CN209295957U CN201822186361.6U CN201822186361U CN209295957U CN 209295957 U CN209295957 U CN 209295957U CN 201822186361 U CN201822186361 U CN 201822186361U CN 209295957 U CN209295957 U CN 209295957U
Authority
CN
China
Prior art keywords
sopwith staff
support plate
adjusting rod
fixed link
land
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822186361.6U
Other languages
Chinese (zh)
Inventor
李林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822186361.6U priority Critical patent/CN209295957U/en
Application granted granted Critical
Publication of CN209295957U publication Critical patent/CN209295957U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of dedicated Sopwith staff of land resources land surveying, and the lower part of support plate is arranged in the bracket, and bracket is bolted mode with support plate and is connected;The left side on fixed link setting support plate top, and fixed link is connected with support plate by welding manner;The top of fixed link is arranged in the adjusting rod, and adjusting rod is connected with fixed link by sliding type;The top of adjusting rod is arranged in the fixing clamp, and fixing clamp is connected with adjusting rod by riveting method;The right side in portion on the supporting plate is arranged in the Sopwith staff, and Sopwith staff with support plate by being connected through mode, the utility model passes through the improvement to above-mentioned apparatus, prevent Sopwith staff from shifting with positioning, measurement data is caused to generate error, and the advantages of operator is no longer helped with hand, can liberate both hands, to go wrong in effective solution existing apparatus and insufficient.

