CN209267084U - It is a kind of to facilitate fixed bus duct side plate - Google Patents

It is a kind of to facilitate fixed bus duct side plate Download PDF

Info

Publication number
CN209267084U
CN209267084U CN201821693838.3U CN201821693838U CN209267084U CN 209267084 U CN209267084 U CN 209267084U CN 201821693838 U CN201821693838 U CN 201821693838U CN 209267084 U CN209267084 U CN 209267084U
Authority
CN
China
Prior art keywords
wall
fixed
side plate
block
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821693838.3U
Other languages
Chinese (zh)
Inventor
张轶
戚少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU QUANHUI ELECTRICAL APPLIANCE Co Ltd
Original Assignee
JIANGSU QUANHUI ELECTRICAL APPLIANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU QUANHUI ELECTRICAL APPLIANCE Co Ltd filed Critical JIANGSU QUANHUI ELECTRICAL APPLIANCE Co Ltd
Priority to CN201821693838.3U priority Critical patent/CN209267084U/en
Application granted granted Critical
Publication of CN209267084U publication Critical patent/CN209267084U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

Facilitate fixed bus duct side plate the utility model discloses a kind of, including side plate body and fixed block, the outer wall of the fixed block right side is fixedly connected with fixed link, the fixed link is fixedly connected with link block far from the one side of fixed block, the outer wall of the side plate body right side offers fixing groove, the outer wall of the link block is flexibly connected with the inner wall of fixing groove, and the outer wall of the link block left side is connected with supporting plate.This facilitates fixed bus duct side plate by the way that crushing block is arranged in one end of pull rod, it can be when link block be inserted into fixing groove, two pieces of effective link blocks of crushing block are fixed, make connection stable between side plate body and fixed block, it is effective to simplify operating procedure cumbersome when busbar side board installation is fixed, shorten bus duct and regular time is installed, speed operations the operating efficiency of personnel, manpower financial capacity has been saved, has promoted device preferably, bigger economic benefit is created for enterprise.

Description

It is a kind of to facilitate fixed bus duct side plate
Technical field
The utility model relates to bus duct technical fields, specially a kind of to facilitate fixed bus duct side plate.
Background technique
As modernization project facility is emerged in large numbers with what is equipped, the fast increasing of the electricity consumption of all trades and professions, the need of various building electric power Want, and it is this need increased trend year by year, using original circuit wiring pattern, i.e. poling mode, when construction, is brought Many difficulties, moreover, when distribution system to be changed, to make its become simple it is some be nearly impossible, however, if using If bus duct, be very easy to can achieve the goal, in addition also building can be made to become more beautiful, bus duct, be by copper, A kind of closed metal device that aluminium busbar column is constituted is used to distribute relatively high power for each element of decentralized system.It is low indoors More and more instead of wire and cable in the power Transmission trunk project project of pressure, existing majority bus duct installation is fixed When complex for operation step, time-consuming and laborious, waste of manpower financial resources.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provide it is a kind of facilitate fixed bus duct side plate, solve Existing majority bus duct installation problem complex for operation step when fixing.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: it is a kind of to facilitate fixed bus duct side plate, Including side plate body and fixed block, the outer wall of the fixed block right side is fixedly connected with fixed link, and the fixed link is far from solid The one side for determining block is fixedly connected with link block, and the outer wall of the side plate body right side offers fixing groove, the link block Outer wall be flexibly connected with the inner wall of fixing groove, the outer wall of the link block left side is connected with supporting plate, the fixation The inside of slot is fixedly connected with the first buffer spring, and one end of first buffer spring is fixedly connected with the outer wall of supporting plate, The other end of first buffer spring is fixedly connected with the inner wall of fixing groove, and the upper and lower surfaces of the side plate body are equal Through-hole is offered, one end of the through-hole is connected with the inside of fixing groove, and the inside of the through-hole is fixedly connected with limited block, The outer wall of the limited block offers through slot, and the internal activity of the through-hole is connected with pull rod, the outer wall and through slot of the pull rod Inner wall be flexibly connected, one end of the pull rod extends to the outside of side plate body, and one end of the pull rod is fixedly connected with handle Hand, the other end of the pull rod are fixedly connected with crushing block, and the outer wall of the crushing block is flexibly connected with the outer wall of link block, institute The external activity for stating pull rod is connected with limit spring, and one end of the limit spring is fixedly connected with the outer wall of fixed block, described The other end of limit spring is fixedly connected with the outer wall of crushing block, and undercut, the side plate are offered on the inside of the side plate body The inside of ontology is hinged with fixed plate by articulated shaft, and the outer wall of the fixed plate is fixedly connected with rubber sheet gasket, the rubber The outer wall of gasket is flexibly connected with the outer wall of fixed block, and the inside of the undercut is fixedly connected with the second buffer spring, and described One end of two buffer springs is fixedly connected with the inner wall of undercut, and the other end of second buffer spring and the outer wall of fixed plate are solid Fixed connection.
Preferably, the quantity of first buffer spring be even numbers, and the first buffer spring described in every two be one group simultaneously It is symmetrical arranged by symmetry axis of the center line of fixing groove.
Preferably, the shape of facing of the crushing block is triangle.
Preferably, the outer wall of the handle offers non-slip groove.
Preferably, the quantity of the undercut be two, and two undercuts with the center line of side plate body be symmetrical axial symmetry It opens up.
Preferably, outer wall of the outer wall of the rubber sheet gasket opposite face with fixed block away from face is flexibly connected.
(3) beneficial effect
The utility model provide it is a kind of facilitate fixed bus duct side plate, have following the utility model has the advantages that this is practical new Type can keep two pieces of crushing blocks effective by the way that crushing block is arranged in one end of pull rod when link block to be inserted into fixing groove Link block is fixed, and makes connection stable between side plate body and fixed block, effective to simplify busbar side board installation fixation When cumbersome operating procedure, shorten bus duct and regular time be installed, the operating efficiency for the personnel that speed operations has saved manpower wealth Power promotes device preferably, and bigger economic benefit is created for enterprise.
Detailed description of the invention
Fig. 1 is the utility model front view;
Fig. 2 is enlarged drawing at A in the utility model Fig. 1;
Fig. 3 is the utility model through-hole enlarged drawing.
In figure: 1 side plate body, 2 fixed blocks, 3 fixed links, 4 link blocks, 5 fixing grooves, 6 supporting plates, 7 first buffer springs, 8 through-holes, 9 limited blocks, 10 through slots, 11 pull rods, 12 handles, 13 crushing blocks, 14 limit springs, 15 undercuts, 16 fixed plates, 17 rubber Gasket, 18 second buffer springs.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of to facilitate fixed bus duct side plate, packet Side plate body 1 and fixed block 2 are included, the outer wall of 2 right side of fixed block is fixedly connected with fixed link 3, and fixed link 3 is far from fixed block 2 One side be fixedly connected with link block 4, the outer wall of 1 right side of side plate body offers fixing groove 5, the outer wall of link block 4 with The inner wall of fixing groove 5 is flexibly connected, and the outer wall of 4 left side of link block is connected with supporting plate 6, and the inside of fixing groove 5 is fixed Be connected with the first buffer spring 7, the quantity of the first buffer spring 7 is even numbers, and the first buffer spring of every two 7 be one group and with The center line of fixing groove 5 is symmetrical arranged for symmetry axis, more stable can be supported fixation to supporting plate 6, make supporting plate 6 Link block 4 after fixation is squeezed, make to connect between link block 4 and crushing block 13 is more close, makes device more Stablize, one end of the first buffer spring 7 is fixedly connected with the outer wall of supporting plate 6, the other end and fixing groove of the first buffer spring 7 5 inner wall is fixedly connected, and the upper and lower surfaces of side plate body 1 offer through-hole 8, one end and the fixing groove 5 of through-hole 8 Inside is connected, and the inside of through-hole 8 is fixedly connected with limited block 9, can be effectively to limit spring by the way that limited block 9 is arranged 14 are fixed, and crushing block 13 is avoided to fall off from the inside of through-hole 8, keep device more stable, and the outer wall of limited block 9 offers Through slot 10, the internal activity of through-hole 8 are connected with pull rod 11, and the outer wall of pull rod 11 is flexibly connected with the inner wall of through slot 10, pull rod 11 One end extend to the outside of side plate body 1, one end of pull rod 11 is fixedly connected with handle 12, and the outer wall of handle 12 offers anti- Sliding slot can effectively increase rubbing between 12 outer wall of handle and operator by opening up non-slip groove in the outer wall of handle 12 Power is wiped, keeps operator more convenient and pull rod 11 is operated, the other end of pull rod 11 is fixedly connected with crushing block 13, squeezes The outer wall of briquetting 13 is flexibly connected with the outer wall of link block 4, and the shape of facing of crushing block 13 is triangle, can be in link block 4 When being inserted into fixing groove 5, two crushing blocks 13 make link block 4 is easier to be put into fixing groove 5, by drawing backwards to moving Crushing block 13 is arranged in one end of bar 11, two pieces of crushing blocks 13 can be made effectively to connect when link block 4 to be inserted into fixing groove 5 It connects block 4 to be fixed, makes connection stable between side plate body 1 and fixed block 2, the external activity of pull rod 11 is connected with limit bullet One end of spring 14, limit spring 14 is fixedly connected with the outer wall of fixed block 2, the other end of limit spring 14 and crushing block 13 it is outer Wall is fixedly connected, and the inside of side plate body 1 offers undercut 15, and the quantity of undercut 15 is two, and two undercuts 15 are with side plate The center line of ontology 1 is that symmetrical axial symmetry opens up, can by opening up two symmetrical undercuts 15 in the inside of side plate body 1 Effectively the upper and lower surfaces of fixed block 2 are fixed, make to connect between side plate body 1 and link block 4 more firm Gu the inside of side plate body 1 is hinged with fixed plate 16 by articulated shaft, the outer wall of fixed plate 16 is fixedly connected with rubber sheet gasket 17, the outer wall of rubber sheet gasket 17 is flexibly connected with the outer wall of fixed block 2, and the outer wall and fixed block 2 of 17 opposite face of rubber sheet gasket are carried on the back Outer wall from face is flexibly connected, can be effectively to fixed block by the way that two rubber sheet gaskets 17 are arranged away from face in fixed block 2 2 are fixed, and make to connect between side plate body 1 and fixed block 2 more stable, and the inside of undercut 15 is fixedly connected with second One end of buffer spring 18, the second buffer spring 18 is fixedly connected with the inner wall of undercut 15, the other end of the second buffer spring 18 It is fixedly connected with the outer wall of fixed plate 16, it is effective to simplify operating procedure cumbersome when busbar side board installation is fixed, shorten female Wire casing installs regular time, and the operating efficiency for the personnel that speed operations has saved manpower financial capacity, pushed away device preferably Extensively, bigger economic benefit is created for enterprise.
In conclusion the utility model is matched by setting fixing groove 5, crushing block 13 and rubber sheet gasket 17, when use Side plate body 1 is fastened to fixed block 2, the upper and lower surfaces of fixed block 2 squeeze rubber cushion blocks 17, and rubber sheet gasket 17 is opposite Outer wall of the outer wall in face with fixed block 2 away from face is flexibly connected, by the way that two rubber sheet gaskets are arranged away from face in fixed block 2 17, so that rubber sheet gasket 17 is carried out extruding fixation to fixed block 2 under the action of the second buffer spring 18, makes side plate body 1 and consolidate Determine to connect between block 2 more stable, link block 4 protrudes into fixing groove 5, when link block 4 and crushing block 13 contact, squeezes The shape of facing of block 13 is triangle, can be when link block 4 is inserted into fixing groove 5, and two crushing blocks 13 are limited backwards to moving 14 forced compression of spring, make crushing block 13 enter through-hole 8 in, what link block 4 can be easier is put into fixing groove 5, continue by Side plate body 1 is pressed, supporting plate 6 is moved to the left, 7 forced compression of the first buffer spring, outer wall and extruding when 4 right side of link block When the outer wall flush of 13 left side of block, the rebound of limit spring 14 moves toward one another crushing block 13, outside 13 left side of crushing block Wall is connect with the outer wall of 4 right side of link block, two pieces of crushing blocks 13 can be kept effective when link block 4 to be inserted into fixing groove 5 Link block 4 be fixed, make connection stable between side plate body 1 and fixed block 2, while the first buffer spring 7 is sprung back, and is pushed away To the external mobile of fixing groove 5, the link block 4 after making 6 pairs of fixations of supporting plate squeezes dynamic supporting plate 6, makes link block 4 and squeezes What is connected between briquetting 13 is more close, keeps device more stable, and effective simplified busbar side board installation is cumbersome when fixing Operating procedure, shorten bus duct and regular time be installed, the operating efficiency for the personnel that speed operations saved manpower financial capacity, made Device is preferably promoted, and bigger economic benefit is created for enterprise.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of facilitate fixed bus duct side plate, including side plate body (1) and fixed block (2), it is characterised in that: described solid The outer wall for determining block (2) right side is fixedly connected with fixed link (3), and the fixed link (3) is fixed far from the one side of fixed block (2) It is connected with link block (4), the outer wall of side plate body (1) right side offers fixing groove (5), outside the link block (4) Wall is flexibly connected with the inner wall of fixing groove (5), and the outer wall of link block (4) left side is connected with supporting plate (6), described The inside of fixing groove (5) is fixedly connected with the first buffer spring (7), one end and supporting plate (6) of first buffer spring (7) Outer wall be fixedly connected, the other end of first buffer spring (7) is fixedly connected with the inner wall of fixing groove (5), the side plate The upper and lower surfaces of ontology (1) offer through-hole (8), and one end of the through-hole (8) is connected with the inside of fixing groove (5) Logical, the inside of the through-hole (8) is fixedly connected with limited block (9), and the outer wall of the limited block (9) offers through slot (10), institute The internal activity for stating through-hole (8) is connected with pull rod (11), and the outer wall of the pull rod (11) is flexibly connected with the inner wall of through slot (10), One end of the pull rod (11) extends to the outside of side plate body (1), and one end of the pull rod (11) is fixedly connected with handle (12), the other end of the pull rod (11) is fixedly connected with crushing block (13), the outer wall of the crushing block (13) and link block (4) Outer wall be flexibly connected, the external activity of the pull rod (11) is connected with limit spring (14), the one of the limit spring (14) End is fixedly connected with the outer wall of fixed block (2), the other end of the limit spring (14) and the fixed company of the outer wall of crushing block (13) It connects, is offered undercut (15) on the inside of the side plate body (1), the inside of the side plate body (1) is hinged with by articulated shaft The outer wall of fixed plate (16), the fixed plate (16) is fixedly connected with rubber sheet gasket (17), the outer wall of the rubber sheet gasket (17) It being flexibly connected with the outer wall of fixed block (2), the inside of the undercut (15) is fixedly connected with the second buffer spring (18), and described One end of two buffer springs (18) is fixedly connected with the inner wall of undercut (15), the other end of second buffer spring (18) and solid The outer wall of fixed board (16) is fixedly connected.
A kind of facilitate fixed bus duct side plate 2. according to claim 1, it is characterised in that: first buffering elastic The quantity of spring (7) is even numbers, and the first buffer spring (7) described in every two is one group and is pair with the center line of fixing groove (5) Claim axial symmetry setting.
A kind of facilitate fixed bus duct side plate 3. according to claim 1, it is characterised in that: the crushing block (13) Face shape be triangle.
A kind of facilitate fixed bus duct side plate 4. according to claim 1, it is characterised in that: the handle (12) Outer wall offers non-slip groove.
A kind of facilitate fixed bus duct side plate 5. according to claim 1, it is characterised in that: the undercut (15) Quantity is two, and two undercuts (15) are that symmetrical axial symmetry opens up with the center line of side plate body (1).
A kind of facilitate fixed bus duct side plate 6. according to claim 1, it is characterised in that: the rubber sheet gasket (17) outer wall of the outer wall of opposite face with fixed block (2) away from face is flexibly connected.
CN201821693838.3U 2018-10-19 2018-10-19 It is a kind of to facilitate fixed bus duct side plate Expired - Fee Related CN209267084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821693838.3U CN209267084U (en) 2018-10-19 2018-10-19 It is a kind of to facilitate fixed bus duct side plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821693838.3U CN209267084U (en) 2018-10-19 2018-10-19 It is a kind of to facilitate fixed bus duct side plate

Publications (1)

Publication Number Publication Date
CN209267084U true CN209267084U (en) 2019-08-16

Family

ID=67558613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821693838.3U Expired - Fee Related CN209267084U (en) 2018-10-19 2018-10-19 It is a kind of to facilitate fixed bus duct side plate

Country Status (1)

Country Link
CN (1) CN209267084U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111957446A (en) * 2020-06-19 2020-11-20 甘肃普罗生物科技有限公司 Mill is with centrifugal cleaner of high-efficient quickly separating impurity
CN112003214A (en) * 2020-08-26 2020-11-27 江苏中顺电气有限公司 Bus duct convenient to be matched with jack box
CN112326331A (en) * 2020-10-28 2021-02-05 王俭 Thin-layer sediment sampler

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111957446A (en) * 2020-06-19 2020-11-20 甘肃普罗生物科技有限公司 Mill is with centrifugal cleaner of high-efficient quickly separating impurity
CN112003214A (en) * 2020-08-26 2020-11-27 江苏中顺电气有限公司 Bus duct convenient to be matched with jack box
CN112003214B (en) * 2020-08-26 2021-12-03 江苏中天电气有限公司 Bus duct convenient to be matched with jack box
CN112326331A (en) * 2020-10-28 2021-02-05 王俭 Thin-layer sediment sampler

Similar Documents

Publication Publication Date Title
CN209267084U (en) It is a kind of to facilitate fixed bus duct side plate
CN209164257U (en) A kind of fixedly connected part for bracket
CN108612716A (en) A kind of fixing device of fixtures for painting
CN209641859U (en) A kind of termination of electrical engineering
CN208637735U (en) A kind of cable connector
CN205454235U (en) Aluminium system concatenation circuit board
CN209184189U (en) A kind of split type bus duct of against shock
CN207318529U (en) One kind is easily installed and the preferable dynamometer instrument of stability
CN209267083U (en) A kind of high leakproofness bus duct
CN209119762U (en) It is a kind of convenient for fixed bus duct
CN207720590U (en) A kind of fixed structure of power module
CN209329610U (en) A kind of easy-to-dismount cable testing bridge
CN208624011U (en) A kind of Suspensible all-purpose card device housings
CN208507127U (en) A kind of fast assembling disassembling structure on LED display cabinet
CN109862722A (en) A kind of plain type combined computer cabinet
CN212763388U (en) Extension device of wire processing machine
CN213460988U (en) Electric wire installation fixed knot constructs
CN219914119U (en) Titanium coil pipe convenient to installation
CN214423546U (en) High-strength grating plate
CN217569559U (en) Graphite spherical classifier impeller structure
CN210985010U (en) Conductor row for bus duct
CN218091768U (en) Detachable decoration panel mounting structure
CN210112490U (en) Modular embedded unit board card
CN209836772U (en) Variable landing stage
CN214845466U (en) High-voltage electrified display convenient to overhaul

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20211019