CN209310438U - Staged biomass power generation fuel particle drying unit with insulation jacket - Google Patents

Staged biomass power generation fuel particle drying unit with insulation jacket Download PDF

Info

Publication number
CN209310438U
CN209310438U CN201822195587.2U CN201822195587U CN209310438U CN 209310438 U CN209310438 U CN 209310438U CN 201822195587 U CN201822195587 U CN 201822195587U CN 209310438 U CN209310438 U CN 209310438U
Authority
CN
China
Prior art keywords
drying box
drying
high temperature
temperature air
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822195587.2U
Other languages
Chinese (zh)
Inventor
穆祥
王西来
郭一帆
高峰超
李俊波
苏明生
张文秉
马海军
杨子超
姬续宁
杨素华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianzong Hongguang Xinjiang Electric Power Engineering Co ltd
Original Assignee
Ningxia Renle Hongguang Cogeneration Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Renle Hongguang Cogeneration Technology Ltd By Share Ltd filed Critical Ningxia Renle Hongguang Cogeneration Technology Ltd By Share Ltd
Priority to CN201822195587.2U priority Critical patent/CN209310438U/en
Application granted granted Critical
Publication of CN209310438U publication Critical patent/CN209310438U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

A kind of staged biomass power generation fuel particle drying unit with insulation jacket, including shell, drying unit, the enclosure interior is provided with drying unit, the hull outside is provided with the supervisor of the high temperature air for supplying high temperature air, case top surface is provided with suction opening, and the humid air of enclosure interior to be discharged, the case top surface is additionally provided with feed inlet, housing bottom surface is provided with discharge port, and insulation jacket is arranged outside drying box.The utility model dries biomass fuel pellet using three layers of drying box, increases biomass fuel pellet residence time in drying box, improves the dries quantity of biomass fuel pellet;Insulation jacket is arranged in drying box, is conducive to cabinet and keeps certain constant temperature, is conducive to dry material.

Description

Staged biomass power generation fuel particle drying unit with insulation jacket
Technical field
The utility model relates to drying unit technical field more particularly to a kind of staged biomass with insulation jacket Fuel used to generate electricity particle drying unit.
Background technique
Biomass electric power plant relies primarily on the heat power generation that biomass fuel pellet burning generates, and biomass fuel pellet exists A certain amount of moisture can be absorbed during storage, natural drying can reduce the water content of fuel, but efficiency is lower, Er Qieshou Inside even from weather is larger;When biomass fuel pellet water content is larger, more heats are consumed in combustion, are not allowed The temperature of boiler easy to control, and then influence generating efficiency.
Summary of the invention
In view of this, it is necessary to provide one kind in view of this, it is necessary to provide a kind of good drying effect, high-efficient having The staged biomass power generation fuel particle drying unit of insulation jacket.
A kind of staged biomass power generation fuel particle drying unit with insulation jacket, including shell, drying unit, The enclosure interior is provided with drying unit, and the hull outside is provided with the supervisor of the high temperature air for supplying high temperature air, Case top surface is provided with suction opening, and the humid air of enclosure interior to be discharged, the case top surface is also set up There is feed inlet, housing bottom surface is provided with discharge port, and the drying unit includes the first drying box, the second drying box, third The second drying box is arranged in drying box, the first drying box lower section, setting third drying box below the second drying box, the first drying box, Be provided with feed end at the top of second drying box, third drying box, bottom is provided with discharge end, and feed end be higher than discharging End is obliquely installed, and the first drying box, the second drying box, third drying box and horizontal plane is made to form angle, the first drying box top The feed end of surface setting is connected to the feed inlet that case top surface is arranged, the discharge end of the first drying box and the second drying box Feed end vertical communication, the discharge end of the second drying box longitudinally connect from top to bottom with the feed end of third drying box from top to bottom Logical, the discharge end of third drying box bottom surface setting is connected to the discharge port that housing bottom surface is arranged, with formation " it " word Shape drying channel, first drying box include cabinet, stepped flitch, and stepped flitch is fixed in the bottom of cabinet Surface, insulation jacket is provided with outside the cabinet, and the insulation jacket includes lagging casing, high temperature air baffle plate, heat preservation Portion outside the enclosure is arranged in shell, and lagging casing and cabinet surround closing inner chamber, and lagging casing passes through with the inner cavity that cabinet surrounds Pipeline is connected to high temperature air supervisor, and guidance high temperature air enters inner cavity, and high temperature air baffle plate is fixed at lagging casing Inner wall surface on and the outer wall surface of cabinet on, the step type flitch include microporous ceramic filter plate, it is longitudinal stop version, it is micro- Hole ceramic filter plate is parallel to the horizontal plane, longitudinal to stop version and horizontal plane, and microporous ceramic filter plate longitudinal stops version and the The bottom of one drying box surrounds cavity, and wind deflector is provided in cavity, and wind deflector is parallel to the horizontal plane, and wind deflector separates cavity At upper chamber and lower cavity, it is provided at least two spray lines in lower cavity, at least two spray lines are from lower cavity It inside passes through, wherein one end passes through longitudinal blocking version, is connected to the inside of the first drying box, and guidance high temperature air enters the first drying The inside of case, the other end are connected to by connecting tube with the high temperature air supervisor that hull outside is arranged, and air inducing is arranged in upper chamber Pipe, induced duct one end are connected to upper chamber, and the other end is connected to at least two spray lines being arranged in lower cavity, and guidance is high Warm air enters in upper chamber, and the top of the box surface is provided with gas vent, and gas vent is connected to the enclosure interior, First drying box, the second drying box, third drying box structure having the same.
Preferably, the high temperature air baffle plate includes fixed liner plate, at least two baffling boss, and fixed liner plate fixation is set It sets in wall surface outside the enclosure and lagging casing inner wall surface, at least two baffling boss are fixed on fixed liner plate, until Few two baffling boss are in semi-cylindrical, form groove between two neighboring baffling boss, be arranged on cabinet exterior surface to Few two baffling boss are staggered at least two baffling boss in lagging casing inner wall surface, make on cabinet exterior surface The groove that two neighboring baffling boss is formed at least two baffling boss face lagging casing inner wall surfaces being arranged.
Preferably, first drying box, the second drying box, be fixedly installed in " V " inside third drying box feeding end The cutting plate of font, and cutting plate bottom offers the feed opening of distribution in long strip.
Preferably, the spray line is equally spaced along longitudinal barrier plate level of stepped flitch, and spray line outlet end It is provided with nozzle.
Preferably, the nozzle is fan-shaped, and the nozzle exit end is internally provided with partition, forms nozzle exit end Multiple outlet cavitys.
Preferably, the angle that first drying box, the second drying box, third drying box and horizontal plane are formed is 5~ 10°。
Preferably, the gas vent exit of the top of the box surface setting is provided with strainer, to prevent biomass fuel Material particle flies out.
The utility model by adopting the above technical scheme, the beneficial effect is that: the utility model utilize power plant generate height Warm exhaust gas dries biomass fuel pellet, and the waste gas residual heat of power plant is effectively utilized, and improves the utilization rate of the energy; Biomass fuel pellet is dried using three layers of drying box, increase that biomass fuel pellet stops in drying box when Between, improve the dries quantity of biomass fuel pellet;Drying box is obliquely installed, and is conducive to biomass fuel pellet in drying box Interior flowing;Insulation jacket is arranged in drying box, is conducive to cabinet and keeps certain constant temperature, is conducive to dry material.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model drying box and high temperature air supervisor.
Fig. 3 is the structural schematic diagram of the utility model nozzle.
Fig. 4 is the structural schematic diagram of the utility model high temperature air baffle plate.
In figure: shell 10, suction opening 101, feed inlet 102, discharge port 103, drying unit 20, the first drying box 201, case Body 2011, stepped flitch 2012, microporous ceramic filter plate 20121, longitudinal barrier plate 20122, wind deflector 20123, induced duct 20124, spray line 2013, nozzle 20131, partition 201311, gas vent 2014, cutting plate 2015, insulation jacket 2016, heat preservation Shell 20161, high temperature air baffle plate 20162, fixed liner plate 201621, the drying of at least two baffling boss 201622, second Case 202, third drying box 203, high temperature air supervisor 30.
Specific embodiment
It is clear in order to be more clear the purpose of this utility model, technical solution and advantageous effects, below in conjunction with attached Figure and specific embodiment, the present invention will be further described in detail.It should be understood that described in this specification Specific embodiment is not intended to limit the utility model just for the sake of explaining the utility model.
Fig. 1 to Fig. 3 is please referred to, the utility model embodiment provides a kind of staged biomass fermentation with insulation jacket Electric fuel particle drying unit, including shell 10, drying unit 20, the shell 10 is internally provided with drying unit 20, described The high temperature air supervisor 30 for supplying high temperature air is provided with outside shell 10, high temperature air derives from residual heat of electric power plant, shell 10 top surfaces are provided with suction opening 101, and the humid air inside shell 10 to be discharged, 10 top surface of shell is also It is provided with feed inlet 102,10 bottom surface of shell is provided with discharge port 103, and the drying unit 20 includes the first drying box 201, the second drying box 202, the second drying box is arranged below first drying box 201 in the second drying box 202, third drying box 203 202 lower section be arranged third drying boxes 203, the first drying box 201, the second drying box 202, third drying box 203 top be all provided with Be equipped with feed end, bottom is provided with discharge end, and feed end is obliquely installed higher than discharge end, makes the first drying box 201, second Drying box 202, third drying box 203 and horizontal plane form angle, the feed end and shell of the setting of 201 top surface of the first drying box The feed inlet 102 of 10 top surface of body setting is connected to, the feed end of the discharge end of the first drying box 201 and the second drying box 202 Vertical communication from top to bottom, the discharge end of the second drying box 202 longitudinally connect from top to bottom with the feed end of third drying box 203 Logical, the discharge end of 203 bottom surface of third drying box setting is connected to the discharge port 103 that 10 bottom surface of shell is arranged, with shape At "the" shape drying channel, first drying box 201 includes cabinet 2011, stepped flitch 2012, stepped flitch 2012 are fixed at the bottom interior surface of cabinet 2011, and insulation jacket 2016, the guarantor are provided with outside the cabinet 2011 Warm collet 2016 includes lagging casing 20161, high temperature air baffle plate 20162, and lagging casing 20161 is arranged outside cabinet 2011 Portion, lagging casing 20161 and cabinet 2011 surround closing inner chamber, and the inner cavity that lagging casing 20161 and cabinet 2011 surround is logical Piping is connected to high temperature air supervisor 30, and guidance high temperature air enters inner cavity, and high temperature air baffle plate 20162 is fixed at In the inner wall surface of lagging casing 20161 and in the outer wall surface of cabinet 2011, the step type flitch 2012 is provided with micropore Ceramic filter plate 20121, longitudinal barrier plate 20122, microporous ceramic filter plate 20121 are parallel to the horizontal plane, and are used for biomass fermentation Electric fuel particle rolls, and the bottom of microporous ceramic filter plate 20121, longitudinal barrier plate 20122 and the first drying box 201 surrounds sky Chamber is provided with wind deflector 20123 in cavity, and wind deflector 20123 is parallel to the horizontal plane, and cavity is separated by wind deflector 20123 Portion's cavity and lower cavity, are provided at least two spray lines 2013 in lower cavity, and at least two spray lines 2013 are from lower part It is passed through in cavity, wherein one end passes through longitudinal barrier plate 20122, is connected to the inside of the first drying box 201, guides high temperature air Into the inside of the first drying box 201, the other end is connected to by connecting tube with the high temperature air supervisor 30 that hull outside is arranged, on Induced duct 20124 is set in portion's cavity, and 20124 one end of induced duct is connected to upper chamber, setting in the other end and lower cavity At least two spray lines 2013 connection, guidance high temperature air enter in upper chamber, and pass through microporous ceramic filter plate 20121 Into the first drying box 201, the biomass fuel pellet being scattered on microporous ceramic filter plate 20121 is blown afloat, biomass is made Fuel particle is in suspended state, and 2011 top surface of cabinet is provided with gas vent 2014, and gas vent 2014 and the shell It is connected to inside body 10, first drying box 201, the second drying box 202, the structure having the same of third drying box 203.
Biomass fuel pellet is dried using three layers of drying box, increases biomass fuel pellet in drying box Residence time reduces the water content of material, improves the dries quantity of biomass fuel pellet.
In the prior art, conveying of the biomass fuel in drying box relies primarily on conveyer belt, and conveyer belt is in transmission process In, the biomass fuel pellet on conveyer belt is unevenly distributed, it may occur that belt deflection phenomenon causes material leakage;Compared to existing Technology, using stepped flitch 2012 is arranged inside drying box, when biomass fuel pellet enters case from 2011 feed end of cabinet When 2011 inside of body, the high temperature air that spray line 2013 sprays causes to fall and break to first micropore ceramics mistake of stepped flitch 2012 20121 surface of filter plate, and the biomass fuel pellet being scattered on 20121 surface of microporous ceramic filter plate is blown afloat, make biology Matter fuel particle is in suspended state on 20121 surface of microporous ceramic filter plate, and spray line 2013 passes through longitudinal barrier plate 20122, it is connected to the inside of the first drying box 201, guidance high temperature air enters the inside of the first drying box 201, makes to be suspended in The biomass fuel pellet on 20121 surface of microporous ceramic filter plate does not stop to overturn forward, when biomass fuel pellet falls to When two 20121 surfaces of microporous ceramic filter plate, the high temperature air that spray line 2013 sprays makes biomass fuel pellet suspend again On 20121 surface of microporous ceramic filter plate, and biomass fuel pellet is made not stop to overturn forward, overturning is repeated several times in this way, makes Biomass fuel pellet along stepped flitch 2012 in waterfall shape whereabouts, increase biomass fuel pellet and high temperature air Contact area improves dries quantity;
The lagging casing 20161 and cabinet 2011 being arranged outside cabinet 2011 surround closing inner chamber, and lagging casing 20161 It is connected to by pipeline with high temperature air supervisor 30 with the inner cavity that cabinet 2011 surrounds, guidance high temperature air enters inner cavity, and high temperature is empty Gas baffle plate 20162 is fixed in the inner wall surface of lagging casing 20161 and in the outer wall surface of cabinet 2011, works as high temperature After air enters inner cavity, high temperature air baffle plate 20162 stops high temperature air quickly to flow in inner cavity, makes the high temperature entered Baffling occurs for air, and reduces the flow velocity of high temperature air, and then makes high temperature air full of entire inner cavity, and is arranged outer in heat preservation High temperature air baffle plate 20162 in the inner wall surface of shell 20161 and in the outer wall surface of cabinet 2011, can form in the lumen Insulating layer reduces temperature leak, plays insulation effect;
When biomass fuel pellet falls to the discharge end of the first drying box 201, due to being provided with sprinkling at discharge end Pipe 2013 blows biomass fuel pellet effectively by high temperature air when entering the feed end of the second drying box 202 It lets go, prevents biomass fuel pellet from windrow phenomenon occurring after entering the second drying box 202, due to the first drying box 201, the Two drying boxes 202, third drying box 203 are obliquely installed, and form angle with horizontal plane, so that biomass fuel pellet is more suitable Benefit moves downward, the humid air generated in drying course, and cabinet is discharged by the gas vent 2014 at 2011 top of cabinet 2011 enter inside shell 10, due to being provided with suction opening 101 at the top of shell 10, the humid air of discharge can be taken away, from And biomass fuel pellet is dried.
Further, the high temperature air baffle plate 20162 includes fixed liner plate 201621, at least two baffling boss 201622, fixed liner plate 201621 is fixed in 20161 inner wall surface of 2011 outer wall surface of cabinet and lagging casing, at least Two baffling boss 201622 are fixed on fixed liner plate 201621, and at least two baffling boss 201622 are in semicolumn Shape forms groove between two neighboring baffling boss, at least two baffling boss 201622 being arranged on cabinet exterior surface with At least two baffling boss 201622 in 20161 inner wall surface of lagging casing are staggered, and make in 2011 outer wall surface of cabinet Two neighboring baffling boss is formed at least two baffling boss, 201622 face lagging casing, 20161 inner wall surface being arranged Groove.
After high temperature air enters insulation jacket 2016, due at least two bafflings being arranged in 2011 outer wall surface of cabinet Boss 201622 is staggered at least two baffling boss 201622 in 20161 inner wall surface of lagging casing, slows down height Warm air enters the flow velocity of inner cavity, due to forming groove between two neighboring baffling boss, and in 2011 outer wall surface of cabinet Two neighboring baffling boss is formed at least two baffling boss, 201622 face lagging casing, 20161 inner wall surface being arranged Groove is conducive to including high temperature air intracavitary point so that high temperature air forms wavy flow direction in inner cavity flow process Cloth it is more uniform, and then keep 2016 internal temperature of insulation jacket it is uniform.
Further, first drying box 201, the second drying box 202,203 feeding end of third drying box inside are fixed It is provided with V-shaped cutting plate 2015, and 2015 bottom of cutting plate offers the feed opening of distribution in long strip.
" V " font is fixedly installed in first drying box 201, the second drying box 202,203 feeding end of third drying box inside Cutting plate 2015, when biomass fuel pellet falls to cutting plate 2015 from stepped flitch 2012, due to cutting plate 2015 bottoms offer feed opening in long strip, so that biomass fuel pellet is in during 2015 base falls of cutting plate Flat distribution, blanking thickness is thinning, when high-temperature gas blows to blanking biomass fuel pellet, can make biomass fuel Grain, which preferably divides, to be let go, and can be reduced biomass fuel pellet and be generated in blanking and pile up phenomenon.
Further, the spray line 2013 is equally spaced along 20122 level of longitudinal barrier plate of stepped flitch 2012, And spray line outlet end is provided with nozzle 20131.
Spray line 2013 is equally spaced, so that the high temperature air distribution sprayed into is more uniform, not will lead to biomass fuel Expect that packing phenomenon occurs for particle;In addition, the high temperature air that the spray line 2013 being evenly distributed sprays can make biomass fuel Grain is overturn more uniform, and the thrust to travel forward is effectively provided for biomass fuel pellet.
Further, the nozzle 20131 is fan-shaped, and 2013 outlet end of the nozzle is internally provided with partition 201311, so that 20131 outlet end of nozzle is formed multiple outlet cavitys.
Fan-shaped nozzle 20131, increases projected area, and multiple outlet cavitys, and nozzle 20131 can be made to spray High temperature air is more uniform.
Further, first drying box 201, the second drying box 202, third drying box 203 and horizontal plane are formed Angle is 5~10 °.
Further, 2014 exit of gas vent of 2011 top surface of cabinet setting is provided with strainer, with to prevent Only biomass fuel pellet flies out.
One better embodiment of the utility model is as follows: when work, biomass fuel pellet is from 2011 feed end of cabinet When into 2011 inside of cabinet, the high temperature air that spray line 2013 sprays causes to fall and break to first micropore of stepped flitch 2012 20121 surface of ceramic filter plate, and the biomass fuel pellet being scattered on 20121 surface of microporous ceramic filter plate is blown afloat, Make biomass fuel pellet on 20121 surface of microporous ceramic filter plate in suspended state, and spray line 2013 passes through longitudinal stop Plate 20122 is connected to the inside of the first drying box 201, and guidance high temperature air enters the inside of the first drying box 201, makes to suspend Biomass fuel pellet on 20121 surface of microporous ceramic filter plate does not stop to overturn forward, when biomass fuel pellet is fallen to When second 20121 surface of microporous ceramic filter plate, the high temperature air that spray line 2013 sprays makes biomass fuel pellet outstanding again 20121 surface of microporous ceramic filter plate is floated on, and biomass fuel pellet is made not stop to overturn forward, overturning is repeated several times in this way, So that biomass fuel pellet falls along stepped flitch 2012 in waterfall shape, biomass fuel pellet and high temperature air are increased Contact area, improve dries quantity;After the drying of the first drying box 201, material by second drying box 202 into Expect that end enters the second drying box 202, after the drying of the second drying box 202, material passes through the feed end of third drying box 203 Into third drying box 203, after the drying of third drying box 203, material is discharged by the discharge port 103 of 10 bottom of shell; It, can be by the first drying box 201, the second drying box 202, third drying box 203 by the suction opening 101 being arranged at the top of shell 10 The humid air that is discharged of gas vent 2014 take away, to complete drying to biomass fuel pellet.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly Interest field, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and according to this reality The equivalent variations made by novel claim, still falls within the scope of the utility model.

Claims (7)

1. a kind of staged biomass power generation fuel particle drying unit with insulation jacket, it is characterised in that: including shell, Drying unit, the enclosure interior are provided with drying unit, and the hull outside is provided with the high temperature for supplying high temperature air Air supervisor, case top surface are provided with suction opening, the humid air of enclosure interior to be discharged, the case top table Face is additionally provided with feed inlet, and housing bottom surface is provided with discharge port, and the drying unit includes the first drying box, the second drying The second drying box is arranged in case, third drying box, the first drying box lower section, setting third drying box below the second drying box, and first Drying box, the second drying box, be provided with feed end at the top of third drying box, bottom is provided with discharge end, and feed end It is obliquely installed higher than discharge end, the first drying box, the second drying box, third drying box and horizontal plane is made to form angle, first dries The feed end of dry box top surface setting is connected to the feed inlet that case top surface is arranged, the discharge end of the first drying box and the The feed end of the feed end of two drying boxes vertical communication from top to bottom, the discharge end of the second drying box and third drying box from up to The discharge end of lower vertical communication, the setting of third drying box bottom surface is connected to the discharge port that housing bottom surface is arranged, with shape At "the" shape drying channel, first drying box includes cabinet, stepped flitch, and stepped flitch is fixed at cabinet Bottom interior surface, be provided with insulation jacket outside the cabinet, the insulation jacket includes lagging casing, high temperature air baffling Plate, lagging casing setting portion outside the enclosure, lagging casing and cabinet surround closing inner chamber, and lagging casing surrounded with cabinet it is interior Chamber is connected to by pipeline with high temperature air supervisor, and guidance high temperature air enters inner cavity, and high temperature air baffle plate is fixed at guarantor In the inner wall surface of warm shell and in the outer wall surface of cabinet, the step type flitch includes microporous ceramic filter plate, longitudinal resistance Version is kept off, microporous ceramic filter plate is parallel to the horizontal plane, longitudinal to stop version and horizontal plane, microporous ceramic filter plate, longitudinal resistance The bottom of gear version and the first drying box surrounds cavity, and wind deflector is provided in cavity, and wind deflector is parallel to the horizontal plane, and wind deflector will Cavity is separated into upper chamber and lower cavity, is provided at least two spray lines in lower cavity, at least two spray lines from It is passed through in lower cavity, wherein one end passes through longitudinal blocking version, is connected to the inside of the first drying box, and guidance high temperature air enters The inside of first drying box, the other end is connected to by connecting tube with the high temperature air supervisor that hull outside is arranged, in upper chamber Induced duct is set, and induced duct one end is connected to upper chamber, and at least two spray lines being arranged in the other end and lower cavity connect Logical, guidance high temperature air enters in upper chamber, and the top of the box surface is provided with gas vent, and gas vent and the shell Inside connection, first drying box, the second drying box, third drying box structure having the same.
2. the staged biomass power generation fuel particle drying unit according to claim 1 with insulation jacket, special Sign is: the high temperature air baffle plate includes fixed liner plate, at least two baffling boss, and fixed liner plate is fixed at cabinet In outer wall surface and lagging casing inner wall surface, at least two baffling boss are fixed on fixed liner plate, at least two foldings Flowing boss is in semi-cylindrical, forms groove between two neighboring baffling boss, at least two foldings being arranged on cabinet exterior surface Stream boss is staggered at least two baffling boss in lagging casing inner wall surface, make to be arranged on cabinet exterior surface to The groove that two neighboring baffling boss is formed in few two baffling boss face lagging casing inner wall surfaces.
3. having the staged biomass power generation fuel particle drying unit of insulation jacket, feature as described in claim 1 Be: first drying box, the second drying box are fixedly installed V-shaped sub-material inside third drying box feeding end Plate, and cutting plate bottom offers the feed opening of distribution in long strip.
4. having the staged biomass power generation fuel particle drying unit of insulation jacket, feature as described in claim 1 Be: the spray line is equally spaced along longitudinal barrier plate level of stepped flitch, and spray line outlet end is provided with nozzle.
5. having the staged biomass power generation fuel particle drying unit of insulation jacket, feature as claimed in claim 4 Be: the nozzle is fan-shaped, and the nozzle exit end is internally provided with partition, so that nozzle exit end is formed multiple outlets empty Chamber.
6. having the staged biomass power generation fuel particle drying unit of insulation jacket, feature as described in claim 1 Be: the angle that first drying box, the second drying box, third drying box and horizontal plane are formed is 5~10 °.
7. having the staged biomass power generation fuel particle drying unit of insulation jacket, feature as described in claim 1 Be: the gas vent exit of the top of the box surface setting is provided with strainer, to prevent material from flying out.
CN201822195587.2U 2018-12-26 2018-12-26 Staged biomass power generation fuel particle drying unit with insulation jacket Active CN209310438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822195587.2U CN209310438U (en) 2018-12-26 2018-12-26 Staged biomass power generation fuel particle drying unit with insulation jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822195587.2U CN209310438U (en) 2018-12-26 2018-12-26 Staged biomass power generation fuel particle drying unit with insulation jacket

Publications (1)

Publication Number Publication Date
CN209310438U true CN209310438U (en) 2019-08-27

Family

ID=67678944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822195587.2U Active CN209310438U (en) 2018-12-26 2018-12-26 Staged biomass power generation fuel particle drying unit with insulation jacket

Country Status (1)

Country Link
CN (1) CN209310438U (en)

Similar Documents

Publication Publication Date Title
CN109506443A (en) Biomass power generation fuel particle drying unit
CN103340066A (en) Positive-negative pressure ventilation drying cylindrical silo and drying method
CN105660903A (en) Tea leaf drying machine and tea leaf drying method
CN209310437U (en) Staged biomass power generation fuel particle drying unit
CN209310438U (en) Staged biomass power generation fuel particle drying unit with insulation jacket
CN208704306U (en) Novel biomass compressed feed drying equipment
CN209588624U (en) Biomass power generation fuel particle drying unit
CN109019034B (en) U-shaped fluidization feeding port
CN207871566U (en) A kind of centrifugal spray drying device
CN207532812U (en) A kind of spray dryer of uniform drying
CN105605989A (en) Safe cannonball for artificial precipitation
CN107514894B (en) No sieve stream washes formula battery material drier
CN207335349U (en) A kind of drying materials equipment with hydrofuge
CN209310439U (en) Biomass power generation fuel particle drying unit with vibration device
CN209310436U (en) The biomass power generation fuel particle drying unit of feeding can be stablized
CN201532096U (en) Pulse combustion drying machine
CN211752552U (en) High-speed centrifugal spraying device
CN201648405U (en) Powdered sugar drying tower
CN211695445U (en) Novel spray control device
CN209508151U (en) A kind of coal tar recovering reutilization system
CN207600139U (en) A kind of dynamic lithium battery novel anode material drying device
CN105831296A (en) Energy-saving type tea leaf drying machine and tea leaf drying method
CN207849987U (en) A kind of belt-type Chinese medicinal material drying equipment for drying
CN206198720U (en) A kind of spray drying device for producing sea cucumber soft capsule
CN109694717A (en) A kind of coal tar recovering reutilization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: 750,000 Collective account of Changcheng Middle Road Police Station, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee after: Wang Xilai

Address before: 750002 Yinchuan Ningfeng District, the Ningxia Hui Autonomous Region 490, Yinchuan IBI breeding center two phase 10, 3 floor 301 room.

Patentee before: XINGXIA TZHG WASTE HEAT GENERATION TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231108

Address after: Room 508, 5th Floor, Office Building, Erdaohu Industrial Park Management Committee, 13th Division, Hami City, Xinjiang Uygur Autonomous Region, 839000

Patentee after: Tianzong Hongguang (Xinjiang) Electric Power Engineering Co.,Ltd.

Address before: 750,000 Collective account of Changcheng Middle Road Police Station, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee before: Wang Xilai

TR01 Transfer of patent right