Description

A kind of dedicated Sopwith staff of land resources land surveying
Technical field
The utility model relates to land resources land survey technical field of tools, more specifically, more particularly to a kind of state The dedicated Sopwith staff of soil resource land surveying.
Background technique
Sopwith staff is one kind of levelling rod.The levelling rod of early stage is mostly made of timber, matter weight and limited length (generally 2m), inconvenient to carry when measurement, after gradually adopt the light-weight high-strength materials such as aluminium alloy to be made, using tower shrink form, Facilitate extraction when use, single measurement of higher degree range greatly improves, and length is generally 5m, and when carrying is shunk, because of it Shape is similar to tower-like, therefore often referred to as Sopwith staff.
But there are need operator to use in Sopwith staff use process for the dedicated Sopwith staff of land resources land surveying used at present Hand is helped, and the level of finding accurately just can be carried out mapping, and operator, which controls bad level, makes Sopwith staff shift, and is easy to cause measurement Data lead to the problem of error etc..
In view of this, being studied improvement for existing problem, providing a kind of position prevents Sopwith staff from shifting, and causes Measurement data generates error, and operator is no longer helped with hand, and the land resources land surveying that can liberate both hands is special With Sopwith staff, it is intended to by the technology, achieve the purpose that solve the problems, such as and improve practical value.
Utility model content
The purpose of this utility model is to provide a kind of dedicated Sopwith staffs of land resources land surveying, to solve above-mentioned background skill Operator is needed to be helped with hand in the Sopwith staff use process proposed in art, the level of finding accurately just can be carried out mapping, operator's control Making bad level makes Sopwith staff shift, and measurement data is easy to cause to lead to the problem of error and deficiency.
To achieve the above object, the utility model provides a kind of dedicated Sopwith staff of land resources land surveying, by following tool Body technique means are reached:
A kind of dedicated Sopwith staff of land resources land surveying, comprising: support plate, bracket, fixed link, adjusting rod, fixing clamp, tower Ruler;The lower part of support plate is arranged in the bracket, and bracket is bolted mode with support plate and is connected;The fixed link The left side on support plate top is set, and fixed link is connected with support plate by welding manner;The adjusting rod is arranged in fixation The top of bar, and adjusting rod is connected with fixed link by sliding type;The top of adjusting rod is arranged in the fixing clamp, and solid Clamp is connected with adjusting rod by riveting method;The right side in portion on the supporting plate, and Sopwith staff and support plate is arranged in the Sopwith staff By being connected through mode.
As advanced optimizing for the technical program, described in a kind of dedicated Sopwith staff of land resources land surveying of the utility model Support plate is rectangular-shaped, and the right side opening of support plate is equipped with the rectangular through-hole for placing Sopwith staff, the rectangular row in the bottom of support plate Column are provided with bracket everywhere.
As advanced optimizing for the technical program, described in a kind of dedicated Sopwith staff of land resources land surveying of the utility model Adjusting rod slides up and down carry out height adjustment in the inside of fixed link, and is fixedly connected by clamping screw.
As advanced optimizing for the technical program, described in a kind of dedicated Sopwith staff of land resources land surveying of the utility model The front end of fixing clamp is clamped with Sopwith staff, and fixing clamp is vertically moved up or down in fixed link by adjusting rod and carries out height adjustment.
Due to the application of the above technical scheme, the utility model has the advantage that compared with prior art
1, a kind of dedicated Sopwith staff of land resources land surveying of the utility model passes through the square using Sopwith staff inside support plate When carrying out height adjustment in shape through-hole, plays the role of positioning to Sopwith staff using rectangular-shaped through-hole, prevents Sopwith staff from shifting, Measurement data is caused to generate error.
2, a kind of dedicated Sopwith staff of land resources land surveying of the utility model, the rectangular installation in the bottom of support plate is everywhere Bracket fixes bracket insertion underground, and Sopwith staff card is developed with ground, to make Sopwith staff not run-off the straight, and operator is no longer It is helped with hand, both hands can be liberated.
3, the utility model by the improvement to above-mentioned apparatus there is positioning to prevent Sopwith staff from shifting, and cause to measure number The advantages of according to error is generated, and operator is no longer helped with hand, can liberate both hands, thus this reality of effective solution With novel the problem of being proposed in background technique one and deficiency.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model Illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.In attached drawing In:
Fig. 1 is a kind of schematic view of the front view of the dedicated Sopwith staff of land resources land surveying of the utility model;
Fig. 2 is that a kind of expansion of the dedicated Sopwith staff of land resources land surveying of the utility model uses structural schematic diagram.
In figure: support plate 1, bracket 2, fixed link 3, adjusting rod 4, fixing clamp 5, Sopwith staff 6.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
It should be noted that in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two More than a;The instructions such as term " on ", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification Description, rather than the device or element of indication or suggestion meaning must have a particular orientation, constructed and grasped with specific orientation Make, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply Relative importance.
Meanwhile in the description of the present invention, unless otherwise clearly defined and limited, term " connected ", " connection " It shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be mechanical connect It connects, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For the general of this field For logical technical staff, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Referring to Figure 1 to Fig. 2, the particular technique that the utility model provides a kind of dedicated Sopwith staff of land resources land surveying is real Apply scheme:
A kind of dedicated Sopwith staff of land resources land surveying, comprising: support plate 1, fixed link 3, adjusting rod 4, is fixed bracket 2 Press from both sides 5, Sopwith staff 6;The lower part of support plate 1 is arranged in bracket 2, and bracket 2 is bolted mode with support plate 1 and is connected;Gu The left side on 1 top of support plate is arranged in fixed pole 3, and fixed link 3 is connected with support plate 1 by welding manner;The setting of adjusting rod 4 exists The top of fixed link 3, and adjusting rod 4 is connected with fixed link 3 by sliding type;The upper of adjusting rod 4 is arranged in fixing clamp 5 Portion, and fixing clamp 5 is connected with adjusting rod 4 by riveting method;The right side on 1 top of support plate, and Sopwith staff 6 is arranged in Sopwith staff 6 With support plate 1 by being connected through mode.
Specifically, support plate 1 is rectangular-shaped, and the right side opening of support plate 1 is equipped with the rectangular through-hole for placing Sopwith staff 6, support The bottom of plate 1 is rectangular to be disposed with bracket 2 everywhere.
Specifically, adjusting rod 4 slides up and down carry out height adjustment in the inside of fixed link 3, and solid by clamping screw Fixed connection.
Specifically, the front end of fixing clamp 5 is clamped with Sopwith staff 6, and fixing clamp 5 is vertically moved up or down by adjusting rod 4 in fixed link 3 Carry out height adjustment.
Specific implementation step:
When using the device, bracket 2 is inserted into below ground first, then Sopwith staff 6 is passed through into support plate 1 and is developed with ground, Then fixing clamp 5 is adjusted into certain height in the vertical lift of fixed link 3 by adjusting rod 4 and clamps Sopwith staff 6, it is easy to operate, prevent Only Sopwith staff 6 shifts.
In summary: a kind of dedicated Sopwith staff of land resources land surveying, by by utilizing Sopwith staff inside support plate Rectangular through-hole in carry out height adjustment when, play the role of positioning to Sopwith staff using rectangular-shaped through-hole, prevent Sopwith staff Offset causes measurement data to generate error, and the bottom of support plate is rectangular to install bracket everywhere, and bracket insertion underground is consolidated Fixed, Sopwith staff card is developed with ground, to make Sopwith staff not run-off the straight, and operator is no longer helped with hand, can be liberated Both hands solve in Sopwith staff use process and operator are needed to be helped with hand, and the level of finding accurately just can be carried out mapping, operator's control Making bad level makes Sopwith staff shift, and measurement data is easy to cause to lead to the problem of error.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of dedicated Sopwith staff of land resources land surveying, comprising: support plate (1), bracket (2), fixed link (3), adjusting rod (4), fixing clamp (5), Sopwith staff (6);It is characterized by: the bracket (2) setting is in the lower part of support plate (1), and bracket (2) with Support plate (1) mode of being bolted is connected;The left side on fixed link (3) setting support plate (1) top, and fixed link (3) it is connected with support plate (1) by welding manner;The adjusting rod (4) is arranged on the top of fixed link (3), and adjusting rod (4) it is connected with fixed link (3) by sliding type;The fixing clamp (5) is arranged on the top of adjusting rod (4), and fixing clamp (5) it is connected with adjusting rod (4) by riveting method;The Sopwith staff (6) is arranged on the right side on support plate (1) top, and Sopwith staff (6) with support plate (1) by being connected through mode.
2. a kind of dedicated Sopwith staff of land resources land surveying according to claim 1, it is characterised in that: the support plate It (1) is rectangular-shaped, and the right side opening of support plate (1) is equipped with the rectangular through-hole for placing Sopwith staff (6), the bottom of support plate (1) is in square Shaped formation is provided with bracket (2) everywhere.
3. a kind of dedicated Sopwith staff of land resources land surveying according to claim 1, it is characterised in that: the adjusting rod (4) carry out height adjustment is slided up and down in the inside of fixed link (3), and is fixedly connected by clamping screw.
4. a kind of dedicated Sopwith staff of land resources land surveying according to claim 1, it is characterised in that: the fixing clamp (5) front end is clamped with Sopwith staff (6), and fixing clamp (5) is vertically moved up or down in fixed link (3) by adjusting rod (4) and carries out height tune Section.
CN201822186361.6U 2018-12-25 2018-12-25 A kind of dedicated Sopwith staff of land resources land surveying Expired - Fee Related CN209295957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822186361.6U CN209295957U (en) 2018-12-25 2018-12-25 A kind of dedicated Sopwith staff of land resources land surveying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822186361.6U CN209295957U (en) 2018-12-25 2018-12-25 A kind of dedicated Sopwith staff of land resources land surveying

Publications (1)

Publication Number Publication Date
CN209295957U true CN209295957U (en) 2019-08-23

Family

ID=67648439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822186361.6U Expired - Fee Related CN209295957U (en) 2018-12-25 2018-12-25 A kind of dedicated Sopwith staff of land resources land surveying

Country Status (1)

Country Link
CN (1) CN209295957U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110823174A (en) * 2019-11-05 2020-02-21 甘肃大禹九洲空间信息科技有限公司 Sopwith staff fixing device is used in survey and drawing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110823174A (en) * 2019-11-05 2020-02-21 甘肃大禹九洲空间信息科技有限公司 Sopwith staff fixing device is used in survey and drawing

Similar Documents

Publication Publication Date Title
CN209295957U (en) A kind of dedicated Sopwith staff of land resources land surveying
CN201857763U (en) Leveling clip for embedded parts
CN204789232U (en) Test jig structure of pitch penetration test appearance
CN203783615U (en) Quick and precise positioning device for anchor rod drilling
CN204252556U (en) A kind of plumb bob frame
CN104632080B (en) A kind of three-dimensional is accurately positioned analog simulation tunnel microdrill
CN209176813U (en) Auxiliary frame of passenger car flexibility positioning tool
CN206496753U (en) Accurate levelling founds chi and helps straight device
CN106705934A (en) Precision geometric leveling measurement vertical ruler righting device and operating method thereof
CN214995951U (en) Jacking limiting device of slip form system
CN209369350U (en) A kind of aluminum alloy pattern plate joint reinforcing device
CN204988288U (en) Efficiency of measure is improved centering rod for engineering survey
CN210947138U (en) Constructional engineering frame roof beam reinforcing apparatus
CN204727117U (en) A kind of auxiliary tray completes the self-jacked device in splendid attire chamber
CN206702444U (en) Street lamp basis steel reinforcement cage preparation rack
CN109403628A (en) A kind of aluminum alloy pattern plate joint reinforcing device
CN206311097U (en) A kind of earth excavation control device
CN214940149U (en) Horizontal dibit distribution moves guide frame
CN205450012U (en) Wind speed test support
CN204007620U (en) Instrument of surveying and mapping bracing frame
CN219675419U (en) Device capable of accurately positioning stand wind tunnel
CN219059668U (en) Quick-mounting and dismounting elevation fine adjustment device for slip form construction
CN206095216U (en) Levelling rod founds chi auxiliary device
CN104061916A (en) Support rack for plotting instrument
CN220051570U (en) Adjustable platform for quick assembly of purlin support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20211225