CN209303449U - A kind of wire-drawing frame - Google Patents
A kind of wire-drawing frame Download PDFInfo
- Publication number
- CN209303449U CN209303449U CN201822062147.XU CN201822062147U CN209303449U CN 209303449 U CN209303449 U CN 209303449U CN 201822062147 U CN201822062147 U CN 201822062147U CN 209303449 U CN209303449 U CN 209303449U
- Authority
- CN
- China
- Prior art keywords
- wire
- wire drawing
- membrane module
- coolant liquid
- spray head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Separation Using Semi-Permeable Membranes (AREA)
Abstract
The utility model discloses a kind of wire-drawing frames, including the actinobacillus wheel, at least a pair of of wire drawing membrane module and take-up pulley being sequentially arranged on wire-drawing direction, it further include cooling system, the cooling system includes sequentially connected collecting tank, settling tank, water pump, liquid reserve tank and spray head, the spray head is located at the top of wire drawing membrane module, and the collecting tank is located at the lower section of wire drawing membrane module.In the utility model, spray head is used to provide coolant liquid for the heat absorption of silk thread generation in wire-drawing process and takes away, collecting tank is for collecting the coolant liquid after use, and it is sent in settling tank, pass through the precipitation process of settling tank, then by treated, coolant liquid is pumped into again in liquid reserve tank, realizes the recycling and reusing of coolant liquid, the consumption of coolant liquid is effectively reduced.
Description
Technical field
The utility model relates to cable wire-drawing equipment technical field, specifically a kind of wire-drawing frame.
Background technique
Wire drawing machine is one of the important equipment in cable production process.In cable production process, need that cable core will be used as
Metal material carry out wire drawing process, so that its diameter is become smaller, meet production requirement.In the actual production process, due to wire
Metal inside histokinesis can all generate a large amount of heat in friction and drawing process at a distance from generating between wire drawing die,
But these heats can not be distributed in time, the temperature of silk thread can be made constantly to increase, and then influence wire-drawing effect.
In the prior art, spray head is set in wire drawing machine and sprays the mode of coolant liquid to drop to the silk thread in drawing process
Temperature, but this mode has certain problems: the equipment due to lacking necessary recycling coolant liquid cannot achieve coolant liquid
Recycling and reusing keeps the dosage of coolant liquid high.
Summary of the invention
According to the above-mentioned deficiencies of the prior art, the utility model proposes a kind of wire-drawing frames, by increasing a kind of cooling
The recovery processing link of liquid, realizes the recycling and reusing of coolant liquid, and the dosage of coolant liquid is effectively reduced.
The utility model solves its technical problem using following technical scheme to realize:
A kind of wire-drawing frame, including the actinobacillus wheel, at least a pair of of wire drawing membrane module and receipts being sequentially arranged on wire-drawing direction
Line wheel further includes cooling system, and the cooling system includes sequentially connected collecting tank, settling tank, water pump, liquid reserve tank and spray
Head, the spray head are located at the top of wire drawing membrane module, and the collecting tank is located at the lower section of wire drawing membrane module.
As the further improvement of the utility model, it has been sequentially arranged surely in the settling tank along coolant flow direction
Pond, sedimentation basin and liquid storage pond are flowed, a pair of dam being mutually matched and gear weir are equipped between the equalization pond and sedimentation basin, it is described
Overflow wall is equipped between sedimentation basin and liquid storage pond.
As the further improvement of the utility model, it is equipped with current stabilization bucket in the equalization pond, current stabilization bucket position is in equalization pond
The lower section of water inlet.
As the further improvement of the utility model, the wire drawing membrane module includes be sequentially arranged along wire-drawing direction
One wire drawing die and the second wire drawing die, the wire-drawing direction between first wire drawing die and second wire drawing die are vertically arranged, institute
On the extended line for stating the wire-drawing direction that spray head is arranged between the first wire drawing die and the second wire drawing die.
First is equipped with as the further improvement of the utility model, between the actinobacillus wheel and the wire drawing membrane module to lead
Line wheel, between first guide roller and the wire drawing membrane module be equipped with first tensioning pressure roller, the wire drawing membrane module with it is described
It is equipped with the second guide roller between take-up pulley, the second tensioning pressure roller is equipped between the wire drawing membrane module and second guide roller.
As the further improvement of the utility model, the first tensioning pressure roller includes with the second tensioning pressure roller
Roll body and pneumatic spring, pneumatic spring include fixed cylinder and the movable body of rod, and the movable body of rod is socketed in the fixed cylinder, living
The end of lever body and roll body are rotatablely connected.
As the further improvement of the utility model, electric heating is equipped between the second tensioning pressure roller and the take-up pulley
Silk, heating wire setting and the side of wire-drawing direction, and with wire-drawing direction keeping parallelism.
The beneficial effects of the utility model are:
In the utility model, cooling system is devised in wire-drawing frame, the cooling system includes sequentially connected collection
Slot, settling tank, water pump, liquid reserve tank and spray head, the spray head are located at the top of wire drawing membrane module, and the collecting tank is located at wire drawing die
The lower section of component, spray head are used to provide coolant liquid for the heat absorption of silk thread generation in wire-drawing process and take away, and collecting tank is used for
Coolant liquid after collecting use, and is sent in settling tank, then will that treated is cooling by the precipitation process of settling tank
Liquid is pumped into liquid reserve tank again, realizes the recycling and reusing of coolant liquid, and the consumption of coolant liquid is effectively reduced.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the main view of present embodiment;
Fig. 2 is the side view of present embodiment;
Fig. 3 is the portion the A detail drawing of Fig. 2;
Fig. 4 is the portion the B detail drawing of Fig. 1.
1- actinobacillus wheel, 2- take-up pulley, 3- wire drawing membrane module, the first wire drawing die of 31-, the second wire drawing die of 32-, the first conducting wire of 4-
Wheel, the second guide roller of 5-, 6- liquid reserve tank, 7- spray head, the tensioning pressure roller of 8- first, 9- heating wire, the tensioning pressure roller of 10- second, 11-
Line, 12- collecting tank, 13- settling tank, 131- equalization pond, 132- sedimentation basin, 133- liquid storage pond, 134- current stabilization bucket, 135- dam,
136- keeps off weir, 137- overflow wall, 14- water pump.
Specific embodiment
Below by the description to embodiment, the shape of for example related each component of specific embodiment of the present utility model
Shape, construction, the mutual alignment between each section and connection relationship, the effect of each section and working principle, manufacturing process and operation
Application method etc., is described in further detail, to help inventive concept of the those skilled in the art to the utility model, technology
Scheme has more complete, accurate and deep understanding.
As the utility model a kind of, embodiment there is provided a kind of wire-drawing frames, including on wire-drawing direction sequentially
The actinobacillus wheel of setting, at least a pair of of wire drawing membrane module and take-up pulley, further include cooling system, the cooling system includes sequentially connecting
Collecting tank, settling tank, water pump, liquid reserve tank and the spray head connect, the spray head are located at the top of wire drawing membrane module, the collection slot position
In the lower section of wire drawing membrane module.
When work, need the Filament winding for carrying out wire drawing process on actinobacillus wheel, and end is solid after wire drawing membrane module
It is scheduled on take-up pulley, take-up pulley is used to batch the silk thread after wire drawing process, and wire drawing membrane module is used to carry out at wire drawing silk thread
It manages, stores in liquid reserve tank for carrying out cooling coolant liquid to the silk thread during wire drawing process, coolant liquid is flowed from spray head
Out, in thread contact in dropping process, and with go to generate heat exchange, with the heat that wire-moving generates, realize cooling to silk thread,
Coolant liquid is eventually fallen into the collecting tank below wire drawing membrane module, is then flowed into settling tank from collecting tank again, coolant liquid exists
Settlement treatment is carried out in settling tank, and impurity therein is made to be deposited in the bottom of settling tank, it then will be in settling tank using water pump
Coolant liquid is pumped into liquid reserve tank, the final recycling and reusing for realizing coolant liquid, to reduce the dosage of coolant liquid.
As a kind of specific embodiment of the utility model, as illustrated in fig. 1 and 2, a kind of wire-drawing frame is provided, wrapped
The actinobacillus wheel 1 being sequentially arranged on wire-drawing direction, at least a pair of of wire drawing membrane module 3 and take-up pulley 2 are included, further includes cooling system,
The cooling system includes sequentially connected collecting tank 12, settling tank 13, water pump 14, liquid reserve tank 6 and spray head 7,7, the spray head
In the top of wire drawing membrane module 3, the collecting tank 12 is located at the lower section of wire drawing membrane module 3.Specifically, as shown in figure 3, described heavy
Equalization pond 131, sedimentation basin 132 and liquid storage pond 133, the equalization pond have been sequentially arranged along coolant flow direction in shallow lake case 13
A pair of dam 135 being mutually matched and gear weir 136, the sedimentation basin 132 and liquid storage pond 133 are equipped between 131 and sedimentation basin 132
Between be equipped with overflow wall 137.Further, it is equipped with current stabilization bucket 134 in the equalization pond 131, current stabilization bucket 134 is located at equalization pond
The lower section of 131 water inlets.The coolant liquid collected from collecting tank 12 initially enters the equalization pond 131 in settling tank 13, due to current stabilization
The design of current stabilization bucket 134 and dam 135 and gear weir 136 in pond 131, makes newly into the coolant liquid in equalization pond 131 to current stabilization
The influence of the disturbance of original coolant liquid is significantly reduced in pond 131, and is limited in equalization pond 131, then again from current stabilization
Channel of the pond 131 across dam 135 and gear weir 136 enters in sedimentation basin 132, the flowing of the coolant liquid in sedimentation basin 132
Slowly, be conducive to the sedimentation of impurity in coolant liquid, realize and be separated by solid-liquid separation, then the coolant liquid in sedimentation basin 132 climbs over overflow again
Wall 137 enters in liquid storage pond 133, and the coolant liquid after settlement treatment is stored in liquid storage pond 133, and finally reusing water pump 14 will
Coolant liquid in liquid storage pond 133 is pumped into liquid reserve tank 6, realizes recycling for coolant liquid.Current stabilization bucket 134 and dam 135 and gear
The design on weir 136 can reduce rapidly the flowing of coolant liquid, be conducive to the stabilization of coolant liquid and the sedimentation of impurity.
As a kind of optional embodiment, the wire drawing membrane module 3 includes the first wire drawing being sequentially arranged along wire-drawing direction
Mould 31 and the second wire drawing die 32, the wire-drawing direction between first wire drawing die 31 and second wire drawing die 32 are vertically arranged,
The spray head 7 is arranged on the extended line of the wire-drawing direction between the first wire drawing die 31 and the second wire drawing die 32.In drawing process,
The state in a vertical shape when by between first wire drawing die 31 and second wire drawing die 32 of silk thread 11, and be from bottom to top according to
It is secondary to pass through the first wire drawing die 31 and the second wire drawing die 32, in addition the setting of spray head 7 the first wire drawing die 31 and the second wire drawing die 32 it
Between wire-drawing direction extended line on, the coolant liquid that spray head 7 sprays is fallen from top to bottom, and with the first wire drawing die 31 and the second drawing
Silk thread 11 between silk mould 32 is in contact, since the flow direction of coolant liquid and the moving direction of silk thread 11 are on the contrary, make coolant liquid
It can be come into full contact with silk thread 11, be conducive to improve cooling effect.
Further, the first guide roller 4, first conducting wire are equipped between the actinobacillus wheel 1 and the wire drawing membrane module 3
It is equipped with the first tensioning pressure roller 8 between wheel 4 and the wire drawing membrane module 3, is set between the wire drawing membrane module 3 and the take-up pulley 2
There is the second guide roller 5, the second tensioning pressure roller 10 is equipped between the wire drawing membrane module 3 and second guide roller 5.First tensioning
Pressure roller 8 and the second tensioning pressure roller 10 can make the silk thread 11 for being located at a pair of 3 two sides of wire drawing membrane module keep tensioning state, prevent
The only relaxation of silk thread 11 influences wire-drawing effect.Specifically, as shown in figure 4, the first tensioning pressure roller 8 and the second tensioning pressure roller
10 include roll body 81 and pneumatic spring, and pneumatic spring includes fixed cylinder 82 and the movable body of rod 83, and the movable body of rod 83 is socketed in
In the fixed cylinder 82, the end of the movable body of rod 83 and roll body 81 are rotatablely connected.
In order to which the coolant liquid of 11 surfaces stick of silk thread after wire drawing is removed, the second tensioning pressure roller 10 and the take-up
Electric-heating assembly is equipped between wheel 2.When work, heat is generated by electric-heating assembly, viscous coolant liquid is glued on 11 surface of silk thread and is dried,
Then it is batched again by take-up pulley 2.Specifically, the electric-heating assembly is heating wire 9, the setting of heating wire 9 and wire-drawing direction
Side, and with wire-drawing direction keeping parallelism.Heating wire 9 is capable of providing stable and lasting heat, is conducive to carry out silk thread 11
Quickly drying.
In the utility model, cooling system is devised in wire-drawing frame, the cooling system includes sequentially connected collection
Slot 12, settling tank 13, water pump 14, liquid reserve tank 6 and spray head 7, the spray head 7 are located at the top of wire drawing membrane module 3, the collecting tank
12 are located at the lower section of wire drawing membrane module 3, and spray head 7 is used to provide coolant liquid for silk thread 11 generates in wire-drawing process heat absorption simultaneously
It takes away, collecting tank 12 is sent in settling tank 13 for collecting the coolant liquid after use, passes through the place of settling of settling tank 13
Reason, then by treated, coolant liquid is pumped into again in liquid reserve tank 6, realizes the recycling and reusing of coolant liquid, coolant liquid is effectively reduced
Consumption.
The utility model is exemplarily described above, it is clear that the utility model implements not by aforesaid way
Limitation, as long as not using the method concept of the utility model and the improvement of various unsubstantialities that technical solution carries out, or not
It is improved that the conception and technical scheme of the utility model are directly applied into other occasions, in the protection model of the utility model
Within enclosing.The protection scope of the utility model should be determined by the scope of protection defined in the claims.
Claims (7)
1. a kind of wire-drawing frame, it is characterised in that: including actinobacillus wheel, at least a pair of of the wire drawing die being sequentially arranged on wire-drawing direction
Component and take-up pulley further include cooling system, and the cooling system includes sequentially connected collecting tank, settling tank, water pump, liquid storage
Case and spray head, the spray head are located at the top of wire drawing membrane module, and the collecting tank is located at the lower section of wire drawing membrane module.
2. wire-drawing frame according to claim 1, it is characterised in that: in the settling tank sequentially along coolant flow direction
Be provided with equalization pond, sedimentation basin and liquid storage pond, be equipped between the equalization pond and sedimentation basin a pair of dam being mutually matched with
Weir is kept off, overflow wall is equipped between the sedimentation basin and liquid storage pond.
3. wire-drawing frame according to claim 2, it is characterised in that: be equipped with current stabilization bucket, current stabilization bucket position in the equalization pond
In the lower section of equalization pond water inlet.
4. wire-drawing frame according to claim 1, it is characterised in that: the wire drawing membrane module include along wire-drawing direction sequentially
The first wire drawing die and the second wire drawing die being arranged, the wire-drawing direction between first wire drawing die and second wire drawing die are vertical
Setting, the spray head are arranged on the extended line of the wire-drawing direction between the first wire drawing die and the second wire drawing die.
5. wire-drawing frame according to claim 1, it is characterised in that: set between the actinobacillus wheel and the wire drawing membrane module
There is the first guide roller, the first tensioning pressure roller, the wire drawing die group are equipped between first guide roller and the wire drawing membrane module
It is equipped with the second guide roller between part and the take-up pulley, second is equipped between the wire drawing membrane module and second guide roller
Calender roller.
6. wire-drawing frame according to claim 5, it is characterised in that: the first tensioning pressure roller and second tensioning are pressed
Roller includes roll body and pneumatic spring, and pneumatic spring includes fixed cylinder and the movable body of rod, and the movable body of rod is socketed in the fixation
In cylinder, the end of the movable body of rod and roll body are rotatablely connected.
7. wire-drawing frame according to claim 5, it is characterised in that: between the second tensioning pressure roller and the take-up pulley
Equipped with heating wire, the side of heating wire setting and wire-drawing direction, and with wire-drawing direction keeping parallelism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822062147.XU CN209303449U (en) | 2018-12-06 | 2018-12-06 | A kind of wire-drawing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822062147.XU CN209303449U (en) | 2018-12-06 | 2018-12-06 | A kind of wire-drawing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209303449U true CN209303449U (en) | 2019-08-27 |
Family
ID=67676236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822062147.XU Active CN209303449U (en) | 2018-12-06 | 2018-12-06 | A kind of wire-drawing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209303449U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115522269A (en) * | 2022-09-06 | 2022-12-27 | 盐城市翔盛碳纤维科技有限公司 | Cooling device for carbon fiber production |
CN116851476A (en) * | 2023-09-05 | 2023-10-10 | 江苏海川光电新材料有限公司 | Metal wire drawing machine |
-
2018
- 2018-12-06 CN CN201822062147.XU patent/CN209303449U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115522269A (en) * | 2022-09-06 | 2022-12-27 | 盐城市翔盛碳纤维科技有限公司 | Cooling device for carbon fiber production |
CN115522269B (en) * | 2022-09-06 | 2023-12-01 | 盐城市翔盛碳纤维科技有限公司 | Cooling device is used in carbon fiber production |
CN116851476A (en) * | 2023-09-05 | 2023-10-10 | 江苏海川光电新材料有限公司 | Metal wire drawing machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209303449U (en) | A kind of wire-drawing frame | |
CN207525490U (en) | Carbon fiber sizing device | |
CN102363360A (en) | High overflow type drawing hot water tank | |
CN108772429A (en) | A kind of metal wire-drawing processing applied widely is with scraping oil recovery apparatus | |
CN202047137U (en) | Pickling device for copper and copper alloy pipe rod type wire rods | |
CN203972516U (en) | Upper odd test unwrapping wire stress eliminating device | |
CN205787264U (en) | Optical cable chiller | |
CN221028095U (en) | Glass production draws limit machine | |
CN103464488A (en) | Wire drawing machine, wire drawing system and cooling method of wire drawing machine | |
CN211489062U (en) | Cable drawing equipment | |
CN207330750U (en) | A kind of glass fiber wire-drawing beaming device | |
CN203935964U (en) | A kind of fabric Wax applyor | |
CN208815070U (en) | A kind of efficient spring manufacture heating equipment | |
CN113546975B (en) | Metal wire drawing machine | |
CN204491050U (en) | A kind of have fast to the reeling machine of cocoon function | |
CN214926306U (en) | Rubber production cooling tank | |
CN108754119A (en) | A kind of copper wire continuous annealing water cooling device | |
CN208427537U (en) | It is a kind of that oil recovery apparatus is scraped based on metal wire-drawing processing | |
CN204159503U (en) | One stays white applying structure | |
CN202022985U (en) | Pickling bath for steel cord | |
CN206415430U (en) | A kind of copper cash oil wiper | |
CN110016704A (en) | A kind of aluminium shape surface treatment process | |
CN205974708U (en) | Preparation of nickel plating alloy wire is with electroplating device | |
CN201099712Y (en) | High modulus high-strength polyethylene fiber multiple layer continuous extraction machine | |
CN205837967U (en) | A kind of for industrial novel material feeding equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |