CN209333944U - A kind of mining chute of epoxy resin filled and process aluminum laminated structure - Google Patents

A kind of mining chute of epoxy resin filled and process aluminum laminated structure Download PDF

Info

Publication number
CN209333944U
CN209333944U CN201822007528.8U CN201822007528U CN209333944U CN 209333944 U CN209333944 U CN 209333944U CN 201822007528 U CN201822007528 U CN 201822007528U CN 209333944 U CN209333944 U CN 209333944U
Authority
CN
China
Prior art keywords
epoxy resin
chute
resin filled
core plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822007528.8U
Other languages
Chinese (zh)
Inventor
于英华
徐平
沈佳兴
单翔宇
曹泉
高文硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201822007528.8U priority Critical patent/CN209333944U/en
Application granted granted Critical
Publication of CN209333944U publication Critical patent/CN209333944U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Soundproofing, Sound Blocking, And Sound Damping (AREA)

Abstract

A kind of mining chute of epoxy resin filled and process aluminum laminated structure, side board including reverse frustoconic, the side board is epoxy resin filled and process aluminium layer plywood, and epoxy resin filled and process aluminium layer plywood is made of liner plate, closed-cell aluminum foam core plate, epoxy resin filled and process aluminium core plate and steel interior lining panel outside steel.The mining chute of epoxy resin filled and process aluminum laminated structure has many advantages, such as good vibration and noise reducing, lightweight, high specific stiffness, environmental protection, and noise when chute work can be significantly reduced simultaneously improves the stiffness and strength of chute while mitigating chute quality and then improves the service life of chute.

