CN209293173U - 模块式钢结构栈桥外部走廊 - Google Patents
模块式钢结构栈桥外部走廊 Download PDFInfo
- Publication number
- CN209293173U CN209293173U CN201821847633.6U CN201821847633U CN209293173U CN 209293173 U CN209293173 U CN 209293173U CN 201821847633 U CN201821847633 U CN 201821847633U CN 209293173 U CN209293173 U CN 209293173U
- Authority
- CN
- China
- Prior art keywords
- module
- trestle
- floor
- verandahs
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 claims abstract description 9
- 241000826860 Trapezium Species 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 3
- 238000003466 welding Methods 0.000 abstract description 3
- 208000027418 Wounds and injury Diseases 0.000 abstract description 2
- 239000000428 dust Substances 0.000 abstract description 2
- 208000014674 injury Diseases 0.000 abstract description 2
- 238000003754 machining Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
模块式钢结构栈桥外部走廊,由地板(2)、顶板(5)、钢扶手(3)和立柱(4)构成的模块,其特征在于,在模块的两端有连接孔,模块之间用螺栓连接。与现有技术相比,本实用新型模块的各构件工厂批量加工,现场组装,不但模块之间用螺栓连接,构件之间也用螺栓连接。节约了施工用地,降低了焊接工作量。因外部走廊依附在栈桥侧壁上,荷载可直接传至栈桥底部型钢梁,外部走廊不需单独设置支撑立柱,可有效降低结构自重,节约材料。整个栈桥重量降低,也在吊装方面节省了一笔资金。外部走廊拼装好后与栈桥整个结构一次性吊装,节约了人工和机械台班,加快了工期,排除了高处作业风险。采用外部走廊、有利于降低粉尘、噪音对人体的伤害。
Description
技术领域
本实用新型涉及一种室外走廊,尤其是一种工厂预制、装配一体化的室外走廊。适用于工业、商业等建筑室外走廊工程。
背景技术
众所周知,建筑走廊有室内走廊和室外走廊。室内走廊占用室内空,因此需增大现有室内空间结构,改变建筑外形尺寸,增加耗钢量,内部走廊在设备运行状态下存在不安全因素,室内噪音、空气对人身造成伤害,目前已被淘汰。因此,目前建筑走廊均室外走廊室外走廊。目前主要为混凝土形式,底板采用钢筋混凝土悬挑梁结构+预制板或现浇混凝土组合形式,采用砖混做围护结构,现场加工占用施工场地,各工序之间关联性大,使用材料种类繁多,浪费材料,整个施工周期长,很不经济。因此,设计一种模块式钢结构栈桥外部走廊,是目前需要解决的技术问题。
发明内容
本实用新型所要解决的技术问题是提供一种模块式钢结构栈桥外部走廊。
本实用新型解决其技术问题的技术方案是:
模块式钢结构栈桥外部走廊,由地板、顶板、钢扶手和立柱构成的模块,在模块的两端有连接孔,模块之间用螺栓连接。
作为本实用新型的一种优选方案,地板的两端有连接孔,地板与地板之间用螺栓连接,立柱的上下两端有连接孔,在地板和顶板上均有立柱连接孔,立柱与地板和顶板用螺栓连接,在立柱的顶部有顶板连接控,顶板与立柱用螺栓连接,钢扶手为两端带有连接部的装配式结构,钢扶手通过连接部与立柱固定。
作为本实用新型的一种优选方案,所述的地板由主梁和次梁焊接成矿架,在矿架上焊接面板。
作为本实用新型的一种优选方案,所述的主梁为槽钢,所述的次梁为与主梁小一号的槽钢,所述的面板为花纹钢板,顶板为薄钢板。
作为本实用新型的一种优选方案,模块式钢结构栈桥外部走廊为半封闭式悬挑走廊,外部形状为梯形结构。
作为本实用新型的一种优选方案,每个模块为3米长。
与现有技术相比,本实用新型模块的各构件工厂批量加工,现场组装,不但模块之间用螺栓连接,构件之间也用螺栓连接。节约了施工用地,降低了焊接工作量。因外部走廊依附在栈桥侧壁上,荷载可直接传至栈桥底部型钢梁,外部走廊不需单独设置支撑立柱,可有效降低结构自重,节约材料。整个栈桥重量降低,也在吊装方面节省了一笔资金。外部走廊拼装好后与栈桥整个结构一次性吊装,节约了人工和机械台班,加快了工期,排除了高处作业风险。采用外部走廊、有利于降低粉尘、噪音对人体的伤害。
附图说明
图1是本实用新型的结构示意图的立面图;
图2是是本实用新型的展开图;
图中1为建筑主体结构外墙;
图1中A为角钢。
具体实施方式
如图所示,模块式钢结构栈桥外部走廊,由地板2、顶板5、钢扶手3和立柱4构成的模块,在模块的两端有连接孔,模块之间用螺栓连接。
地板2的两端有连接孔,地板2与地板2之间用螺栓连接,立柱4的上下两端有连接孔,在地板2和顶板5上均有立柱连接孔,立柱4与地板2和顶板5用螺栓连接,在立柱4的顶部有顶板连接控,顶板5与立柱4用螺栓连接,钢扶手3为两端带有连接部的装配式结构,钢扶手3通过连接部与立柱4固定。
所述的地板2由主梁和次梁焊接成矿架,在矿架上焊接面板。
所述的主梁为槽钢,所述的次梁为与主梁小一号的槽钢,所述的面板为花纹钢板,顶板5为薄钢板。
模块式钢结构栈桥外部走廊为半封闭式悬挑走廊,外部形状为梯形结构。
每个模块为3米长。
Claims (5)
1.模块式钢结构栈桥外部走廊,由地板(2)、顶板(5)、钢扶手(3)和立柱(4)构成的模块,其特征在于,在模块的两端有连接孔,模块之间用螺栓连接;地板(2)的两端有连接孔,地板(2)与地板(2)之间用螺栓连接,立柱(4)的上下两端有连接孔,在地板(2)和顶板(5)上均有立柱连接孔,立柱(4)与地板(2)和顶板(5)用螺栓连接,在立柱(4)的顶部有顶板连接控,顶板(5)与立柱(4)用螺栓连接,钢扶手(3)为两端带有连接部的装配式结构,钢扶手(3)通过连接部与立柱(4)固定。
2.根据权利要求1所述的模块式钢结构栈桥外部走廊,其特征在于,所述的地板(2)由主梁和次梁焊接成矿架,在矿架上焊接面板。
3.根据权利要求2所述的模块式钢结构栈桥外部走廊,其特征在于,所述的主梁为槽钢,所述的次梁为与主梁小一号的槽钢,所述的面板为花纹钢板,顶板(5)为薄钢板。
4.根据权利要求1所述的模块式钢结构栈桥外部走廊,其特征在于,模块式钢结构栈桥外部走廊为半封闭式悬挑走廊,外部形状为梯形结构。
5.根据权利要求1所述的模块式钢结构栈桥外部走廊,其特征在于,每个模块为3米长。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821847633.6U CN209293173U (zh) | 2018-11-10 | 2018-11-10 | 模块式钢结构栈桥外部走廊 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821847633.6U CN209293173U (zh) | 2018-11-10 | 2018-11-10 | 模块式钢结构栈桥外部走廊 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209293173U true CN209293173U (zh) | 2019-08-23 |
Family
ID=67646329
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821847633.6U Active CN209293173U (zh) | 2018-11-10 | 2018-11-10 | 模块式钢结构栈桥外部走廊 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209293173U (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109267645A (zh) * | 2018-11-10 | 2019-01-25 | 李国新 | 模块式钢结构栈桥外部走廊 |
| CN111719688A (zh) * | 2020-07-23 | 2020-09-29 | 广东海龙建筑科技有限公司 | 箱式模块化工厂预制钢结构走廊 |
-
2018
- 2018-11-10 CN CN201821847633.6U patent/CN209293173U/zh active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109267645A (zh) * | 2018-11-10 | 2019-01-25 | 李国新 | 模块式钢结构栈桥外部走廊 |
| CN111719688A (zh) * | 2020-07-23 | 2020-09-29 | 广东海龙建筑科技有限公司 | 箱式模块化工厂预制钢结构走廊 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202400710U (zh) | 一种采用组合式井架组装的电梯井道壁 | |
| CN106193311B (zh) | 模块化组装式房屋结构 | |
| CN104763109B (zh) | 一种大跨度钢结构厂房屋面压型底瓦快速施工方法 | |
| CN207260319U (zh) | 一体化模块装配式建筑结构 | |
| CN103912063B (zh) | 由预制板构建的装配式房屋体系 | |
| CN102913002A (zh) | 整体式钢结构活动房及其安装方法 | |
| CN103266662B (zh) | 轻钢复合板拼装房屋 | |
| CN204960416U (zh) | 一种基于模块化组合技术的变电站装配式建筑物 | |
| CN205296407U (zh) | 嵌入式钢结构装配住宅柱梁连接结构 | |
| CN209293173U (zh) | 模块式钢结构栈桥外部走廊 | |
| CN210086489U (zh) | 一种干式连接的低层装配式建筑结构体系 | |
| CN111411694A (zh) | 一体化装配式框架结构建筑体系 | |
| RU2631125C1 (ru) | Строительный модуль для строительства зданий | |
| CN207934332U (zh) | 具有钢异形柱的装配式建筑 | |
| CN203821596U (zh) | 由预制板构建的装配式房屋体系 | |
| CN111088859A (zh) | 一种装配式外墙结构及其安装方法 | |
| CN105735479A (zh) | 墙板折叠式活动板房 | |
| CN204098314U (zh) | 钢板组合楼板 | |
| CN109267645A (zh) | 模块式钢结构栈桥外部走廊 | |
| CN204139316U (zh) | 一种钢构剪力墙结构体系 | |
| CN210710452U (zh) | 一种设置在核心筒剪力墙上的塔吊钢结构基础 | |
| CN103112766A (zh) | 悬置于房屋建筑地下室顶板上方的施工电梯及其施工方法 | |
| CN2931627Y (zh) | 框架、墙板组合楼房 | |
| CN217517797U (zh) | 全装配式多层排架建筑 | |
| CN104612287A (zh) | 模块化钢结构楼房墙体与柱子结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230625 Address after: No. 112 Luchan Street, Yongnian District, Handan City, Hebei Province, 057150 Patentee after: Middling coal Leo Handan Environmental Protection Technology Co.,Ltd. Address before: 056002 Hebei Province, Handan city Congtai Congtai Road No. 56 Patentee before: CHINA COAL BUILDING & INSTALLATION ENGINEERING GROUP Co.,Ltd. |
|
| TR01 | Transfer of patent right |