CN209292897U - Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device - Google Patents

Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device Download PDF

Info

Publication number
CN209292897U
CN209292897U CN201821973005.2U CN201821973005U CN209292897U CN 209292897 U CN209292897 U CN 209292897U CN 201821973005 U CN201821973005 U CN 201821973005U CN 209292897 U CN209292897 U CN 209292897U
Authority
CN
China
Prior art keywords
anchorage
tensioning
twisted steel
fining twisted
spanner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821973005.2U
Other languages
Chinese (zh)
Inventor
钟跃
王永林
李彬
蒋华君
张华勇
刘彦西
赵生富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201821973005.2U priority Critical patent/CN209292897U/en
Application granted granted Critical
Publication of CN209292897U publication Critical patent/CN209292897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device, anchorage spanner includes wrench socket (11) and pinch bar (12);Wrench socket (11) bottom is fixed with anchorage cutting ferrule (13), and circle latch (14) is equipped at the top of the wrench socket (11);The pinch bar (12) includes round head (15) and handle portion (16), and round head (15) inner ring is equipped with card slot (17) of the circle for latch at the top of catch sleeve, the notch tightening of the card slot (17).The utility model has been filled up currently without a kind of blank dedicated for vertical prestressing fining twisted steel anchorage impact wrench, on the basis of not influencing stretching construction, construction efficiency is effectively improved by anchorage handle, while also secure to pre-stress construction quality.

Description

Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device
Technical field
The utility model relates to prestressed concrete fields, specially a kind of to be used for science of bridge building finish rolling screw thread presstressed reinforcing steel The fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device that anchorage is tightened after tensioning.
Background technique
In science of bridge building, prestressed concrete continuous beam usually designs accurate screw-thread steel as vertical prestressing bar, in advance Tension slot groove is arranged in stress rib top, and vertical prestressing adopts the anchorage that screws up with a wrench (hex nut) after being stretched to proof stress.By In the influence of vertical fining twisted steel tension of prestressed tendon technique, anchorage is in tension slot groove, tightens relatively difficult, use at present The oblique tension slot groove of going deep into of fork spanner (open-end wrench) tightens anchorage, constructs more difficult, and quality is difficult to ensure.
There is presently no the equipment of a effective simplicity can easily be used for vertical fining twisted steel presstressed reinforcing steel anchorage It tightens.
Summary of the invention
Anchorage is tightened difficult, quality and is difficult to ensure when in view of current vertical prestressing fining twisted steel tension of prestressed tendon Status, the utility model aim one are to provide a kind of accurate screw-thread steel anchorage spanner, and anchorage anchoring construction when facilitating tensioning improves Work efficiency guarantees pre-stress construction quality;The utility model aim two is to provide a kind of concrete continuous beam pre-stress stretching device.
The utility model aim is first is that adopt the following technical scheme that realization:
A kind of fining twisted steel anchorage spanner, including wrench socket and pinch bar;The wrench socket bottom fixation is set There is anchorage cutting ferrule, a circle latch is equipped at the top of the wrench socket;The pinch bar includes round head and handle portion, the circle Head inner ring is equipped with card slot of the circle for latch at the top of catch sleeve, the notch tightening of the card slot.
The utility model aim is second is that adopt the following technical scheme that realization:
A kind of concrete continuous beam pre-stress stretching device, including the prestressing force conduit peschel that is embedded in concrete beam body in advance and Prestressing force fining twisted steel, the prestressing force are pierced by prestressing force conduit peschel with fining twisted steel;Outside the prestressing force conduit peschel Anchor rear screw muscle is banded between beam body tension slot groove 20-30cm;Prestressing force finish rolling screw thread in beam body tension slot groove It is set with backing plate on steel and has screwed anchorage.
It further include anchorage spanner, tensioning split heads and prestressed stretch-draw jack.
The anchorage spanner includes wrench socket and pinch bar;The wrench socket bottom is fixed with anchorage cutting ferrule, A circle latch is equipped at the top of the wrench socket;The pinch bar includes round head and handle portion, and the round head inner ring is set There are card slot of the circle for latch at the top of catch sleeve, the notch tightening of the card slot.
The prestressing force connects sleeve connection tensioning spreading fining twisted steel by tensioning with fining twisted steel top.
The anchorage cutting ferrule of the wrench socket bottom of the anchorage spanner is sheathed on outside anchorage, i.e. tensioning spreading finish rolling screw thread Steel passes through the round head of wrench socket and pinch bar.
Tensioning split heads is placed outside the beam body tension slot groove of the concrete beam body, installation tensioning is very heavy on the tensioning split heads Top, tensioning spreading fining twisted steel are connect after passing through tensioning split heads with stretch-draw jack.
When implementation, installation screw-thread steel tensioning connects sleeve before vertical prestressing fining twisted steel prepares tensioning, then by anchorage The accurate screw-thread steel of spanner sleeve portion housing and anchorage make anchorage be caught in anchorage cutting ferrule pipe, then connect sleeve connection by tensioning Spreading fining twisted steel installs tensioning split heads, installs tensioning with jack and carries out tensioning, be stretched to design proof stress, uses The card slot of the round head of anchorage pinch bar and the latch of cannula tip cooperate, and the band wrench casing rotation of rotational handle portion is tightened Anchorage.
The utility model is ingenious in design rationally, easy to operate, can be widely applied to apply in sciences of bridge building such as highway, railways Work has good practical application and promotional value.
Detailed description of the invention
Fig. 1 shows fining twisted steel prestressed stretch-draw structural schematic diagrams.
Fig. 2 indicates anchorage spanner structure schematic diagram.
Fig. 3 indicates pinch bar front view.
Fig. 4 a indicates status diagram before the accurate screw-thread steel tensioning of prestressing force.
Fig. 4 b indicates that installation tensioning connection sleeve and anchorage spanner casing prepare status diagram.
Fig. 4 c indicates working state schematic representation when tensioning.
In figure: 1- beam body tension slot groove, 2- anchorage (nut), 3- backing plate, 4- prestressing force fining twisted steel, 5- anchor rear screw Muscle, 6- tensioning connect sleeve, 7- tensioning split heads, 8- stretch-draw jack, 9- tensioning spreading fining twisted steel, 10- prestressing force iron Leather hose, 11- wrench socket, 12- pinch bar, 13- anchorage cutting ferrule, 14- latch, 15- round head, 16- handle portion, 17- card slot, 18- concrete beam body.
Specific embodiment
Specific embodiment of the utility model is described in detail with reference to the accompanying drawing.
A kind of fining twisted steel anchorage spanner, as shown in Figure 2,3, including wrench socket 11 and pinch bar 12;Spanner set 11 bottoms of cylinder are fixed with anchorage cutting ferrule 13, and a circle latch 14 is equipped at the top of wrench socket 11;Pinch bar 12 includes round head 15 and handle portion 16,15 inner ring of round head is equipped with card slot 17 of the circle for latch at the top of catch sleeve, and the notch of card slot 17 is received Tightly.
When it is implemented, the spanner is mainly made of spanner casing, pinch bar, middle sleeve is hollow, and lower part is according to essence Roll the processing of screw-thread steel anchorage size (32 anchorage the widest part 67mm of Φ is processed to guarantee centainly to be inserted in reserved hole by 75mm).Set Cylinder by Φ 90*5mm seamless steel pipe and 3cm thick steel plate custom cut welding be composed, spanner by 1cm thick steel plate shape cutting and At.
Using the accurate screw-thread steel of casing hollow sleeve and anchorage, handle drives casing rotation, casing part when stretch-draw anchor Anchorage cutting ferrule drive anchorage rotation anchored.
A kind of concrete continuous beam pre-stress stretching device, as shown in Figure 1, pre- in concrete beam body 18 including being embedded in advance Stress conduit peschel 10 and prestressing force fining twisted steel 4, prestressing force fining twisted steel 4 are pierced by prestressing force conduit peschel 10;It answers in advance It is banded with anchor rear screw muscle 5 between the outer 20-30cm apart from beam body tension slot groove 1 of power conduit peschel 10, due to carrying out anchoring prestress When screw-thread steel, the concrete stress of tensioning trench bottom, to prevent the concrete cracking at tension slot groove, spy is in prestressing force conduit peschel To increase arrangement of reinforcement (anchor rear screw muscle);Prestressing force suit backing plate 3 on fining twisted steel 4 and rotation in beam body tension slot groove 1 It is screwed with anchorage 2.
It further include anchorage spanner, tensioning split heads 7 and prestressed stretch-draw jack 8.
Anchorage spanner includes wrench socket 11 and pinch bar 12;11 bottom of wrench socket is fixed with anchorage cutting ferrule 13, A circle latch 14 is equipped at the top of wrench socket 11;Pinch bar 12 includes round head 15 and handle portion 16, and 15 inner ring of round head is set There are card slot 17 of the circle for latch at the top of catch sleeve, the notch tightening of card slot 17.
Prestressing force connects sleeve 6 by tensioning with 4 top of fining twisted steel and connects tensioning spreading fining twisted steel 9.
The anchorage cutting ferrule 13 of 11 bottom of wrench socket of anchorage spanner is sheathed on outside anchorage 2, i.e. tensioning spreading finish rolling spiral shell Line steel 9 passes through the round head 15 of wrench socket 11 and pinch bar 12.
Tensioning split heads 7 is placed outside the beam body tension slot groove 1 of concrete beam body 18, and stretch-draw jack 8 is installed on tensioning split heads 7, Tensioning spreading fining twisted steel 9 is connect after passing through tensioning split heads 7 with stretch-draw jack 8.
When it is implemented, state is as shown in fig. 4 a before the accurate screw-thread steel tensioning of prestressing force.Vertical prestressing fining twisted steel 4 Installation screw-thread steel tensioning connects sleeve 6 before preparing tensioning, then by the accurate screw-thread steel of anchorage spanner sleeve portion housing and anchorage, makes Anchorage is caught in anchorage cutting ferrule, as shown in Figure 4 b.Sleeve connection tensioning spreading fining twisted steel, installation are connected by tensioning again Tensioning split heads installs tensioning with jack and carries out tensioning, design proof stress is stretched to, using the round head of anchorage pinch bar Card slot and cannula tip latch cooperate, rotational handle portion band wrench casing rotate and tighten anchorage (as illustrated in fig. 4 c).
The utility model has been filled up currently without one kind dedicated for vertical prestressing fining twisted steel anchorage impact wrench Blank construction efficiency effectively improved by anchorage handle, while to prestressing force on the basis of not influencing stretching construction Construction quality is also secure.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change It also should be regarded as the protection scope of the utility model into replacement.

Claims (2)

1. a kind of fining twisted steel anchorage spanner, it is characterised in that: including wrench socket (11) and pinch bar (12);It is described to pull Gloves cylinder (11) bottom is fixed with anchorage cutting ferrule (13), and circle latch (14) is equipped at the top of the wrench socket (11);It is described Pinch bar (12) includes round head (15) and handle portion (16), and round head (15) inner ring is equipped with a circle and is used for catch sleeve The card slot (17) of top latch.
2. a kind of concrete continuous beam pre-stress stretching device, including the prestressing force conduit peschel being embedded in concrete beam body (18) in advance (10) and prestressing force is with fining twisted steel (4), and the prestressing force is pierced by prestressing force conduit peschel (10) with fining twisted steel (4);Its Be characterized in that: the prestressing force conduit peschel (10) is banded with anchor rear screw muscle between beam body tension slot groove (1) 20-30cm outside (5);It is set with backing plate (3) on the prestressing force fining twisted steel (4) in beam body tension slot groove (1) and has screwed anchorage (2);
It further include anchorage spanner, tensioning split heads (7) and prestressed stretch-draw jack (8);
The anchorage spanner includes wrench socket (11) and pinch bar (12);Wrench socket (11) bottom is fixed with anchor Have cutting ferrule (13), circle latch (14) is equipped at the top of the wrench socket (11);The pinch bar (12) includes round head (15) and handle portion (16), round head (15) inner ring are equipped with card slot (17) of the circle for latch at the top of catch sleeve;
The prestressing force connects tensioning spreading fining twisted steel by tensioning connection sleeve (6) with fining twisted steel (4) top (9);
The anchorage cutting ferrule (13) of wrench socket (11) bottom of the anchorage spanner is sheathed on anchorage (2) outside, i.e. tensioning spreading Fining twisted steel (9) passes through the round head (15) of wrench socket (11) and pinch bar (12);
The beam body tension slot groove (1) of the concrete beam body (18) places tensioning split heads (7) outside, installs on the tensioning split heads (7) Stretch-draw jack (8), the tensioning pass through tensioning split heads (7) with spreading fining twisted steel (9) and connect afterwards with stretch-draw jack (8) It connects.
CN201821973005.2U 2018-11-28 2018-11-28 Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device Expired - Fee Related CN209292897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821973005.2U CN209292897U (en) 2018-11-28 2018-11-28 Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821973005.2U CN209292897U (en) 2018-11-28 2018-11-28 Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device

Publications (1)

Publication Number Publication Date
CN209292897U true CN209292897U (en) 2019-08-23

Family

ID=67656258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821973005.2U Expired - Fee Related CN209292897U (en) 2018-11-28 2018-11-28 Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device

Country Status (1)

Country Link
CN (1) CN209292897U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700596A (en) * 2019-10-31 2020-01-17 广西路建工程集团有限公司 Finish-rolled deformed steel bar tensioning anchor device and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700596A (en) * 2019-10-31 2020-01-17 广西路建工程集团有限公司 Finish-rolled deformed steel bar tensioning anchor device and construction method thereof

Similar Documents

Publication Publication Date Title
CN206090563U (en) Earth anchor device with barb
CN207892252U (en) A kind of multi beam prestress wire lashing banding draft gear
CN209292897U (en) Fining twisted steel anchorage spanner and concrete continuous beam pre-stress stretching device
CN202012075U (en) Fast connection device of prestressed concrete pipe pile
CN108221666B (en) Compound ground tackle is used to FRP muscle
CN202925767U (en) Low-retraction pre-stressed anchorage device
CN206467574U (en) For finish rolling deformed bar anchorage sleeve fastener
CN205189428U (en) Push -pull system is opened to bent panel mount carbon fiber plate ground tackle
CN204531182U (en) The clipping ground tackle of a kind of intermediate plate type CFRP muscle
CN105064615B (en) A kind of steel bar anchoring device and installation method
CN104695629A (en) Clamping piece type CFRP rib clamping anchorage device
CN206070885U (en) Screw-thread steel plug-in type branch sleeve for building
CN205976218U (en) A strong connecting device of pretightning force tooth for composite pipe
CN2835437Y (en) Falsework fastening fastener
CN210685355U (en) Scaffold fastener locking device
CN206607872U (en) The removable sleeve of pore-forming when reinforcing bar starches anchor grafting
CN105332513A (en) Curved plate-type carbon fiber plate anchor device tensioning system
CN108396958A (en) Multifunctional scaffold for constructional engineering
CN211572532U (en) Tool type wall connecting piece for external scaffold
CN204876349U (en) Steel bar anchoring device
CN205259178U (en) Prestressing tendons NOT AND prestressing tendons anchor coupling sleeve
CN208803374U (en) A kind of low retracting secondary stretch-draw anchorage
CN211360942U (en) Simple foundation bolt threading device
CN109629565A (en) Rapid reinforcement geotechnique threaded anchor rod and its application method
CN208009449U (en) A kind of jack supporting seat for prestressed soil nailing tensioning

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20211128