CN209326076U - A kind of central air-conditioning water cooled pipeline erection scaffolding - Google Patents
A kind of central air-conditioning water cooled pipeline erection scaffolding Download PDFInfo
- Publication number
- CN209326076U CN209326076U CN201821860694.6U CN201821860694U CN209326076U CN 209326076 U CN209326076 U CN 209326076U CN 201821860694 U CN201821860694 U CN 201821860694U CN 209326076 U CN209326076 U CN 209326076U
- Authority
- CN
- China
- Prior art keywords
- water cooled
- cooled pipeline
- central air
- fixed
- cover board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to heating and ventilating equipment field more particularly to a kind of central air-conditioning water cooled pipeline erection scaffoldings.The technical problem to be solved by the present invention is to provide one kind easy to disassemble to recycle, while convenient for taking out heavy water cooled pipeline, and provides the central air-conditioning water cooled pipeline erection scaffolding of illumination.A kind of central air-conditioning water cooled pipeline erection scaffolding includes mounting plate, sliding block, fixing glue, support groove body, wing bolt, the first body cradle and cover board;Sliding slot and mounting hole are offered on mounting plate;Fixing glue penetrating mounting holes, and be inserted into wall and installed;Support groove body is slidably connected by sliding block and sliding rail;Cover board is hinged by the first body cradle and support groove body, and cover board blocks support groove body;The first threaded hole is offered on cover board, support groove body.The utility model has reached recycling easy to disassemble, while convenient for taking out heavy water cooled pipeline, and provides the effect of illumination.
Description
Technical field
The utility model relates to heating and ventilating equipment field more particularly to a kind of central air-conditioning water cooled pipeline erection scaffoldings.
Background technique
Central air conditioner system is made of one or more cold and heat source systems and multiple air handling systems, which is different from
Traditional cryogen formula air-conditioning, air centralized processing have reached comfort requirement.The principle for using liquid gasification to freeze is air conditioning system
System provides institute's chilling requirement, to offset the refrigeration duty of indoor environment;Heating system provides institute's calorific requirement for air handling system, uses
To offset indoor environment thermic load.Freezed using the water cooler of water-cooling type, needs convey using water cooled pipeline cold
Freeze water, and water cooled pipeline needs to be close to wall and is installed close to ceiling, so that the life of crowd is not interfered with, it is common to pacify
The bracket of water cooled pipeline is filled when being installed, is not easy to disassembly & recycling, and when water cooled pipeline damage needs replacing maintenance, by
Cause weight very heavy in conveying fluid temperature is extremely low in water cooled pipeline and length is too long and be difficult to take out, therefore needs research and development one
Kind easy to disassemble can recycle, while convenient for taking out heavy water cooled pipeline, and provide the central air-conditioning water cooled pipeline peace of illumination
Dress uses bracket.
Utility model content
The utility model is not easy to disassembly & recycling to overcome the bracket of common installation water cooled pipeline when being installed,
And when water cooled pipeline damage needs replacing maintenance, due to conveying in water cooled pipeline, fluid temperature is extremely low and length is too long leads to weight
Amount is very heavy and is difficult to the shortcomings that taking out, and the technical problem to be solved by the present invention is to provide one kind can be easy to disassemble time
It receives, while convenient for taking out heavy water cooled pipeline, and the central air-conditioning water cooled pipeline erection scaffolding of illumination is provided.
The utility model is reached by technological means in detail below:
A kind of central air-conditioning water cooled pipeline erection scaffolding includes mounting plate, sliding block, fixing glue, support groove body, butterfly
Bolt, the first body cradle and cover board;Sliding slot and mounting hole are offered on mounting plate;Fixing glue penetrating mounting holes, and it is inserted into wall
Inside installed;Support groove body is slidably connected by sliding block and sliding rail;Cover board is hinged by the first body cradle and support groove body, and
Cover board blocks support groove body;The first threaded hole is offered on cover board, support groove body;Wing bolt through cover board and with the first spiral shell
Pit is spirally connected.
Further, which further includes having the second body cradle, curved placement plate,
Three body cradles, drawstring, fixed ring, snap-gauge and the first pull ring;Second body cradle is fixed in bottom surface in support slot body;Curved placement plate
It is hinged with the second body cradle, and curved placement plate is contacted with bottom surface in support slot body;Fixed ring is fixed in the external wall of support slot;It draws
Rope is hinged by third body cradle and curved placement plate, and runs through fixed ring;Snap-gauge is fixed in drawstring, and is located in fixed ring
Side is clamped with fixed ring;First pull ring is fixed in snap-gauge top surface.
Further, the central air-conditioning water cooled pipeline erection scaffolding further include have screw rod, hook, electric wire, battery and
LED lamp panel;The external bottom surface of support slot offers the second threaded hole;Screw rod and screw hole;Hook is fixed in screw rod bottom;It stores
Battery is fixed in the external bottom surface of support slot;LED lamp panel is fixed in battery bottom surface;Electric wire one end is fixed in battery, another
End connects other batteries along water cooled pipeline by hook support.
Further, which further includes having rubber pad;Rubber pad is fixed in curved
Place plate top surface.
Further, which further includes having clamping groove body;Clamping groove body is fixed in
The external top surface of support slot, and be clamped with cover board.
Further, which further includes having the second pull ring;Second pull ring is fixed in
Cover board side.
Compared with prior art, the utility model has the following beneficial effects:
The utility model has reached recycling easy to disassemble, while convenient for taking out heavy water cooled pipeline, and provides illumination
Effect cooperates fixing glue to be mounted on the wall bracket by mounting plate, cooperates sliding block can easy to disassemble or installation by sliding slot
Groove body is supported, placement water cooled pipeline is carried out by support groove body, thus make bracket convenient for assembling, it is easy to carry, pass through curved placement
Plate cooperation drawstring can will be placed in the water cooled pipeline in curved placement plate and tilt along the second body cradle, to make water cooled pipeline along bent
The inclined surface of type placement plate and slide off support groove body, heavy water cooled pipeline is taken out to have the function that facilitate, by setting
Illuminating effect can be provided for pedestrian by setting LED lamp panel, and cooperate battery that LED lamp panel can be made to be powered or have a power failure in the external world by electric wire
In the case where be capable of providing illuminating effect, improve the functionality of bracket, facilitate the trip of pedestrian.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the utility model.
Fig. 2 is second of schematic view of the front view of the utility model.
Fig. 3 is the third schematic view of the front view of the utility model.
Fig. 4 is the 4th kind of schematic view of the front view of the utility model.
Fig. 5 is the 5th kind of schematic view of the front view of the utility model.
Fig. 6 is the 6th kind of schematic view of the front view of the utility model.
The label in accompanying drawing is: 1- mounting plate, 2- sliding slot, 3- sliding block, 4- mounting hole, 5- fixing glue, 6- support groove body, 7-
Wing bolt, the first body cradle of 8-, 9- cover board, the first threaded hole of 10-, the second body cradle of 11-, the curved placement plate of 12-, 13-
Three body cradles, 14- drawstring, 15- fixed ring, 16- snap-gauge, the first pull ring of 17-, the second threaded hole of 18-, 19- screw rod, 20- hook,
21- electric wire, 22- battery, 23-LED lamp plate, 24- rubber pad, 25- are clamped groove body, the second pull ring of 26-.
Specific embodiment
The utility model is described further below in conjunction with attached drawing:
Embodiment
A kind of central air-conditioning water cooled pipeline erection scaffolding includes as shown in figures 1 to 6 mounting plate 1, sliding block 3, fixing glue
5, groove body 6, wing bolt 7, the first body cradle 8 and cover board 9 are supported;Sliding slot 2 and mounting hole 4 are offered on mounting plate 1;Fixing glue
5 penetrating mounting holes 4, and be inserted into wall and installed;Support groove body 6 is slidably connected by sliding block 3 with sliding rail;Cover board 9 passes through
First body cradle 8 and support groove body 6 are hinged, and cover board 9 blocks support groove body 6;First is offered on cover board 9, support groove body 6
Threaded hole 10;Wing bolt 7 is spirally connected through cover board 9 and with the first threaded hole 10.
Central air conditioner system is made of one or more cold and heat source systems and multiple air handling systems, which is different from
Traditional cryogen formula air-conditioning, air centralized processing have reached comfort requirement.The principle for using liquid gasification to freeze is air conditioning system
System provides institute's chilling requirement, to offset the refrigeration duty of indoor environment;Heating system provides institute's calorific requirement for air handling system, uses
To offset indoor environment thermic load.Freezed using the water cooler of water-cooling type, needs convey using water cooled pipeline cold
Freeze water, and water cooled pipeline needs to be close to wall and is installed close to ceiling, so that the life of crowd is not interfered with, it is common to pacify
The bracket of water cooled pipeline is filled when being installed, is not easy to disassembly & recycling, and when water cooled pipeline damage needs replacing maintenance, by
Cause weight very heavy in conveying fluid temperature is extremely low in water cooled pipeline and length is too long and be difficult to take out, so this branch can be used
Frame carries out installation water cooled pipeline, can effective solution these problems.
Mounting plate 1 is moved to suitable position and is adjacent to metope by worker, by heading into fixing glue 5 by mounting hole 4
In wall, mounting plate 1 can be fixed on metope, by that will support in sliding slot 2 of the groove body 6 by the insertion mounting plate 1 of sliding block 3,
Support groove body 6 can be mounted on mounting plate 1, wing bolt 7 be screwed out, and opened cover board 9 by the first body cradle 8,
To open support groove body 6, water cooled pipeline can be placed in support groove body 6 by worker, hinged by first after placement
Cover board 9 is covered support groove body 6 by frame 8, to prevent water cooled pipeline from moving out of support groove body 6, and wing bolt 7 is screwed in the first spiral shell
In pit 10, to have the function that facilitate installation, when needing removal bracket, by the way that wing bolt 7 will be screwed out, cover board 9 is opened
Afterwards, that is, it can be taken off water cooled pipeline, and support groove body 62 taken out along the chute by sliding block 3, i.e., separable support slot body 6 and installation
Plate 1, to have the function that recycling easy to disassemble.
Wherein, according to Fig.2, which further includes having the second body cradle 11, song
Type placement plate 12, third body cradle 13, drawstring 14, fixed ring 15, snap-gauge 16 and the first pull ring 17;Second body cradle 11 is fixed in
Support 6 inner bottom surface of groove body;Curved placement plate 12 and the second body cradle 11 are hinged, and bottom in curved placement plate 12 and support groove body 6
Face contact;Fixed ring 15 is fixed in support 6 outer wall of groove body;Drawstring 14 is hinged by third body cradle 13 and curved placement plate 12,
And run through fixed ring 15;Snap-gauge 16 is fixed in drawstring 14, and is located at 15 top of fixed ring, is clamped with fixed ring 15;First pull ring
17 are fixed in 16 top surface of snap-gauge;When water cooled pipeline needs replacing or repairs, need to take water cooled pipeline from support groove body 6
Out, and water cooled pipeline is since a large amount of chilled water is contained and preponderance in inside, and temperature is extremely low, and worker is difficult to water cooled pipeline
It is removed from support groove body 6, so curved placement plate 12 is arranged, curved placement plate 12 agrees with the outer surface of round water cooled pipeline,
When placement being facilitated to be put into water cooled pipeline in support groove body 6, placement water cooled pipeline can be carried out by curved placement plate 12, work as needs
When taking out water cooled pipeline, cover board 9 is opened, worker is by pulling the first pull ring 17 that snap-gauge 16, drawstring 14 will be driven to rise, to make
Drawstring 14 is tilted curved placement plate 12 along the second body cradle 11 by third body cradle 13, by water cooled pipeline along inclined song
Type placement plate 12 slides off support groove body 6, takes out water cooling tube to have the function that, and after the first pull ring 17 is put down,
Snap-gauge 16 is fixed ring 15 and blocks, and can store the first pull ring 17.
Wherein, which further includes having screw rod 19, hook 20, electric wire 21, battery
22 and LED lamp panel 23;Support 6 outer bottom of groove body offers the second threaded hole 18;Screw rod 19 and screw hole;It is affixed to link up with 20
In 19 bottom of screw rod;Battery 22 is fixed in support 6 outer bottom of groove body;LED lamp panel 23 is fixed in 22 bottom surface of battery;Electric wire 21
One end is fixed in battery 22, and the other end connects other batteries 22 along water cooled pipeline by 20 support of hook;According to figure
Shown in 3, passerby's time line of walking below water cooled pipeline is insufficient in order to prevent, so setting LED lamp panel 23, passes through installation electric power storage
Pond 22 can provide the power supply of LED lamp panel 23, can supplement electric power by electric wire 21 for battery 22, and in energization, LED light
Plate 23 can provide through 21 direct-electrifying of electric wire, and in the event of a loss of power, LED lamp panel 23 will not lose illuminating effect, by filling
The battery 22 of full electric power carries out offer electric power, to can when ensure that passerby is when below walking with water cooled pipeline
Bright guide is obtained, the trend of electric wire 21 can be oriented to by hook 20, makes an electric wire 21 that can connect multiple batteries 22, and
And the phenomenon that avoiding 21 hanging of electric wire is played, it, can be by screw rod 19 from the second threaded hole 18 when hook 20 gets rusty and needs replacing
It screws out, so as to carry out replacement hook 20.
Wherein, according to Fig.4, which further includes having rubber pad 24;Rubber pad
24 are fixed in curved 12 top surface of placement plate;Rubber pad 24, which is arranged, can provide the effect on protection water cooled pipeline surface, avoid water cooling tube
Road surface and support 6 inner wall of groove body directly contact and by its coarse surface scratching, while rubber pad 24 can play it is certain
Antihunt action.
Wherein, which further includes having clamping groove body 25;Clamping groove body 25 is fixed in
The outer top surface of groove body 6 is supported, and is clamped with cover board 9;According to Fig.5, after setting clamping groove body 25, cover board 9 is hinged by first
, can be temporarily fixed by cover board 9 by clamping groove body 25 after frame 8 is raised, avoid the cover board 9 when placing or repairing replacement water cooled pipeline
It loses fixed function and turns down.
Wherein, which further includes having the second pull ring 26;Second pull ring 26 is fixed in
9 side of cover board;According to Fig.6, the second pull ring 26 of setting can keep the use of bracket more convenient convenient for pulling open cover board 9.
The control mode of the utility model is automatically controlled by controller, and the control circuit of controller passes through this field
Technical staff's simple programming can be realized, the offer of power supply also belongs to the common knowledge of this field, and the utility model master
To be used to protect mechanical device, so the utility model is not explained control mode and circuit connection.
The opening in technical solutions of the utility model using technical solution described in the utility model or those skilled in the art
It gives, designs similar technical solution, and reach above-mentioned technical effect, be to fall into the protection scope of the utility model.
Claims (6)
1. a kind of central air-conditioning water cooled pipeline erection scaffolding, which is characterized in that include mounting plate, sliding block, fixing glue, support
Groove body, wing bolt, the first body cradle and cover board;Sliding slot and mounting hole are offered on mounting plate;Fixing glue penetrating mounting holes, and
It is installed in insertion wall;Support groove body is slidably connected by sliding block and sliding rail;Cover board passes through the first body cradle and support slot
Body is hinged, and cover board blocks support groove body;The first threaded hole is offered on cover board, support groove body;Wing bolt runs through cover board
And with the first screw hole.
2. a kind of central air-conditioning water cooled pipeline erection scaffolding according to claim 1, which is characterized in that the central air-conditioning
Water cooled pipeline erection scaffolding further include have the second body cradle, curved placement plate, third body cradle, drawstring, fixed ring, snap-gauge and
First pull ring;Second body cradle is fixed in bottom surface in support slot body;Curved placement plate and the second body cradle are hinged, and curved placement
Plate is contacted with bottom surface in support slot body;Fixed ring is fixed in the external wall of support slot;Drawstring passes through third body cradle and curved placement
Plate is hinged, and runs through fixed ring;Snap-gauge is fixed in drawstring, and is located above fixed ring, is clamped with fixed ring;First pull ring is affixed
In snap-gauge top surface.
3. a kind of central air-conditioning water cooled pipeline erection scaffolding according to claim 2, which is characterized in that the central air-conditioning
Water cooled pipeline erection scaffolding further includes having screw rod, hook, electric wire, battery and LED lamp panel;The external bottom surface of support slot offers
Second threaded hole;Screw rod and screw hole;Hook is fixed in screw rod bottom;Battery is fixed in the external bottom surface of support slot;LED
Lamp plate is fixed in battery bottom surface;Electric wire one end is fixed in battery, and the other end is connected by hook support along water cooled pipeline
Connect other batteries.
4. a kind of central air-conditioning water cooled pipeline erection scaffolding according to claim 3, which is characterized in that the central air-conditioning
Water cooled pipeline erection scaffolding further includes having rubber pad;Rubber pad is fixed in curved placement plate top surface.
5. a kind of central air-conditioning water cooled pipeline erection scaffolding according to claim 4, which is characterized in that the central air-conditioning
Water cooled pipeline erection scaffolding further includes having clamping groove body;Clamping groove body is fixed in the external top surface of support slot, and is clamped with cover board.
6. a kind of central air-conditioning water cooled pipeline erection scaffolding according to claim 5, which is characterized in that the central air-conditioning
Water cooled pipeline erection scaffolding further includes having the second pull ring;Second pull ring (26) is fixed in cover board side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821860694.6U CN209326076U (en) | 2018-11-13 | 2018-11-13 | A kind of central air-conditioning water cooled pipeline erection scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821860694.6U CN209326076U (en) | 2018-11-13 | 2018-11-13 | A kind of central air-conditioning water cooled pipeline erection scaffolding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209326076U true CN209326076U (en) | 2019-08-30 |
Family
ID=67710041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821860694.6U Expired - Fee Related CN209326076U (en) | 2018-11-13 | 2018-11-13 | A kind of central air-conditioning water cooled pipeline erection scaffolding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209326076U (en) |
-
2018
- 2018-11-13 CN CN201821860694.6U patent/CN209326076U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209326076U (en) | A kind of central air-conditioning water cooled pipeline erection scaffolding | |
CN113985952B (en) | Intelligent monitoring and regulating method for freezer | |
CN113091027A (en) | Real-time power consumption running state detection system and detection method based on intelligent street lamp | |
CN208221118U (en) | A kind of cooling device of blower | |
CN112013318A (en) | Intelligent street lamp with display screen having protection and cleaning functions | |
CN209445238U (en) | A kind of intelligent lighting street lamp with temp regulating function | |
CN209263431U (en) | A kind of detachable portable refrigerator | |
US5325813A (en) | Curtain control system for animal enclosures | |
CN210717271U (en) | Automatic starting emergency lighting equipment | |
CN213631128U (en) | Environment-friendly energy-saving partition type refrigeration house | |
CN204350392U (en) | Compact shelving intelligent lighting management system | |
CN205791082U (en) | Electric power power distribution cabinet | |
CN205944822U (en) | Power line automatic power supply control device | |
CN208817270U (en) | A kind of underwater resistance to compression searchlight | |
CN206388110U (en) | A kind of follow-on computer network facility case | |
CN208422333U (en) | A kind of convenient ad distribution device of replacement billboard | |
CN212040357U (en) | Reagent melting device with alarm | |
CN110513624A (en) | Ceiling illuminator | |
CN202056987U (en) | Chargeable air cooler | |
CN211430307U (en) | Temperature free adjusting device for aquaculture greenhouse | |
CN218829588U (en) | Voltage stabilizer with illumination maintenance structure | |
CN209213536U (en) | A kind of LED line being easily installed | |
CN214543325U (en) | Power maintenance detection tool | |
CN219779519U (en) | Distribution box convenient to overhaul | |
CN219824985U (en) | Warning equipment for power substation and distribution substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190830 Termination date: 20211113 |