CN209303424U - A kind of non-dusting building waste wet processed workshop - Google Patents
A kind of non-dusting building waste wet processed workshop Download PDFInfo
- Publication number
- CN209303424U CN209303424U CN201821635622.1U CN201821635622U CN209303424U CN 209303424 U CN209303424 U CN 209303424U CN 201821635622 U CN201821635622 U CN 201821635622U CN 209303424 U CN209303424 U CN 209303424U
- Authority
- CN
- China
- Prior art keywords
- conveyer belt
- building waste
- dusting
- workshop
- crusher
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/58—Construction or demolition [C&D] waste
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/78—Recycling of wood or furniture waste
Abstract
A kind of non-dusting building waste wet processed workshop, it includes workshop and the transfer assembly in workshop, humidify component, connect the processing unit of transfer assembly, transfer assembly includes feed conveyor belt, humidify the dust excluder that component includes spray thrower and is set in workshop, spray thrower is installed on feed conveyor belt, spray thrower includes the first water inlet pipe, dust cover, tube head, spraying rack and spray head, dust cover is connected to feed conveyor belt, first water inlet pipe is connected to tube head, dust cover is in opening parcel-like and with connecting pipe head, spraying rack is connected to tube head, spray head connects spraying rack and is located in dust cover;The workshop can carry out wetting and chalk dust removing operation to it, greatly reduce the generation of dust, effectively reduce the pollution of dust, achieved the effect that environmental protection in building waste pre-treatment and treatment.
Description
Technical field
The utility model relates to building waste processing technology fields, in particular relate to a kind of non-dusting building waste
Wet processed workshop.
Background technique
Building waste is in the solid waste for implementing to generate in newly-built, renovating and enlarging or demolishing process to building
Object.According to the difference of the generating source of building waste, construction building rubbish and demolition building waste can be divided into.Construction building rubbish
As the term suggests being exactly the solid waste generated in newly-built, reconstruction or extention project, and demolishes building waste and be exactly
The building waste generated when building is removed and removed.
With the quickening of urbanization process, urban construction, reconstruction of the old city town produce a large amount of building waste, building waste
Quantity has accounted for 1/3 of municipal refuse total amount or more, wherein most building wastes are unprocessed, just transported by unit in charge of construction
Toward countryside or rural area, air storage or landfill consume a large amount of land acquisition expense, refuse collection expense etc., occupy a large amount of soils, shape
The phenomenon that enclosing village, besieged city at rubbish seriously affects town and country image, then causes huge environmental problem, economic problems even society
It can problem.Building waste circular regeneration is worked and is combined with the production of economic materials for wall, is produced and is built with building waste
With sand, the building waste that can not largely handle not only had been dissolved, but also has solved the problems, such as resource rational utilization, resource can be effectively improved
Utilization efficiency, protecting ecology and promotes economic development.
The building waste treatment process of the prior art, can generate a large amount of dust and dust, two are caused in garbage disposal
Secondary pollution seriously affects personal health for the staff of working region.
Utility model content
The purpose of this utility model is to provide a kind of non-dusting building waste wet processed workshops, can build
Before garbage disposal and in processing, wetting and chalk dust removing operation are carried out to it, the generation of dust is greatly reduced, effectively reduces powder
The pollution of dirt has achieved the effect that environmental protection.
The embodiments of the present invention are achieved in that
A kind of non-dusting building waste wet processed workshop comprising workshop and transfer assembly in workshop plus
Wet component, the processing unit for connecting transfer assembly, transfer assembly includes feed conveyor belt, and humidification component includes spray thrower and setting
In the dust excluder in workshop, spray thrower is installed on feed conveyor belt, and spray thrower includes the first water inlet pipe, dust cover, tube head, spray
Frame and spray head, dust cover are connected to feed conveyor belt, and the first water inlet pipe is connected to tube head, and dust cover is in parcel-like and has connection
The opening of tube head, spraying rack are connected to tube head, and spray head connects spraying rack and is located in dust cover;Conveyer belt transmits building waste
Workshop is sent out in workshop and by the reclaimed sand handled or reworked material, spray thrower pre-process to building waste building stones pre-
It is wet, dust is greatly reduced, dust excluder to final dusting is carried out in workshop, effectively maintains workshop condition cleannes again.
In the utility model preferred embodiment, above-mentioned spray thrower further includes fixed plate, and fixed plate is provided with for solid
Fixed through-hole, fixed plate are connected to dust cover bottom end, and fixed plate is connected to feed conveyor belt by through-hole.
In the utility model preferred embodiment, above-mentioned spray head is atomising head, and the bottom of spraying rack connects multiple atomizations
Head, atomising head inside are connected to the first water inlet pipe by spraying rack and tube head.
In the utility model preferred embodiment, the inner hollow of above-mentioned spraying rack and it is connected to tube head, spraying rack
Top is stuck in the opening of dust cover.
In the utility model preferred embodiment, above-mentioned dust excluder include the second water inlet pipe and multiple spray heads, second
Water inlet pipe is provided at least 2, and the second water inlet pipe is located above processing unit, and spray head is connected to the bottom of the second water inlet pipe.
In the utility model preferred embodiment, above-mentioned processing unit includes the first crusher and automatic magnetic separator, the
One crusher and automatic magnetic separator are installed on feed conveyor belt, and the first crusher is between spray thrower and automatic magnetic separator.
In the utility model preferred embodiment, above-mentioned conveyer belt includes more, and the height of the feeding end of conveyer belt is low
In the height of the discharge end of conveyer belt.
In the utility model preferred embodiment, above-mentioned conveyer belt further includes the first conveyer belt, the second conveyer belt, third
Conveyer belt, the 4th conveyer belt and the 5th conveyer belt, the first conveyer belt, the second conveyer belt, third conveyer belt, the 4th conveyer belt and
Five conveyer belts join end to end and in flat-folded shapes.
In the utility model preferred embodiment, above-mentioned processing unit further includes middle roll-over, the second crusher, vibration
Sieve, third crusher and storage box, middle roll-over are connected to the discharge end of the first conveyer belt, and the second crusher is connected to the second transmission
The discharge end of band, vibrating screen are connected to the discharge end of third crusher, and third crusher is connected to the discharge end of the 4th conveyer belt,
Storage box is connected to the discharge end of the 5th conveyer belt.
In the utility model preferred embodiment, above-mentioned conveyer belt further includes the first discharging band and the second discharging band, and the
One discharging band connection is to vibrating screen, the second discharging band connection to storage box.
The beneficial effects of the utility model are:
The utility model carries out pre-wetting processing by building stones of the spray thrower to building waste, effectively reduces building rubbish
The dust that can be generated when rubbish processing is introduced the water by the second water inlet pipe and spray head to the inner space in workshop, broken to building stones
The dust that broken and transmission process generates is sprayed again, can be soaked in building waste pre-treatment and treatment to it
It is operated with chalk dust removing, greatly reduces the generation of dust, effectively reduce the pollution of dust, achieved the effect that environmental protection.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by
Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also
To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the schematic diagram in the utility model non-dusting building waste wet processed workshop;
Fig. 2 is the utility model spray thrower schematic diagram;
Fig. 3 is the second water inlet pipe of the utility model schematic diagram;
Icon: 100- non-dusting building waste wet processed workshop;101- feed conveyor belt;The first conveyer belt of 102-;
The second conveyer belt of 103-;104- third conveyer belt;The 4th conveyer belt of 105-;The 5th conveyer belt of 106-;The first crusher of 111-;
112- automatic magnetic separator;Roll-over in 113-;The second crusher of 114-;115- vibrating screen;116- third crusher;117- storage
Case;The discharging band of 121- first;The discharging band of 122- second;123- third discharging band;130- spray thrower;The first water inlet pipe of 131-;
132- fixed plate;133- dust cover;134- tube head;135- spraying rack;136- atomising head;The second water inlet pipe of 137-;138- spray
Head.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and
The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below
The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the range of the utility model protection.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that the orientation of the instructions such as term " on ", "inner", "outside", "bottom"
Or positional relationship be based on the orientation or positional relationship shown in the drawings or the utility model product using when usually put
Orientation or positional relationship is merely for convenience of describing the present invention and simplifying the description, rather than the dress of indication or suggestion meaning
It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the utility model
Limitation.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, it is not understood to indicate or imply phase
To importance.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Set ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
First embodiment
Fig. 1 is please referred to, the present embodiment provides a kind of non-dusting building waste wet processed workshops 100 comprising workshop
It include feed conveyor belt with transfer assembly, humidification component, damping device and processing unit, the transfer assembly being set in workshop
101, the first conveyer belt 102, the second conveyer belt 103, third conveyer belt 104, the 4th conveyer belt 105, the 5th conveyer belt 106,
One discharging band 121, second discharging band 122 and third discharging band 123, damping device include resilient cushion and damping spring, processing dress
It sets including spray thrower 130, the first crusher 111, automatic magnetic separator 112, middle roll-over 113, multicylinder hydraulic spindle breaker, vibration
Sieve 115, impact crusher and storage box 117;Building waste is sent to the reclaimed sand that in workshop and will have been handled by conveyer belt
Or reworked material sends out workshop, damping device plays the role of buffering to processing unit and conveyer belt, and processing unit is to building rubbish
Rubbish is handled, and is delivered to conveyer belt.
Transfer assembly include feed conveyor belt 101, the first conveyer belt 102, the second conveyer belt 103, third conveyer belt 104,
4th conveyer belt 105, the 5th conveyer belt 106, first discharging band 121, second discharging band 122 and third discharging band 123, charging pass
Band 101 is sent to be connected to the first conveyer belt 102, the both ends of the first conveyer belt 102 are separately connected feed conveyor belt 101 and middle roll-over
113, the second conveyer belt 103 of transmission outlet connection of middle roll-over 113, the second conveyer belt 103 is connected to the second crusher 114,
In the second crusher 114 be multicylinder hydraulic spindle breaker, one end connection multicylinder hydraulic spindle of third conveyer belt 104 is broken
The other end of machine, third conveyer belt 104 connects vibrating screen 115, and the both ends of the 4th conveyer belt 105 are separately connected vibrating screen 115
Outlet end and third crusher 116, wherein third crusher 116 is impact crusher, and the both ends of the 5th conveyer belt 106 are distinguished
Impact crusher and storage box 117 are connected, one end of the first discharging band 121 is connected to the discharge port of reciprocating sieve, the first discharging
The other end with 121 extends workshop, and one end of the second discharging band 122 and third discharging band 123 is respectively connected to storage box
117, second discharging band 122 and third discharging band 123 the other end each extend over out workshop.
Extend workshop, ground proximity setting, the bottom setting of feed conveyor belt 101 in one end of feed conveyor belt 101
There is resilient cushion, which is connected to ground, plays the role of the vibration for buffering feed conveyor belt 101, the first crusher 111
It is set to feed conveyor belt 101, feed conveyor belt 101 is provided with the interval of the first crusher 111 of installation, the first crusher 111
It is set to the interval and the building waste for transmitting feed conveyor belt 101 carries out primary fragmentation, automatic screening machine is set to charging
The top of conveyer belt 101 is located between the first crusher 111 and charging transmission end of tape, and 112 pairs of automatic magnetic separator are passed through it
The building waste of lower section feed conveyor belt 101 carries out automatic screening and goes out Ferrous particles or substance, and Ferrous particles or substance are in magnetic field
Under the action of moved from trend magnetic pole, so that automatic magnetic separator 112 adsorbs Ferrous particles or substance.
First conveyer belt 102, the second conveyer belt 103, third conveyer belt 104, the 4th conveyer belt 105 and the 5th conveyer belt
106 respectively in the structure that one end is low and the other end is high, wherein the first conveyer belt 102, the second conveyer belt 103, third conveyer belt
104, the starting point of the 4th conveyer belt 105 and the 5th conveyer belt 106 is respectively lower than end, the first conveyer belt 102, the second conveyer belt
103, third conveyer belt 104, the 4th conveyer belt 105 and the 5th conveyer belt 106 be in head and the tail rugosity, the first conveyer belt 102 warp in
Roll-over 113 connects the second conveyer belt 103, and the second conveyer belt 103 connects third conveyer belt 104 through multicylinder hydraulic spindle breaker,
Third conveyer belt 104 connects the 4th conveyer belt 105 through vibrating screen 115, and the 4th conveyer belt 105 is through impact crusher connection the 5th
Conveyer belt 106, the first conveyer belt 102, the second conveyer belt 103, third conveyer belt 104, the 4th conveyer belt 105 and the 5th transmission
It arranges in the head and the tail of shape by high and low, which makes the arrangement back and forth of 5 conveyer belts save the inner space in workshop, saves significantly
About land seizure.
