CN209273950U - Plastic tube production system - Google Patents

Plastic tube production system Download PDF

Info

Publication number
CN209273950U
CN209273950U CN201822125237.9U CN201822125237U CN209273950U CN 209273950 U CN209273950 U CN 209273950U CN 201822125237 U CN201822125237 U CN 201822125237U CN 209273950 U CN209273950 U CN 209273950U
Authority
CN
China
Prior art keywords
groups
plastic tube
isolated area
production system
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822125237.9U
Other languages
Chinese (zh)
Inventor
蒋祖新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Xin Fluorine Material Technology Co Ltd
Original Assignee
Hefei Xin Fluorine Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Xin Fluorine Material Technology Co Ltd filed Critical Hefei Xin Fluorine Material Technology Co Ltd
Priority to CN201822125237.9U priority Critical patent/CN209273950U/en
Application granted granted Critical
Publication of CN209273950U publication Critical patent/CN209273950U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)

Abstract

The utility model discloses plastic tube production system, including blow moulding machine, molding cooling device and dragger, the blow moulding machine, molding cooling device and dragger are arranged successively;The utility model is not only simple in structure, the plastic tube of blow molding can be rapidly cooled, cooling time is short, good cooling results, while being adsorbed by vacuum adsorption machine, so that plastic tube is close to inboard wall of tube body, it is cooling to can speed up plastic conduit, it can also guarantee the dimensional accuracy of plastic tube, while the plastic tube after cooling and shaping is drawn by dragger, can be avoided the damage of plastic tube.

Description

Plastic tube production system
Technical field
The utility model relates to plastic tube production fields, and in particular to plastic tube production system.
Background technique
Plastic tube can be molded, squeeze out, being molded, being blow molded, thermoforming, printing, bonding, coating and machining.Blow molding is a kind of Most commonly seen plastics pipe production method.
Traditional plastic tube is typically all to be produced using blow molding, also referred to as hollow blow molding, a kind of modeling quickly grown Expect processing method.Blow molding process during World War II, starts for producing low density polyethylene (LDPE) bottle.After the fifties Phase, with the birth of high density polyethylene (HDPE) and the development of blow molding machine, blow molding technology is widely applied.Hollow container Volume has used computer control up to thousands of liters, some production.Plastics suitable for blow molding have polyethylene, polyvinyl chloride, Polypropylene, polyester etc., the hollow container of gained are widely used as industrial packaging container.According to parison production method, blow molding can be divided into Extrusion-blown modling and injection-blow molding, what new development was got up has multilayer blow moulding and stretch-blow.
Traditional plastic tube production system be typically all be blow molded by blow moulding machine after be cooled and shaped in mold, then into Row winding, due to the limitation of mold, cooling time is longer, causes the production efficiency of plastic tube lower, and during cooling It due to the presence of plastic tube internal stress itself, may cause a deviation to the size of plastic tube, while the winding of plastic tube is general All it is directly to be wound using winder, is easy to impact the quality of plastic tube.
Utility model content
The purpose of the utility model is to overcome the above-mentioned problems in the prior art, provide plastic tube production system, It is not only simple in structure, the plastic tube of blow molding can be rapidly cooled, cooling time is short, good cooling results, leads to simultaneously It crosses vacuum adsorption machine to be adsorbed, plastic tube is made to be close to inboard wall of tube body, it is cooling to can speed up plastic conduit, it can also be ensured that plastics The dimensional accuracy of pipe, while the plastic tube after cooling and shaping is drawn by dragger, it can be avoided the damage of plastic tube.
To realize above-mentioned technical purpose and the technique effect, the utility model is achieved through the following technical solutions:
Plastic tube production system, including blow moulding machine, molding cooling device and dragger, the blow moulding machine, the cooling dress of molding It sets and is arranged successively with dragger;
The molding cooling device includes rack, the frame top be equipped with tank, the tank left part be equipped at Pattern tool, the molding die top are equipped with hole in four groups of connections, and lower part is equipped with four groups of connection lower opening, the tank front end face Equipped with upper seal casinghousing and lower seal casinghousing, the upper seal casinghousing right end is connected by main tracheae with vacuum adsorption machine, institute It states lower seal casinghousing right end to be connected by water main with external water source, the flood trench bottom passes through first row water pipe and water tank It is connected, at least provided with four groups of hollow upper connecting bases on the upper seal casinghousing, wherein two groups of four upper connecting bases and centre Hole is connected to by tracheae and is provided with control valve with intermediate two groups of connection lower opening in connection, and hole passes through water pipe in the connection of two groups of both ends It is connected with tank, at least provided with two groups of hollow lower connecting bases, the company of lower connecting base and both ends on the lower seal casinghousing Lower opening is connect to be connected to by water pipe and be provided with control valve.
Further, the molding die includes tube body and shell, and five groups of isolation seats are arranged at intervals on the tube body, In isolation seat described in two groups be respectively arranged on the both ends of tube body, be provided with groove on isolation seat described in five groups, be equipped in the groove Sealing ring, the sealing ring and outer casing inner wall are in sealing contact, four groups of isolated areas will be separated between shell and tube body, described in four groups Isolated area is followed successively by the first isolated area, the second isolated area, third isolated area and the 4th isolated area along axial direction, the tube body corresponding the Two isolated areas and third isolated area are provided with adsorption hole, and the adsorption hole includes the duct of several scattering devices.
Further, the upper hole of connection described in four groups and connection lower opening respectively correspond the first isolated area, the second isolated area, third Isolated area and the 4th isolated area.
Further, the dragger includes two groups of conveyer belts.
Further, plastic tube passes through between conveyer belt described in two groups.
The income effect of the utility model is:
The utility model is not only simple in structure, and can be rapidly cooled to the plastic tube of blow molding, and cooling time is short, Good cooling results, while being adsorbed by vacuum adsorption machine, so that plastic tube is close to inboard wall of tube body, it is cold to can speed up plastic conduit But, it can also be ensured that the dimensional accuracy of plastic tube, while the plastic tube after cooling and shaping is drawn by dragger, it can Avoid the damage of plastic tube.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention, For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings Other attached drawings.
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is that the utility model forms cooling device structural schematic diagram;
Fig. 3 is the utility model forming die structure schematic diagram.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts All other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model is plastic tube production system, including blow moulding machine 1, molding and are led cooling device 2 Draw machine 3, blow moulding machine 1, molding cooling device 2 and dragger 3 are arranged successively;
Forming cooling device 2 includes rack 201, is equipped with tank 203 at the top of rack 201,203 left part of tank be equipped at Pattern tool 207,207 top of molding die are equipped with hole 2072 in four groups of connections, and lower part is equipped with four groups of connection lower opening 2078, tank 203 front end faces are equipped with upper seal casinghousing 204 and lower seal casinghousing 2010, and upper 204 right end of seal casinghousing is by main tracheae 209 and very Suction random 208 is connected, and lower 2010 right end of seal casinghousing is connected by water main 2011 with external water source, tank 203 Bottom is connected by the first drainpipe 202 with water tank 2012, at least provided with four groups of hollow upper connections on upper seal casinghousing 204 Seat 2013, wherein hole 2072 and intermediate two groups of connection lower opening 2078 pass through gas in four upper connecting bases 2013 and intermediate two groups of connections Pipe 206, which is connected to, is simultaneously provided with control valve, and hole 2072 is connected by water pipe 205 with tank 203 in the connection of two groups of both ends, under it is close At least provided with two groups of hollow lower connecting bases 2014 on capsule body 2010, lower connecting base 2014 and the connection lower opening 2078 at both ends are logical Water pipe 205 is crossed to be connected to and be provided with control valve.
Wherein, molding die 207 includes tube body 20712 and shell 2071, is arranged at intervals with five groups of isolation on tube body 20712 Seat 2076, wherein two groups of isolation seats 2076 are respectively arranged on the both ends of tube body 20712, is provided with groove on five groups of isolation seats 2076 2075, groove 2075 is interior to be equipped with sealing ring 2074, and sealing ring 2074 and 2071 inner wall of shell are in sealing contact, by shell 2071 and pipe Four groups of isolated areas are separated between body 20712, four groups of isolated areas are followed successively by the first isolated area 2077, the second isolated area along axial direction 2079, third isolated area 20710 and the 4th isolated area 20711, corresponding second isolated area 2079 of tube body 20712 and third isolated area 20710 are provided with adsorption hole 2073, and adsorption hole 2073 includes the duct of several scattering devices.
Wherein, hole 2072 and connection lower opening 2078 respectively correspond the first isolated area 2077, the second isolated area in four groups of connections 2079, third isolated area 20710 and the 4th isolated area 20711.
Wherein, dragger 3 includes two groups of conveyer belts 301.
Wherein, plastic tube 4 passes through between two groups of conveyer belts 301.
One concrete application of the present embodiment are as follows: in use, preliminary molding plastic tube 4 is sent into shaping mould by blow moulding machine 1 In tool 207, cooling water enters the first isolated area 2077 and the 4th isolated area 20711 by water pipe 205, in pipeline 20712 Plastic tube 4 is cooled down, while vacuum adsorption machine 208 passes through tracheae 206 to the second isolated area 2079 and third isolated area 20710 Vacuum suction is carried out, plastic tube 4 is made to be close to 20712 inner wall of pipeline, cooling velocity is fast, while can guarantee the size essence of plastic tube Degree, plastic tube 4 pass through tank 203 and are drawn by dragger 3, can prevent from winding between plastic tube.
To sum up, the utility model is not only simple in structure, and can be rapidly cooled to the plastic tube of blow molding, when cooling Between short, good cooling results, while being adsorbed by vacuum adsorption machine, so that plastic tube is close to inboard wall of tube body, can speed up plastics Tube-cooled, it can also be ensured that the dimensional accuracy of plastic tube, while the plastic tube after cooling and shaping is led by dragger Draw, can be avoided the damage of plastic tube.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Specific features described in conjunction with this embodiment or example, structure, material live feature be contained in the utility model at least one In embodiment or example.In the present specification, schematic expression of the above terms be not necessarily referring to identical embodiment or Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiment or examples In can be combined in any suitable manner.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. plastic tube production system, it is characterised in that: described including blow moulding machine (1), molding cooling device (2) and dragger (3) Blow moulding machine (1), molding cooling device (2) and dragger (3) are arranged successively;
The molding cooling device (2) includes rack (201), is equipped with tank (203) at the top of the rack (201), described big Sink (203) left part is equipped with molding die (207), and molding die (207) top is equipped with hole (2072) in four groups of connections, under Portion is equipped with four groups of connection lower opening (2078), and tank (203) front end face is equipped with upper seal casinghousing (204) and lower seal casinghousing (2010), upper seal casinghousing (204) right end is connected by main tracheae (209) with vacuum adsorption machine (208), close under described Capsule body (2010) right end is connected by water main (2011) with external water source, and tank (203) bottom passes through first Drainpipe (202) is connected with water tank (2012), at least provided with four groups of hollow upper connecting bases on the upper seal casinghousing (204) (2013), wherein four upper connecting bases (2013) and hole (2072) in intermediate two groups of connections and intermediate two groups of connection lower opening (2078) It is connected to by tracheae (206) and is provided with control valve, hole (2072) pass through water pipe (205) and tank in the connection of two groups of both ends (203) it is connected, at least provided with two groups of hollow lower connecting bases (2014), lower connecting base on the lower seal casinghousing (2010) (2014) it is connected to the connection lower opening (2078) at both ends by water pipe (205) and is provided with control valve.
2. plastic tube production system according to claim 1, it is characterised in that: the molding die (207) includes tube body (20712) and shell (2071) five groups of isolation seats (2076), are arranged at intervals on the tube body (20712), wherein described in two groups Isolation seat (2076) is respectively arranged on the both ends of tube body (20712), and groove (2075) are provided on isolation seat described in five groups (2076), Sealing ring (2074) are equipped in the groove (2075), the sealing ring (2074) and shell (2071) inner wall are in sealing contact, will Be separated into four groups of isolated areas between shell (2071) and tube body (20712), isolated area described in four groups along axial direction be followed successively by first every From area (2077), the second isolated area (2079), third isolated area (20710) and the 4th isolated area (20711), the tube body (20712) corresponding second isolated area (2079) and third isolated area (20710) are provided with adsorption hole (2073), the adsorption hole (2073) include several scattering devices duct.
3. plastic tube production system according to claim 2, it is characterised in that: connect upper hole (2072) described in four groups and connect It connects lower opening (2078) and respectively corresponds the first isolated area (2077), the second isolated area (2079), third isolated area (20710) and the 4th Isolated area (20711).
4. plastic tube production system according to claim 1, it is characterised in that: the dragger (3) includes two groups of transmission Band (301).
5. plastic tube production system according to claim 4, it is characterised in that: conveyer belt described in two groups has between (301) Plastic tube (4) passes through.
CN201822125237.9U 2018-12-18 2018-12-18 Plastic tube production system Expired - Fee Related CN209273950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822125237.9U CN209273950U (en) 2018-12-18 2018-12-18 Plastic tube production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822125237.9U CN209273950U (en) 2018-12-18 2018-12-18 Plastic tube production system

Publications (1)

Publication Number Publication Date
CN209273950U true CN209273950U (en) 2019-08-20

Family

ID=67611680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822125237.9U Expired - Fee Related CN209273950U (en) 2018-12-18 2018-12-18 Plastic tube production system

Country Status (1)

Country Link
CN (1) CN209273950U (en)

Similar Documents

Publication Publication Date Title
CN208962446U (en) A kind of blow moulding machine quickly cooling mold
CA2400574A1 (en) Synthetic resin preform to be biaxially stretched and blow molded into a bottle
JP6494984B2 (en) Preforms and containers for biaxial stretch blow molding
CN100402383C (en) Blow molded product
CN102497971A (en) Method for producing an item made of thermoplastic plastic
CN210190546U (en) Filter device of blowing system of blow molding machine
CN101966748B (en) Mould device, equipment and method for producing plastic container
CN209273950U (en) Plastic tube production system
JP2010188711A (en) Method for manufacturing bottomed cylindrical container
CN209320284U (en) Forming plastic pipe mold
CN107214931B (en) Vessel port production method
CN204054594U (en) One is exempted to vacuumize plastic tube extrusion mould
CN210634105U (en) Air conditioner air duct forming die
CN209395235U (en) Forming plastic pipe cooling device
CN206030519U (en) Bottle blowing machine bottleneck cutting molding system smoke emission device
CN206703493U (en) A kind of plastic beverage bottle blow molding apparatus
CN207549396U (en) A kind of PE double-wall corrugated pipes and process equipment
CN205202125U (en) Oilcan blowing mould
CN207657162U (en) A kind of Multi-layer blown film molding die
CN107825685A (en) A kind of PE double-wall corrugated pipes and process equipment
CN205075320U (en) Pesticide bottle blowing mould
CN206765340U (en) A kind of muffler for being directed to blow moulding machine
CN206030521U (en) Bottle blowing machine bottleneck auxiliary cooling device
CN204275213U (en) Be in charge of in breathing and be in charge of production equipment in breathing
CN215151739U (en) Bottle blowing mold with adjustable mold cavity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

Termination date: 20211218