CN209295183U - Solve the air preheater composite structure of blocking etching problem - Google Patents

Solve the air preheater composite structure of blocking etching problem Download PDF

Info

Publication number
CN209295183U
CN209295183U CN201821683905.3U CN201821683905U CN209295183U CN 209295183 U CN209295183 U CN 209295183U CN 201821683905 U CN201821683905 U CN 201821683905U CN 209295183 U CN209295183 U CN 209295183U
Authority
CN
China
Prior art keywords
air
water
steam
water inlet
air heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821683905.3U
Other languages
Chinese (zh)
Inventor
张广文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
North China Power Engineering Beijing Co Ltd
Original Assignee
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Power Engineering Co Ltd of China Power Engineering Consulting Group filed Critical North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority to CN201821683905.3U priority Critical patent/CN209295183U/en
Application granted granted Critical
Publication of CN209295183U publication Critical patent/CN209295183U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

The utility model solves the air preheater composite structure of blocking etching problem, and air preheater has high temperature section and middle-temperature section, does not contain low-temperature zone;It is connected with heat medium water First air steam air heater between primary air fan and air preheater, heat medium water Secondary Air steam air heater is connected between secondary air fan and air preheater, heating agent shredded tobacco for water pipes cooler is connected between air preheater and deduster;Heating agent shredded tobacco for water pipes cooler has outlet pipe and water inlet pipe, and outlet pipe is divided into the water inlet of First air steam air heater water inlet pipe connection heat medium water First air steam air heater and the water inlet of Secondary Air steam air heater water inlet pipe connection heat medium water Secondary Air steam air heater;The water outlet of heat medium water First air steam air heater, which is summarized by First air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler, and the water outlet of heat medium water Secondary Air steam air heater, which is summarized by Secondary Air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler.The utility model can completely avoid rotary regenerative air preheater corrosion as caused by acid and ammonium hydrogen sulfate and stifled ash, and ensure that boiler efficiency is constant.

Description

Solve the air preheater composite structure of blocking etching problem
Technical field
The utility model relates to a kind of air preheater composite structures for solving blocking etching problem.
Background technique
Fig. 1 is a kind of conventional air preheater dependency structure schematic diagram, and boiler 1 connects rotary regenerative air preheater 2, empty Air preheater 2 is connected to deduster 3, and air preheater 2 connects primary air fan 4 and secondary air fan 5, and air preheater has high temperature Section 21, middle-temperature section 22 and low-temperature zone 23.
Rotary regenerative air preheater is for air needed for the flue gas heat of economizer exit is passed to boiler combustion The important heat exchange equipment of modern medium-and-large-sized coal-fired power station boiler.In order to improve boiler efficiency, according to coal quality condition, air preheater outlet Exhaust gas temperature general control is between 120 DEG C~150 DEG C.The corrosion of air preheater low-temperature zone and stifled ash are running common problems, Boiler efficiency is not only reduced, blower power consumption can also be caused to increase, even causes fan stall when stifled grey serious.
The main reason for corrosion of air preheater low-temperature zone and stifled ash, first is that the sulfuric acid vapor in flue gas condenses in changing for low-temperature zone Cause on thermal element, second is that SO in the escape ammonia and flue gas in SCR denitration process3The ammonium hydrogen sulfate of generation is changed low-temperature zone Condensation causes on thermal element.No matter liquid sulfuric acid or liquid sulfuric acid hydrogen ammonium, be deposited on heat exchange element, other than corrosivity, The dust in flue gas can be also adhered to, air preheater is caused to block, the viscosity of ammonium hydrogen sulfate is stronger.
According to present research, between substantially 150 DEG C~200 DEG C of temperature range that ammonium hydrogen sulfate condenses, this temperature Section is more taller than the adiabatic condensation temperature of sulfuric acid vapor.The operation of rotary regenerative air preheater is can not to avoid this temperature range , therefore, the design of air preheater can not effectively avoid low-temperature zone from corroding and block up ash, can only take measures, and slow down corrosion hair It is raw, mitigate chocking-up degree.Common technological means are as follows: 1) air preheater heat exchange element step-by-step arrangement, i.e. high temperature section, middle-temperature section and low Temperature section (can also high middle-temperature section merge setting), and increase low-temperature zone heat exchange element length, keep the crystallizing field of ammonium hydrogen sulfate complete Cold section is fallen in, hydrogen sulfate ammonium precipitation product area segmentation is avoided.In engineering, low-temperature zone height is generally 1000mm or so.2) using conjunction The cold section of heat accumulating element template and material of reason.3) effective cleaning device etc. is arranged in air preheater.
But above-mentioned means cannot tackle the problem at its root.
Utility model content
The technical issues of the utility model is solved is providing a kind of brand new, can completely avoid rotary air Preheater corrodes as caused by acid and ammonium hydrogen sulfate and stifled ash, and ensures that boiler efficiency is constant, in a certain range smoke evacuation temperature Degree can fine tune.
Technological means used by the utility model is as described below.
A kind of air preheater composite structure solving blocking etching problem, boiler connects rotary regenerative air preheater, empty Air preheater is connected to deduster, and air preheater connects primary air fan and secondary air fan, air preheater have high temperature section and Middle-temperature section does not contain low-temperature zone;Heat medium water First air steam air heater, secondary air fan are connected between primary air fan and air preheater It is connected with heat medium water Secondary Air steam air heater between air preheater, heating agent shredded tobacco for water pipes is connected between air preheater and deduster Cooler;Heating agent shredded tobacco for water pipes cooler has outlet pipe and water inlet pipe, and outlet pipe is divided into First air steam air heater water inlet pipe connection heat medium water one The water inlet of water inlet and Secondary Air steam air heater water inlet pipe the connection heat medium water Secondary Air steam air heater of secondary wind steam air heater;Heating agent The water outlet of water First air steam air heater, which is summarized by First air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler, heating agent The water outlet of water Secondary Air steam air heater, which is summarized by Secondary Air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler.
Outlet pipe connects auxiliary steam heating before being divided into First air steam air heater water inlet pipe and Secondary Air steam air heater water inlet pipe Device.
Heat medium water variable frequency pump is arranged in water inlet pipe after First air steam air heater outlet pipe and Secondary Air steam air heater outlet pipe summarize
It is had the beneficial effect that caused by the utility model.
The utility model solves rotary regenerative air heater blocking, etching problem, and rotary regenerative air heater is reluctant The stifled grey problem of burn into has been transferred to the relatively easy heating agent shredded tobacco for water pipes cooler for solving problems, is convenient to clean maintenance.
Detailed description of the invention
Fig. 1 is conventional air preheater dependency structure schematic diagram.
Fig. 2 is the dependency structure schematic diagram of the utility model.
Specific embodiment
A kind of air preheater composite structure for solving blocking etching problem of the utility model, boiler 1 are connected by pipeline Rotary regenerative air preheater 2, air preheater 2 are connected to deduster 3 by pipeline, and air preheater 2 connects 4 He of primary air fan Secondary air fan 5, focuses on, and air preheat utensil 2 has high temperature section 21 and middle-temperature section 22, does not contain low-temperature zone.
Heat medium water First air steam air heater 6 is connected between primary air fan 4 and air preheater 2, secondary air fan 5 and air are pre- It is connected with heat medium water Secondary Air steam air heater 7 between hot device 2, heating agent shredded tobacco for water pipes cooler is connected between air preheater 2 and deduster 3 8。
Heating agent shredded tobacco for water pipes cooler 8 have outlet pipe 81 and water inlet pipe 82, outlet pipe 81 rear end be divided into First air steam air heater into Water pipe 811 connects the water inlet of heat medium water First air steam air heater 6 and Secondary Air steam air heater water inlet pipe 812 connects heat medium water two The water inlet of secondary wind steam air heater 7;The water outlet of heat medium water First air steam air heater 6 is summarized by First air steam air heater outlet pipe 821 Heating agent shredded tobacco for water pipes cooler 8 is connected to water inlet pipe 82, the water outlet of heat medium water Secondary Air steam air heater 7 passes through Secondary Air steam air heater outlet pipe 822 summarize to the connection heating agent shredded tobacco for water pipes cooler 8 of water inlet pipe 82.
Outlet pipe 81 divides to connect auxiliary before First air steam air heater water inlet pipe 811 and Secondary Air steam air heater water inlet pipe 812 Steam heater 9.
Heating agent is arranged in water inlet pipe 82 after First air steam air heater outlet pipe 821 and Secondary Air steam air heater outlet pipe 822 summarize Water variable frequency pump 10.
In the present specification, Ty1, Ty2, Ty3 respectively indicate the high temperature section of rotary regenerative air heater, middle-temperature section and low-temperature zone Exit gas temperature, low-temperature zone here are the low-temperature zones in conventional air preheater.When the utility model is implemented, to guarantee revolution Formula air preheater does not occur to corrode and block up ash, and outlet exhaust gas temperature (Ty2) is it is ensured that the wall temperature of middle-temperature section heat exchange element is higher than sulphur Sour hydrogen ammonium adiabatic condensation temperature, and there are appropriate allowance, Ty2 is calculated by concrete engineering condition and is determined.
The utility model is to ensure that boiler efficiency does not reduce, and heat medium water heat-exchange system (includes heating agent shredded tobacco for water pipes cooler, heat medium water First air steam air heater and heat medium water Secondary Air steam air heater) capacity should be with novel rotary type air preheater middle-temperature section exit gas temperature (Ty2) be used as its inlet temperature, using conventional rotary regenerative air heater low-temperature zone exit gas temperature (Ty3) as its outlet temperature into Row type selecting, and there are appropriate allowance, Ty3 is calculated by concrete engineering condition and is determined.
The utility model uses heat medium water frequency conversion pump group, and the adjustment of heating agent water may be implemented in the revolving speed by adjusting pump, And then realize the adjusting (meeting low as far as possible under security situation) of heating agent shredded tobacco for water pipes cooler exit gas temperature Ty3, and then can be complete Ensure high efficiency boiler rate in load range, cooperation auxiliary steam heating device can ensure novel rotary type within the scope of full load Air preheater middle-temperature section wall temperature is higher than ammonium hydrogen sulfate adiabatic condensation temperature.
The auxiliary steam heating device, main function are as follows: 1) the initial water temperature needed to establish heating agent water system; 2) for preventing heat medium water heat-exchange system frostbite during winter operation/stoppage in transit;3) (winter operation, is set coal varitation when necessary Alternative type allowance deficiency etc.), to improve novel rotation regenerative air heater middle-temperature section wall temperature, to guarantee that ammonium hydrogen sulfate does not occur Condensation.
Heating agent shredded tobacco for water pipes cooler operating condition is severe, can be using mature anticorrosion, anti-wear, anti-clogging technology, such as: 1) Abrasionproof false tube is arranged in cigarette cooler entrance;2) heat exchanger tube uses H-type finned tube;3) cigarette cooler outlet section heat exchanger tube is (containing fin, branch Fagging etc.) it uses and crosses enamel processing;4) efficient soot blower etc. is arranged in heating agent shredded tobacco for water pipes cooler.These technological means are in active service machine There are the experience and achievement of successful operation in group.
Heat medium water steam air heater works in environment corrosion-free, without wearing, without risk is blocked, is using routine techniques production Can, it is the mature equipment on boiler controller system.
It is that the stifled grey problem of conventional rotary regenerative air preheater low-temperature zone burn into has been transferred to phase in the utility model in essence It solves to block, on the heating agent shredded tobacco for water pipes cooler of etching problem to easy.
In the stifled grey problem of processing burn into, rotary regenerative air heater relative difficulty, soot blowing effect is difficult to ensure.The reason is as follows that: 1) soot blower is arranged on the cold and hot end flue of air preheater, and soot blower is opposite transport with air preheater heat exchange element Dynamic relationship causes sootblowing dielectric (superheated steam or high-pressure washing water) cannot be with most appropriate angle and whole energy effects Onto heat exchange element, soot blowing effect is had a greatly reduced quality;2) soot blower can only be arranged on the cold and hot end flue of air preheater, be blown The energy of grey medium is unevenly distributed in the whole height of heat exchange element, i.e., heat exchange element deashing remoter from cool and heat ends is more tired It is difficult.Root is it was found that ammonium hydrogen sulfate coagulation region is away between preheater low-temperature zone heat transfer element bottom about 380mm~810mm.Cause This, the structure of existing rotary regenerative air heater causes soot blowing ineffective.
Heating agent shredded tobacco for water pipes cooler is relatively easy in the stifled grey problem of processing burn into.Since heating agent shredded tobacco for water pipes cooler is directly arranged at On flue, and it is static equipment, is taking necessary anticorrosion, in anti-wear, anti-clogging technical foundation, soot blower is cold with cigarette Device heat exchange element is opposing stationary, and soot blower flexible arrangement, can accomplish to blow it is complete, blow through, it is ensured that ash-removal effect.

Claims (3)

1. a kind of air preheater composite structure for solving blocking etching problem, boiler connect rotary regenerative air preheater, air Preheater is connected to deduster, and air preheater connects primary air fan and secondary air fan, which is characterized in that air preheater has High temperature section and middle-temperature section do not contain low-temperature zone;
Heat medium water First air steam air heater is connected between primary air fan and air preheater, between secondary air fan and air preheater It is connected with heat medium water Secondary Air steam air heater, heating agent shredded tobacco for water pipes cooler is connected between air preheater and deduster;
Heating agent shredded tobacco for water pipes cooler has outlet pipe and water inlet pipe, and it is primary that outlet pipe is divided into First air steam air heater water inlet pipe connection heat medium water The water inlet of water inlet and Secondary Air steam air heater water inlet pipe the connection heat medium water Secondary Air steam air heater of wind steam air heater;Heat medium water The water outlet of First air steam air heater, which is summarized by First air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler, heat medium water The water outlet of Secondary Air steam air heater, which is summarized by Secondary Air steam air heater outlet pipe to water inlet pipe, connects heating agent shredded tobacco for water pipes cooler.
2. the air preheater composite structure as described in claim 1 for solving blocking etching problem, which is characterized in that outlet pipe Auxiliary steam heating device is connected before being divided into First air steam air heater water inlet pipe and Secondary Air steam air heater water inlet pipe.
3. the air preheater composite structure as claimed in claim 1 or 2 for solving blocking etching problem, which is characterized in that one Heat medium water variable frequency pump is arranged in water inlet pipe after secondary wind steam air heater outlet pipe and Secondary Air steam air heater outlet pipe summarize.
CN201821683905.3U 2018-10-17 2018-10-17 Solve the air preheater composite structure of blocking etching problem Active CN209295183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821683905.3U CN209295183U (en) 2018-10-17 2018-10-17 Solve the air preheater composite structure of blocking etching problem

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821683905.3U CN209295183U (en) 2018-10-17 2018-10-17 Solve the air preheater composite structure of blocking etching problem

Publications (1)

Publication Number Publication Date
CN209295183U true CN209295183U (en) 2019-08-23

Family

ID=67654120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821683905.3U Active CN209295183U (en) 2018-10-17 2018-10-17 Solve the air preheater composite structure of blocking etching problem

Country Status (1)

Country Link
CN (1) CN209295183U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109163351A (en) * 2018-10-17 2019-01-08 中国电力工程顾问集团华北电力设计院有限公司 Solve the air preheater composite structure of blocking etching problem

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109163351A (en) * 2018-10-17 2019-01-08 中国电力工程顾问集团华北电力设计院有限公司 Solve the air preheater composite structure of blocking etching problem

Similar Documents

Publication Publication Date Title
CN201251371Y (en) Flue gas pre-cooling system with highly-effective water and energy conservation
CN105972632B (en) Air preheater hot wind adverse current in coal-burning power plant is anti-blocking and the system and its technique of corrosion
CN102734787B (en) Concurrent recycling system for boiler smoke afterheat
CN105889897B (en) A kind of thermal power plant residual heat integrative recycling system and method
CN201973697U (en) System capable of generating low-pressure steam by utilizing flue gas afterheat
CN109163351A (en) Solve the air preheater composite structure of blocking etching problem
CN109737446A (en) A kind of recycling of power plant boiler smoke discharging residual heat and flue gas disappear white system
CN110726153A (en) Coal-fired power plant flue gas whitening elimination system and method
CN209295183U (en) Solve the air preheater composite structure of blocking etching problem
CN210568552U (en) Boiler energy-saving and flue gas whitening system
CN101706109A (en) Embedded deep cooler for boiler flue gas
CN111957065B (en) System for producing ammonium sulfate by ammonia desulfurization liquid post-treatment and application method thereof
CN208703902U (en) The utilization system of fume afterheat and deslagging waste heat based on CFB boiler
CN204042943U (en) Desulfurization system for thermal power plant
CN203131855U (en) Powdery solid fuel boiler and dry method purification process system
CN108826269A (en) The utilization system of fume afterheat and deslagging waste heat based on CFB boiler
CN214891305U (en) High-temperature fly ash waste heat recovery device
CN203068557U (en) Granular fuel boiler and dry desulfurization process system
CN202274500U (en) System for improving utilization grade of waste heat of flue gas
CN102042581A (en) System for generating low-pressure steam by utilizing flue gas waste heat
CN205919305U (en) High cloud of dust gas disposal of smoke treatment device and rotary hearth furnace high temperature and waste heat utilization system
CN212456949U (en) Separation type air preheating system for preventing ABS (anti-lock brake System) of air preheater from being blocked
CN209596915U (en) Plume governing system
CN210410113U (en) Anhydrous calcium chloride flue gas waste heat retrieval and utilization and white system that disappears
CN208349328U (en) A kind of dedusting of coal-fired hot-water boiler flue gas disappears white waste heat depth recovery system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant