CN209308085U - A kind of automated watch-keeping facility of settlement of foundation - Google Patents

A kind of automated watch-keeping facility of settlement of foundation Download PDF

Info

Publication number
CN209308085U
CN209308085U CN201920011155.3U CN201920011155U CN209308085U CN 209308085 U CN209308085 U CN 209308085U CN 201920011155 U CN201920011155 U CN 201920011155U CN 209308085 U CN209308085 U CN 209308085U
Authority
CN
China
Prior art keywords
fixedly installed
settlement
ground
component
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920011155.3U
Other languages
Chinese (zh)
Inventor
王开拓
张立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Nationalities University
Original Assignee
Qinghai Nationalities University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Nationalities University filed Critical Qinghai Nationalities University
Priority to CN201920011155.3U priority Critical patent/CN209308085U/en
Application granted granted Critical
Publication of CN209308085U publication Critical patent/CN209308085U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of automated watch-keeping facilities of settlement of foundation, including hydrostatic level, ground basic body and ground, ground basic body is fixedly installed at the top of the ground, the bottom end of the ground body interior is movably installed with sedimentation component, the top movable of the sedimentation component is equipped with support component, hydrostatic level is fixedly installed at the top of the support component, the top movable of described ground basic body is equipped with mounting assembly, the bottom of the mounting assembly is fixedly installed with guide sleeve, the output end of the hydrostatic level is connect by guide sleeve with display screen, storage box is fixedly installed at the top of the mounting assembly, the surface of the storage box is fixedly installed display screen, water repellent component is fixedly installed at the top of the storage box.The utility model by be provided with a series of structure make the present apparatus during use and have many advantages, such as dismounting simply with work efficiency is high.

Description

A kind of automated watch-keeping facility of settlement of foundation
Technical field
The utility model relates to surveying device technical field, specially a kind of automated watch-keeping facility of settlement of foundation.
Background technique
With the continuous development in epoch, the automated watch-keeping facility of settlement of foundation plays important during ground surveys Effect, settlement of foundation refer to that foundation soil foundation surface caused by densification under additional stress effect sinks, excessive sedimentation, Especially differential settlement can make building run-off the straight, cracking so that being unable to normal use, and foundation settlement prediction needs are used The automated watch-keeping facility of settlement of foundation is surveyed, the automated watch-keeping facility of existing settlement of foundation be inconvenient to carry out installation with Disassembly, influence staff and carry out exploration work, and is complicated for operation, facilitate staff carry out using, thus it is proposed that A kind of automated watch-keeping facility of settlement of foundation is existing to solve the problems, such as.
Utility model content
The purpose of this utility model is to provide a kind of automated watch-keeping facilities of settlement of foundation, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of automated watch-keeping facility of settlement of foundation, Including hydrostatic level, basic body and ground, ground basic body is fixedly installed at the top of the ground, in described ground basic body The bottom end in portion is movably installed with sedimentation component, and the top movable of the sedimentation component is equipped with support component, the support component Top be fixedly installed with hydrostatic level, the top movable of described ground basic body is equipped with mounting assembly, the mounting assembly Bottom be fixedly installed with guide sleeve, the output end of the hydrostatic level is connect by guide sleeve with display screen, the installation Storage box is fixedly installed at the top of component, the surface of the storage box is fixedly installed display screen, the side of the display screen It is fixedly installed with control button, the side of the display screen is fixedly installed supply hub, and supply hub is located at control button Bottom, be fixedly installed with water repellent component at the top of the storage box.
Preferably, the inside of the mounting assembly is fixedly installed with top plate, and the two sides of top plate bottom are all fixedly installed with branch Strut is fixedly installed with connecting rod between support rod and top plate.
Preferably, the inside of the water repellent component is fixedly installed with mounting base, is fixedly installed with waterproof at the top of mounting base Baffle.
Preferably, the inside of the support component is fixedly installed with support base, and the bottom of support base is fixedly installed with support Plate, the two sides inside support plate are all movably installed with fastening bolt.
Preferably, the inside of the sedimentation component is fixedly installed with sedimentation plate, settles two sides all activity installations of intralamellar part There is side bolt.
Preferably, the surface of the storage box is equipped with door body by articulate, and the surface of door body is fixedly installed sight Window is examined, the side of observation window is fixedly installed with handle.
Compared with prior art, the utility model has the beneficial effects that the automated watch-keeping facility of the settlement of foundation passes through peace Equipped with mounting assembly, staff can be facilitated to carry out installation and removal to the present apparatus, it is easy to operate with work efficiency is high, pass through Sedimentation component is installed, can ancillary staff carry out ground survey work, the precision of exploration is improved, by being equipped with static(al) Level can monitor automatically settlement of foundation, easy to operate, by being equipped with water repellent component, can prevent rainwater Infiltration, improves the service life of the present apparatus, by being equipped with storage box, can store to some monitorings with equipments of recording, Facilitate staff to operate, by being equipped with control button, staff is facilitated to control the present apparatus, it is easy to operate, pass through Support component is installed, the present apparatus can be supported, the stability of the present apparatus is improved, dismounting is simple.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the rearview of the utility model;
Fig. 3 is the support component partial structural diagram of the utility model;
Fig. 4 is the sedimentation component partial structural diagram of the utility model.
In figure: 1, water repellent component;101, water bar;102, mounting base;2, display screen;3, guide sleeve;4, mounting assembly; 401, top plate;402, connecting rod;403, support rod;5, hydrostatic level;6, support component;601, support plate;602, support base; 603, fastening bolt;7, basic body;8, component is settled;801, plate is settled;802, side bolt;9, ground;10, control button;11, Supply hub;12, storage box;1201, door body;1202, observation window;1203, handle.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-4 is please referred to, a kind of embodiment provided by the utility model: a kind of automated watch-keeping facility of settlement of foundation, packet Include hydrostatic level 5, basic body 7 and ground 9, the side of display screen 2 be fixedly installed supply hub 11, supply hub 11 is logical It crosses conducting wire to be electrically connected with extraneous power supply, supply hub 11 can provide electric energy for the present apparatus, and staff is facilitated to grasp Make, and supply hub 11 is located at the bottom of control button 10, the side of display screen 2 is fixedly installed with control button 10, and control is pressed Button 10 is electrically connected by conducting wire with supply hub 11, and the model of the control button 10 can be LA53-2 control button, control Button 10 processed is mainly used for far distance control contactor, electromagnetic starter, relay coil and other control line roads, it can also be used to Electric interlock route facilitates staff to control the start and stop of the present apparatus, and easy to operate, the top on ground 9 is fixedly installed with ground Ontology 7, the bottom end inside ground basic body 7 are movably installed with sedimentation component 8, sedimentation component 8 can ancillary staff carry out ground Base surveys work, improves the precision of exploration, and the top movable of sedimentation component 8 is equipped with support component 6, and support component 6 can be right The present apparatus is supported, and improves the stability of the present apparatus, dismounting is simple, and the top of support component 6 is fixedly installed with static level Instrument 5, hydrostatic level 5 are electrically connected by conducting wire with control button 10, and the model of the hydrostatic level 5 can be YT-DG- 0300 hydrostatic level, hydrostatic level 5 are the precision instruments for measuring height difference and its variation, be mainly used for large-scale storage tank, dam, The vertical displacements such as nuclear power station, skyscraper, foundation pit, tunnel, bridge, subway and inclined monitoring, static liquid level are generally pacified On the survey pier contour mounted in testee or on testee wall contour, integrated module automatic measurement list is generallyd use Member acquisition data, are connect by wired or wireless communication with computer, to realize automatic observation, can to settlement of foundation into The automatic monitoring of row, easy to operate, the top movable of ground basic body 7 is equipped with mounting assembly 4, and mounting assembly 4 can facilitate work Personnel to the present apparatus carry out installation and removal, it is easy to operate with work efficiency is high, the bottom of mounting assembly 4 is fixedly installed with guiding The output end of set 3, hydrostatic level 5 is connect by guide sleeve 3 with display screen 2, and the top of mounting assembly 4 is fixedly installed with storage Case 12, storage box 12 can store some monitorings with equipments of recording, and staff is facilitated to operate, storage box 12 Surface is fixedly installed display screen 2, and display screen 2 is electrically connected by conducting wire with hydrostatic level 5, and display screen 2 can be right The situation of exploration is shown, staff is facilitated to check, the top of storage box 12 is fixedly installed with water repellent component 1, is prevented Water assembly 1 can prevent the infiltration of rainwater, improve the service life of the present apparatus.
Further, the inside of mounting assembly 4 is fixedly installed with top plate 401, and the two sides of 401 bottom of top plate are all fixedly installed with Support rod 403 is fixedly installed with connecting rod 402 between support rod 403 and top plate 401, available when the present apparatus is worked Support rod 403 is supported storage box 12 with connecting rod 402, and staff is facilitated to carry out exploration work.
Further, the inside of water repellent component 1 is fixedly installed with mounting base 102, and the top of mounting base 102 is fixedly installed with anti- Water baffle 101, water bar 101 can drain rainwater, prevent the infiltration of rainwater, improve the service life of the present apparatus.
Further, the inside of support component 6 is fixedly installed with support base 602, and the bottom of support base 602 is fixedly installed with branch Fagging 601, the two sides inside support plate 601 are all movably installed with fastening bolt 603, available when the present apparatus is worked Fastening bolt 603 carries out installation and removal to support component 6, easy to operate.
Further, the inside for settling component 8 is fixedly installed with sedimentation plate 801, settles two sides all activity peaces inside plate 801 Equipped with side bolt 802, when the present apparatus is worked, ground is carried out using sedimentation 801 ancillary staff of plate and surveys work, is mentioned The precision of height exploration.
Further, the surface of storage box 12 is equipped with door body 1201 by articulate, and the surface fixation of door body 1201 is set It is equipped with observation window 1202, the side of observation window 1202 is fixedly installed with handle 1203, when the work of present apparatus memory, using handle Hand 1203 is opened door body 1201 and is stored to the surveying device inside storage box 12 with equipments of recording, and staff is facilitated to carry out It uses.
Working principle: using before the present apparatus, user of service first detects device, after confirming that there is no problem, in use, First sedimentation component 8 is installed, support component 6 is then mounted on to the top of sedimentation component 8, then by hydrostatic level 5 It is mounted on the top of support component 6, mounting assembly 4 is then mounted on to the surface of ground basic body 7, then carries out storage box 12 Installation recycles control button 10 to open the present apparatus, carries out exploration work followed by hydrostatic level 5.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of automated watch-keeping facility of settlement of foundation, including hydrostatic level, basic body and ground, it is characterised in that: institute It states and is fixedly installed with ground basic body at the top of ground, the bottom end of the ground body interior is movably installed with sedimentation component, described The top movable of sedimentation component is equipped with support component, and hydrostatic level is fixedly installed at the top of the support component, described The top movable of ground basic body is equipped with mounting assembly, and the bottom of the mounting assembly is fixedly installed with guide sleeve, the static(al) The output end of level is connect by guide sleeve with display screen, and storage box is fixedly installed at the top of the mounting assembly, described The surface of storage box is fixedly installed display screen, and the side of the display screen is fixedly installed with control button, the display screen Side is fixedly installed supply hub, and supply hub is located at the bottom of control button, and the top of the storage box is fixedly mounted There is water repellent component.
2. a kind of automated watch-keeping facility of settlement of foundation according to claim 1, it is characterised in that: the mounting assembly Inside is fixedly installed with top plate, and the two sides of top plate bottom are all fixedly installed with support rod, are fixedly mounted between support rod and top plate There is connecting rod.
3. a kind of automated watch-keeping facility of settlement of foundation according to claim 1, it is characterised in that: the water repellent component Inside is fixedly installed with mounting base, is fixedly installed with water bar at the top of mounting base.
4. a kind of automated watch-keeping facility of settlement of foundation according to claim 1, it is characterised in that: the support component Inside is fixedly installed with support base, and the bottom of support base is fixedly installed with support plate, all activity installations of the two sides inside support plate There is fastening bolt.
5. a kind of automated watch-keeping facility of settlement of foundation according to claim 1, it is characterised in that: the sedimentation component Inside is fixedly installed with sedimentation plate, and the two sides for settling intralamellar part are all movably installed with side bolt.
6. a kind of automated watch-keeping facility of settlement of foundation according to claim 1, it is characterised in that: the table of the storage box Face is equipped with door body by articulate, and the surface of door body is fixedly installed observation window, and the side of observation window is fixedly installed with handle Hand.
CN201920011155.3U 2019-01-04 2019-01-04 A kind of automated watch-keeping facility of settlement of foundation Expired - Fee Related CN209308085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920011155.3U CN209308085U (en) 2019-01-04 2019-01-04 A kind of automated watch-keeping facility of settlement of foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920011155.3U CN209308085U (en) 2019-01-04 2019-01-04 A kind of automated watch-keeping facility of settlement of foundation

Publications (1)

Publication Number Publication Date
CN209308085U true CN209308085U (en) 2019-08-27

Family

ID=67680391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920011155.3U Expired - Fee Related CN209308085U (en) 2019-01-04 2019-01-04 A kind of automated watch-keeping facility of settlement of foundation

Country Status (1)

Country Link
CN (1) CN209308085U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749345A (en) * 2019-09-30 2020-02-04 中地泓通工程技术有限公司 Dam stability monitoring equipment for hydraulic and hydroelectric engineering
CN117905118A (en) * 2024-01-19 2024-04-19 中南大学 Real-time monitoring device for pit bottom uplift of foundation pit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749345A (en) * 2019-09-30 2020-02-04 中地泓通工程技术有限公司 Dam stability monitoring equipment for hydraulic and hydroelectric engineering
CN117905118A (en) * 2024-01-19 2024-04-19 中南大学 Real-time monitoring device for pit bottom uplift of foundation pit
CN117905118B (en) * 2024-01-19 2024-08-06 中南大学 Real-time monitoring device for pit bottom uplift of foundation pit

Similar Documents

Publication Publication Date Title
CN100588897C (en) Apparatus and method for measuring road bed sedimentation from long distance by laser
CN209308085U (en) A kind of automated watch-keeping facility of settlement of foundation
CN104457634B (en) Micro-tremor measurement based bridge pier scour monitoring system and method
CN104631516B (en) A kind of portable reinforced earth retaining walls facial disfigurement monitoring device and monitoring method
CN111412840A (en) Contact net detection equipment and contact net detection method
CN209247001U (en) A kind of rail track construction water Pingdu detection device
CN110924457A (en) Foundation pit deformation monitoring method and system based on measuring robot
CN204785450U (en) A handheld support for cover protectometer
CN204346501U (en) For deep soil movement and the underground water table parameter measuring device of side slope
TWI497038B (en) Auto-measuring system for measuring a plurality of data of a river
CN113945918A (en) Suspension rod type hydrological flow measurement device and use method thereof
CN211206615U (en) Monitoring device for stray current
CN217682221U (en) Water pump lift and flow test equipment
JP2018179535A (en) Soundness monitoring system and soundness monitoring method
CN110243677A (en) Shield duct piece steel bar corrosion causes the test method of Stiffness Deterioration under a kind of multifactor effect
CN102735156A (en) Gravity type piezoelectric sheet erosion monitoring device
CN106257245A (en) Conduit section monitoring system
CN211626392U (en) Contact net check out test set
CN211978042U (en) Water level monitoring device for hydraulic engineering
CN212107648U (en) Geological disaster monitoring device
CN204343346U (en) A kind of portable reinforced earth retaining walls facial disfigurement monitoring device
CN206291860U (en) A kind of tunnel laser restrains device
CN219347906U (en) Precipitation observation well alarm device convenient to observe water level
CN217358494U (en) Base settlement difference real-time monitoring device
CN106840472B (en) A kind of high-precision three-dimensional soil pressure testing device and its range adjust system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant