CN209275494U CN201822139072.0U CN201822139072U CN209275494U CN 209275494 U CN209275494 U CN 209275494U CN 201822139072 U CN201822139072 U CN 201822139072U CN 209275494 U CN209275494 U CN 209275494U
Authority
CN
China
Prior art keywords
fixed
wall
respectively provided
strength steel
limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822139072.0U
Other languages
Chinese (zh)
Inventor
戴海峰
陈雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Ruimakebao Metal Products Co Ltd
Original Assignee
Xuzhou Ruimakebao Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Ruimakebao Metal Products Co Ltd filed Critical Xuzhou Ruimakebao Metal Products Co Ltd
Priority to CN201822139072.0U priority Critical patent/CN209275494U/en
Application granted granted Critical
Publication of CN209275494U publication Critical patent/CN209275494U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the one kind in Hot Galvanizing Technology field to be based on high-strength steel crack resistence hot zinc plating equipment, including fixed top plate, fixed block is respectively provided at left and right sides of the top of the fixed top plate, clamp device is respectively provided at left and right sides of the bottom of the fixed top plate, the inner wall activity grafting steel pipe of the clamp device, the opposing end surface of clamp device described in two groups connected is threadedly coupled fixed bracket, compression bar is arranged in the support bracket fastened outer wall activity, connecting rod is arranged in the top of the compression bar, limited block is arranged in the top of the connecting rod, and limit hole is arranged in the front and back end of limited block, the left and right sides outer wall of the connecting rod is respectively provided with limit plate, the support bracket fastened left and right sides outer wall is respectively provided with and the matched limit telescopic bar of limit plate, the steel pipe of different pore size size can be fixed, uniformly the surface of steel pipe can be applied Pressure guarantees the phenomenon that high-strength steel is not in cracking in following process.

Description

One kind being based on high-strength steel crack resistence hot zinc plating equipment
Technical field
The utility model relates to Hot Galvanizing Technology fields, specially a kind of to be based on high-strength steel crack resistence hot zinc plating equipment.
Background technique
During high-strength steel carries out hot galvanizing, for general high-strength steel after the process for completing hot galvanizing for the first time, needing will be high Intensity, which is taken out, carries out subsequent processing, and the existing device of subsequent processing typically passes through chain or lantern ring directly drives The movement of firm steel during movement or following process, the phenomenon that surface of high-strength steel is easy to appear slight crack or face checking, makes High-strength steel can not further be processed by obtaining, and influence quality and speed.For this purpose, it is proposed that a kind of based on high-strength steel crack resistence heat Galvanizing rig.
Utility model content
The purpose of this utility model is to provide one kind to be based on high-strength steel crack resistence hot zinc plating equipment, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides the following technical solutions: one kind being based on the hot galvanizing of high-strength steel crack resistence Device, including fixed top plate, the top left and right sides of the fixed top plate are respectively provided with fixed block, and the bottom of the fixed top plate is left Right two sides are respectively provided with clamp device, the inner wall activity grafting steel pipe of the clamp device, the phase for the clamp device described in two groups that is connected Fixed bracket is threadedly coupled to end face, compression bar is arranged in the support bracket fastened outer wall activity, and connection is arranged in the top of the compression bar Bar, limited block is arranged in the top of the connecting rod, and limit hole, the left and right sides of the connecting rod is arranged in the front and back end of limited block Outer wall is respectively provided with limit plate, and the support bracket fastened left and right sides outer wall is respectively provided with and the matched limit telescopic bar of limit plate.
Further, the clamp device includes the outer sleeve for being fixed at fixed top plate bottom, the outer sleeve Casing is arranged in outer wall, and the inner cavity activity grafting threaded rod of described sleeve pipe, one end that the threaded rod extends on the inside of outer sleeve is set Set fastening plates.
Further, the fastening plates are set as hemispherical steel plate, and the bottom of steel plate far from one end of outer sleeve inner wall Uniformly bonding Teflon coated glass fiber cloth.
Further, the limit telescopic bar includes the hollow pipe fitting for being fixed at fixed bracket outer wall, hollow pipe fitting Inner cavity activity be arranged limit pull rod, and hollow pipe fitting opening setting with the matched postive stop baffle of limit pull rod.
Further, the compression bar includes the fixed link for being movably arranged on fixed bracket outer wall, and fixed link is close to steel pipe Pressing plate is arranged in one end of outer wall.
Further, two sides outer wall is respectively provided with blind hole to the fixed bracket up and down, and the inner wall of blind hole passes through pin shaft activity Connect compression bar.
Compared with prior art, the utility model has the beneficial effects that the utility model is uniform in the bottom of fixed bottom plate Shin bone device is set, and the threaded rod on clamp device in outer sleeve is being connected through a screw thread rotary motion, can be by different pore size The steel pipe of size is fixed, and fix while can prevent the face checking of steel pipe by the fastening plates on threaded rod, together When the compression bar overturn on fixed bracket is set, can uniformly press to the surface of steel pipe, guarantee high-strength steel subsequent The phenomenon that being not in cracking in processing.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model clamp device structural schematic diagram.
In figure: 1, fixed top plate;2, fixed block;3, clamp device;31, outer sleeve;32, casing;33, threaded rod;34, tight Solid plate;4, steel pipe;5, fixed bracket;6, compression bar;7, connecting rod;8, limited block;9, limit telescopic bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: one kind is filled based on the hot galvanizing of high-strength steel crack resistence It sets, including fixed top plate 1, is respectively provided with fixed block 2 at left and right sides of the top of fixed top plate 1, through-hole is set on fixed block 2, is passed through Fixed block 2 can drive fixed 1 elevating movement of top plate, be respectively provided with clamp device 3 at left and right sides of the bottom of fixed top plate 1, fasten The inner wall activity grafting steel pipe 4 of device 3, the opposing end surface of the two groups of clamp devices 3 that are connected are threadedly coupled fixed bracket 5, fixed branch Compression bar 6 is arranged in the outer wall activity of frame 5, and connecting rod 7 is arranged in the top of compression bar 6, and limited block 8 is arranged in the top of connecting rod 7, and limits Limit hole is arranged in the front and back end of block 8, and the left and right sides outer wall of connecting rod 7 is respectively provided with limit plate, fixes outside the left and right sides of bracket 5 Wall is respectively provided with and the matched limit telescopic bar 9 of limit plate.
As shown in Fig. 2, clamp device 3 includes being fixed at the outer sleeve 31 of fixed 1 bottom of top plate, outer sleeve 31 it is outer Casing 32, the inner cavity activity grafting threaded rod 33 of casing 32 is arranged in wall, and one end that threaded rod 33 extends to 31 inside of outer sleeve is set Set fastening plates 34, by clamp device 3 can the steel pipe 4 to different pore size be fixed;
As shown in Fig. 2, fastening plates 34 are set as hemispherical steel plate, and the bottom of steel plate far from one end of 31 inner wall of outer sleeve Uniformly bonding Teflon coated glass fiber cloth, fastening plates 34 share six groups, can be uniformly to steel by six groups of fastening plates 34 Pipe 4 applies pressure, so that protecting the surface of steel pipe 4 will not cracking;
As shown in Figure 1, limit telescopic bar 9 includes the hollow pipe fitting for being fixed at fixed 5 outer wall of bracket, hollow pipe fitting Limit pull rod, and opening setting and the matched postive stop baffle of limit pull rod of hollow pipe fitting is arranged in inner cavity activity, by flexible Limit pull rod in gag lever post 9 is plugged in limit plate, thus the position of compression column with fixed 6;
As shown in Figure 1, compression bar 6 includes the fixed link for being movably arranged on fixed 5 outer wall of bracket, and fixed link is close to steel pipe 4 Pressing plate is arranged in one end of outer wall, makes to apply pressure to the surface of steel pipe 4 by the pressing plate in compression bar 6, it is strong to reinforce 4 surface of steel pipe Degree;
As shown in Figure 1, fixed about 5 two sides outer wall of bracket is respectively provided with blind hole, and the inner wall of blind hole is connected by pin shaft activity Compression bar 6 is connect, overturns compression bar 6 on fixed bracket 5 by pin shaft, it is convenient that the surface of steel pipe is observed.
Embodiment: the steel pipe after the completion of hot galvanizing is fixed by processing by clamp device 3, passes through the hole of steel pipe first Diameter rotates the threaded rod 33 of bottom in clamp device 3 first, then rotates threaded rod 33 and adjusts the height in outer sleeve 31, so Steel pipe 4 is inserted into outer sleeve 31 afterwards, successively the threaded rod 33 of rotation top is fixed by steel pipe 4, then rotates remaining four groups of spiral shell The surface of steel pipe 4 is fixed in rasp bar 33, then overturns compression bar 6 on fixed bracket 5 by limited block, makes the bottom of compression bar 6 Portion is fitted in the surface of steel pipe 4, then pulls the limit pull rod in flexible gag lever post 9 to be plugged in limit plate, thus by compression bar 6 It is fixed, it can make to hang over drive steel pipe 4 on fixed block 2 by lifting device and move, so that steel pipe 4 be driven to be moved to hot dip In zinc following process equipment.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. one kind is based on high-strength steel crack resistence hot zinc plating equipment, including fixed top plate (1), it is characterised in that: the fixed top plate (1) it is respectively provided with fixed block (2) at left and right sides of top, is respectively provided with clamp device at left and right sides of the bottom of the fixed top plate (1) (3), the inner wall activity grafting steel pipe (4) of the clamp device (3), the opposing end surface spiral shell for the clamp device (3) described in two groups that is connected Line is connected and fixed bracket (5), and compression bar (6) are arranged in the outer wall activity of the fixed bracket (5), the top setting of the compression bar (6) Limited block (8) are arranged in the top of connecting rod (7), the connecting rod (7), and limit hole is arranged in the front and back end of limited block (8), described The left and right sides outer wall of connecting rod (7) is respectively provided with limit plate, and the left and right sides outer wall of the fixed bracket (5) is respectively provided with and limits The matched limit telescopic bar (9) of plate.
2. according to claim 1 a kind of based on high-strength steel crack resistence hot zinc plating equipment, it is characterised in that: the fastening dress Setting (3) includes the outer sleeve (31) for being fixed at fixed top plate (1) bottom, and casing is arranged in the outer wall of the outer sleeve (31) (32), the inner cavity activity grafting threaded rod (33) of described sleeve pipe (32), the threaded rod (33) extend on the inside of outer sleeve (31) One end be arranged fastening plates (34).
3. according to claim 2 a kind of based on high-strength steel crack resistence hot zinc plating equipment, it is characterised in that: the fastening plates (34) one end far from outer sleeve (31) inner wall is set as hemispherical steel plate, and the bottom of steel plate is uniformly bonded Teflon coating glass Glass fiber cloth.
4. according to claim 1 a kind of based on high-strength steel crack resistence hot zinc plating equipment, it is characterised in that: the limit is stretched Contracting bar (9) includes the hollow pipe fitting for being fixed at fixed bracket (5) outer wall, and the inner cavity activity setting limit of hollow pipe fitting is drawn Bar, and opening setting and the matched postive stop baffle of limit pull rod of hollow pipe fitting.
5. according to claim 1 a kind of based on high-strength steel crack resistence hot zinc plating equipment, it is characterised in that: the compression bar It (6) include being movably arranged on the fixed link of fixed bracket (5) outer wall, and pressure is arranged close to one end of steel pipe (4) outer wall in fixed link Plate.
6. according to claim 1 a kind of based on high-strength steel crack resistence hot zinc plating equipment, it is characterised in that: the fixed branch Two sides outer wall is respectively provided with blind hole to frame (5) up and down, and the inner wall of blind hole is flexibly connected compression bar (6) by pin shaft.
CN201822139072.0U 2018-12-20 2018-12-20 One kind being based on high-strength steel crack resistence hot zinc plating equipment Expired - Fee Related CN209275494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822139072.0U CN209275494U (en) 2018-12-20 2018-12-20 One kind being based on high-strength steel crack resistence hot zinc plating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822139072.0U CN209275494U (en) 2018-12-20 2018-12-20 One kind being based on high-strength steel crack resistence hot zinc plating equipment

Publications (1)

Publication Number Publication Date
CN209275494U true CN209275494U (en) 2019-08-20

Family

ID=67611876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822139072.0U Expired - Fee Related CN209275494U (en) 2018-12-20 2018-12-20 One kind being based on high-strength steel crack resistence hot zinc plating equipment

Country Status (1)

Country Link
CN (1) CN209275494U (en)

Similar Documents

Publication Publication Date Title
CN206032656U (en) Building clamp
CN108050787A (en) A kind of timber drying device and furnace drying method
CN209275494U (en) One kind being based on high-strength steel crack resistence hot zinc plating equipment
CN209222448U (en) A kind of fixed device of hardware spray painting convenient to use
CN209362828U (en) A kind of television enclosure paint line
CN104526224B (en) Coach front surrounding assembly assembling-welding fixtures and use it to carry out the technique of front wall assembly welding equipment
CN208762600U (en) A kind of new automobile hex bolts galvanizing equipment
CN208824831U (en) A kind of robot automatic glue spreading device
CN205368136U (en) Optical fiber perform clamping device
CN109850060A (en) The installation method of straight subsection profile in a kind of shipbuilding
CN105448427B (en) A kind of enamel-cover line winding device
CN110714103B (en) Leather repair equipment based on composite microfiber direct coating technology
CN208239282U (en) A kind of fixed device of wooden barrel manufacturing
CN207495746U (en) A kind of excessive glaze remove device
CN207806245U (en) One kind being based on hardware stamping part apparent visual verifying attachment
CN209384697U (en) A kind of fixed device of building cracks reparation
CN208929443U (en) A kind of pulse hot pressing welding machine
CN208513891U (en) A kind of welder for elevator production
CN207579160U (en) A kind of squeezer
CN207805887U (en) A kind of modified copper wire lamp automatic gum coater
CN207276769U (en) A kind of equipment of blind hole plating
CN218452939U (en) Hydraulic prop dismounting and repairing machine
CN210411393U (en) Multifunctional plaster hot-melt adhesive machine
CN209362802U (en) Automatic spray apparatus is used in a kind of production of security protection components
CN209157627U (en) The high-strength thin-walled metal composite pipe socket joint Quick Connect Kit of PHP

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820