CN209286688U - MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator - Google Patents

MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator Download PDF

Info

Publication number
CN209286688U
CN209286688U CN201821434611.7U CN201821434611U CN209286688U CN 209286688 U CN209286688 U CN 209286688U CN 201821434611 U CN201821434611 U CN 201821434611U CN 209286688 U CN209286688 U CN 209286688U
Authority
CN
China
Prior art keywords
evaporator
pipeline
downward film
film evaporator
barium chloride
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821434611.7U
Other languages
Chinese (zh)
Inventor
林福平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Huaneng Environmental Protection & Technology Co Ltd
Original Assignee
Yichang Huaneng Environmental Protection & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Huaneng Environmental Protection & Technology Co Ltd filed Critical Yichang Huaneng Environmental Protection & Technology Co Ltd
Priority to CN201821434611.7U priority Critical patent/CN209286688U/en
Application granted granted Critical
Publication of CN209286688U publication Critical patent/CN209286688U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to high-purity barium chloride production technical field, it is related to a kind of Production of Barium Chloride system of traditional four-effect evaporator of MVR evaporator replacement, including barium chloride original fluid container, the barium chloride original fluid container passes through pipeline and feed pump, preheater is sequentially communicated by pipeline, the preheater at the top of pipeline and downward film evaporator by being connected to, the downward film evaporator is connected to by pipeline with gas-liquid separator, it is sequentially communicated at the top of the gas-liquid separator by pipeline and vapour compression machine, the vapour compression machine is connected to by pipeline with downward film evaporator, the connection with preheater of the downward film evaporator, the downward film evaporator bottom is pumped by pipeline and first circulation, it is sequentially communicated at the top of downward film evaporator.The utility model can reduce the usage amount of steam and the investment of equipment, and energy-saving effect is significant, operating cost is low, occupied area is small and public auxiliary facility is few.

Description

MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator
Technical field
The utility model belongs to high-purity barium chloride production technical field, is related to a kind of traditional quadruple effect steaming of MVR evaporator replacement Send out the Production of Barium Chloride system of device.
Background technique
High-purity barium chloride is the new demand that scientific and technological progress and production practices propose material, it is widely used in aviation boat It, the every field of electronics, medicine, special steel, special glass, the high-tech and conventional industries such as papermaking.High-purity barium chloride be with Industrial chlorinating titanate is raw material, through pervaporation, removal of impurities, crystallization, cleaning, drying, and the impurity that aforesaid operations obtain is repeated and contains It measures less, the high-purity barium chloride that barium chloride content is high.The purity of high-purity barium chloride how much is determined with its impurity content 's.During carrying out Production of Barium Chloride, generated in the impurity such as calcium, strontium, magnesium and production process due to containing in ore Some impurity cause inevitably to carry these a large amount of impurity in barium chloride, and certain industries are not achieved to impurity in purity The requirement of content.Therefore, it in order to be purified, needs to carry out industrial chlorinating titanate secondary or recrystallizes three times.Traditional weight Method for crystallising is that ore reaction solution (liquid barium chloride) is first evaporated crystallization, by the high temperature again of the barium chloride after evaporative crystallization Dissolution carries out secondary crystallization (recrystallization), obtains the higher barium chloride of purity.Multiple-effect steaming is generallyd use in evaporation and crystal process Device is sent out, steam thermal energy can be utilized to greatest extent, while can also make that liquid is sufficiently heated and heating time is long, but During heating evaporation, consume energy still higher, while barium chloride crystalline deposit is easy to produce in evaporator pipeline, blocking pipe Road shortens the service life of equipment.And triple effect or four-effect evaporator occupied area are larger, evaporation time is too long, installation cost Increase with capital cost.
Summary of the invention
In order to solve the above technical problems, the utility model provides a kind of chlorine of traditional four-effect evaporator of MVR evaporator replacement Change barium production system, filter effect improves a lot.
The embodiment of the utility model is:
A kind of MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator, including barium chloride original fluid container, described Barium chloride original fluid container is sequentially communicated with feed pump, preheater by pipeline by pipeline, and the preheater passes through pipeline and falling liquid film Connection at the top of formula evaporator, the downward film evaporator are connected to by pipeline with gas-liquid separator, at the top of the gas-liquid separator It is sequentially communicated by pipeline and vapour compression machine, the vapour compression machine is connected to by pipeline with downward film evaporator, the drop The connection with preheater of kestner long-tube evaporator, the downward film evaporator bottom are steamed by pipeline and first circulation pump, falling film type It is sequentially communicated at the top of hair device.
Preferably, it is additionally provided with cyclone between the first circulation pump and downward film evaporator, the cyclone apex is logical It is connected at the top of piping and downward film evaporator.
Preferably, the vapour compression machine is connected to by pipeline with the first medium conduit entrance of downward film evaporator, institute The first medium pipe outlet for stating downward film evaporator is connected to the second medium conduit entrance of preheater.
It is further preferred that the liquid discharge outlet of the gas-liquid separator is situated between by second circulation pump with the second of preheater Matter conduit entrance connection.
It is further preferred that the first medium of the downward film evaporator is steam, the second medium of the preheater is Water.
Preferably, the condensate liquid of the preheater is discharged through condensate liquid discharge nozzle, and the gas-liquid separator and vacuum pump connect It is logical.
It is further preferred that being equipped with surge tank, knockout drum between the gas-liquid separator and vacuum pump.
It is further preferred that being equipped with packing layer inside the knockout drum.
The utility model the utility model has the advantages that
1, the utility model can reduce the usage amount of steam and the investment of equipment, energy-saving effect is significant, operating cost is low, The small and public auxiliary facility of occupied area is few.
2, it is additionally provided with cyclone between first circulation pump and downward film evaporator, can prevents from being formed in concentration process Barium chloride crystallization causes pipeline blockage, crystalline solid material is isolated pipeline in time, while also reducing the loss of equipment.
3, vapour compression machine add thermogenetic steam be again introduced into downward film evaporator first medium pipeline for heat steaming Hair further utilizes, and after downward film evaporator steam heat exchange, the coolant-temperature gage of condensation is higher, the first medium of downward film evaporator Pipe outlet is connected to the second medium conduit entrance of preheater, and the heat of condensed water can be made full use of by being recycled to preheater.
4, the condensed water heat that gas-liquid separator separates obtain is higher, and the liquid discharge outlet of gas-liquid separator is followed by second Ring pump is connected to the second medium conduit entrance of preheater, can make full use of the heat of condensed water.
5, it is equipped with surge tank, knockout drum between the gas-liquid separator and vacuum pump, is equipped with filler inside the knockout drum Layer is clean by moisture absorption, prevents condensed water from entering in vacuum pump, the pump housing is caused to damage.
Detailed description of the invention
Fig. 1 utility model device schematic diagram;
Wherein: barium chloride original fluid container 1, feed pump 2, preheater 3, downward film evaporator 4, gas-liquid separator 5, both vapor compression Machine 6, first circulation pump 7, cyclone 8, second circulation pump 9, condensate liquid discharge nozzle 10, vacuum pump 11, surge tank 12, knockout drum 13, packing layer 131.
Specific embodiment
Combined with specific embodiments below, further details of elaboration, but the implementation of the utility model are made to the utility model Mode is not limited to the range of embodiment expression.These embodiments are merely to illustrate the utility model, originally not for limitation The range of utility model.In addition, those skilled in the art can make utility model after the content for reading the utility model Various modifications, these equivalent variations equally fall within the appended claims for the utility model book limited range.
Embodiment 1
A kind of MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator, including barium chloride original fluid container 1, institute It states barium chloride original fluid container 1 to be sequentially communicated by pipeline and feed pump 2, preheater 3 by pipeline, the preheater 3 passes through pipeline It is connected to at the top of downward film evaporator 4, the downward film evaporator 4 is connected to by pipeline with gas-liquid separator 5, the gas-liquid point It is sequentially communicated from pipeline is passed through at the top of device 5 with vapour compression machine 6, the vapour compression machine 6 passes through pipeline and downward film evaporator 4 Connection, the connection with preheater 3 of the downward film evaporator 4,4 bottom of downward film evaporator are followed by pipeline with first It is sequentially communicated at the top of ring pump 7, downward film evaporator 4.
Preferably, cyclone, 8 top of cyclone are additionally provided between the first circulation pump 7 and downward film evaporator 4 By being connected at the top of pipeline and downward film evaporator 4.
Preferably, the vapour compression machine 6 is connected to by pipeline with the first medium conduit entrance of downward film evaporator 4, The first medium pipe outlet of the downward film evaporator 4 is connected to the second medium conduit entrance of preheater 3.
It is further preferred that the liquid discharge outlet of the gas-liquid separator 5 passes through second circulation pump 9 and the of preheater 3 Second medium conduit entrance connection.
It is further preferred that the first medium of the downward film evaporator 4 is steam, the second medium of the preheater 3 For water.
Preferably, the condensate liquid of the preheater 3 is discharged through condensate liquid discharge nozzle 10, the gas-liquid separator 5 and vacuum 11 connection of pump.
It is further preferred that being equipped with surge tank 12, knockout drum 13 between the gas-liquid separator 5 and vacuum pump 11.
It is further preferred that being equipped with packing layer 131 inside the knockout drum 13.
When the utility model is used, barium chloride material liquid by feed pump 2 is pumped into preheater 3 through heat in barium chloride original fluid container 1 Water preheating, into 4 top of downward film evaporator, in membranaceous by thermal evaporation in evaporation tube.Barium chloride is molten in downward film evaporator 4 The secondary steam that liquid vaporization generates enters solvent gasification and produces gas-liquid separator 5, and the secondary steam after separation enters both vapor compression Machine 6 heats barium chloride solution into downward film evaporator 4 after adherence pressure and temperature in vapour compression machine 6 again Evaporation.Downward film evaporator 4 first medium evaporation generate condensed water and gas-liquid separator 5 be separated to condensed water, return It is flow to preheating of the preheater 3 for barium chloride material liquid, recycles the sensible heat of condensed water.The barium chloride of 4 bottom of downward film evaporator Concentrate, if without concentration do not have it is up to standard through first circulation pump 7 be back to downward film evaporator 4 further evaporated it is dense Contracting, the cyclone 8 of setting come out the Crystallization Separation in concentrate, prevent pipeline blockage.
Embodiment described above is only the preferred embodiment of the utility model, does not therefore limit the guarantor of the utility model Range is protected, thus it is all according to equivalence changes made by the shape of the utility model, construction and principle, the utility model should all be covered by In protection scope.

Claims (5)

1. a kind of MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator, including barium chloride original fluid container (1), Be characterized in that: the barium chloride original fluid container (1) is sequentially communicated with feed pump (2), preheater (3) by pipeline by pipeline, institute Preheater (3) are stated by being connected at the top of pipeline and downward film evaporator (4), the downward film evaporator (4) passes through pipeline and gas Liquid/gas separator (5) connection, gas-liquid separator (5) top are sequentially communicated by pipeline with vapour compression machine (6), the steam Compressor (6) is connected to by pipeline with downward film evaporator (4), the company with preheater (3) of the downward film evaporator (4) Logical, downward film evaporator (4) bottom at the top of pipeline and first circulation pump (7), downward film evaporator (4) by successively connecting It is logical;It is additionally provided with cyclone (8) between the first circulation pump (7) and downward film evaporator (4), it is logical at the top of the cyclone (8) It is connected at the top of piping and downward film evaporator (4);The vapour compression machine (6) passes through pipeline and downward film evaporator (4) First medium conduit entrance connection, the first medium pipe outlet of the downward film evaporator (4) and the second of preheater (3) are situated between Matter conduit entrance connection;The liquid discharge outlet of the gas-liquid separator (5) passes through the of second circulation pump (9) and preheater (3) Second medium conduit entrance connection.
2. MVR evaporator according to claim 1 replaces the Production of Barium Chloride system of traditional four-effect evaporator, feature exists In: the first medium of the downward film evaporator (4) is steam, and the second medium of the preheater (3) is water.
3. MVR evaporator according to claim 1 replaces the Production of Barium Chloride system of traditional four-effect evaporator, feature exists In: the condensate liquid of the preheater (3) is discharged through condensate liquid discharge nozzle (10), the gas-liquid separator (5) and vacuum pump (11) Connection.
4. MVR evaporator according to claim 3 replaces the Production of Barium Chloride system of traditional four-effect evaporator, feature exists In: surge tank (12), knockout drum (13) are equipped between the gas-liquid separator (5) and vacuum pump (11).
5. MVR evaporator according to claim 4 replaces the Production of Barium Chloride system of traditional four-effect evaporator, feature exists In: packing layer (131) are equipped with inside the knockout drum (13).
CN201821434611.7U 2018-09-03 2018-09-03 MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator Expired - Fee Related CN209286688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821434611.7U CN209286688U (en) 2018-09-03 2018-09-03 MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821434611.7U CN209286688U (en) 2018-09-03 2018-09-03 MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator

Publications (1)

Publication Number Publication Date
CN209286688U true CN209286688U (en) 2019-08-23

Family

ID=67652285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821434611.7U Expired - Fee Related CN209286688U (en) 2018-09-03 2018-09-03 MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator

Country Status (1)

Country Link
CN (1) CN209286688U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110407275A (en) * 2019-08-30 2019-11-05 厦门佳誉华电镀设备有限公司 A kind of evaporation concentration equipment
CN112090096A (en) * 2019-09-18 2020-12-18 上海巨道环保科技有限公司 Sodium sulfide MVR plate type evaporation process
CN114684987A (en) * 2022-02-25 2022-07-01 武汉宏澳绿色能源工程有限责任公司 MVR wastewater treatment device and using method thereof
CN115531898A (en) * 2022-10-10 2022-12-30 扬州永锋工业设备安装有限公司 Environment-friendly energy-saving MVR evaporator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110407275A (en) * 2019-08-30 2019-11-05 厦门佳誉华电镀设备有限公司 A kind of evaporation concentration equipment
CN112090096A (en) * 2019-09-18 2020-12-18 上海巨道环保科技有限公司 Sodium sulfide MVR plate type evaporation process
CN114684987A (en) * 2022-02-25 2022-07-01 武汉宏澳绿色能源工程有限责任公司 MVR wastewater treatment device and using method thereof
CN115531898A (en) * 2022-10-10 2022-12-30 扬州永锋工业设备安装有限公司 Environment-friendly energy-saving MVR evaporator

Similar Documents

Publication Publication Date Title
CN209286688U (en) MVR evaporator replaces the Production of Barium Chloride system of traditional four-effect evaporator
CN104803535B (en) A kind of recovery system and recovery process for reclaiming salt from desulfurization wastewater
CN106379920B (en) Lithium chloride sodium chloride mixed aqueous solution evaporation analysis sodium produces the device and method of pure lithium chloride solution
CN106115804A (en) A kind of for cobaltous sulfate efficient concentration with the apparatus system of continuous crystallisation
CN109096140A (en) Energy-saving dimethyl acetamide rectification and purification Processes and apparatus
CN107789851A (en) A kind of triple effect vacuum vaporation system for improving copper sulphate evaporation efficiency
CN205603247U (en) Rise diaphragm type multiple -effect water distiller
CN108862325A (en) The recovery and treatment method and equipment of sodium chloride-containing and potassium chloride high-salt wastewater
CN109621466A (en) A kind of system and method for new caprolactam water solution evaporation production caprolactam
CN205099538U (en) High concentration contains salt waste water MVR evaporation crystallization process system
TWI547596B (en) Method of concentrating aqueous alkali and apparatus suitable for this purpose
CN106512450B (en) Minimize energy-saving evaporation regenerating unit
CN101837998B (en) Method for evaporating, concentrating and crystallizing solution of aluminum chloride
CN209221515U (en) A kind of lithium chloride evaporation concentration device
CN208097426U (en) A kind of sodium aluminate solution mixing concentration systems
CN107744669A (en) Potassium permanganate is electrolysed feed liquid evaporation concentration system
CN108187352A (en) A kind of sodium aluminate solution mixing concentration systems
CN104524806B (en) A kind of hexamethylenamine complete continuous crystallisation production technology and equipments
CN102020327B (en) Ammonia nitrogen waste water treatment equipment
CN207641007U (en) Potassium permanganate is electrolysed feed liquid evaporation concentration system
CN106587479A (en) Industrial electroplating wastewater zero-discharge treatment equipment and treatment process thereof
CN207805082U (en) A kind of high-efficiency falling film evaporation device equipment
CN106474756A (en) A kind of energy-efficient MVR vaporising device
CN106984193A (en) A kind of Tianna solution dewatering and system
CN208130544U (en) High level salt solution evaporation crystallization equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20210903

CF01 Termination of patent right due to non-payment of annual fee