CN209292882U - Continuous deck simply supported beam connecting plate - Google Patents
Continuous deck simply supported beam connecting plate Download PDFInfo
- Publication number
- CN209292882U CN209292882U CN201821739126.0U CN201821739126U CN209292882U CN 209292882 U CN209292882 U CN 209292882U CN 201821739126 U CN201821739126 U CN 201821739126U CN 209292882 U CN209292882 U CN 209292882U
- Authority
- CN
- China
- Prior art keywords
- muscle
- layer
- cementation
- fissures
- upper layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000003205 muscle Anatomy 0.000 claims abstract description 51
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 19
- 238000000926 separation method Methods 0.000 claims abstract description 3
- 239000004567 concrete Substances 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- ZAMOUSCENKQFHK-UHFFFAOYSA-N Chlorine atom Chemical compound [Cl] ZAMOUSCENKQFHK-UHFFFAOYSA-N 0.000 claims 1
- 229910052801 chlorine Inorganic materials 0.000 claims 1
- 239000000460 chlorine Substances 0.000 claims 1
- KNVAYBMMCPLDOZ-UHFFFAOYSA-N propan-2-yl 12-hydroxyoctadecanoate Chemical compound CCCCCCC(O)CCCCCCCCCCC(=O)OC(C)C KNVAYBMMCPLDOZ-UHFFFAOYSA-N 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000012423 maintenance Methods 0.000 abstract description 6
- 238000001816 cooling Methods 0.000 abstract description 3
- 238000004140 cleaning Methods 0.000 abstract description 2
- -1 polyethylene Polymers 0.000 description 4
- 239000004698 Polyethylene Substances 0.000 description 3
- 229920001084 poly(chloroprene) Polymers 0.000 description 3
- 229920000573 polyethylene Polymers 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 235000019738 Limestone Nutrition 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 239000006071 cream Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Continuous deck simply supported beam connecting plate, it is corresponded in reinforced concrete (3) structure and the cementation of fissures slot (6) parallel with seam is laterally set on the upside of seam, in the reinforced concrete (3) of cementation of fissures slot (6) two sides along the longitudinal direction that upper beam (11) stretching, extension is laid with, lower leaf is continuously symmetrically installed upper layer vertical muscle (4) in parallel and lower layer indulges muscle (5), upper layer, which is indulged between muscle (4), indulges between muscle (5) that lateral perpendicular separation uniformly connects one group of transverse bar (7) respectively lower layer, and it is indulged on upper layer and vertically connects lacing wire between muscle (4) and lower layer vertical muscle (5).Easy cleaning cementation of fissures slot efficiently, easily can support rapid construction to install, and be easy to cementation of fissures operation and cooling maintenance, can control filling layer height lower than 0.5cm;Artificial occupancy is reduced, the working strength of worker is significantly reduced, shortens working hour, the convenient Rapid-Repair to road minute crack extends road life, reduces maintenance cost.
Description
Technical field
The utility model relates to the structure improved technologies of overpass connecting sewing, especially continuous deck simply supported beam connecting plate.
Background technique
Bridge floor continuously refers to that superstructure is combined together using armored concrete, becomes an overall structure.From stress
Feature point: simply supported girder bridge, continuous bridge, cantilever glider bridge.Simply supported girder bridge, using hole as unit, the respective independent stress of adjacent bridge opening belongs to
Statically determinate structure is suitable for medium and small span.Its advantages are that structure is simple, and it is convenient to set up, and can lower cost, shorten the construction period, simultaneously
Most easily it is designed to the prefabricated member of various standard spans.But adjacent two across between there are incorgruous corner, there is dog-ear on road surface, influence
Driving is smooth.
Concrete simply supported beam is divided into monoblock type and assembled or split blade type two major classes by construction technology.
(1), monoblock type simply supported beam, lateral stiffness is big, and stability is good.Due to being limited by girder carrier crane capacity,
Monolithic beam applies in general to poured-in-place.
(2), Fabricated Simple Supported Beams are then the bridge types being widely used at present.Concrete simply supported beam is by load-carrying members beam
Cross-sectional form can be divided into slab bridge, girt strip bridge and Box-girder Bridges.
More mature connection plate technique is needed to continuous deck simply supported beam Specific construction in the prior art.
Utility model content
The purpose of the utility model is to provide continuous deck simply supported beam connecting plates, solve the above technical problem.
The purpose of this utility model will be realized by following technical measures: indulge muscle including reinforced concrete, upper layer, lower layer indulges
Muscle, cementation of fissures slot and transverse bar;It is corresponded in the reinforced concrete structure of continuous laying on the upside of seam laterally on the upside of two upper beam abutment joints
The cementation of fissures slot parallel with seam is set, and is laid in the reinforced concrete of cementation of fissures slot two sides along upper beam stretching, extension longitudinal upper and lower point
Layer is continuously symmetrically installed upper layer in parallel to be indulged muscle and lower layer and indulges muscle, upper layer indulge between muscle indulged lower layer between muscle it is laterally vertical respectively between
Every uniformly one group of transverse bar of connection, and is indulged on upper layer and vertically connect lacing wire between the vertical muscle of muscle and lower layer.
Especially, waterproof layer and pitch concrete layer are installed on reinforced concrete upper layer.
Especially, the vertical muscle longitudinal length in upper layer is longer than the vertical muscle of lower layer.
Especially, muscle is indulged on upper layer and its transverse bar is mounted between the conplane vertical, horizontal reinforcing bar of reinforced concrete, and lower layer indulges muscle
Quantity be that upper layer indulges two times of muscle.
Especially, mat formation neoprene rubber sheet in cementation of fissures trench bottom.
The advantages of the utility model and effect: easy cleaning cementation of fissures slot efficiently, easily can support rapid construction to pacify
Dress is easy to cementation of fissures operation and cooling maintenance, can control filling layer height lower than 0.5cm;Artificial occupancy is reduced, is significantly reduced
The working strength of worker, shorten working hour, the convenient Rapid-Repair to road minute crack, extend road life, reduce maintenance at
This.
Detailed description of the invention
Fig. 1 is the installation of the utility model embodiment 1 and cross-sectional structure schematic diagram.
Fig. 2 is that the utility model embodiment 1 overlooks bar construction schematic diagram.
Appended drawing reference includes:
Pitch concrete layer 1, waterproof layer 2, reinforced concrete 3, muscle 4 is indulged on upper layer, lower layer indulges muscle 5, cementation of fissures slot 6, transverse bar 7, polyethylene bubble
Foam plate 8, pier cap beam 9, neoprene rubber sheet 10, upper beam 11, deck paving reinforcing bar 12, support 13.
Specific embodiment
The utility model includes: reinforced concrete 3, muscle 4 is indulged on upper layer, lower layer indulges muscle 5, cementation of fissures slot 6 and transverse bar 7.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1: as shown in figure 1 and 2, the reinforced concrete 3 of continuous laying on the upside of two 11 abutment joints of upper beam, and
It is corresponded in 3 structure of reinforced concrete and the cementation of fissures slot 6 parallel with seam is laterally set on the upside of seam, and the reinforcing bar in 6 two sides of cementation of fissures slot
The vertical muscle 5 of muscle 4 and lower layer is indulged on longitudinal upper and lower layered and parallel upper layer that is continuously symmetrically installed in concrete 3 along the stretching, extension laying of upper beam 11, on
Lateral perpendicular separation uniformly connects one group of transverse bar 7 respectively between the vertical muscle 5 of lower layer between the vertical muscle 4 of layer, and indulges 4 He of muscle on upper layer
Lower layer indulges and vertically connects lacing wire between muscle 5.
In aforementioned, waterproof layer 2 and pitch concrete layer 1 are installed on 3 upper layer of reinforced concrete.
In aforementioned, upper layer indulges 4 longitudinal length of muscle and is longer than the vertical muscle 5 of lower layer.
In aforementioned, muscle 4 is indulged on upper layer and its transverse bar 7 is mounted between the conplane vertical, horizontal reinforcing bar of reinforced concrete 3, lower layer
The quantity of vertical muscle 5 is two times that muscle 4 is indulged on upper layer.
In aforementioned, mat formation neoprene rubber sheet 10 in 6 bottom of cementation of fissures slot.
In the utility model embodiment, in two 11 abutment joint top filled polyethylene cystosepiments 8 of upper beam, on two sections
Beam 11 butt end bottom in portion's is supported on pier cap beam 9 with support 13 respectively.
In the utility model embodiment, the vertical muscle 4 in upper layer is 3200mm long, and the vertical muscle 5 of lower layer is 2400mm long, and muscle 4 is indulged under in upper layer
Vertical 5 specification of muscle of layer be7 specification of transverse bar6 width 5mm of cementation of fissures slot, interior 851 sealing of filling of cementation of fissures slot 6
Cream, 1 thickness 90mm of pitch concrete layer, 2 thickness 2mm of waterproof layer, 3 thickness 80mm of reinforced concrete, 2mm after chlorobutylene sheet rubber 10, polyethylene
Plate 8 is 100mm high, thick 40mm.
The utility model embodiment is in construction, when cementation of fissures operation, is injected base joint grouting glue in cementation of fissures slot 6 by pouring machine,
The sealing compound baste in cementation of fissures slot 6 is made, control filling layer height is lower than 0.5cm;Cementation of fissures thermic lance temperature sets 1500 DEG C, adopts
It is 0.2~0.5Mpa with air-source pressure, it is summer 10m/min, winter 5m/min that the cementation of fissures, which clears up speed,;When cooling maintenance, to
Cementation of fissures operation terminates, and in maintenance, on packing material surface, paving spills dry sand, pulverized limestone etc. and vibrates, is compacted, smoothes out, about 10~
Road can come into operation after 20min.
Claims (5)
1. continuous deck simply supported beam connecting plate, including reinforced concrete (3), upper layer indulge muscle (4), lower layer indulge muscle (5), cementation of fissures slot (6) and
Transverse bar (7);It is characterized in that, correspondence connects in reinforced concrete (3) structure of two upper beam (11) abutment joints upside continuous layings
It sews on side and the cementation of fissures slot (6) parallel with seam is laterally set, and along upper beam in the reinforced concrete (3) of cementation of fissures slot (6) two sides
(11) stretching, extension be laid with it is longitudinal upper and lower it is layered and parallel be continuously symmetrically installed that muscle (4) are indulged on upper layer and lower layer is vertical muscle (5), muscle is indulged on upper layer
(4) lateral perpendicular separation uniformly connects one group of transverse bar (7) respectively between lower layer vertical muscle (5) between, and indulges muscle (4) on upper layer
And lower layer indulges and vertically connects lacing wire between muscle (5).
2. continuous deck simply supported beam connecting plate as described in claim 1, which is characterized in that on reinforced concrete (3) upper layer, installation is anti-
Water layer (2) and pitch concrete layer (1).
3. continuous deck simply supported beam connecting plate as described in claim 1, which is characterized in that it is long that muscle (4) longitudinal length is indulged on upper layer
Muscle (5) are indulged in lower layer.
4. continuous deck simply supported beam connecting plate as described in claim 1, which is characterized in that indulge muscle (4) and its transverse bar (7) in upper layer
It is mounted between the conplane vertical, horizontal reinforcing bar of reinforced concrete (3), the quantity that lower layer indulges muscle (5) is the two of upper layer vertical muscle (4)
Times.
5. continuous deck simply supported beam connecting plate as described in claim 1, which is characterized in that mat formation chlorine in cementation of fissures slot (6) bottom
Buna piece (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821739126.0U CN209292882U (en) | 2018-10-25 | 2018-10-25 | Continuous deck simply supported beam connecting plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821739126.0U CN209292882U (en) | 2018-10-25 | 2018-10-25 | Continuous deck simply supported beam connecting plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209292882U true CN209292882U (en) | 2019-08-23 |
Family
ID=67646792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821739126.0U Expired - Fee Related CN209292882U (en) | 2018-10-25 | 2018-10-25 | Continuous deck simply supported beam connecting plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209292882U (en) |
-
2018
- 2018-10-25 CN CN201821739126.0U patent/CN209292882U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638254B (en) | A kind of few girder composite beam bridge and its construction method using Prefabricated composite floorings | |
CN105544373B (en) | A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges | |
CN102535355B (en) | Method for reinforcing bridge structure separated steel-concrete combined truss | |
CN105926423B (en) | It is a kind of applied to the combination beam type bridge floor continuation apparatus of Hollow Slab Beam Bridge and bridge floor continuation method | |
CN102296546A (en) | Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof | |
CN212477409U (en) | Expansion joint device structure of road surface seamless bridge | |
CN102535357B (en) | Method for strengthening double-T bridge composite structure for railway | |
CN106337361B (en) | A kind of separate type FRP- concrete-steel combination beam bridge structure and construction method | |
CN205205654U (en) | Seam construction of precast concrete festival segmentation bridge | |
CN104652268A (en) | Bridge deck continuous seam structure and forming method thereof | |
CN105064198A (en) | Semi-prefabricated assembled corrugated steel web plate combined box girder and preparation method thereof | |
CN206219997U (en) | A kind of box crossbeam of bridge is reinforced and mounting structure | |
CN205063133U (en) | Superimposed sheet superstructure system of prestressing force bottom plate based on take truss | |
CN209307882U (en) | It is a kind of for improving the cushion cap device on pile foundation reinforcement basis | |
CN107905084B (en) | RPC steel truss combined bridge deck and continuous beam bridge | |
CN112281663B (en) | Construction method for widening connection of upper structures of new and old bridges | |
CN209292882U (en) | Continuous deck simply supported beam connecting plate | |
CN202181507U (en) | Bridge deck continuous structure of simply supported bridge | |
CN204899033U (en) | Shaped steel concrete combination flat beam | |
KR20080107567A (en) | Truss structure of a temporary bridge | |
CN203546516U (en) | Longitudinal continuous limit ballastless track on steel truss girder bridge | |
CN205603974U (en) | Low circuit single line location support rail girder segment limit structure within a definite time that puts of well low -speed maglev traffic engineering | |
CN206298821U (en) | Simply supported girder bridge composite connection board is constructed | |
CN212316678U (en) | Railway bridge integral steel bridge deck slab ballast groove | |
CN204475146U (en) | A kind of hollow slab bridge structure strengthening lateral stiffness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190823 |