CN209308230U - A kind of double-layer curtain wall closing-in structure - Google Patents

A kind of double-layer curtain wall closing-in structure Download PDF

Info

Publication number
CN209308230U
CN209308230U CN201821484320.9U CN201821484320U CN209308230U CN 209308230 U CN209308230 U CN 209308230U CN 201821484320 U CN201821484320 U CN 201821484320U CN 209308230 U CN209308230 U CN 209308230U
Authority
CN
China
Prior art keywords
connecting rod
curtain wall
base
connector sleeve
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821484320.9U
Other languages
Chinese (zh)
Inventor
杨川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lucky Win Decoration Design Engineering Co Ltd
Original Assignee
Shanghai Lucky Win Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lucky Win Decoration Design Engineering Co Ltd filed Critical Shanghai Lucky Win Decoration Design Engineering Co Ltd
Priority to CN201821484320.9U priority Critical patent/CN209308230U/en
Application granted granted Critical
Publication of CN209308230U publication Critical patent/CN209308230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model proposes a kind of double-layer curtain wall closing-in structures, are disposed with the first curtain wall, the second curtain wall and base and at least one contraction connecting piece;Contraction connecting piece includes at least three first connecting rods, at least three connector sleeves and at least three second connecting rods;The back side of first curtain wall is uniformly provided at least three first connecting rods;Act 2 is embedded with the connector sleeve to match with first connecting rod quantity and position within the walls;Base is equipped with the second connecting rod to match with connector sleeve quantity and position;First connecting rod is inserted in one end of connector sleeve, and the second connecting rod is inserted in the other end of connector sleeve;First connecting rod and the second connecting rod are fixed by fastener and connector sleeve limit;Hanging buckle is equipped on base and the second curtain wall;Through-hole is equipped in first connecting rod and the second connecting rod;First connecting rod and the second connecting rod pass through through-hole by iron wire and hang on hanging buckle, and to propose a kind of installation convenience, bearing capacity is big and is easily installed neat double-layer curtain wall closing-in structure.

Description

A kind of double-layer curtain wall closing-in structure
Technical field
The utility model relates to decorations technical field more particularly to a kind of double-layer curtain wall closing-in structures.
Background technique
Curtain wall is the exterior wall enclosure of building, and not load-bearing is hung up as curtain, therefore also known as " curtain wall ", it is modern Large-scale and skyscraper commonly has the lightweight wall of decorative effect.It is made of panel and support system, it can be opposite Main structure has certain displacement ability or itself has certain deformability, do not undertake the building external shield knot that main structure is acted on Structure or decorative structure.
Existing curtain wall mostly uses double-layer curtain wall, is middle control layer between double-layer curtain wall, has reached the effect of heat preservation, but double Layer curtain wall and it is several layers of between mostly use single metallic rod to be attached, metallic rod long-time bearing curtain wall will lead to metal sense It bends, influences the service life of curtain wall, and in the art, how to make to keep smooth between curtain wall plate during installation Degree is consistent, becomes the problem in curtain wall construction.
Utility model content
The purpose of this utility model is that proposing a kind of installation convenience, bearing capacity is big and is easily installed neat double-layer curtain wall Closing-in structure.
In order to achieve the above objectives, the utility model proposes a kind of double-layer curtain wall closing-in structure, including set gradually first Curtain wall, the second curtain wall and base and at least one contraction connecting piece;
Wherein, the contraction connecting piece includes at least three first connecting rods, at least three connector sleeves and at least three pieces the Two connecting rods;The back side of first curtain wall is uniformly provided at least three first connecting rods;The act 2 is pre-buried within the walls There is the connector sleeve to match with the first connecting rod quantity and position;The base is equipped with and the connector sleeve quantity and position Set the second connecting rod to match;The first connecting rod is inserted in one end of the connector sleeve, and second connecting rod plugs In the other end of the connector sleeve;The first connecting rod and second connecting rod are limited by fastener and the connector sleeve It is fixed;
Elastic clamping block is equidistantly equipped on the first connecting rod and second connecting rod;The connector sleeve inner ring is equipped with The card slot matched with the elastic clamping block;
Hanging buckle is equipped on the base and second curtain wall;It is equipped in the first connecting rod and the second connecting rod Through-hole;The first connecting rod and the second connecting rod pass through the through-hole by iron wire and hang on the hanging buckle.
Preferably, the fastener includes the nut that tapered thread is covered and matched with the thread bush;The taper spiral shell Line set is sheathed on the first connecting rod and the second connecting rod, and it is outer that the thread bush is sheathed on the tapered thread set;It is described The side of tapered thread set is equipped at least one notch that high direction setting is covered along the tapered thread, makes the tapered thread Set has shrinkage.
Preferably, second connecting rod is realized by welding or screw and the base and is connected.
Preferably, the base is keel shoe or metope.
Preferably, it presets fluted in the base, resilient pin is equipped in the groove;The bottom of second connecting rod End is equipped with the tongue-and-groove matched with the bolt;Second connecting rod is inserted in tongue-and-groove and the base by the bolt Realize connection.
Compared with prior art, the utility model is advantageous in that: the utility model is using first connecting rod, connection It covers the connection between the second connecting rod and connects the first curtain wall, the second curtain wall and base, generally dismountable connection structure, Easy to disassemble, connector sleeve plays the role of supporting again to first connecting rod and the second connecting rod, and connecting rod is avoided to should be curtain wall Active force generates deformation by the arrangement and iron wire of at least three contraction connecting pieces with the cooperation with buckle and again serves to branch The effect of support keeps whole force structure more evenly stronger, extends the service life of curtain wall.
Elastic clamping block is equidistantly equipped on first connecting rod and second connecting rod, connector sleeve inner ring is equipped with and elastic card The card slot that block matches, operator only need by base and metope it is fixed after, by the arrangement of fixture block equidistant in connecting rod, Each module curtain wall is spliced convenient for fast and accurately neat.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of double-layer curtain wall closing-in structure in an embodiment of the present invention.
Specific embodiment
To keep the purpose of this utility model, technical solution and advantage clearer, below by the technology to the utility model Scheme is further described.
As shown in Figure 1, the utility model proposes a kind of double-layer curtain wall closing-in structure, including set gradually the first curtain wall 1, Second curtain wall 2 and base 3 and at least one contraction connecting piece 4;
Wherein, contraction connecting piece 4 includes at least three first connecting rods 41, at least three connector sleeves 42 and at least three pieces the Two connecting rods 43;The back side of first curtain wall 1 is uniformly provided at least three first connecting rods 41;It is embedded in second curtain wall 2 and the The connector sleeve 42 that one connecting rod, 41 quantity and position match;Base 3, which is equipped with, to match with 42 quantity of connector sleeve and position Second connecting rod 43;First connecting rod 41 is inserted in one end of connector sleeve 42, and the second connecting rod 43 is inserted in the another of connector sleeve 42 One end;First connecting rod 41 and the second connecting rod 43 are fixed by fastener and the limit of connector sleeve 42;
Elastic clamping block is equidistantly equipped on first connecting rod 41 and the second connecting rod 43;42 inner ring of connector sleeve is equipped with and elasticity The card slot that fixture block matches;
Hanging buckle is equipped on base 3 and the second curtain wall 2;Through-hole is equipped in first connecting rod 41 and the second connecting rod 43; First connecting rod 41 and the second connecting rod 43 pass through through-hole by iron wire and hang on hanging buckle.
In the present embodiment, fastener includes the nut 442 that tapered thread set 441 and matched with thread bush 441;Taper Thread bush 441 is sheathed on first connecting rod 41 and the second connecting rod 43, and thread bush 441 is sheathed on outside tapered thread set 441;Cone The side of shape thread bush 441 is equipped at least one notch along the high direction setting of tapered thread set 441, makes tapered thread set 441 have shrinkage.
In the present embodiment, the second connecting rod 43 is realized by welding or screw and base 3 and is connected.
In the present embodiment, base 3 is keel shoe or metope.
In the present embodiment, it presets fluted in base 3, resilient pin is equipped in groove;The bottom end of second connecting rod 43 Equipped with the tongue-and-groove matched with bolt;Second connecting rod 43 is inserted in tongue-and-groove by bolt and realizes connection with base 3.
The utility model connects first using the connection between first connecting rod 41, connector sleeve 42 and the second connecting rod 43 Curtain wall 1, the second curtain wall 2 and base 3, generally dismountable connection structure is easy to disassemble, and connector sleeve 42 gives first connecting rod 41 Play the role of supporting again with the second connecting rod 43, connecting rod is avoided to should be the active force of curtain wall, generates deformation, pass through at least three The arrangement of a contraction connecting piece 4 and iron wire are again served to the effect of support, are made whole force structure with the cooperation with buckle It is more evenly stronger, extend the service life of curtain wall.
Elastic clamping block is equidistantly equipped on first connecting rod 41 and the second connecting rod 43,42 inner ring of connector sleeve is equipped with and elasticity The card slot that fixture block matches passes through the row of fixture block equidistant in connecting rod after operator only needs to fix base 3 and metope Cloth splices each module curtain wall convenient for fast and accurately neat.
The preferred embodiment that above are only the utility model, does not play the role of any restrictions to the utility model. Any person of ordinary skill in the field, in the range of not departing from the technical solution of the utility model, to the utility model The technical solution and technology contents of exposure make the variation such as any type of equivalent replacement or modification, belong to without departing from the utility model Technical solution content, still fall within the protection scope of the utility model.

Claims (5)

1. a kind of double-layer curtain wall closing-in structure, which is characterized in that including the first curtain wall, the second curtain wall and base set gradually, And at least one contraction connecting piece;
Wherein, the contraction connecting piece includes at least three first connecting rods, at least three connector sleeves and at least three second companies Extension bar;The back side of first curtain wall is uniformly provided at least three first connecting rods;The act 2 be embedded within the walls with The connector sleeve that the first connecting rod quantity and position match;The base is equipped with and the connector sleeve quantity and position phase Matched second connecting rod;The first connecting rod is inserted in one end of the connector sleeve, and second connecting rod is inserted in institute State the other end of connector sleeve;The first connecting rod and second connecting rod are solid by fastener and connector sleeve limit It is fixed;
Elastic clamping block is equidistantly equipped on the first connecting rod and second connecting rod;The connector sleeve inner ring is equipped with and institute State the card slot that elastic clamping block matches;
Hanging buckle is equipped on the base and second curtain wall;It is equipped on the first connecting rod and the second connecting rod logical Hole;The first connecting rod and the second connecting rod pass through the through-hole by iron wire and hang on the hanging buckle.
2. double-layer curtain wall closing-in structure according to claim 1, which is characterized in that the fastener includes tapered thread set With the nut matched with the thread bush;The tapered thread set is sheathed on the first connecting rod and the second connecting rod, It is outer that the thread bush is sheathed on the tapered thread set;The side of the tapered thread set is equipped at least one along the taper spiral shell Line covers the notch of high direction setting, and the tapered thread set is made to have shrinkage.
3. double-layer curtain wall closing-in structure according to claim 1, which is characterized in that second connecting rod by welding or Person's screw and the base, which realize, to be connected.
4. double-layer curtain wall closing-in structure according to claim 1, which is characterized in that the base is keel shoe or wall Face.
5. double-layer curtain wall closing-in structure according to claim 1, which is characterized in that preset fluted, institute in the base It states and is equipped with resilient pin in groove;The bottom end of second connecting rod is equipped with the tongue-and-groove matched with the bolt;Described second Connecting rod is inserted in tongue-and-groove by the bolt and realizes connection with the base.
CN201821484320.9U 2018-09-11 2018-09-11 A kind of double-layer curtain wall closing-in structure Expired - Fee Related CN209308230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821484320.9U CN209308230U (en) 2018-09-11 2018-09-11 A kind of double-layer curtain wall closing-in structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821484320.9U CN209308230U (en) 2018-09-11 2018-09-11 A kind of double-layer curtain wall closing-in structure

Publications (1)

Publication Number Publication Date
CN209308230U true CN209308230U (en) 2019-08-27

Family

ID=67668906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821484320.9U Expired - Fee Related CN209308230U (en) 2018-09-11 2018-09-11 A kind of double-layer curtain wall closing-in structure

Country Status (1)

Country Link
CN (1) CN209308230U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236506A (en) * 2020-01-20 2020-06-05 福建省兴岩建设集团有限公司 Hang curtain futilely with short cantilever dry-hanging device
CN111663688A (en) * 2020-06-08 2020-09-15 浙江大道建设工程有限公司 Curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236506A (en) * 2020-01-20 2020-06-05 福建省兴岩建设集团有限公司 Hang curtain futilely with short cantilever dry-hanging device
CN111663688A (en) * 2020-06-08 2020-09-15 浙江大道建设工程有限公司 Curtain wall
CN111663688B (en) * 2020-06-08 2022-06-03 浙江大道建设工程有限公司 Curtain wall

Similar Documents

Publication Publication Date Title
CN209308230U (en) A kind of double-layer curtain wall closing-in structure
CN106115504B (en) A kind of suspender
CN210562939U (en) Assembled bearing structure of banquet hall top surface
CN208984840U (en) A kind of side-by-side twin-core flat optical cable
CN204139400U (en) A kind of double-layer curtain wall
CN209134010U (en) A kind of cable testing bridge of deformation resistant
CN207998725U (en) Wall-mounted device for clothing processing
CN209315492U (en) A kind of vertical hanger convenient for assembling
CN210713452U (en) Anti-deformation ceiling
CN206250701U (en) A kind of many cable installation racks
CN221321436U (en) Heavy furred ceiling mounting structure
CN105909665B (en) A kind of novel hook
CN202787617U (en) Sleeve type lift sub
CN207953820U (en) A kind of supporter for placing arc plate class or flat-type product
CN202519919U (en) Wall-penetrating bridge cutoff heat insulation component
CN217427534U (en) Quick locking device for cable bridge
CN215055505U (en) Automatic control device for butt joint length of net rack rod pieces
CN211083117U (en) Pipeline antidetonation props up hoist and mount and puts
CN208625540U (en) A kind of towel holder connection device
CN213445928U (en) Rope breakage protector for tower crane
CN104234283B (en) A kind of double-layer curtain wall
CN208981701U (en) A kind of mounting structure of building outer laying and hanging ornamental prefabricated component and building body
CN211286050U (en) Novel wallboard anti-cracking structure is built in room
CN103598721B (en) A kind of bed of lying with paulin
CN207665085U (en) A kind of falling-proof type television stand being easily installed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190827

Termination date: 20210911

CF01 Termination of patent right due to non-payment of annual fee