One end of first discharging band 121 is connected to the reclaimed sand outlet of reciprocating sieve, and the other end of the first discharging band 121 extends
Workshop out, the reclaimed sand that the first discharging band 121 filters out reciprocating sieve transmit out workshop, the second discharging band 122 and third discharging
Band 123 is respectively connected to storage box 117, and the other end of the second discharging band 122 and third discharging band 123 each extends over out workshop,
Regeneration stone in storage box 117 is transmitted out workshop by the second discharging band 122 and third discharging band 123.Damping device includes damping
Pad and damping spring, damping spring are set to below conveyer belt, the first conveyer belt 102, the second conveyer belt 103, third conveyer belt
104, the bottom of the 4th conveyer belt 105 and the 5th conveyer belt 106 is separately installed with multiple damping springs, multiple damping spring connections
To the bottom of same conveyer belt, multiple damping springs arranges from one end of conveyer belt to the other end, positioned at the first conveyer belt 102,
Second conveyer belt 103, third conveyer belt 104, the 4th conveyer belt 105 are identical with the structure of the damping spring of the 5th conveyer belt 106,
There is interval, damping spring is used for the first conveyer belt 102, the second conveyer belt 103, third conveyer belt between adjacent damping spring
104, the 4th conveyer belt 105 and the 5th conveyer belt 106 are buffered, and play the building stones vibration amplitude for reducing and being located on conveyer belt
Effect;The bottom of feed conveyor belt 101 is provided with resilient cushion, and the bottom of processing unit is provided with resilient cushion, resilient cushion difference
It is set to the bottom of middle roll-over 113, multicylinder hydraulic spindle breaker, vibrating screen 115, impact crusher and storage box 117, is subtracted
Shake pad carries out damping to feed conveyor belt 101 and processing unit, plays the role of buffer unit.
Processing unit include the first crusher 111, automatic magnetic separator 112, middle roll-over 113, multicylinder hydraulic spindle breaker,
Vibrating screen 115, impact crusher and storage box 117, the first crusher 111 are set to the interval of feed conveyor belt 101, from
Dynamic magnetic separator 112 is set to the top of feed conveyor belt 101, is located at the end of the first crusher 111 and feed conveyor belt 101
End, middle roll-over 113 are set to the end of the first conveyer belt 102, and both ends are separately connected the first conveyer belt 102 and the second conveyer belt
103, multicylinder hydraulic spindle breaker is set to the end of the second conveyer belt 103, and both ends are separately connected 103 He of the second conveyer belt
Third conveyer belt 104, vibrating screen 115 are set to the end of third conveyer belt 104, and both ends are separately connected third conveyer belt 104
With the 4th conveyer belt 105, impact crusher is set to the end of the 4th conveyer belt 105, and both ends are separately connected the 4th transmission
Band 105 and the 5th conveyer belt 106, storage box 117 are connected to the end of the 5th conveyer belt 106.
Referring to figure 2., humidification component includes spray thrower 130 and dust excluder, and spray thrower 130 is set to feed conveyor belt 101,
Between its feeding end for being located at feed conveyor belt 101 and the first crusher 111, spray thrower 130 includes the first water inlet pipe 131, consolidates
Fixed board 132, dust cover 133, tube head 134, spraying rack 135 and spray head, wherein spray head is atomising head 136, and atomising head 136 is by moisture
It dissipates, one end of the first water inlet pipe 131 is extended outside workshop, and the other end is located at the top of feed conveyor belt 101, the first water inlet pipe
131 connection dust covers 133, fixed plate 132 are connected to two side bottoms of dust cover 133, and fixed plate 132 has fixed dust cover
Fixed plate 132 is fixed on the two sides of feed conveyor belt 101 by bolt hole by 133 bolt hole, bolt, and dust cover 133 has
Dust caused by spraying because of atomising head 136 is blocked, tube head 134 is set to the top of dust cover 133, the top and bottom ends of tube head 134
First water inlet pipe 131 is connected to spraying rack 135, it is the shelf of shower water that the inside of spraying rack 135, which communicates, which is in
Discoid, the top of spraying rack 135 is in T shape, and the top center of dust cover 133 is provided with the hole of connection two sides, spray
Frame 135 is connect by the hole with dust cover 133, and atomising head 136 is connected to the bottom of spraying rack 135, and the spraying rack 135 is shared more
A atomising head 136, atomising head 136 are the spray head for being fine particle by water dispersion.
Referring to figure 3., dust excluder includes the second water inlet pipe 137 and spray head 138, is provided with two second water inlets in workshop
The spray head 138 of the second water inlet pipe 137 of pipe 137 and connection, spray head 138 are connected to the bottom of the second water inlet pipe 137, spray head
138 are connected with the inside of the second water inlet pipe 137, and the second water inlet pipe 137 is arranged from one end of either inside to the other end, spray
First 138 spray the water of the second water inlet pipe 137 building stones to the conveying being located on conveyer belt.
The working principle of the example of the utility model are as follows:
The processing workshop, by spray thrower 130 to be conveyed into workshop processing building stones carry out wet operation, by second into
Water pipe 137 and spray head 138 are to carrying out chalk dust removing operation in workshop, when building stones pass through spray thrower 130, atomising head 136 is by first
Water in water inlet pipe 131 sprays, and water soaks stone surface, which is limited sky inside it by dust cover 133
Between, reduce the diffusion of dust;Conveyer belt includes feed conveyor belt 101, the first conveyer belt 102, the second conveyer belt 103, third
The folding back and forth of conveyer belt 104, the 4th conveyer belt 105 and the 5th conveyer belt 106 saves the length and width of transmission carrying space
Degree, reduces the occupied area in workshop in this way, and conveyer belt is arranged so that the width in workshop saves certain sky by high and low
Between, it is soaked by front end and soaks space in workshop in building stones and treatment process, significantly reduce the dust in workshop.
The example of the utility model carries out pre-wetting processing by building stones of the spray thrower 130 to building waste, effectively reduces
The dust that can be generated when building waste processing is introduced the water into workshop by the second water inlet pipe 137 and spray head 138
Portion space, the dust that and transmission process broken to building stones generates are sprayed again, before building waste processing and can be handled
In, wetting and chalk dust removing operation are carried out to it, are greatly reduced the generation of dust, are effectively reduced the pollution of dust, reach
The effect of environmental protection.
In conclusion the utility model can soak it and be removed in building waste pre-treatment and treatment
Dust operation, greatly reduces the generation of dust, effectively reduces the pollution of dust, achieved the effect that environmental protection.
Present specification describes the example of the embodiments of the present invention, it is not meant to that these embodiments illustrate and describe
All possible forms of the utility model.It should be understood that the embodiment in specification can be implemented with a variety of alternative forms.Attached drawing without
It needs drawn to scale;Some features can be zoomed in or out to show the details of particular elements.Disclosed specific structure and function are thin
Section is not taken by way of limitation explanation, and those skilled in the art is only instructed to implement the representative base of the utility model in a variety of forms
Plinth.It will be understood to one skilled in the art that can be with one or more with reference to multiple features that either figure illustrates and describes
The feature combination illustrated in other attached drawings is to form the embodiment for not yet explicitly illustrating or describing.The assemblage characteristic offer of explanation is used for
The representative embodiment of typical case.However, can root with the multiple combinations of the consistent feature of introduction of the utility model and modification
According to needing for specific application or implementation.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (10)
1. a kind of non-dusting building waste wet processed workshop, which is characterized in that it includes workshop and the biography in workshop
Sending component, humidification component, the processing unit for connecting transfer assembly, transfer assembly includes feed conveyor belt, and humidification component includes spray
Leaching device and the dust excluder being set in workshop, the spray thrower are installed on the feed conveyor belt, and the spray thrower includes first
Water inlet pipe, dust cover, tube head, spraying rack and spray head, the dust cover are connected to the feed conveyor belt, first water inlet pipe
It is connected to tube head, the dust cover is connected to tube head in opening parcel-like and with the connection tube head, the spraying rack, institute
Spray head is stated to connect the spraying rack and be located in the dust cover.
2. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the spray thrower is also
Including fixed plate, the fixed plate is provided with through-hole for fixing, and the fixed plate is connected to the dust cover bottom end, described
Fixed plate is connected to the feed conveyor belt by through-hole.
3. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the spray head is mist
Change head, the bottom of the spraying rack connects multiple atomising heads, passes through the spraying rack and the pipe inside the atomising head
Head is connected to first water inlet pipe.
4. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the spraying rack
It inner hollow and is connected to the tube head, the top of the spraying rack is stuck in the opening of the dust cover.
5. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the dust excluder packet
The second water inlet pipe and multiple spray heads are included, second water inlet pipe is provided at least 2, and second water inlet pipe is located at the place
It manages above device, the spray head is connected to the bottom of second water inlet pipe.
6. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the processing unit
Including the first crusher and automatic magnetic separator, first crusher and the automatic magnetic separator are installed on the charging transmission
Band, first crusher is between the spray thrower and the automatic magnetic separator.
7. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the conveyer belt packet
More are included, the height of the feeding end of the conveyer belt is lower than the height of the discharge end of the conveyer belt.
8. non-dusting building waste wet processed workshop according to claim 1, which is characterized in that the conveyer belt is also
Including the first conveyer belt, the second conveyer belt, third conveyer belt, the 4th conveyer belt and the 5th conveyer belt, first conveyer belt, institute
The second conveyer belt, the third conveyer belt, the 4th conveyer belt and the 5th conveyer belt is stated to join end to end and roll in plane
It is stacked.
9. non-dusting building waste wet processed workshop according to claim 8, which is characterized in that the processing unit
It further include middle roll-over, the second crusher, vibrating screen, third crusher and storage box, the middle roll-over is connected to described first and passes
The discharge end of band is sent, second crusher is connected to the discharge end of second conveyer belt, and the vibrating screen is connected to described
The discharge end of third crusher, the third crusher are connected to the discharge end of the 4th conveyer belt, the storage box connection
To the discharge end of the 5th conveyer belt.
10. non-dusting building waste wet processed workshop according to claim 9, which is characterized in that the conveyer belt
It further include the first discharging band and the second discharging band, the first discharging band connection to the vibrating screen, the second discharging band is even
It is connected to the storage box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821635622.1U CN209303424U (en) | 2018-10-08 | 2018-10-08 | A kind of non-dusting building waste wet processed workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821635622.1U CN209303424U (en) | 2018-10-08 | 2018-10-08 | A kind of non-dusting building waste wet processed workshop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209303424U true CN209303424U (en) | 2019-08-27 |
Family
ID=67670669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821635622.1U Active CN209303424U (en) | 2018-10-08 | 2018-10-08 | A kind of non-dusting building waste wet processed workshop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209303424U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110586307A (en) * | 2019-10-18 | 2019-12-20 | 成都市新利豪建材有限公司 | Cone crusher suitable for building refuse handles |
-
2018
- 2018-10-08 CN CN201821635622.1U patent/CN209303424U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110586307A (en) * | 2019-10-18 | 2019-12-20 | 成都市新利豪建材有限公司 | Cone crusher suitable for building refuse handles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203695592U (en) | Construction waste treatment system | |
CN107497580A (en) | A kind of sandstone production line | |
CN206444710U (en) | Environment-friendly type building decoration refuse disposal installation | |
CN208302867U (en) | A kind of building construction Slag recovering device | |
CN110369024A (en) | A kind of mining industry lithotripsy apparatus | |
CN107597383A (en) | A kind of building waste processing equipment | |
KR20080069758A (en) | Device for separation the industrial waste | |
CN209303424U (en) | A kind of non-dusting building waste wet processed workshop | |
CN207138082U (en) | Dry method building waste process for producing line | |
CN206746803U (en) | Sand washing sand all-in-one processed | |
CN208711786U (en) | A kind of construction site building waste processing recycling and reusing device | |
CN206731768U (en) | A kind of construction site refuse disposal installation | |
CN204747057U (en) | Dustproof construction waste processing equipment | |
CN206882112U (en) | A kind of Aggregate of recycled concrete oscillatory type screening plant | |
CN109603976A (en) | A kind of armored concrete refuse treatment plant of environmental protection | |
CN211385210U (en) | Reducing mechanism is used to building energy-concerving and environment-protective | |
CN109226196A (en) | A kind of reconstruction production line handling a variety of building wastes and technique | |
CN209303423U (en) | A kind of low noise building waste processing workshop for saving land occupation | |
CN211802702U (en) | Construction waste treatment device | |
CN210252611U (en) | Mechanism sand belt cleaning device | |
CN207204316U (en) | A kind of sandstone production line | |
CN209537330U (en) | A kind of building waste recycling automatic Size-sealing device of concrete block | |
CN208303210U (en) | A kind of high efficiency screening direct discharging screen | |
CN209491050U (en) | The separator of brick and concrete block in a kind of building castoff | |
CN109173524B (en) | Charging and dust removing device suitable for basalt particle raw materials |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |