4 inside, be a relatively independent cavity, the top sewing of seal cavity 14 is equipped with drop cloth 15, on drop cloth 15
It is provided with buckle, and can be fixed on detent on the plastic cement demarcation plate 12 of side, operation is sealed to seal cavity 14, to spy
Fixed tool carries out package and fixed placement.
The application method of the present embodiment are as follows: in actual use, staff can hold frenulum 9, drive the device
After being moved to suitable location, required tool is removed from the storage string bag 7 or sleeve 3, carries out Hydroelectric Project Construction operation, it is main
Space inside backpack body 4 is larger, can be used for storing some small-sized electric tools, such as cutting machine, and electric drill etc. is made in Hydroelectric Project Construction
When industry, when need to use small-sized electric tool, it can unzip 8, the tools such as cutting machine are taken out inside main backpack body 4, and be taken
The mobile factor such as band influences, and when by external torque, collision and friction can be generated between electric tool, can to avoid damaging
There is the tool in sharp face to be put into inside seal cavity 14 cutting machine etc., lid is fabricated to by the good fiber cloth of anti-cutting performance
Cloth 15, drop cloth 15 to the components such as cutting machine carry out package and position limitation protection, when need to pipeline or metope etc. carry out dimensional measurement
When, the connection of manual override card slot buckle opens protection door-plate 2, clamps the tape measure of tape measure disk 10 manually, by it from folding and unfolding mouth 13
Middle export, the measurement to the parts to be tested progress linear measure longimetry or to the carry out height such as metope, and at this point, due to kit itself weight
One end of power, tape measure disk 10 is fixed always, can avoid the complicated processes that one end is fixed in measurement process, especially
Small pipeline etc. measurement, one end of small pipeline can be contacted with tape measure head end, tape measure abutting pipe surface, small pipeline it is another
One end holds out against kit, at this time at 13 position of folding and unfolding mouth show number be pipeline length, when need to carry out levelness or
When the processes such as the installation of linear position, touch of key-press can be put, opens laser designator 11, the line launched by laser designator 11
Property visible laser, the direction and height that can refer to the light construct, such as the laying of floor board, and when installation promotes each
Plate is in same level.
Embodiment 2
The basic phase of structure of the structure of the present embodiment Hydroelectric Project Construction kit and 1 Hydroelectric Project Construction kit of embodiment
Together, the difference is that: rotating mechanism is installed in the junction of non-slip mat 5 and fixing seat 1;Rotating mechanism includes shaft 17
With support plate 18, shaft 17 is mounted on the gap location of fixing seat 1 Yu non-slip mat 5, and support plate 18 is fixedly mounted on the bottom of shaft 17
End, the bottom end of support plate 18 is fixedly connected with non-slip mat 5, and the outer surface fixing sleeve of support plate 18 be connected to dust board 16(referring to
Fig. 3).The height of dust board 16 is larger, can form a guard ring, prevent dust in external environment etc. from directly connecing with shaft 17
Touching, and support plate 18 can increase the surface hardness of non-slip mat 5, and transmit support force, be carried out by shaft 17 to entire kit
Support, under stress condition, entire kit 17 can be rotated around the shaft.
The application method of the present embodiment are as follows: by the kit fixed placement after specific position, non-slip mat 5 connects with ground
Touching, and the support torque generated transmit support force through support plate 18 and shaft 17, are supported, are utilizing to entire kit
When laser designator 11 or tape measure disk 10 such as measure at the operation, active force can be applied to kit, under the drive of active force,
Shaft 17 drives kit to be integrally rotated, and thus changes the detection direction of laser designator 11 or tape measure disk 10, just
In actual use, since the impurity such as construction site dust are more, there are certain interval between dust board 16 and fixing seat 1, not shadow
While ringing kit rotation, it can avoid overwhelming majority impurity and enter inside shaft 17, influence the use of shaft 17, when necessary, be
The stability of strutting system to kit is improved, 18 top of support plate can be contacted by way of sliding slot sliding block with 1 bottom end of fixing seat,
Both while having had support effect, kit 17 rotation around the shaft is not influenced.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (7)
1. a kind of Hydroelectric Project Construction kit, including main backpack body (4), it is characterised in that: the fixed peace in the bottom end of the main backpack body (4)
Equipped with fixing seat (1), the surface and its inside of the fixing seat (1) are equipped with measuring mechanism;The measuring mechanism includes assembly
Slot (6) and tape measure disk (10), fitting groove (6) are arranged on the surface of fixing seat (1), and the surface activity of fitting groove (6) is equipped with anti-
It protects door-plate (2), tape measure disk (10) is mounted on the inside of fixing seat (1) by axis body, and the surface of tape measure disk (10) is provided with folding and unfolding
Mouth (13), and folding and unfolding mouth (13) extends to fitting groove (6) inside.
2. a kind of Hydroelectric Project Construction kit according to claim 1, it is characterised in that: the tape measure disk (10) is primary
It is equipped with laser designator (11) inside fixing seat (1), and laser designator (11) extends to the inside of fitting groove (6).
3. a kind of Hydroelectric Project Construction kit according to claim 1, it is characterised in that: the bottom end of the fixing seat (1)
Non-slip mat (5) are installed.
4. a kind of Hydroelectric Project Construction kit according to claim 1, it is characterised in that: the surface of the main backpack body (4)
It being provided with opening, and the surface being open is equipped with zipper (8), main backpack body (4) surface of zipper (8) two sides is equipped with frenulum (9),
Main backpack body (4) surface below frenulum (9) is equipped with sleeve (3).
5. a kind of Hydroelectric Project Construction kit according to claim 1, it is characterised in that: the two sides of the main backpack body (4)
Surface is all equipped with the storage string bag (7).
6. a kind of Hydroelectric Project Construction kit according to claim 1, it is characterised in that: pacify in the inside of main backpack body (4)
Equipped with partition;The partition includes seal cavity (14) and plastic cement demarcation plate (12), and plastic cement demarcation plate (12) is fixed
It is mounted on the inside of main backpack body (4), the main backpack body (4) that seal cavity (14) is arranged in plastic cement demarcation plate (12) side is internal, close
The top of envelope cavity (14) is movably installed with drop cloth (15).
7. a kind of Hydroelectric Project Construction kit according to claim 1 or 2, it is characterised in that: non-slip mat (5) and fixed
The junction of seat (1) is equipped with rotating mechanism;The rotating mechanism includes shaft (17) and support plate (18), shaft (17) installation
Gap location in fixing seat (1) and non-slip mat (5), support plate (18) are fixedly mounted on the bottom end of shaft (17), support plate (18)
Bottom end be fixedly connected with non-slip mat (5), and the outer surface fixing sleeve of support plate (18) is connected to dust board (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822220219.9U CN209335590U (en) | 2018-12-27 | 2018-12-27 | A kind of Hydroelectric Project Construction kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822220219.9U CN209335590U (en) | 2018-12-27 | 2018-12-27 | A kind of Hydroelectric Project Construction kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209335590U true CN209335590U (en) | 2019-09-03 |
Family
ID=67759513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822220219.9U Expired - Fee Related CN209335590U (en) | 2018-12-27 | 2018-12-27 | A kind of Hydroelectric Project Construction kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209335590U (en) |
-
2018
- 2018-12-27 CN CN201822220219.9U patent/CN209335590U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209335590U (en) | A kind of Hydroelectric Project Construction kit | |
CN209327478U (en) | A kind of looped network cable circuit detection device | |
CN211348159U (en) | Civil household poisonous and harmful gas detection system | |
CN210512928U (en) | Engineering blast hole measuring device | |
CN209043324U (en) | A kind of engineering mapping total station | |
CN208629391U (en) | A kind of geological exploration tool box | |
CN211452358U (en) | Multifunctional construction engineering management measuring device | |
CN216523480U (en) | Building that conveniently carries detects uses scale | |
CN209175707U (en) | A kind of portable geological mapping tool box | |
CN201674153U (en) | Bag special for routing inspection of electric power circuit | |
CN216523954U (en) | Handheld room surveying and mapping ruler | |
CN217028857U (en) | Pressure-stopping water plug for hydrogeological exploration | |
CN212268150U (en) | Portable wireless measurement while drilling instrument | |
CN205670009U (en) | A kind of dip stick in infrastructure project | |
CN211285552U (en) | Hydraulic engineering ground detection device | |
CN215493710U (en) | Waterproof detection device of electric instrument | |
CN218705569U (en) | Pipeline soil resistivity testing arrangement | |
CN212919219U (en) | Geological hammer with graduated scale | |
CN209727531U (en) | A kind of geological prospecting sampling apparatus | |
CN215929254U (en) | Oil gas pipeline leakage test recorder | |
CN214394146U (en) | Portable multi-functional electric power overhauls toolbox | |
CN207098656U (en) | A kind of charging device of band storage | |
CN212989683U (en) | Electronic material evidence investigation instrument capable of rapidly acquiring on site | |
CN217003911U (en) | Energy-concerving and environment-protective type geographic information surveying instrument | |
CN214097574U (en) | Portable electromechanical device detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20201227 |