CN209308699U - A kind of tunnel double-lining hydraulic lifting Integral Steel end mould - Google Patents

A kind of tunnel double-lining hydraulic lifting Integral Steel end mould Download PDF

Info

Publication number
CN209308699U
CN209308699U CN201821832991.XU CN201821832991U CN209308699U CN 209308699 U CN209308699 U CN 209308699U CN 201821832991 U CN201821832991 U CN 201821832991U CN 209308699 U CN209308699 U CN 209308699U
Authority
CN
China
Prior art keywords
integral steel
lining
hydraulic
mould
tunnel double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821832991.XU
Other languages
Chinese (zh)
Inventor
刘杰
杨涛
范标
闫有民
王平寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Transportation Construction Group Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Original Assignee
Gansu Transportation Construction Group Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Transportation Construction Group Co Ltd, Gansu Road and Bridge Construction Group Co Ltd filed Critical Gansu Transportation Construction Group Co Ltd
Priority to CN201821832991.XU priority Critical patent/CN209308699U/en
Application granted granted Critical
Publication of CN209308699U publication Critical patent/CN209308699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a kind of tunnel double-lining hydraulic lifting Integral Steel end mould, which includes two lining trolley arc plates, 4 pieces of Integral Steel panels, hydraulic power unit and 4 hydraulic cylinders being placed on pedestal.Deep floor is evenly equipped on the Integral Steel panel;Several bolts hole are evenly equipped on the Integral Steel panel and the two linings trolley arc plate, consolidation bolt is correspondingly provided in the bolt hole;The consolidation bolt is connected with steel sliding groove;The Integral Steel panel is connected with the top of the hydraulic cylinder by 1 hinge pin;The hydraulic power unit is equipped with 4 retractable joysticks, and each retractable joystick is connected with 1 hydraulic cylinder.The utility model automatically controls lifting, high degree of automation, simple, convenient quick by hydraulic system, saves artificial and reduces timber etc. and have enough to meet the need waste of material.

Description

A kind of tunnel double-lining hydraulic lifting Integral Steel end mould
Technical field
The utility model relates to Tunnel Second Lining technical field of concrete more particularly to a kind of tunnel double-lining hydraulic liftings Integral Steel end mould.
Background technique
Tunnel Second Lining concreting is the critical process of constructing tunnel.Currently, tunnel double-lining concrete end is sealed Mould generallys use the plank sheathing sealing end of interim processing, needs to intercept corresponding wood according to lining section when blocking using plank sheathing Plate, plank, which usually has enough to meet the need 3 ~ 5 times, to be used, and timber waste is larger;And it is needed using wooden model sealing end manually by one piece Block template is cut out, then is transported to manually installed on trolley, and installation speed is slower, consuming it is artificial more;Wooden model sealing end is monolithic Plank stress alone, need to individually reinforce every block of plank sheathing, reinforce and expend that auxiliary material is more, consuming it is artificial more, and reinforce It is improper to be easy to cause the problems such as running mould, swollen mould, spillage;Follower head is finished by wooden model seam shadow using wooden model sealing end concrete construction It rings and will appear faulting of slab ends, end is not straight suitable, beautiful.How to realize two lining end head formwork Fast Installations and reduce circulation material waste, It saves manually, really realizes that energy conservation and environmental protection is just particularly important.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of easily and efficiently tunnel double-lining hydraulic lifting is whole Formula steel end mould.
To solve the above problems, a kind of tunnel double-lining hydraulic lifting Integral Steel end mould described in the utility model, special Sign is: the end mould includes two lining trolley arc plates, 4 pieces of Integral Steel panels, hydraulic power unit and 4 hydraulic oil being placed on pedestal Cylinder;Deep floor is evenly equipped on the Integral Steel panel;It is uniformly distributed on the Integral Steel panel and the two linings trolley arc plate There are several bolts hole, consolidation bolt is correspondingly provided in the bolt hole;The consolidation bolt is connected with steel sliding groove;The monoblock type Steel facing is connected with the top of the hydraulic cylinder by 1 hinge pin;The hydraulic power unit is equipped with 4 retractable joysticks, Each retractable joystick is connected with 1 hydraulic cylinder.
The pedestal is fixed on trolley crossbeam.
The deep floor with a thickness of 5 ~ 10cm.
Length travel≤8cm of the steel sliding groove, vertical displacement≤10cm.
The stroke of the hydraulic cylinder is not less than 70cm.
The steel sliding groove is 2.
The consolidation bolt is equipped with rotating handle.
Compared with the prior art, the utility model has the following advantages:
1, the present invention uses hydraulic automatic lifting, high degree of automation, and it is fast to reinforce speed.
2, the utility model uses Integral Steel panel, and once mounting is reused, and reduces the circulation materials such as timber damage Consumption, meanwhile, Integral Steel slab strength with ribbing is high, and formwork reinforcement effect is good, effectively solves to reinforce swollen mould, runs modulus problem.
3, the utility model is rapidly completed that template is in place, demoulding using hydraulic cylinder is flexible, simple, convenient quick, It saves artificial.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the partial schematic diagram of the utility model.
In figure: 1-two lining trolley arc plates;2-Integral Steel panels;3-deep floors;4-hydraulic cylinders;5-is hydraulic Pumping plant;6-retractable joysticks;7-sliding grooves;8-hinge pins;9-consolidation bolts;10-pedestals.
Specific embodiment
As shown in Figure 1 and 2, a kind of tunnel double-lining hydraulic lifting Integral Steel end mould, the end mould include two lining trolley arc plates 1, 4 pieces of Integral Steel panels 2, hydraulic power unit 5 and 4 hydraulic cylinders 4 being placed on pedestal 10.
The deep floor 3 with a thickness of 5 ~ 10cm is evenly equipped on Integral Steel panel 2, to enhance the rigid slab strength of monoblock type. Several bolts hole are evenly equipped on Integral Steel panel 2 and two lining trolley arc plates 1, consolidation bolt 9 is correspondingly provided in the bolt hole;Gu Knot bolt 9 is connected with steel sliding groove 7;Integral Steel panel 2 is connected with the top of hydraulic cylinder 4 by 1 hinge pin 8, hingedly Bolt 8 is free to rotate, by the flexible of control hydraulic cylinder 4, can adjust Integral Steel using hinge pin 8 and steel sliding groove 7 The overturning and vertical telescopic amount of panel 2.Hydraulic power unit 5 is equipped with 4 retractable joysticks 6, each retractable joystick 6 and 1 liquid Compressing cylinder 4 is connected.
Wherein: pedestal 10 is fixed on trolley crossbeam.
Length travel≤8cm of steel sliding groove 7, vertical displacement≤10cm.
The stroke of hydraulic cylinder 4 is not less than 70cm.
Steel sliding groove 7 is 2.
It consolidates bolt 9 and is equipped with rotating handle.Consolidation bolt 9 can be rotated in steel sliding groove 7, be slided.
Integral Steel panel 2 is that general steel plate size is identical as two lining trolley integral panels sizes, and panel width is lining cutting Thickness+with two width that are overlapped of lining 1 width of trolley arc plate.
4 pieces of Integral Steel panels 2 are arranged in common two-lane tunnel.
1 hydraulic power unit 5 and 4 retractable joystick 6 can control 4 liters of 4 hydraulic cylinders of installation on the car respectively Drop, the overturning of control Integral Steel panel 2 and jacking.
When work, consolidation bolt 9 completes Integral Steel panel 2 and is turned into vertical state, then hydraulic cylinder by rotation 4 continue to extend, and consolidation bolt 9 continues to move obliquely in steel sliding groove 7, complete Integral Steel panel 2 and two lining trolleys Arc plate 1 and preliminary bracing profiled are close to.
After Integral Steel panel 2 is in place, by being reserved in same position on two lining trolley arc plates 1 and the rigid panel 2 of monoblock type Bolt hole use with rotational handle consolidation bolt 9 be rapidly completed Integral Steel panel 2 with two lining trolley arc plates 1 fastening.

Claims (7)

1. a kind of tunnel double-lining hydraulic lifting Integral Steel end mould, it is characterised in that: the end mould includes two lining trolley arc plate (1), 4 Block Integral Steel panel (2), hydraulic power unit (5) and 4 hydraulic cylinders (4) being placed on pedestal (10);The Integral Steel face Deep floor (3) are evenly equipped on plate (2);It is evenly equipped on the Integral Steel panel (2) and two lining trolley arc plate (1) several Bolt hole is correspondingly provided with consolidation bolt (9) in the bolt hole;The consolidation bolt (9) is connected with steel sliding groove (7);It is described whole Body formula steel facing (2) is connected with the top of the hydraulic cylinder (4) by 1 hinge pin (8);It is set on the hydraulic power unit (5) There are 4 retractable joysticks (6), each retractable joystick (6) is connected with 1 hydraulic cylinder (4).
2. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the pedestal (10) it is fixed on trolley crossbeam.
3. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the ribs Plate (3) with a thickness of 5 ~ 10cm.
4. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the steel is sliding Length travel≤the 8cm of dynamic slot (7), vertical displacement≤10cm.
5. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the hydraulic oil The stroke of cylinder (4) is not less than 70cm.
6. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the steel is sliding Dynamic slot (7) are 2.
7. a kind of tunnel double-lining hydraulic lifting Integral Steel end as described in claim 1 mould, it is characterised in that: the consolidation spiral shell Bolt (9) is equipped with rotating handle.
CN201821832991.XU 2018-11-08 2018-11-08 A kind of tunnel double-lining hydraulic lifting Integral Steel end mould Active CN209308699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821832991.XU CN209308699U (en) 2018-11-08 2018-11-08 A kind of tunnel double-lining hydraulic lifting Integral Steel end mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821832991.XU CN209308699U (en) 2018-11-08 2018-11-08 A kind of tunnel double-lining hydraulic lifting Integral Steel end mould

Publications (1)

Publication Number Publication Date
CN209308699U true CN209308699U (en) 2019-08-27

Family

ID=67672469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821832991.XU Active CN209308699U (en) 2018-11-08 2018-11-08 A kind of tunnel double-lining hydraulic lifting Integral Steel end mould

Country Status (1)

Country Link
CN (1) CN209308699U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111365037A (en) * 2020-04-16 2020-07-03 青海民族大学 Tunnel supporting template for civil engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111365037A (en) * 2020-04-16 2020-07-03 青海民族大学 Tunnel supporting template for civil engineering
CN111365037B (en) * 2020-04-16 2021-10-26 青海民族大学 Tunnel supporting template for civil engineering

Similar Documents

Publication Publication Date Title
CN104763446A (en) Multi-functional trolley for subway station construction
CN109404010B (en) Aluminum tunnel mold system and operation method thereof
CN209308699U (en) A kind of tunnel double-lining hydraulic lifting Integral Steel end mould
CN201106282Y (en) Post-irrigating band, construction joint plate side module
CN210858744U (en) Tunnel lining trolley template
CN202001024U (en) Engineering van capable of rapidly repairing tunnel defects
CN204001678U (en) A kind of building multi-purpose type Combined formwork
CN102322138A (en) The modular sliding formwork
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN207598259U (en) A kind of end molding block apparatus for lining trolley filling concrete
CN203947493U (en) Assembling type device for detecting manhole
CN203200982U (en) Steel bar truss buckling hanging type floor support plate
CN104790353A (en) Sluice pier construction method for small and medium size sluices
CN101864835B (en) Early-dismantling support of aluminum alloy top plate
CN205188844U (en) Framed bent template system
CN111156028A (en) Hydraulic jacking integral steel end die with two linings in tunnel
CN204081468U (en) A kind of shear-wall strengthening formwork structure
CN204041078U (en) A kind of tunnel lining trolley plugging device
CN209099602U (en) A kind of removable steel bar truss floor template in UHPC ultra-high performance concrete bottom
CN213979882U (en) Combined template for constructing non-standard layer structure
CN203129597U (en) Connection structure of building wood formworks
CN214498452U (en) Upright thin-wall side wall curing means
CN204826636U (en) Ear design support is chosen to plain type roof beam
CN205224045U (en) Examine and repair gate slot second phase concrete construction device
CN206329349U (en) A kind of tunnel-liner closure mould bases

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant