CN209330688U - A kind of new vertical afforestation equipment and system - Google Patents

A kind of new vertical afforestation equipment and system Download PDF

Info

Publication number
CN209330688U
CN209330688U CN201822158945.2U CN201822158945U CN209330688U CN 209330688 U CN209330688 U CN 209330688U CN 201822158945 U CN201822158945 U CN 201822158945U CN 209330688 U CN209330688 U CN 209330688U
Authority
CN
China
Prior art keywords
fixinig plate
flowerpot
hanging belt
new vertical
afforestation equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822158945.2U
Other languages
Chinese (zh)
Inventor
黄俊宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Green Pick-Up Technology Co Ltd
Original Assignee
Xiamen Green Pick-Up Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Green Pick-Up Technology Co Ltd filed Critical Xiamen Green Pick-Up Technology Co Ltd
Priority to CN201822158945.2U priority Critical patent/CN209330688U/en
Priority to PCT/CN2019/091084 priority patent/WO2020124964A1/en
Application granted granted Critical
Publication of CN209330688U publication Critical patent/CN209330688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of new vertical afforestation equipment and system, wherein a kind of new vertical afforestation equipment, including flexible hanging belt, fixation kit, anti-deviation rope and flowerpot;Flexible hanging belt is clamped with several flowerpots by fixation kit respectively along its length;Anti- deviation rope is successively connect with several fixation kits along flexible hanging belt length direction;Fixation kit is detachable.New vertical afforestation equipment provided by the utility model avoids the installation of large area bracket by design of the flexible hanging belt in conjunction with flowerpot;By the anti-design for deviateing rope, avoids flowerpot from swaying with the wind and cause safety accident;Detachable by fixation kit, convenience is according to the needs of users or seasonal variations adjust flowerpot spacing, meets the use demand of user.In addition new vertical greening system that the utility model provides improves the stability of whole system by the mounting structure of upper bracket and lower bracket using new vertical afforestation equipment as described above.

Description

A kind of new vertical afforestation equipment and system
Technical field
The utility model relates to vertical greening field, in particular to a kind of new vertical afforestation equipment and system.
Background technique
With increasingly sharpening for urbanization process, building occupies urban land, and green coverage is caused to fall sharply, ecological environment It is destroyed, plant growth is unfavorable, urban heat land effect aggravation.To alleviate urban ecological problem, meet urban development, increase is built Vertical greening is built, the natural environment for creating suitable for plant growth is particularly important.
In the prior art, the greening of metope is mainly mounted on surface of wall using components such as template, planting grooves, in slot Landscape plant is planted, metope is afforested, main installation form has modular, tiled type, suspension type etc..For example, Chinese Utility model patent 201520201538.9 discloses a kind of planting box for vertical greening, including for containing planting matrix Box body, box body can with multiple assembly, formed vertical greening walls with cultivations of flowers or grass;The bottom of box body is provided with water fender and box body is divided into two Part;The open topped front of box body is provided with the plantation storehouse for plantation outwardly protruded;Bottom in the plantation storehouse of box body Portion is equipped with connection web plate, and connection web plate is provided with upward water fender close to water storing bin outer rim;The left and right ends of the box body point It She You not a latch groove;There is mounting groove at the box body back side, has mounting hole on mounting groove;It is provided on the plantation inclined plate of box body Air hole.Its planting box realizes fixation by being mounted on aluminium sheet or other hard mounting racks.When carrying out, skyscraper is green When change, planting box could be installed after needing the bracket for carrying out large area to install, cause rack construction difficulty problem.
Utility model content
To solve the problems, such as to mention in above-mentioned background technique, the utility model provides a kind of new vertical afforestation equipment and is System, wherein a kind of new vertical afforestation equipment, including flexible hanging belt, fixation kit, anti-deviation rope and flowerpot;Wherein:
The flexibility hanging belt is clamped with several flowerpots by fixation kit respectively along its length;The anti-deviation rope edge Flexible hanging belt length direction is successively connect with several fixation kits;The fixation kit is detachable.
Further, the flexible hanging belt is equipped with mounting ring;The fixation kit is connected to the mounting ring.
Further, the fixation kit includes outer fixinig plate, outer gasket, internal gasket, interior fixinig plate and fastener;It is described Internal gasket, interior fixinig plate are successively arranged on the inside of flowerpot;Outer gasket, fixinig plate are successively arranged on the outside of the flowerpot;
The fastener sequentially passes through interior fixinig plate, internal gasket, flowerpot, outer gasket and connects with outer fixinig plate;The flexibility Hanging belt is held between the flowerpot and outer gasket or between outer gasket and fixinig plate.
Further, the shape of the outer fixinig plate includes following at least one: " bow " shape, " Π " shape or plate shaped.
Further, the outer fixinig plate two sides are equipped with the second through-hole;Anti- deviation bar one end is connected to second through-hole Interior, the other end is flexibly connected with anti-deviation rope.
Further, the outer fixinig plate is equipped with first passage and second channel;It is set in the first passage, second channel There are drip irrigation pipe or lamp bar.
Further, it is connected between the two neighboring outer fixinig plate on the flexible hanging belt by fixed link;It is described solid Fixed pole is that side sets hollow squares jaggy;The notch is towards the outer fixinig plate;It prevents from deviateing rope and/or drip irrigation pipe And/or lamp bar is set in the cavity of the outer fixinig plate.
Further, the outer fixinig plate is equipped with first passage and second channel;It is set in the first passage, second channel There are drip irrigation pipe or lamp bar.
Further, the outer fixinig plate is that side sets hollow squares jaggy;The notch is towards the outer gasket; It prevents from deviateing rope and/or drip irrigation pipe and/or lamp bar is set in the cavity of the fixed link.
Further, the flowerpot upper surface is equipped with lamp bar.
New vertical afforestation equipment provided by the utility model is avoided by design of the flexible hanging belt in conjunction with flowerpot The installation of large area bracket;By the anti-design for deviateing rope, avoids flowerpot from swaying with the wind and cause safety accident;Pass through fixed group Part is detachable, and convenience is according to the needs of users or seasonal variations adjust flowerpot spacing, meets the use demand of user.Meanwhile it hanging Dress band and the dismountable structure of fixation kit facilitate carry out descending operation, when encountering typhoon day, can fall hanging belt, unload Flowerpot hides typhoon.
In addition the utility model provides a kind of new vertical greening system, green using new vertical described in Arbitrary Term as above Makeup is set;It further include upper bracket and lower bracket;
The upper bracket, lower bracket are respectively arranged in above and below green belt;Flexibility hanging belt upper end suspension In the upper bracket, lower end is connect with lower bracket;The anti-deviation rope both ends are connect with upper bracket and lower bracket respectively.
New vertical greening system provided by the utility model is improved whole by the mounting structure of upper bracket and lower bracket The stability of a system.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is Some embodiments of the utility model, for those of ordinary skill in the art, without creative efforts, It is also possible to obtain other drawings based on these drawings.
Fig. 1 is that new vertical greening system provided by the utility model installs an implementation example figure;
Fig. 2 is that new vertical greening system installs an implementation example figure;
Fig. 3 is that new vertical greening system installs an implementation example figure;
Fig. 4 is one implementation example figure of upper bracket;
Fig. 5 is one implementation example figure of upper bracket;
Fig. 6 is hanging belt scheme of installation;
Fig. 7 is one implementation example figure of new vertical afforestation equipment;
Fig. 8 is the explosive view of Fig. 7;
Fig. 9 is one implementation example figure of new vertical afforestation equipment;
Figure 10 is the explosive view of Fig. 9;
Figure 11 is one implementation example figure of new vertical afforestation equipment;
Figure 12 is one implementation example figure of new vertical afforestation equipment;
Figure 13 is fixed link scheme of installation;
Figure 14 is one implementation example figure of the China and foreign countries Fig. 8 fixinig plate;
Figure 15 is one implementation example figure of the China and foreign countries Figure 10 fixinig plate;
Figure 16 is one implementation example figure of the China and foreign countries Figure 11 fixinig plate;
Figure 17 is one implementation example figure of internal gasket;
Figure 18 is the anti-scheme of installation for deviateing rope with anti-deviation bar;
Figure 19 is mounting ring side view.
Appended drawing reference:
10 11 mounting ring of flexible hanging belt, 12 shackle
The outer fixinig plate of 13 crossbeam, 14 hand handle 21
Fixinig plate in 22 outer 23 internal gaskets 24 of gasket
25 fixed link, 31 bolt, 32 nut
41 42 anti-50 hanging rings of deviation bar of anti-deviations rope
60 upper bracket, 61 foot base, 62 pulley
The 63 anti-deviation rings of manual 64 convex block of line disk 65
70 flowerpot, 71 first through hole, 72 second groove
73 drainage hole, 74 rough surface, 80 protection post
91 maintenance 92 lower bracket of aisle, 93 skyline cranes
211 second through-hole, 212 first passage, 213 second channel
214 215 first groove of side plate, 251 notch
217 lamp bar, 231 hollow posts
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, every other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to The range of the utility model protection.
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For limitations of the present invention.In addition, term " first ", " second " and similar word are not offered as any sequence, number Amount or importance, and the component part for only having used differentiation different.The similar word such as " connection " or " connected " is simultaneously non-limiting It but may include electrical connection, light connects etc. with the connection of physics or machinery, it is either direct or indirectly.
A kind of new vertical afforestation equipment provided by the utility model and system, one kind provided by the utility model is novel to hang down Straight afforestation equipment and system, wherein a kind of new vertical afforestation equipment, including flexible hanging belt 10, fixation kit, anti-deviation rope 41 and flowerpot 70;Wherein:
The flexibility hanging belt 10 is clamped with several flowerpots 70 by fixation kit respectively along its length;The anti-deviation Rope 41 is successively connect with several fixation kits along flexible 10 length direction of hanging belt;The fixation kit is detachable.
When it is implemented, new vertical afforestation equipment, including flexible hanging belt 10, fixation kit, anti-deviation rope 41 and flower Basin 70;Wherein: flexible hanging belt 10 successively or is staggeredly equipped with floral disc 70 along its length;The side side wall of flowerpot 70 passes through fixation Component is held on flexible hanging belt 10;Anti- deviation rope 41 sequentially passes through several fixed groups along flexible 10 length direction of hanging belt Part plays fixed function to fixation kit, avoid flowerpot 70 in the case that wind-force it is larger especially in high-storey sway with the wind, thus Improve the security performance of afforestation equipment;By fixation kit dismountable structure design, it is convenient according to the needs of users or season Transformation or floristics adjust the distance between flowerpot 70;70 spacing of flowerpot can such as be turned down in summer, it is big to reduce direct sunlight Reach energy conservation and environmental protection in building, if in winter, in the insufficient situation of sunlight, can tune up the spacing of flowerpot, guarantee that plant receives Sufficient sunlight, at the same avoid due to afforest it is overstocked caused by gloomy phenomenon;In addition, being set by fixation kit detachable structure Meter, facilitates carry out disassembled for transport;Preferably, fixation kit detachable structure includes but is not limited to be bolted.
When installation, hoisting apparatus stops after flexible hanging belt 10 is first sling a distance from ground or installation site upwards Only rise, then carries out flowerpot installation;After installing the part, flexible hanging belt 10 slings a distance to hoisting apparatus upwards again Stop rising afterwards, continues flowerpot installation after the flowerpot quantity whole installation to flexible hanging belt 10 that will be needed, then lead to It crosses hoisting apparatus and flexible hanging belt 10 is sling to the position afforested to needs, by flexible 10 upper end of hanging belt and a fixed device Connection, flexible 10 lower end of hanging belt is connect with another fixed device, the bracket installation of large area is avoided, to solve Existing planting box needs first to carry out the problem of large area bracket installation when installing, reduce high-storey operating rate, also improve peace Fill efficiency.In addition, anti-deviation rope is made of steel wire.By the anti-design for deviateing rope, the flexibility in lifting process can be lifted Band 10 provides dependence, and flexible hanging belt 10 is avoided to rotate because of wind.
Wherein, flexible hanging belt 10 is elongate objects flexible and with load-bearing, including but not limited to hoisting rope, cloth rope, Nylon rope.
New vertical afforestation equipment provided by the utility model is not necessarily to by design of the flexible hanging belt in conjunction with flowerpot The bracket installation for carrying out large area, realizes the purpose for facilitating installation;Flowerpot is fixed by the anti-design for deviateing rope, is kept away Exempt from flowerpot and sway with the wind to cause safety accident;It is detachable by fixation kit, it is convenient according to the needs of users or seasonal variations tune Flowerpot spacing is saved, the use demand of user is met.