Description

A kind of mining chute of epoxy resin filled and process aluminum laminated structure
Technical field
The utility model belongs to mining machinery field, and in particular to a kind of epoxy resin filled and process aluminum laminated structure is mining Chute.
Background technique
Mining chute is the important equipment in coal conveying and coal preparation plant's screening classification process, it plays reprinting, distribution, collection In, equal part, adjust process flow the effects of.Mining chute in work process, constantly by spoil and lump coal friction with Impact, can generate very big vibration and noise.This can not only endanger the physical and mental health of worker, also will affect itself and therewith phase The working performance and service life of attached device.The structure of traditional chute is generally using the method manufacture of welding.The lining that chute uses Plate material mainly has cast iron, cast stone, high molecular material, carbon steel, stainless steel and rubber etc..Plain cast iron material liner plate is wear-resisting Performance is poor, and toughness is low;Cast stone and polymeric liner wearability are preferable, but poor toughness;Carbon steel and stainless steel liner plate toughness High but wearability is low;Rubber lining good toughness, vibration absorbing performance are strong, but blocking easy to fall off, service life are lower.
For the vibration noise for solving the problems, such as mining chute, there are several types of one for the mode mainly taken both at home and abroad at present It is that the overall structure of chute is improved and optimized, traditional chute is such as improved to spiral chute, optimizes the main of chute Structural parameters etc.;The second is the individual sites in traditional chute install bump leveller or damper additional, including simply in chute Upper welding spillplate or setting buffering bucket etc..The shortcomings that first method is effect of vibration and noise reduction office in the above vibration and noise reducing method It is sex-limited big.The shortcomings that second method be increase chute complex degree of structure, and if install additional bump leveller or damper structure If unreasonable or its position installs that technique is unreasonable can also cause bigger vibration and noise additional.
Utility model content
To overcome the shortcomings of existing chute vibration, the big and above-mentioned solution chute vibration noise measure of noise, the utility model Purpose be to provide a kind of mining chute of epoxy resin filled and process aluminum laminated structure, significantly reduce mining chute work when making an uproar Sound and vibration.
In order to achieve the above objectives, the utility model provides a kind of epoxy resin filled and process aluminum laminated structure mining chute, The chute includes the side board of reverse frustoconic, and the side board is epoxy resin filled and process aluminium layer plywood, the epoxy Resin filled and process aluminium layer plywood includes outer liner plate, closed-cell aluminum foam core plate, epoxy resin filled and process aluminium core plate and interior lining panel.
The outer steel plate thickness is 2~3mm;The closed-cell aluminum foam core thickness is 6~9mm;The epoxy Resin filled and process aluminium core plate thickness is 4~6mm;The interior steel plate thickness is 2~3mm.
The material of the outer liner plate is selected from Q235 carbon steel, Q345 carbon steel or 45 steel;The closed-cell foam aluminium core The relative density of plate is 0.1~0.35;The material of the interior lining panel is selected from Q235 carbon steel, Q345 carbon steel or 45 steel.
The epoxy resin filled and process aluminium core plate is to be immersed in epoxy resin solution uniformly to fill out with Open-cell Aluminum Foam Solidify after filling and be made, the epoxy resin solution by epoxy resin (E-51), toughener dibutyl phthalate (DBP) (DBP) and Curing agent (T-31) configuration obtains, by the ratio between number, E-51:DBP:T-31=(98~102): (24~26): (24~26).
The outer liner plate, closed-cell aluminum foam core plate, epoxy resin filled and process aluminium core plate and interior lining panel bind mode For epoxy resin bonding.
The outer liner plate is located at the outermost of laminate, plays the internal core plate of protection and meets chute stiffness and strength and wants The effect asked.
The closed-cell aluminum foam core plate is located at the inside of outer liner plate, and effect includes: first is that using closed-cell aluminum foam Sound absorption, sound insulation, vibration damping, high-damping, the excellent characteristics for absorbing impact, improve its sound insulation, and sound absorption, vibration absorbing performance are slipped to improve The effect of slot vibration and noise reducing;Second is that enhancing chute using the lightweight of foamed aluminium, the excellent characteristics of high specific stiffness, high specific strength Rigidity and intensity and to improve its Lightness.
The epoxy resin filled and process aluminium core plate is located at the inside of closed-cell aluminum foam core plate, and effect is to make full use of The high damping of epoxy resin and foamed aluminium mitigates the vibration of chute, and then reduces noise when chute work.
The interior lining panel is located at the most inner side of laminate, and the effect of interior lining panel includes: first is that playing protection epoxy resin The effect of filled and process aluminium core plate;Second is that further increasing the effect of the stiffness and strength of chute;Third is that guaranteeing that chute conveys charcoal It is unimpeded with spoil connection, while guaranteeing the effect of the wearability of chute.
The preparation method of the mining chute of epoxy resin filled and process aluminum laminated structure of the utility model, step include:
Step 1, according to the size of the mining chute of epoxy resin filled and process aluminum laminated structure, plate shearing machine shear steel is used Plate obtains the expansion plate of interior lining panel and outer liner plate;
Step 2, it according to the size of the mining chute of epoxy resin filled and process aluminum laminated structure, is cut using wire cutting mode Open celled foam aluminium sheet, and be dipped in epoxy resin solution to epoxy resin solution and be substantially filled to open celled foam aluminium sheet Afterwards, solidification is taken out, epoxy resin filled and process aluminium core plate is obtained;
Step 3, it according to the size of the mining chute of epoxy resin filled and process aluminum laminated structure, is cut using wire cutting mode Closed-cell foam aluminium sheet obtains closed-cell aluminum foam core plate;
Step 4, the expansion plate of interior lining panel and outer liner plate is welded as cylinder respectively, and successively will be outer using epoxy resin Liner plate, closed-cell aluminum foam core plate, epoxy resin filled and process aluminium core plate and interior lining panel are bonded as entirety, obtain epoxy resin filling Foamed aluminium laminate structures are mining chute;
Wherein, step 1~3 do not have sequencing.
The utility model has the beneficial effects that
1, the damping ratio of the mining chute of epoxy resin filled and process aluminum laminated structure provided by the utility model is compared to biography System steel chute can be improved 4 times or more, and vibration amplitude can reduce 50% or more;In terms of noise reduction, for frequency in chute Rate is the noise of 125~1000Hz, and the maximum sound transmission loss of this is mining chute is 9.9dB, than the maximum sound insulation of conventional steel chute It is big by 115.22% to measure 4.6dB;For the noise of 1000~4000Hz of frequency in chute, maximum sound transmission loss is 24.1dB, than passing The maximum sound transmission loss 16dB of system steel chute is big by 50.63%.
Detailed description of the invention
Fig. 1 is the three dimensional structure diagram of the mining chute of epoxy resin filled and process aluminum laminated structure of embodiment 1, In: 1- outer liner plate, 2- closed-cell aluminum foam core plate, 3- epoxy resin filled and process aluminium core plate, 4- interior lining panel;
Fig. 2 is epoxy resin filled and process aluminium layer plywood schematic diagram.
Specific embodiment
Below in conjunction with drawings and examples, the present invention will be further described.
Embodiment 1
The mining chute of a kind of epoxy resin filled and process aluminum laminated structure combined with Figure 1 and Figure 2, including reverse frustoconic side Plate, the side board be epoxy resin filled and process aluminium layer plywood, the epoxy resin filled and process aluminium layer plywood include outer liner plate 1, Closed-cell aluminum foam core plate 2, epoxy resin filled and process aluminium core plate 3, interior lining panel 4.
Outer liner plate 1 with a thickness of 2mm, closed-cell aluminum foam core plate 2 with a thickness of 6mm, epoxy resin filled and process aluminium core plate 3 With a thickness of 4mm, interior lining panel 4 with a thickness of 2mm, the large and small mouth diameter of chute is respectively 600mm and 420mm, is highly 468mm。
The preparation method of the mining chute of epoxy resin filled and process aluminum laminated structure of the present embodiment:
Step 1, according to the mining chute size of epoxy resin filled and process aluminum laminated structure, Q235 carbon is sheared using plate shearing machine Plain steel plate obtains the expansion plate of outer liner plate 1 and interior lining panel 4;
Step 2, with wire cutting machine cutting open celled foam aluminum cylinder, it is E- that open celled foam aluminum cylinder, which is dipped into the ratio between number, Make to take out solidification after filling full epoxy resin solution in its hole in the epoxy resin solvent of 51:DBP:T-31=100:25:25, Obtain the epoxy resin filled and process aluminium core plate 3 in manufacture laminate;
Step 3, the closed-cell foam aluminum cylinder for being 0.35 with wire cutting machine cutting relative density manufactures the closed pore bubble of laminate Foam aluminium core plate 2;
Step 4, the expansion plate of interior lining panel and outer liner plate is welded as to the interior lining panel and outer liner plate of chute using welding manner Cylinder;Using epoxy adhesive by the outer liner plate 1 of above-mentioned preparation, closed-cell aluminum foam core plate 2, epoxy resin filled and process aluminium Core plate 3 and the bonding of interior lining panel 4 are an entirety, and the mining chute of epoxy resin filled and process aluminum laminated structure is made.

Claims (4)

1. a kind of mining chute of epoxy resin filled and process aluminum laminated structure, which is characterized in that the chute includes inverted round stage The side board of shape, the side board are epoxy resin filled and process aluminium layer plywood, the epoxy resin filled and process aluminium layer plywood Including outer liner plate, closed-cell aluminum foam core plate, epoxy resin filled and process aluminium core plate and interior lining panel.
2. chute according to claim 1, which is characterized in that the outer lining plate thickness is 2~3mm;The closed pore Foamed aluminum-core plate thickness is 6~9mm;The epoxy resin filled and process aluminium core plate thickness is 4~6mm;The interior lining panel With a thickness of 2~3mm.
3. chute according to claim 1, which is characterized in that the material of the outer liner plate be selected from Q235 carbon steel, Q345 carbon steel or 45 steel;The relative density of the closed-cell aluminum foam core plate is 0.1~0.35;The material of the interior lining panel Selected from Q235 carbon steel, Q345 carbon steel or 45 steel.
4. chute according to claim 1, which is characterized in that the outer liner plate, closed-cell aluminum foam core plate, epoxy resin The bind mode of filled and process aluminium core plate and interior lining panel is epoxy resin bonding.
CN201822007528.8U 2018-12-03 2018-12-03 A kind of mining chute of epoxy resin filled and process aluminum laminated structure Expired - Fee Related CN209333944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822007528.8U CN209333944U (en) 2018-12-03 2018-12-03 A kind of mining chute of epoxy resin filled and process aluminum laminated structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822007528.8U CN209333944U (en) 2018-12-03 2018-12-03 A kind of mining chute of epoxy resin filled and process aluminum laminated structure

Publications (1)

Publication Number Publication Date
CN209333944U true CN209333944U (en) 2019-09-03

Family

ID=67750199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822007528.8U Expired - Fee Related CN209333944U (en) 2018-12-03 2018-12-03 A kind of mining chute of epoxy resin filled and process aluminum laminated structure

Country Status (1)

Country Link
CN (1) CN209333944U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109248777A (en) * 2018-12-03 2019-01-22 辽宁工程技术大学 Mining chute of a kind of epoxy resin filled and process aluminum laminated structure and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109248777A (en) * 2018-12-03 2019-01-22 辽宁工程技术大学 Mining chute of a kind of epoxy resin filled and process aluminum laminated structure and preparation method thereof

Similar Documents

Publication Publication Date Title
US20160118034A1 (en) Particulate Sound Barrier and Sound Absorption/Insulation Board Thereof
CN209333944U (en) A kind of mining chute of epoxy resin filled and process aluminum laminated structure
CN102767471B (en) Vertical axis wind power generator blade and manufacturing method thereof
CN106881923B (en) A kind of preparation method of complex intensifying type foam metal battenboard
CN202131570U (en) Hollow reinforcement filled enhanced sound barrier with oblique holes
CN109248777A (en) Mining chute of a kind of epoxy resin filled and process aluminum laminated structure and preparation method thereof
CN105365835A (en) Novel high-speed train shock-absorption and noise-reduction floor structure
CN106495619A (en) Cement based railway sound barrier sound-absorbing material and preparation method thereof
CN102909900A (en) Epoxy resin-based damping material-filled corrugated structure sandwich plate and preparation method thereof
CN106945183A (en) Environment-friendly and energy-efficient stone material saw and its processing technology
CN104149400B (en) A kind of Double helix fiber enhanced foam laminate
CN205742589U (en) A kind of damping-constraining Rotating fields with ribbing
CN212688579U (en) Vibration and noise reduction device for track floating plate
CN206623487U (en) A kind of automobile engine bottom guard plate
CN202412827U (en) Automobile damping silencing pad
CN208830064U (en) A kind of compound type polyurethane sleeper pad
CN204021016U (en) Passenger vehicle honeycomb floor mounting structure and passenger vehicle
CN207140468U (en) A kind of layer flexible buffers sandwich material
CN215519688U (en) Reinforced composite floor with noise isolation function
CN206298993U (en) A kind of sound-proof wall body
CN107574732A (en) A kind of device for reducing manhole periphery concrete cracking
CN206748764U (en) Environment-friendly and energy-efficient stone material saw
CN202811193U (en) Blade of vertical-axis wind-driven generator
CN107152888A (en) A kind of lightweight impact resistance protective plate
CN207109518U (en) Vibratory plate compactor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903