CN209328365U - A kind of masonry plastering template - Google Patents

A kind of masonry plastering template Download PDF

Info

Publication number
CN209328365U
CN209328365U CN201821747981.6U CN201821747981U CN209328365U CN 209328365 U CN209328365 U CN 209328365U CN 201821747981 U CN201821747981 U CN 201821747981U CN 209328365 U CN209328365 U CN 209328365U
Authority
CN
China
Prior art keywords
fixedly connected
concrete
pedestal
template
planet carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821747981.6U
Other languages
Chinese (zh)
Inventor
康望才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hankun Building Security Equipment Co Ltd
Original Assignee
Hunan Hankun Building Security Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hankun Building Security Equipment Co Ltd filed Critical Hunan Hankun Building Security Equipment Co Ltd
Priority to CN201821747981.6U priority Critical patent/CN209328365U/en
Application granted granted Critical
Publication of CN209328365U publication Critical patent/CN209328365U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model relates to masonry plastering template technical fields, in particular a kind of masonry plastering template, including pedestal and link, the left and right ends of the pedestal are fixedly connected to the link being vertically arranged, the top of the pedestal is fixedly connected with concrete lintel, wall is fixedly connected on the inside of the concrete lintel, the top of the wall is fixedly connected with oblique top brick, the front end of the front side oblique top brick is fixedly connected with construction column template, the bottom end of the construction column template is fixedly connected with constructional column reinforcing bar, horizontally disposed concrete windowsill is fixedly connected on the inside of the rear side wall, pre-buried concrete segment is fixedly connected on the inside of the rear side wall, in the utility model, pass through the concrete lintel of setting, link, pedestal, oblique top brick, constructional column reinforcing bar and concrete windowsill, it can be by concrete lintel preferably to whole The stability of a device is controlled, and improves the service life of the present apparatus, and can preferably show the mounting means of the present apparatus.

Description

A kind of masonry plastering template
Technical field
The utility model relates to masonry plastering template technical field, specially a kind of masonry plastering template.
Background technique
Masonry project refers to common clay brick, load-bearing clay hollow brick, autoclaved lime-sand brick, and flyash brick is various middle-size and small-size The masonry of building block and stone material, China just carries out wall reform at present, uses to save farmland, less with common clay brick, into one Step promotes and applies various building-blocks, wherein with hollow brick mainstream the most, with the development of society, answering masonry plastering template With further extensively, therefore, the demand to a kind of masonry plastering template is growing.
The most table structure of masonry plastering template occurred currently on the market is simple, has a single function, most stable is poor, makes It is short with the service life, and all information of template cannot be shown completely, and general masonry plastering template does not have automatic ash removing Function, after being covered with dust all over, very slow cleaning brings many inconvenience to user, therefore, proposes one regarding to the issue above Kind masonry plastering template.
Utility model content
The purpose of this utility model is to provide a kind of masonry plastering templates, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides the following technical solutions:
A kind of masonry plastering template, including pedestal and link, the left and right ends of the pedestal are fixedly connected to be set vertically The link set, the top of the pedestal are fixedly connected with concrete lintel, are fixedly connected with wall on the inside of the concrete lintel Body, the top of the wall are fixedly connected with oblique top brick, and the front end of the front side oblique top brick is fixedly connected with construction column template, institute The bottom end for stating construction column template is fixedly connected with constructional column reinforcing bar, is fixedly connected on the inside of the rear side wall horizontally disposed Concrete windowsill, pre-buried concrete segment is fixedly connected on the inside of the rear side wall, and the top of the concrete lintel is solid Surely the bottom end for being connected with ring gear described in ring gear is fixedly connected with crossbeam, and the top of the crossbeam is rotatably connected to planet carrier, described The top of planet carrier is fixedly connected with motor, and the main shaft end of the motor is fixedly connected with driving gear, and driving gear with Planet carrier rotation connection, the left and right ends of the driving gear are engaged with driven gear, and driven gear and planet carrier rotate Connection, the left and right ends of the planet carrier are fixedly connected to fixed plate, and the bottom end of the fixed plate is fixedly connected with fountain head.
Preferably, the number of the link in total there are four, and be evenly distributed in the left and right sides of pedestal.
Preferably, the outer diameter of the driving gear and the outer diameter of driven gear are equal in magnitude.
Preferably, the upside of concrete windowsill is arranged in the position of the pre-buried concrete segment.
Preferably, the length of the concrete windowsill is equal with the length scale of concrete lintel.
Compared with prior art, the utility model has the beneficial effects that
1, in the utility model, by the ring gear of setting, driving gear, motor, planet carrier, fixed plate, driven gear and Crossbeam influences this visit of visitor when the present apparatus is in outdoor product completely dust for a long time, can be by the effect of fountain head to this The surrounding of device is quickly cleaned, and the efficiency of work is improved;
2, in the utility model, pass through the concrete lintel of setting, link, pedestal, oblique top brick, construction column template, construction Column reinforcing bar and concrete windowsill preferably can control the stability of whole device by concrete lintel, improve this The service life of device, and can preferably show the mounting means of the present apparatus.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the mounting structure schematic diagram of the utility model concrete windowsill;
Fig. 3 is the mounting structure schematic diagram of the utility model fountain head.
In figure: 1- pedestal, 2- link, 3- oblique top brick, 4- concrete lintel, 5- ring gear, 6- driving gear, 7- motor, 8- Planet carrier, 9- fixed plate, 10- driven gear, 11- crossbeam, 12- construct column template, 13- constructional column reinforcing bar, 14- concrete window The pre-buried concrete segment of platform, 15-, 16- wall, 17- fountain head.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution:
A kind of masonry plastering template, including pedestal 1 and link 2, the left and right ends of the pedestal 1 are fixedly connected to vertically The link 2 of setting, the top of the pedestal 1 are fixedly connected with concrete lintel 4, and the inside of the concrete lintel 4 is fixed to be connected It is connected to wall 16, the top of the wall 16 is fixedly connected with oblique top brick 3, and the front end of the front side oblique top brick 3 is fixedly connected with Construct column template 12, the bottom end of the construction column template 12 is fixedly connected with constructional column reinforcing bar 13, the rear side wall 16 it is interior Side is fixedly connected with horizontally disposed concrete windowsill 14, and the inside of the rear side wall 16 is fixedly connected with pre-buried concrete and builds Block 15, the bottom end that the top of the concrete lintel 4 is fixedly connected with ring gear 5 described in ring gear 5 is fixedly connected with crossbeam 11, described The top of crossbeam 11 is rotatably connected to planet carrier 8, and the top of the planet carrier 8 is fixedly connected with motor 7, the master of the motor 7 Shaft end is fixedly connected with driving gear 6, and driving gear 6 and planet carrier 8 are rotatablely connected, the left and right two of the driving gear 6 End is engaged with driven gear 10, and driven gear 10 and planet carrier 8 are rotatablely connected, and the left and right ends of the planet carrier 8 are solid Surely it is connected with fixed plate 9, the bottom end of the fixed plate 9 is fixedly connected with fountain head 17.
The number of the link 2 in total there are four, and be evenly distributed in the left and right sides of pedestal 1, link 2 can be passed through Effect realize overall movement to the present apparatus, easy to carry, the outer diameter of the outer diameter and driven gear 10 of the driving gear 6 is big It is small equal, it is ensured that steady, the stability of raising present apparatus work of whole device rotation, the pre-buried concrete segment 15 Position the upside of concrete windowsill 14 is set, the entire stabilization that pre-buried concrete segment 15 improves the present apparatus can be passed through Property, the length of the concrete windowsill 14 is equal with the length scale of concrete lintel 4, it is ensured that concrete windowsill 14 it is steady It is qualitative.
The model Y1-160M1-8 motor of the motor 7.
Workflow: the utility model first pass through before the use external power supply be powered and fountain head 17 with it is external Water pump communicates, and when the present apparatus is moved, can be carried out by link 2 and pedestal 1 to the present apparatus by hanging device It is mobile, pass through oblique top brick 3, concrete lintel 4, construction column template 12, constructional column reinforcing bar 13, concrete windowsill 14, pre-buried coagulation The stability and service life of whole device can be improved in earth building blocks 15 and wall 16, when need to present apparatus surrounding dust into When row quickly cleans, Rapid Cleaning, fountain head 17 and horizontal direction are carried out by dust of the fountain head 17 to 16 outer surface of wall It is arranged in 30 degree of angles, it is ensured that fountain head 17 can comprehensively clean the present apparatus, after having cleared up two sides, make motor 7 drive driven gear 10 to rotate in the inside of ring gear 5 by the effect of driving gear 6, while can also be driven by planet carrier 8 solid Fixed board 9 is rotated with fountain head 17, and fountain head 17 will not be interfered with concrete lintel 4, the position tune of fountain head 17 After haveing suffered, cleaning dust can be carried out to remaining two sides wall 16.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of masonry plastering template, including pedestal (1) and link (2), it is characterised in that: the left and right ends of the pedestal (1) It is fixedly connected to the link (2) being vertically arranged, the top of the pedestal (1) is fixedly connected with concrete lintel (4), described mixed It is fixedly connected with wall (16) on the inside of solidifying soil lintel (4), the top of the wall (16) is fixedly connected with oblique top brick (3), preceding The front end of oblique top brick (3) described in side is fixedly connected with construction column template (12), and the bottom end of construction column template (12) is fixed to be connected It is connected to constructional column reinforcing bar (13), horizontally disposed concrete windowsill (14) is fixedly connected on the inside of the rear side wall (16), It is fixedly connected on the inside of the rear side wall (16) pre-buried concrete segment (15), the top of the concrete lintel (4) is solid Surely the bottom end for being connected with ring gear (5) ring gear (5) is fixedly connected with crossbeam (11), the top rotation connection of the crossbeam (11) Have planet carrier (8), the top of the planet carrier (8) is fixedly connected with motor (7), and the main shaft end of the motor (7) is fixed to be connected It is connected to driving gear (6), and driving gear (6) and planet carrier (8) are rotatablely connected, the left and right ends of the driving gear (6) are equal It is engaged with driven gear (10), and driven gear (10) and planet carrier (8) are rotatablely connected, the left and right ends of the planet carrier (8) It is fixedly connected to fixed plate (9), the bottom end of the fixed plate (9) is fixedly connected with fountain head (17).
2. a kind of masonry plastering template according to claim 1, it is characterised in that: the number of the link (2) is a total of Four, and it is evenly distributed in the left and right sides of pedestal (1).
3. a kind of masonry plastering template according to claim 1, it is characterised in that: the outer diameter of the driving gear (6) with The outer diameter of driven gear (10) is equal in magnitude.
4. a kind of masonry plastering template according to claim 1, it is characterised in that: the pre-buried concrete segment (15) Position is arranged in the upside of concrete windowsill (14).
5. a kind of masonry plastering template according to claim 1, it is characterised in that: the length of the concrete windowsill (14) It is equal with the length scale of concrete lintel (4).
CN201821747981.6U 2018-10-26 2018-10-26 A kind of masonry plastering template Expired - Fee Related CN209328365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821747981.6U CN209328365U (en) 2018-10-26 2018-10-26 A kind of masonry plastering template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821747981.6U CN209328365U (en) 2018-10-26 2018-10-26 A kind of masonry plastering template

Publications (1)

Publication Number Publication Date
CN209328365U true CN209328365U (en) 2019-08-30

Family

ID=67708728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821747981.6U Expired - Fee Related CN209328365U (en) 2018-10-26 2018-10-26 A kind of masonry plastering template

Country Status (1)

Country Link
CN (1) CN209328365U (en)

Similar Documents

Publication Publication Date Title
CN108160289B (en) High-efficient breaker of building rubbish
CN211163390U (en) Reinforcing bar rust cleaning device for building
CN208563066U (en) A kind of reinforcement of concrete defect device
CN208218333U (en) A kind of construction site material lift device
CN207988441U (en) A kind of mortar gypsum automatic rendering device
CN110843138A (en) Make reinforced compounding device of muddy earth ration based on gravity changes
CN113530180A (en) Floor mortar scraper blade for building engineering
CN209328365U (en) A kind of masonry plastering template
CN214995669U (en) Wall plastering device for building construction
CN207277774U (en) Portable ceramic tile machinery apparatus of plastering
CN108581800A (en) A kind of timber processing polished device
CN110435004B (en) Concrete mixing equipment for construction
CN114748955A (en) Dust falling device for stone mining and application method thereof
CN212072273U (en) Cutting device is used in building materials processing
CN211415742U (en) Slurry stirring pool
CN209286933U (en) A kind of construction site dust-extraction unit
CN208184277U (en) A kind of concrete-pouring template support device
CN206128671U (en) Building surface cleaning lifting machine constructs
CN207054661U (en) A kind of eel string piece cleaning device
CN220882898U (en) Movable visual precast concrete member production coordinate projection positioning device
CN204773028U (en) Stirring sprinkler in cement pond
CN217557544U (en) Wall plastering device for house building engineering
CN220639864U (en) A remove bracket for aerated concrete block
CN213471688U (en) Mixing device for fireproof autoclaved aerated concrete blocks
CN217514266U (en) Cutting device for processing aerated concrete building blocks based on ceramsite

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190830

CF01 Termination of patent right due to non-payment of annual fee