The utility model provides following examples:
Embodiment 1
When it is implemented, flexible hanging belt 10 is equipped with mounting ring 11 (such as shown in Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11 Shown in Figure 19), mounting ring 11 includes but is not limited to becket or cloth ring or alloy hoop;Mounting ring 11 is fixed using sewing or perforation Mode be fixed on flexible hanging belt 10;The part of fixation kit passes through mounting ring 11 and is fixed, and passes through mounting ring 11 with the structure of fixation kit, can be realized dual fail-safe, keep the connection of flexible hanging belt 10 and flowerpot 70 even closer securely, mention High safety performance.
Embodiment 2
When it is implemented, fixation kit includes outer fixinig plate 21, outer gasket as shown in Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11 22, internal gasket 23, interior fixinig plate 24 and fastener, wherein fastener includes two bolts 31 and nut 32;The inside of flowerpot 70 according to It is secondary to be equipped with internal gasket 23, interior fixinig plate 24;Outer gasket 22, outer fixinig plate 21 are successively arranged on the outside of flowerpot 70;Internal gasket 23, outer pad Piece 22 is made of rubber material;Interior fixinig plate 24 and outer fixinig plate 21 are made of hard material, including but not limited to metal, conjunction Gold, timber, stone material;
A bolt 31 in fastener sequentially passes through interior 24 side of fixinig plate, 23 side of internal gasket, 70 side wall of flowerpot First through hole 71,22 side of outer gasket and 21 side of outer fixinig plate are connect with a nut 32, and another bolt 31 sequentially passes through interior 24 other side of fixinig plate, 23 other side of internal gasket, flowerpot 70,22 other side of outer gasket and 21 other side of outer fixinig plate and another Nut 32 connects;Two bolts 31 are respectively arranged on the two sides of flexible hanging belt 10;And flexible hanging belt 10 is held on 70 He of flowerpot Between outer gasket 22 or between outer gasket 22 and fixinig plate 21.By the design of internal gasket 23 and outer gasket 22, flowerpot is increased Frictional force between property hanging belt 10;By the design of interior fixinig plate 24 and outer fixinig plate 21, it can guarantee bonding strength;It is logical The structure design for crossing above-mentioned fixation kit, can effectively support 70 weight of flowerpot, even weight is the flowerpot of 25kg 70 will not there is a phenomenon where glide.Preferably, to further increase bonding strength, the fastener is 4 bolts 31 and 4 Nut;The connection type of 4 bolt 31 and 4 nuts is identical as the connection type of above-mentioned 2 bolts 31 and 2 nut 32, This is repeated no more.
Embodiment 3
As shown in Figure 7, Figure 8, fixation kit includes outer fixinig plate 21, outer gasket 22, internal gasket 23, interior fixinig plate 24 and tight Firmware, wherein outer fixinig plate 21 is " bow " shape;Internal gasket 23, interior fixinig plate 24 are successively arranged on the inside of flowerpot 70;70 outside of flowerpot It is successively arranged outer gasket 22, outer fixinig plate 21;Fastener sequentially pass through interior fixinig plate 24, internal gasket 23,70 side wall of flowerpot One through-hole 71, outer gasket 22 and outer fixinig plate 21 connect;Flexible hanging belt 10 is set in the groove at outer 21 middle part of fixinig plate.
Preferably, the outer fixinig plate 21 of " bow " shape pass through after the mounting ring 10 on flexible hanging belt 10 with fastener assembly;Outside Gasket 22 is set between flowerpot 70 and flexible hanging belt 10.Outer fixinig plate 21 is increased by the design of above-mentioned " bow " shape to lift with flexible With the contact area between 10, bonding strength is improved.
Embodiment 4
As shown in Figure 9, Figure 10, fixation kit includes outer fixinig plate 21, outer gasket 22, internal gasket 23,24 and of interior fixinig plate Fastener, wherein outer fixinig plate 21 is " Π " shape;Internal gasket 23, interior fixinig plate 24 are successively arranged on the inside of flowerpot 70;Outside flowerpot 70 Side is successively arranged outer gasket 22, outer fixinig plate 21;Fastener sequentially passes through interior fixinig plate 24, internal gasket 23, flowerpot 70 side wall First through hole 71, outer gasket 22 and outer fixinig plate 21 connect;70 side wall of flowerpot is equipped with the second groove 72 being recessed inwardly;Flexibility is hung Band 10 is filled to be set in the second groove 72.
Preferably, the outer fixinig plate 21 of " Π " shape and outer gasket 22 both pass through after the mounting ring 10 on flexible hanging belt 10 with it is tight Fastener components.The present embodiment increases the contact area between flexible hanging belt 10 by the second groove 72 of sunken inside, realizes The raising of bonding strength.
Embodiment 5
21 two sides of outer fixinig plate in embodiment 1-5 as above are equipped with side plate 214;Side plate 214 is equipped with the second through-hole 211;Anti- 42 one end of deviation bar is buckled in the second through-hole 211, and the other end is that spiral shape is flexibly connected with anti-deviation rope 41.
Embodiment 6
As shown in Figure 14, Figure 15, outer fixinig plate 21 is equipped with first passage 212 and second channel 213 along the vertical direction;First Drip irrigation pipe or lamp bar 217 are equipped in channel 212, second channel 213.Pass through first passage 212 and second channel 213;To trickle irrigation Pipe or lamp bar 217 carry out position and fix, the hair of wrapping phenomena caused by avoiding drip irrigation pipe or lamp bar 217 from desultorily placing It is raw.
Embodiment 7
As shown in figure 11, outer fixinig plate 21 is that side sets hollow squares jaggy;Notch is towards outer gasket 22;It prevents partially It is set in the cavity of outer fixinig plate 21 from rope 41 and/or drip irrigation pipe and/or lamp bar 217.By said structure design, reduce anti- The connection for deviateing bar, reduces installation and Material Cost.
Embodiment 8
As shown in figure 11,70 upper surface of flowerpot is laterally or longitudinally equipped with lamp bar 217, and the light emission direction of lamp bar 217 is along plant Direction of growth setting.It is in order to which the fluorescent tube for issuing lamp bar 217 exposes to plant sheet that 70 upper surface of flowerpot, which is arranged in, in lamp bar 217 On body, reach good Night Scenery Effect;Lamp bar 217 is avoided to be arranged along outer 21 vertical direction of fixinig plate and the light that occurs is blocked and asked Topic.
Embodiment 9
As shown in figure 11,70 two sides of flowerpot are equipped with hand handle 14, conveniently mention and unload flowerpot 70.
Embodiment 10
As shown in figure 9,70 bottom of flowerpot is equipped with drainage hole 73.
Embodiment 11
As shown in Figure 10, the side wall that the flowerpot 70 is contacted with the internal gasket 23 and/or outer gasket 22 is equipped with rough surface 74.The rough surface 74 is graininess or sandblasting shape.It is improved between internal gasket 23 and/or outer gasket 22 by rough surface 74 Frictional force.
Embodiment 12
As shown in figure 17, the position corresponding with the first through hole 71 of 70 side wall of flowerpot of internal gasket 23 is equipped in convexing to form Void column 231.When installation, the hollow posts 231 are set in first through hole 71;Bolt 31 passes through hollow posts 231, passes through hollow posts 231 package bolts, can protect flowerpot 70 not damaged by it.
Embodiment 13
As shown in figure 13, fixed link 25 is connected between two neighboring flowerpot 70.Specifically, in the connection of 25 upper end of fixed link On the bolt of flowerpot bottom, 25 lower end of fixed link is connected on the bolt at the top of lower flowerpot.It is designed by segmented fixed link 25, On the one hand, on the other hand can reduce flowerpot inclination can prevent that flowerpot can be connected when flexible hanging belt 10 is broken, Play double protection.
Embodiment 14
As shown in fig. 6, being connected with shackle 12 at the top of flexible hanging belt 10;Hanging ring 50 is connected in the shackle 12.Installation When, since there are many plants for the entire flexible lifting of hanging belt 10, weight is larger, is lifted on if skyline crane 93 slings shackle 12 The convex block 64 of upper bracket 60, it may appear that overweight caused the problem of shackle 12 can not be adjusted flexibly.It is hung by being connected in shackle 12 The design of ring 50, peace skyline crane 93 drives drives flexible hanging belt 10 to rise by shackle 12, when arriving raised 64 height, hanging ring 50 After being buckled in protrusion 64, the decline of skyline crane 93 is detached from shackle 12.Flexible 10 weight of hanging belt not in skyline crane 93 but relies at this time Protrusion 64, skyline crane 93 can be withdrawn, and install next flexible hanging belt 10.Realization is safely and quickly installed, and installation effect is improved Rate.
Embodiment 15
As shown in Figure 12 and Figure 13, fixation kit includes outer fixinig plate 21, outer gasket 22, internal gasket 23,24 and of interior fixinig plate Fastener, wherein fastener includes two bolts 31 and nut 32;Internal gasket 23, interior fixinig plate are successively arranged on the inside of flowerpot 70 24;Outer gasket 22, outer fixinig plate 21 are successively arranged on the outside of flowerpot 70;Two neighboring outer fixinig plate 21 on flexible hanging belt 10 In, 25 top of bolt connection for 21 bottom of outer fixinig plate being located above, underlying outer 21 top of fixinig plate Bolt is connect with 25 bottom of fixed link;Fixed link 25 is the hollow squares that side is equipped with notch 251;Notch 251 is towards outer fixation Piece 21;Bolt passes through entire fixed link 25 from the side wall for being equipped with 251 side of notch and connect with nut;Anti- deviation steel wire 41 is set to solid 25 two sides of fixed pole, and position is carried out by bolt and is fixed, avoid it from skidding off from notch 251;Drip irrigation pipe and/or lamp bar 217 from Notch 251 enters in the cavity of outer fixinig plate 21, between the bolt of 25 two sides of fixed link.Fixed link 25 be metal or other Hard material is made.
Two flowerpots adjacent on flexible hanging belt 10 are attached fixation by fixed link 25, flexibility is avoided the occurrence of and hangs Fill safety accident caused by band 10 is broken.In addition, test use when find, after fixed link 25, whole device it is steady It is qualitative more preferable, improve vertical greening device wind loading rating.
In addition the utility model provides a kind of new vertical greening system, green using new vertical described in Arbitrary Term as above Makeup is set;It further include upper bracket 60 and lower bracket 92;
The upper bracket 60, lower bracket 92 are respectively arranged in above and below green belt;On the flexibility hanging belt 10 End hangs on the upper bracket, and lower end is connect with lower bracket 92;The anti-deviation restrict 42 both ends respectively with upper bracket 60 and lower branch Frame 92 connects.
When it is implemented, a kind of new vertical greening system, using the new vertical afforestation equipment of Arbitrary Term as above;Also wrap Include upper bracket 60 and lower bracket 92;Upper bracket 60, lower bracket 92 are respectively arranged in above and below green belt;Flexible hanging belt 10 upper ends hang on upper bracket, and lower end is connect with lower bracket 92;Anti- deviation restrict 42 both ends respectively with upper bracket 60 and lower bracket 92 Connection.
When installation, skyline crane 93 drives drives flexible hanging belt 10 to rise by shackle 12, the protrusion onto upper bracket 60 When 64 height, after hanging ring 50 is buckled in protrusion 64, the decline of skyline crane 93 is detached from shackle 12.10 weight of flexible hanging belt is not rising at this time Fortune machine 93 but rely on protrusion 64, skyline crane 93 can be withdrawn, and install next flexible hanging belt 10.Then, staff will Flexible 10 bottom of hanging belt is mounted on lower bracket 92, realizes that the installation of flexible hanging belt 10 is fixed.Through upper bracket 60 under The design of bracket 92 can effectively fix flexible hanging belt 10, improve the stability of whole system.
New vertical greening system provided by the utility model is improved whole by the mounting structure of upper bracket and lower bracket The stability of a system.
The utility model also provides following examples
Embodiment 16
The lower bracket 92 is crossbeam 13;The crossbeam 13 is mounted on bottom surface or suspension, by the weight of crossbeam to flexibility Hanging belt 10 is fixed.Preferably, 13 two sides of crossbeam are equipped with protection post 80, flexible 10 bottom of hanging belt can be protected Shield;Meanwhile be also avoided that pedestrian too close to flexible hanging belt 10 occur flowerpot or plant fall caused by safety problem.
Embodiment 17
As shown in Fig. 2, lower bracket 92 is mounted on above businessman or gate, it is described for convenience of the maintenance of flexible hanging belt 10 Maintenance aisle 91 is equipped with above businessman or gate.
Embodiment 18
As shown in figure 3, being equipped with pulley 62 on upper bracket 60;Manual line disk 63, flexibility lifting are installed on lower bracket 92 10 upper end of band is penetrated from 62 bottom side of pulley, is pierced by from the 62 bottom other side of pulley and is connect with manual line disk 63, by manual Line disk 63 realizes the lifting of flexible hanging belt 10, facilitates and carries out plant replacement or the flexible maintenance of hanging belt 10.
Embodiment 19
As shown in Fig. 4, Fig. 7, Fig. 9;Upper bracket 60 is set there are three A-frame, in the middle part of A-frame bottom be equipped with it is convex The A-frame end of block 64, two sides is equipped with through-hole or anti-deviation ring;Anti- deviation rope 41 passes through anti-deviation bar 42 and outer fixinig plate 21 connections;Hanging ring 50 on flexible hanging belt 10 is installed on the convex block 64 at middle part;Two anti-deviation ropes 41 and two sides A-frame end is equipped with through-hole or anti-deviation ring connects, and realizes that the installation of new vertical afforestation equipment is fixed.
Embodiment 20
As shown in Fig. 5, Figure 11, upper bracket 60 is a Three-dimensional triangle body, and the outwardly extending end of upper bracket 60 is equipped with convex Block 64;Anti- deviation ring 65 is equipped with below the convex block 64;The anti-cavity two sides deviateed rope 41 and pass through outer fixinig plate 21, the bolt Between two anti-deviation ropes 41.When installation, the shackle 12 on flexible hanging belt 10 is installed on end equipped on convex block 64;It is anti- Deviate rope 41 to be installed on the anti-deviation ring 65 of 64 lower section of convex block, reduces the anti-installation diameter for deviateing rope 41, simplify branch The structure of frame 60.
Upper bracket 60, which extends outwardly, in above-described embodiment projects to appropriate location, and making to afforest inside and outside building can all appreciate Plant.
Although more herein used such as flexible hanging belt, mounting ring, shackle, crossbeam, fixinig plate, gasket, spiral shell Bolt, nut, anti-deviation silk, anti-deviation bar, hanging ring, bracket, foot base, flowerpot, through-hole, the second groove, protection post, maintenance aisle, The terms such as bracket, skyline crane, notch, channel, side plate, the first groove, but it does not exclude the possibility of using other terms.It uses These terms are used for the purpose of being more convenient to describe and explain the essence of the utility model;It is construed as any additional Limitation be all contrary to the spirit of the present invention.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (9)

1. a kind of new vertical afforestation equipment, which is characterized in that including flexible hanging belt (10), fixation kit, anti-deviation rope (41) and flowerpot (70);Wherein:
The flexibility hanging belt (10) is clamped with several flowerpots (70) by fixation kit respectively along its length;The anti-deviation Rope (41) is successively connect with several fixation kits along flexible hanging belt (10) length direction;The fixation kit is detachable.
2. new vertical afforestation equipment according to claim 1, it is characterised in that: the flexibility hanging belt (10) is equipped with Mounting ring (11);The fixation kit is connected to the mounting ring (11).
3. new vertical afforestation equipment according to claim 1, it is characterised in that: the fixation kit includes outer fixinig plate (21), outer gasket (22), internal gasket (23), interior fixinig plate (24) and fastener;Interior pad is successively arranged on the inside of the flowerpot (70) Piece (23), interior fixinig plate (24);Outer gasket (22), outer fixinig plate (21) are successively arranged on the outside of the flowerpot (70);
The fastener sequentially passes through interior fixinig plate (24), internal gasket (23), flowerpot (70), outer gasket (22) and outer fixinig plate (21) it connects;It is described flexibility hanging belt (10) be held between the flowerpot (70) and outer gasket (22) or outer gasket (22) and outside Between fixinig plate (21).
4. new vertical afforestation equipment according to claim 3, it is characterised in that: the shape packet of the outer fixinig plate (21) Include following at least one: " bow " shape, " Π " shape or plate shaped.
5. new vertical afforestation equipment according to claim 3, it is characterised in that: outer fixinig plate (21) two sides are equipped with Second through-hole (211);Anti- deviation bar (42) one end is connected in second through-hole (211), the other end and anti-deviation rope (41) It is flexibly connected.
6. new vertical afforestation equipment according to claim 3, it is characterised in that: the outer fixinig plate (21) is equipped with first Channel (212) and second channel (213);Drip irrigation pipe or lamp bar are equipped in the first passage (212), second channel (213) (217)。
7. according to the described in any item new vertical afforestation equipments of claim 3-6, it is characterised in that: the flexibility hanging belt (10) it is connected between the two neighboring outer fixinig plate (21) on by fixed link (25);The fixed link (25) is side equipped with scarce The hollow squares of mouth (251);The notch (251) is towards the outer fixinig plate (21);Anti- deviation rope (41) and/or drip irrigation pipe And/or lamp bar (217) is set in the cavity of the fixed link (25).
8. new vertical afforestation equipment according to claim 1, it is characterised in that: flowerpot (70) upper surface is equipped with lamp Item (217).
9. a kind of new vertical greening system, it is characterised in that: green using such as described in any item new verticals of claim 1-8 Makeup is set;It further include upper bracket (60) and lower bracket (92);
The upper bracket (60), lower bracket (92) are respectively arranged in above and below green belt;The flexibility hanging belt (10) Upper end hangs on the upper bracket, and lower end is connect with lower bracket (92);The anti-deviation rope (42) both ends respectively with upper bracket (60) it is connected with lower bracket (92).
CN201822158945.2U 2018-12-21 2018-12-21 A kind of new vertical afforestation equipment and system Active CN209330688U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201822158945.2U CN209330688U (en) 2018-12-21 2018-12-21 A kind of new vertical afforestation equipment and system
PCT/CN2019/091084 WO2020124964A1 (en) 2018-12-21 2019-06-13 High-altitude greening lifting device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822158945.2U CN209330688U (en) 2018-12-21 2018-12-21 A kind of new vertical afforestation equipment and system

Publications (1)

Publication Number Publication Date
CN209330688U true CN209330688U (en) 2019-09-03

Family

ID=67758285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822158945.2U Active CN209330688U (en) 2018-12-21 2018-12-21 A kind of new vertical afforestation equipment and system

Country Status (1)

Country Link
CN (1) CN209330688U (en)

Similar Documents

Publication Publication Date Title
CN108040671A (en) A kind of ecological wall construction of Garden Engineering
CN212436546U (en) Greening landscape wall
JP2008289462A (en) Wall surface greening method for construction such as building allowing plant unit to go up and down
CN206341631U (en) One kind suspension vertical greening device
CN209330688U (en) A kind of new vertical afforestation equipment and system
CN207201529U (en) A kind of frame for passion fruit
CN110149959B (en) Frame-type wall green vertical climbing structure of planting based on landscape garden design
CN108901459A (en) Plant raw wall virescence fabric and suspension lifting formula vertical greening device and its application method
CN215011988U (en) Indoor integrated tendril hanging device
CN108901469A (en) A kind of community's road scaffolding system for vegetable growing
CN110972768B (en) Greening structure combined with liana
CN204560411U (en) Simple and easy Mobile type vertical rack for prostrate plant and combined type are overgrow type plant facade frame
CN208691828U (en) Plant raw wall virescence fabric and suspension lifting formula vertical greening device
CN211671565U (en) Afforestation device
CN108112392A (en) A kind of stent for being used to plant tomato
CN208329169U (en) A kind of skeleton symbol quick-mounting type suspension type is built in the air
CN106171658A (en) A kind of flexible structure booth
CN112125163A (en) Supplementary device of building stones
CN205511087U (en) Large -scale flowers container of planting
CN209151795U (en) A kind of wine-growing protective net
CN211580832U (en) Corridor frame planting technique case
CN212746285U (en) Garden street lamp with greening function
CN105941074B (en) A kind of balcony grape trellis
CN105941075B (en) A kind of balcony liftable grape trellis
CN220274375U (en) Liftable aerial strawberry cultivation groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant