CN209308054U - A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation - Google Patents

A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation Download PDF

Info

Publication number
CN209308054U
CN209308054U CN201822112618.3U CN201822112618U CN209308054U CN 209308054 U CN209308054 U CN 209308054U CN 201822112618 U CN201822112618 U CN 201822112618U CN 209308054 U CN209308054 U CN 209308054U
Authority
CN
China
Prior art keywords
outer tube
self
steel pipe
locking
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822112618.3U
Other languages
Chinese (zh)
Inventor
刘慧群
梁峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architecture Design and Research Institute of Tongji University Group Co Ltd
Original Assignee
Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architecture Design and Research Institute of Tongji University Group Co Ltd filed Critical Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority to CN201822112618.3U priority Critical patent/CN209308054U/en
Application granted granted Critical
Publication of CN209308054U publication Critical patent/CN209308054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of outer tube prestress anchorage cable offshore wind farm single-pile foundations, including steel pipe single pile (4), stablize guiding node (3), self-locking prestress wire and outer tube (5), stable guiding node (3) setting steel pipe single pile (4) is outside, the outer tube (5) is sheathed on steel pipe single pile (4) outside along stable guiding node (3), and outer tube (5) top diameter is less than base diameter, the self-locking prestress wire is arranged in outer tube (5) wall, self-locking prestress wire one end is anchored in seabed by self-locking manner, power transmission node (2) tensioning that the other end passes through setting at the top of steel pipe single pile (4), make steel pipe single pile (4) preloading power.Compared with prior art, the utility model has many advantages, such as that stability is good, bore diameter is smaller.

Description

A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation
Technical field
The utility model belongs to offshore wind farm single-pile foundation construction technical field, more particularly, to a kind of outer tube prestressing force Anchor cable offshore wind farm single-pile foundation.
Background technique
Under the action of wind, unrestrained load, basis is primarily subjected to moment of flexure and cuts Oversea wind power generation structure in addition to bearing pressure Power.Major diameter steel cylinder single-pile foundation is widely used in offshore wind farm project.But when there are the difficulty that when lithosphere, drills for foundation bottom Greatly, need to be first with heavy caliber rock borer drilling depth up to 3 times or more apertures, then use large-scale piling machine instead and squeeze into petrosal foramen downwards, finally Concrete perfusion.Which need to use large scale equipment, there is that energy consumption is high, high cost is insufficient, and test pile condition and true pile foundation Plinth condition is not met.
Utility model content
The purpose of this utility model is exactly to overcome the problems of the above-mentioned prior art and to provide a kind of outer tube pre- Stress anchor cable offshore wind farm single-pile foundation.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation, including steel pipe single pile, stable guiding node, self-locking Prestress wire and outer tube, the stable guiding node are arranged outside steel pipe single pile, and the outer tube is along the stable guiding Node cover is set to outside steel pipe single pile, and outer tube top diameter is less than base diameter, and the self-locking prestress wire is worn In in housing tube wall, self-locking prestress wire one end is anchored in seabed by self-locking manner, and the other end passes through steel pipe The power transmission node tensioning being arranged at the top of single pile, makes steel pipe single pile preloading power.
Further, the self-locking prestress wire includes steel strand wires ontology and is set to steel strand wires body end Self-locking anchor head.
Further, the stable guiding node is provided with multiple, is uniformly distributed in steel pipe single pile outer wall.
Further, multiple stable guiding nodes are divided into multilayer node layer, each node layer along steel pipe single pile by up to Lower distribution, and the length for stablizing guiding node in each node layer from top to bottom successively increases.
Further, the through-hole for passing through the self-locking prestress wire is offered in the housing tube wall.
Further, the self-locking prestress wire is anchored in middle weathering lithosphere by self-locking manner.
Compared with prior art, the utility model have with following the utility model has the advantages that
1, for the utility model using outer tube is provided with, self-locking prestress wire is anchored to seabed by outer tube, Compared with general single-pile foundation, the superiority of rock foundation is taken full advantage of, is bent using single pile, the combination of rock anchor cable resistance to plucking Bending resistance is cut, and stability is good.
2, the utility model, which is provided with, stablizes guiding node, facilitates the oblique of outer tube to squeeze into, effectively improves construction efficiency.
3, the utility model bore diameter is smaller, and structure is simple, easy for construction, and time-consuming is few, can save duration and cost, There is the basis of rock suitable for bottom.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Figure label: 1 be steel strand wires ontology, 2 be power transmission node, 3 be stablize guiding node, 4 be steel pipe single pile, 5 be shield Casing, 6 be self-locking anchor head, 7 be sea, 8 be sea bed mud face, 9 be silt layer, 10 be strong-weathered rock rock layers, 11 be middle decomposed rock Rock layers.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.The present embodiment is with the utility model Implemented premised on technical solution, the detailed implementation method and specific operation process are given, but the guarantor of the utility model Shield range is not limited to the following embodiments.
As shown in Figure 1, the present embodiment provides a kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation, including steel pipe list Guiding node 3, self-locking prestress wire and outer tube 5 are stablized in stake 4, stablize guiding node 3 and are arranged outside steel pipe single pile 4, outside Casing 5 is sheathed on outside steel pipe single pile 4 along guiding node 3 is stablized, and 5 top diameter of outer tube is less than base diameter, and outer tube 5 is opened Equipped with through-hole, self-locking prestress wire is arranged in 5 wall of outer tube by through-hole, and self-locking prestress wire one end is logical Cross self-locking manner and be anchored in seabed, the other end by 2 tensioning of power transmission node that is arranged at the top of steel pipe single pile 4, make steel pipe single pile 4 by Precompression.Self-locking prestress wire includes steel strand wires ontology 1 and the self-locking anchor head 6 for being set to 1 end of steel strand wires ontology.
In the present embodiment, stablizes guiding node 3 and be provided with multiple, be uniformly distributed in 4 outer wall of steel pipe single pile.Multiple stabilizations are led Draw node 3 to divide for multilayer node layer, each node layer is from top to bottom distributed along steel pipe single pile 4, and stablizes guiding section in each node layer The length of point 3 from top to bottom successively increases.Outer tube 5 is sheathed on outside steel pipe single pile 4 along guiding node 3 is stablized, and keeps outer tube 5 oblique To seabed is squeezed into, if the angle of 5 side wall of outer tube and horizontal plane can be 70-80 °.
In the present embodiment, self-locking prestress wire passes through mud silt layer 9, strong-weathered rock rock layers 10, and bottom passes through certainly Break adrift head 6 locks in apoplexy lithosphere 11 certainly.Geological conditions according to locating for it is different and is divided into hanging section, squeezes into section and anchoring Section, wherein hanging section is located at 8 or more sea bed mud face, squeezes into section and is located at silt layer 9, anchoring section is located at strong-weathered rock rock layers 10.
The work progress of above-mentioned outer tube prestress anchorage cable offshore wind farm single-pile foundation includes:
1, steel pipe single pile 4 is squeezed into strong-weathered rock rock layers 10, meets resistance to compression condition;
2, protecting pipe 5 is squeezed into the periphery of steel pipe single pile 4 along guiding node 3 is stablized, it is oblique to squeeze into silt layer 9, into strong Decomposed rock rock layers 10;
3, in 5 internal drilling of protecting pipe, the enough anchorage depths of middle weathering lithosphere 11 are pierced;
4, the self-locking prestress wire comprising self-locking anchor head 6 is put into hole;
5, it constructs self-locking head and is in the milk, conserve;
6, the tensioning self-locking prestress wire at the power transmission node 2 on top makes 4 preloading power of steel pipe single pile.
The preferred embodiments of the present invention have been described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality according to the design of the utility model on the basis of existing technology in domain Available technical solution is tested, it all should be within the scope of protection determined by the claims.

Claims (6)

1. a kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation, which is characterized in that led including steel pipe single pile (4), stabilization Drawing node (3), self-locking prestress wire and outer tube (5), steel pipe single pile (4) are arranged outside in stable guiding node (3), The outer tube (5) is sheathed on steel pipe single pile (4) outside along stable guiding node (3), and outer tube (5) top diameter is less than Base diameter, the self-locking prestress wire are arranged in outer tube (5) wall, self-locking prestress wire one end It is anchored in seabed by self-locking manner, the other end makes steel pipe by power transmission node (2) tensioning being arranged at the top of steel pipe single pile (4) Single pile (4) preloading power.
2. outer tube prestress anchorage cable offshore wind farm single-pile foundation according to claim 1, which is characterized in that described self-locking Formula prestress wire includes steel strand wires ontology (1) and the self-locking anchor head (6) for being set to steel strand wires ontology (1) end.
3. outer tube prestress anchorage cable offshore wind farm single-pile foundation according to claim 1, which is characterized in that the stabilization Guiding node (3) is provided with multiple, is uniformly distributed in steel pipe single pile (4) outer wall.
4. outer tube prestress anchorage cable offshore wind farm single-pile foundation according to claim 3, which is characterized in that multiple described Stablize guiding node (3) and be divided into multilayer node layer, each node layer is from top to bottom distributed along steel pipe single pile (4), and in each node layer The length for stablizing guiding node (3) from top to bottom successively increases.
5. outer tube prestress anchorage cable offshore wind farm single-pile foundation according to claim 1, which is characterized in that the housing The through-hole for passing through the self-locking prestress wire is offered in pipe (5) wall.
6. outer tube prestress anchorage cable offshore wind farm single-pile foundation according to claim 1, which is characterized in that described self-locking Formula prestress wire is anchored in middle weathering lithosphere (11) by self-locking manner.
CN201822112618.3U 2018-12-14 2018-12-14 A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation Active CN209308054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822112618.3U CN209308054U (en) 2018-12-14 2018-12-14 A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822112618.3U CN209308054U (en) 2018-12-14 2018-12-14 A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation

Publications (1)

Publication Number Publication Date
CN209308054U true CN209308054U (en) 2019-08-27

Family

ID=67677169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822112618.3U Active CN209308054U (en) 2018-12-14 2018-12-14 A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation

Country Status (1)

Country Link
CN (1) CN209308054U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114763698A (en) * 2021-01-15 2022-07-19 中国电建集团华东勘测设计研究院有限公司 Pre-tensioned pile anchor combined foundation for shallow covering layer seabed and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114763698A (en) * 2021-01-15 2022-07-19 中国电建集团华东勘测设计研究院有限公司 Pre-tensioned pile anchor combined foundation for shallow covering layer seabed and construction method thereof

Similar Documents

Publication Publication Date Title
CN107299632A (en) Marine rock drilling strike-on type large diameter pile structure and construction method
CN104047543B (en) A kind of construction method of large diameter drill hole pile pore-forming in high intensity lithostratigraphy
CN209308054U (en) A kind of outer tube prestress anchorage cable offshore wind farm single-pile foundation
CN108203984A (en) A kind of Dangerous Rock Body bolting with wire mesh method
CN105297764B (en) Marine wind electric field fan single-pile foundation and its construction method
CN211646449U (en) Combined single-pile foundation of offshore wind turbine
CN1982651A (en) Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
CN110516407A (en) More cluster fracturing fracture complexity calculating methods in a kind of fracture-type reservoir net horizontal section
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN106759432A (en) A kind of construction method of offshore wind farm super-large diameter piling bar
CN207300838U (en) A kind of static seratum exploring experimental rig
CN203930082U (en) Self-drilling type shearing wave proving installation
CN211873069U (en) Composite structure offshore wind turbine wing plate single pile foundation
Zhang et al. Numerical and experimental investigation on hydraulic fracturing for offshore wind turbine rock-socketed pile foundation construction
CN201474618U (en) Multistage alloy leading roller bit
CN104632192A (en) Pumping well downhole indicator diagram dynamic acquisition instrument
CN207348055U (en) A kind of casing external member for Bridge Pile Foundation Construction
CN202630860U (en) Testing device for long drill hole by virtue of deep-part base point method
CN204344057U (en) A kind of impact holing drilling slurry spacer assembly
CN209430236U (en) Monitoring and warning integration Deep Vertical Well wellbore apparatus based on constant resistance and large deformation anchor cable
CN205116208U (en) Offshore wind farm fan single pile basis
Ahsanuzzaman et al. Quantifying the influence of construction parameters on hollow-bar micropiles pullout capacity in sandy soil
CN203559777U (en) Tooth-shaped drill bit used for drilling
Chao et al. Study on vertical bearing capacity of the riser composite pile in clay
CN204386549U (en) A kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant