CN209261919U - Anti-seismic support and hanger for fan - Google Patents
Anti-seismic support and hanger for fan Download PDFInfo
- Publication number
- CN209261919U CN209261919U CN201822241770.1U CN201822241770U CN209261919U CN 209261919 U CN209261919 U CN 209261919U CN 201822241770 U CN201822241770 U CN 201822241770U CN 209261919 U CN209261919 U CN 209261919U
- Authority
- CN
- China
- Prior art keywords
- connecting piece
- fan
- hanger
- connecting rod
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000006096 absorbing agent Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
本实用新型提供了一种风机抗震支吊架,涉及建筑机电吊架技术领域。一种风机抗震支吊架,包括本体。体包括平行设置的第一横梁和第二横梁。第一横梁和第二横梁之间设有两个间隔设置的安装件,两个安装件的两端均分别与第一横梁及第二横梁连接。两个安装件之间设有第三横梁。第三横梁与第一横梁以及第二横梁平行。第三横梁上设有固定架。固定架包括第一连接件和第二连接件,第一连接件沿本体的高度设置,第二连接件沿本体的宽度方向设置。第一连接件的两端分别与第三横梁及第二连接件连接。第一横梁与第二横梁均设有第三连接件。利用第二连接件与风机的竖板连接,第三连接件与风机的横板连接,能够使风机稳定地安装于本体上。
The utility model provides an anti-seismic support and hanger for a fan, which relates to the technical field of building electromechanical hangers. An anti-seismic support and hanger for a fan, including a body. The body includes a first beam and a second beam arranged in parallel. Two mounting parts arranged at intervals are arranged between the first cross beam and the second cross beam, and both ends of the two mounting parts are respectively connected with the first cross beam and the second cross beam. A third beam is provided between the two mounting parts. The third beam is parallel to the first beam and the second beam. A fixing frame is arranged on the third beam. The fixing frame includes a first connecting piece and a second connecting piece, the first connecting piece is arranged along the height of the body, and the second connecting piece is arranged along the width direction of the main body. Two ends of the first connecting piece are respectively connected with the third beam and the second connecting piece. Both the first beam and the second beam are provided with a third connecting piece. The second connecting piece is connected to the vertical plate of the fan, and the third connecting piece is connected to the horizontal plate of the fan, so that the fan can be stably installed on the body.
Description
技术领域technical field
本实用新型涉及建筑机电吊架技术领域,具体来说,是指一种风机抗震支吊架。The utility model relates to the technical field of building electromechanical hangers, in particular to an anti-seismic support and hanger for a fan.
背景技术Background technique
在建筑工程中,有着大量的机电设备安装作用,其中风管、电缆、风机等都设计为吊装方式。这些吊装用的以垂直向下的受力为主,在正常状态下,机电设备在没有受到震动等外力作用下,吊装用支架也仅受到其重力的影响,而一旦建筑物受到地震等外来影响时,机电设备也随着振动摇晃,因此为了抗震目前市面上多数采用具有传力杆的抗震支吊架来安装各种设备。吊架在安装风机时,一般只使用一个连接件将风机的底部与横梁连接,十分的不稳定,风机脱离横梁的风险很大。In construction engineering, there are a large number of mechanical and electrical equipment installation functions, among which air ducts, cables, fans, etc. are all designed as hoisting methods. These hoisting devices are mainly subjected to vertical downward force. Under normal conditions, when the electromechanical equipment is not subjected to external forces such as vibration, the hoisting bracket is only affected by its gravity. Once the building is affected by external influences such as earthquakes At the same time, the electromechanical equipment also shakes with the vibration. Therefore, in order to resist earthquakes, most of the current markets use anti-seismic supports and hangers with dowel bars to install various equipment. When the fan is installed on the hanger, generally only one connecting piece is used to connect the bottom of the fan to the beam, which is very unstable, and the risk of the fan detaching from the beam is high.
实用新型内容Utility model content
有鉴于此,本实用新型的目的在于克服现有技术的不足,提供一种风机抗震支吊架,以解决风机的底部与横梁连接不稳定,风机容易脱离横梁的问题。In view of this, the purpose of this utility model is to overcome the deficiencies of the prior art and provide a fan anti-seismic support and hanger to solve the problem that the bottom of the fan is not connected to the cross beam and the fan is easily separated from the cross beam.
本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:
一种风机抗震支吊架,包括本体,本体包括平行设置的第一横梁和第二横梁;第一横梁和第二横梁之间设有两个间隔设置的安装件,两个安装件的两端均分别与第一横梁及第二横梁连接;两个安装件之间设有第三横梁,第三横梁上设有固定架,固定架包括第一连接件和第二连接件,第一连接件沿本体的高度方向设置,第二连接件沿本体的宽度方向设置;第一连接件的两端分别与第三横梁及第二连接件连接;An anti-seismic support and hanger for a fan, including a body, the body includes a first beam and a second beam arranged in parallel; two mounting parts arranged at intervals are arranged between the first beam and the second beam, and the two ends of the two mounting parts They are respectively connected with the first beam and the second beam; a third beam is arranged between the two mounting parts, and a fixing frame is arranged on the third beam, and the fixing frame includes a first connecting piece and a second connecting piece, and the first connecting piece It is arranged along the height direction of the body, and the second connecting piece is arranged along the width direction of the body; both ends of the first connecting piece are respectively connected with the third beam and the second connecting piece;
还包括有风机连接件,风机连接件包括竖板和横板,竖板的上端与风机的外壳连接,下端与横板连接;在第一横梁和第二横梁上均设置有两个第三连接件;一个第二连接件与一个第三连接件为一组,分别连接竖板和横板。It also includes a fan connecting piece, the fan connecting piece includes a vertical plate and a horizontal plate, the upper end of the vertical plate is connected with the casing of the fan, and the lower end is connected with the horizontal plate; two third connecting beams are provided on the first beam and the second beam. pieces; a second connecting piece and a third connecting piece form a group, respectively connecting the vertical plate and the horizontal plate.
进一步,第一连接件包括第一连接杆、第二连接杆以及第三连接杆;第一连接杆、第二连接杆以及第三连接杆的一端均与第三横梁连接;第一连接杆与第三横梁垂直;第二连接杆、第三连接杆分别与第二连接件的两端围成三角形。Further, the first connecting piece includes a first connecting rod, a second connecting rod and a third connecting rod; one end of the first connecting rod, the second connecting rod and the third connecting rod are all connected to the third beam; the first connecting rod and The third beam is vertical; the second connecting rod and the third connecting rod respectively surround the two ends of the second connecting piece to form a triangle.
进一步,第二连接件包括套筒和内杆,内杆设于套筒内,套筒与内杆可拆卸连接,套筒与第一连接件连接,内杆的长度大于套筒的长度。Further, the second connecting piece includes a sleeve and an inner rod, the inner rod is arranged in the sleeve, the sleeve is detachably connected to the inner rod, the sleeve is connected to the first connecting piece, and the length of the inner rod is greater than that of the sleeve.
进一步,套筒和内杆均设有对应的贯通孔。Further, both the sleeve and the inner rod are provided with corresponding through holes.
进一步,两个安装件的两端均分别与第一横梁及第二横梁可拆卸连接。Further, both ends of the two mounting parts are detachably connected to the first beam and the second beam respectively.
进一步,第三横梁的两端分别与两个安装件可拆卸连接。Further, both ends of the third beam are detachably connected to the two mounting pieces respectively.
进一步,固定架的数量为两个,两个固定架间隔设置。Further, the number of fixing frames is two, and the two fixing frames are arranged at intervals.
进一步,第三连接件设有弹性减震器。Further, the third connecting piece is provided with an elastic shock absorber.
与现有技术相比,本实用新型具有的有益效果是:Compared with the prior art, the utility model has the beneficial effects of:
一种风机抗震支吊架,包括本体。体包括平行设置的第一横梁和第二横梁。第一横梁和第二横梁之间设有两个间隔设置的安装件,两个安装件的两端均分别与第一横梁及第二横梁连接。两个安装件之间设有第三横梁。第三横梁与第一横梁以及第二横梁平行。第三横梁上设有固定架。固定架包括第一连接件和第二连接件,第一连接件沿本体的高度设置,第二连接件沿本体的宽度方向设置。第一连接件的两端分别与第三横梁及第二连接件连接。第一横梁与第二横梁均设有第三连接件。利用第二连接件与风机的竖板连接,第三连接件与风机的横板连接,能够使风机稳定地安装于本体上。An anti-seismic support and hanger for a fan, including a body. The body includes a first beam and a second beam arranged in parallel. Two mounting parts arranged at intervals are arranged between the first cross beam and the second cross beam, and both ends of the two mounting parts are respectively connected with the first cross beam and the second cross beam. A third beam is provided between the two mounting parts. The third beam is parallel to the first beam and the second beam. A fixing frame is arranged on the third beam. The fixing frame includes a first connecting piece and a second connecting piece, the first connecting piece is arranged along the height of the body, and the second connecting piece is arranged along the width direction of the main body. Two ends of the first connecting piece are respectively connected with the third beam and the second connecting piece. Both the first beam and the second beam are provided with a third connecting piece. The second connecting piece is connected to the vertical plate of the fan, and the third connecting piece is connected to the horizontal plate of the fan, so that the fan can be stably installed on the body.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1是本实用新型实施例提供的风机抗震支吊架的第一视角示意图;Fig. 1 is a schematic diagram of the first perspective of the anti-seismic support and hanger of the fan provided by the embodiment of the utility model;
图2是本实用新型实施例提供的风机抗震支吊架的第二视角的示意图;Fig. 2 is a schematic diagram of a second viewing angle of the anti-seismic support and hanger of the fan provided by the embodiment of the utility model;
图3是本实用新型实施例提供的风机抗震支吊架中安装组件的示意图。Fig. 3 is a schematic diagram of installation components in the wind turbine anti-seismic hanger provided by the embodiment of the present invention.
图标:110-本体;111-第一横梁;112-第二横梁;113-第三横梁;114-第三连接件;120-安装件;131a-第一连接杆;131b-第二连接杆;131c-第三连接杆;132-第二连接件;132a-套筒;132b-内杆;132c-贯通孔;200-风机;210-竖板;220-横板。Icons: 110-body; 111-first beam; 112-second beam; 113-third beam; 114-third connecting piece; 120-mounting piece; 131a-first connecting rod; 131b-second connecting rod; 131c-third connecting rod; 132-second connecting piece; 132a-sleeve; 132b-inner rod; 132c-through hole; 200-fan; 210-vertical plate; 220-horizontal plate.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚,下面将对本实用新型的技术方案进行详细的描述。显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全面的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所得到的所有其它实施方式,都属于本实用新型所保护的范围。In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Apparently, the described embodiments are only some embodiments of the present utility model, rather than a comprehensive embodiment. Based on the embodiments of the present utility model, all other implementations obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.
实施例:Example:
如图1至图3所示,本实施例提供了一种风机抗震支吊架,包括本体110。As shown in FIG. 1 to FIG. 3 , this embodiment provides a wind turbine anti-seismic support and hanger, including a body 110 .
如图1所示,本体110包括平行设置的第一横梁111和第二横梁112。第一横梁111和第二横梁112之间设有两个间隔设置的安装件120,两个安装件120的两端均分别与第一横梁111及第二横梁112连接。也即,第一横梁111和第二横梁112均沿本体110的长度方向设置,两个安装件120均沿本体110的宽度方向设置。两个安装件120与第一横梁111、第二横梁112之间围成一个矩形。As shown in FIG. 1 , the body 110 includes a first beam 111 and a second beam 112 arranged in parallel. Two mounting parts 120 are arranged at intervals between the first cross beam 111 and the second cross beam 112 , and both ends of the two mounting parts 120 are respectively connected to the first cross beam 111 and the second cross beam 112 . That is, both the first beam 111 and the second beam 112 are arranged along the length direction of the body 110 , and the two mounting parts 120 are both arranged along the width direction of the body 110 . A rectangle is enclosed between the two mounting parts 120 and the first beam 111 and the second beam 112 .
两个安装件120之间设有第三横梁113。第三横梁113与第一横梁111以及第二横梁112平行。且第三横梁113与第一横梁111以及第二横梁112均间隔设置。A third beam 113 is disposed between the two mounting parts 120 . The third beam 113 is parallel to the first beam 111 and the second beam 112 . And the third beam 113 is spaced apart from the first beam 111 and the second beam 112 .
第三横梁113上设有固定架。固定架包括第一连接件和第二连接件132,第一连接件沿本体110的高度设置,第二连接件132沿本体110的宽度方向设置。第一连接件的两端分别与第三横梁113及第二连接件132连接。第一横梁111与第二横梁112均设有第三连接件114。A fixing frame is arranged on the third beam 113 . The fixing frame includes a first connecting piece and a second connecting piece 132 , the first connecting piece is arranged along the height of the main body 110 , and the second connecting piece 132 is arranged along the width direction of the main body 110 . Both ends of the first connecting member are respectively connected to the third beam 113 and the second connecting member 132 . Both the first beam 111 and the second beam 112 are provided with a third connecting member 114 .
在本实施例中,还包括有风机连接件,风机连接件包括竖板210和横板220,竖板210的上端与风机的外壳连接,下端与横板220连接;在第一横梁111和第二横梁112上均设置有两个第三连接件114;一个第二连接件132与一个第三连接114件为一组,分别连接竖板210和横板220。竖板210与横板220连接呈“L”型。其中,第二连接件132的两端分别与风机200的两个竖板210连接。第三连接件114与风机200的横板220连接。In this embodiment, it also includes a fan connecting piece, the fan connecting piece includes a vertical plate 210 and a horizontal plate 220, the upper end of the vertical plate 210 is connected with the casing of the fan, and the lower end is connected with the horizontal plate 220; Two third connecting pieces 114 are arranged on the two beams 112 ; one second connecting piece 132 and one third connecting piece 114 form a group, and connect the vertical plate 210 and the horizontal plate 220 respectively. The vertical board 210 is connected with the horizontal board 220 to form an "L" shape. Wherein, two ends of the second connecting piece 132 are respectively connected with the two vertical plates 210 of the fan 200 . The third connecting piece 114 is connected to the horizontal plate 220 of the fan 200 .
承上述,本实施例提供的风机抗震支吊架利用第二连接件132与风机200的竖板210连接,第三连接件114与风机200的横板220连接,能够使风机200稳定地安装于本体110上。Based on the above, the fan anti-seismic support and hanger provided in this embodiment is connected to the vertical plate 210 of the fan 200 by the second connecting piece 132, and the third connecting piece 114 is connected to the horizontal plate 220 of the fan 200, so that the fan 200 can be stably installed on the on the body 110 .
优选地,在本实施例中,固定架的数量为两个,两个固定架分别设于风机200的两端。利用2个固定架能够使风机200更加稳定地安装于本体110上。Preferably, in this embodiment, there are two fixing frames, and the two fixing frames are respectively arranged at two ends of the fan 200 . The fan 200 can be more stably installed on the body 110 by using two fixing frames.
需要说明的是,风机200的竖板210和横板220均设有通孔,第二连接件132的两端设有螺纹,第二连接件132的端部穿过竖板210上的通孔后利用螺母固定。第三连接件114的端部也设有螺纹,第三连接件114的端部穿过横板220上的通孔后利用螺母固定。It should be noted that the vertical plate 210 and the horizontal plate 220 of the fan 200 are provided with through holes, the two ends of the second connecting piece 132 are provided with threads, and the ends of the second connecting piece 132 pass through the through holes on the vertical plate 210 Then fix it with nuts. The end of the third connecting piece 114 is also provided with threads, and the end of the third connecting piece 114 passes through the through hole on the horizontal plate 220 and is fixed by a nut.
进一步,第一连接件包括第一连接杆131a、第二连接杆131b以及第三连接杆131c。第一连接杆131a、第二连接杆131b以及第三连接杆131c的一端均与第三横梁113连接。第一连接杆131a与第三横梁113垂直;第二连接杆131b、第三连接杆131c与第二连接件132围成三角形。此时,利用第二连接杆131b和第三连接杆131c能够使第二连接件132更加稳定地安装于第三横梁113上。Further, the first connecting member includes a first connecting rod 131a, a second connecting rod 131b and a third connecting rod 131c. One ends of the first connecting rod 131 a , the second connecting rod 131 b and the third connecting rod 131 c are all connected to the third beam 113 . The first connecting rod 131a is perpendicular to the third beam 113; the second connecting rod 131b, the third connecting rod 131c and the second connecting member 132 form a triangle. At this time, the second connecting member 132 can be more stably installed on the third beam 113 by using the second connecting rod 131b and the third connecting rod 131c.
如图2所示,第二连接件132包括套筒132a和内杆132b,内杆132b设于套筒132a内,套筒132a与内杆132b可拆卸连接,套筒132a与第一连接件连接,内杆132b的长度大于套筒132a的长度。在本实施例中,由于内杆132b和套筒132a可拆卸连接,只需更换不同长度的内杆132b就能够适用于不同长度的风机200使用。As shown in Figure 2, the second connector 132 includes a sleeve 132a and an inner rod 132b, the inner rod 132b is arranged in the sleeve 132a, the sleeve 132a is detachably connected to the inner rod 132b, and the sleeve 132a is connected to the first connector , the length of the inner rod 132b is greater than the length of the sleeve 132a. In this embodiment, since the inner rod 132b and the sleeve 132a are detachably connected, it is only necessary to replace the inner rod 132b of different lengths to be applicable to fans 200 of different lengths.
具体地,内杆132b和套筒132a的可拆卸方式可以为:第一种,套筒132a设有内螺纹,内杆132b设有配合的外螺纹。第二种,如图3所示,套筒132a和内杆132b均设有对应的贯通孔132c,利用螺钉穿过对应的贯通孔132c再通过螺母固定。在本实施例中,贯通孔132c的形状呈长条状。Specifically, the detachable manners of the inner rod 132b and the sleeve 132a may be: first, the sleeve 132a is provided with an internal thread, and the inner rod 132b is provided with a matching external thread. In the second type, as shown in FIG. 3 , the sleeve 132 a and the inner rod 132 b are both provided with corresponding through holes 132 c, and screws are passed through the corresponding through holes 132 c and then fixed by nuts. In this embodiment, the shape of the through hole 132c is elongated.
进一步,两个安装件120的两端均分别与第一横梁111及第二横梁112可拆卸连接。以方便改变安装件120的位置。在本实施例中,第一横梁111和第二横梁112均设有多个第一通孔,两个安装件120设有多个第二通孔,利用螺钉螺母实现其可拆卸连接。同理,第三横梁113的两端分别与两个安装件120可拆卸连接。Further, both ends of the two mounting parts 120 are detachably connected to the first beam 111 and the second beam 112 respectively. It is convenient to change the position of the mounting part 120 . In this embodiment, the first beam 111 and the second beam 112 are provided with a plurality of first through holes, and the two mounting parts 120 are provided with a plurality of second through holes, and are detachably connected by screws and nuts. Similarly, both ends of the third beam 113 are detachably connected to the two mounting parts 120 respectively.
综上,本实施例提供的风机抗震支吊架,能够将风机200十分稳定地安装在上面。To sum up, the anti-seismic support and hanger for the fan provided by this embodiment can mount the fan 200 on it very stably.
以上所述,仅为实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。The above is only a specific embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or replacements within the technical scope disclosed in the utility model , should be covered within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822241770.1U CN209261919U (en) | 2018-12-28 | 2018-12-28 | Anti-seismic support and hanger for fan |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822241770.1U CN209261919U (en) | 2018-12-28 | 2018-12-28 | Anti-seismic support and hanger for fan |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209261919U true CN209261919U (en) | 2019-08-16 |
Family
ID=67566061
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822241770.1U Expired - Fee Related CN209261919U (en) | 2018-12-28 | 2018-12-28 | Anti-seismic support and hanger for fan |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209261919U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112833053A (en) * | 2021-01-23 | 2021-05-25 | 浙江亿火建筑科技有限公司 | Bidirectional anti-seismic support and hanger for fan |
-
2018
- 2018-12-28 CN CN201822241770.1U patent/CN209261919U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112833053A (en) * | 2021-01-23 | 2021-05-25 | 浙江亿火建筑科技有限公司 | Bidirectional anti-seismic support and hanger for fan |
| CN112833053B (en) * | 2021-01-23 | 2022-09-16 | 浙江亿火建筑科技有限公司 | Bidirectional anti-seismic support and hanger for fan |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104137367B (en) | Damping Spacer Bars for Four Conductor Harnesses | |
| CN203847957U (en) | Wall hanging frame for hanging electric appliance | |
| CN106098315B (en) | An electrical equipment installation mechanism | |
| CN205118615U (en) | Wall mount arm bracket set and projection screen for projection screen | |
| CN209130471U (en) | A kind of antidetonation suspension and support | |
| CN102896046B (en) | A kind of Cathode system of cantilever beam structure of electric dust remover | |
| CN205653036U (en) | Structure of wireless communication device integration installation | |
| CN206585197U (en) | A kind of low-voltage cabinet crosses line bridge mounting suspension | |
| CN209457481U (en) | A cross arm used for a new cement pole | |
| CN203492307U (en) | Circuit board support structure and electric cooker | |
| CN207588402U (en) | A kind of double sliding tube busbar gold utensil brackets | |
| CN206340939U (en) | A kind of electrical engineering cable adapter | |
| CN106711904B (en) | A kind of damping conductor spacer of insulator chain | |
| CN207625245U (en) | A kind of pipe busbar gold utensil bracket | |
| CN208062754U (en) | A kind of porcelain pole arm fixed structure | |
| CN210573163U (en) | Special projecting apparatus of political economy problem analysis | |
| CN211480506U (en) | An inner frame for power distribution cabinet | |
| CN208609007U (en) | A kind of computer network suspension type router of anti-wiring loosening | |
| CN108661406B (en) | Corner tower lightning protection wire bracket and corner tower | |
| CN205862938U (en) | A kind of power equipment installing mechanism | |
| CN205207514U (en) | Damping structure of equipment of hanging | |
| CN207621964U (en) | A kind of LED support facilitating installation and stabilization | |
| CN222413959U (en) | An assembled building external hanging platform | |
| CN220150545U (en) | A buffer connection structure between steel structure roof and curtain wall steel structure | |
| CN208257537U (en) | A kind of motor fixing device for installing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190816 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |