CN209261282U CN201822189192.1U CN201822189192U CN209261282U CN 209261282 U CN209261282 U CN 209261282U CN 201822189192 U CN201822189192 U CN 201822189192U CN 209261282 U CN209261282 U CN 209261282U
Authority
CN
China
Prior art keywords
steel
roof
girder steel
roof boarding
novel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822189192.1U
Other languages
Chinese (zh)
Inventor
余利鹏
魏素芳
铁磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822189192.1U priority Critical patent/CN209261282U/en
Application granted granted Critical
Publication of CN209261282U publication Critical patent/CN209261282U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of Novel steel structure workshop, provide a kind of stable structure, waterproof rationally, save the Novel steel structure factory building of material consumption, including roof, wall and the steel column for supporting roof, roof and steel column are steel construction, the roof includes the roof boarding of top layer, is supported by steel column girder steel, the purlin being arranged between roof boarding and girder steel, the roof boarding and girder steel are in tilted layout, roof boarding bottom is located above wall, relative to parapet is provided on the outside of workshop at the top of the wall, water discharge member is provided between parapet bottom and roof boarding.The utility model structure novel, it is skillfully constructed, leak is effectively prevented under the premise of guaranteeing drainage effect, each component is mutually supported and is fixedly connected, greatly improve whole structural stability, whole steel construction has also effectively saved the consumption of material simultaneously, improves construction efficiency, is used for production workshop significant effect.

Description

A kind of Novel steel structure workshop
Technical field
The utility model relates to steel building field, specifically a kind of stable structure, waterproof are reasonable, save material consumption Novel steel structure factory building.
Background technique
In order to build a good production environment, in order to be protected from it by exposing to the weather to equipment and product, Need to erect a good factory.Due to demand difference, there is biggish difference in workshop and general house structure, Seek big, stable structure in space etc. in workshop, it is clear that the house of existing concrete structure is difficult to take into account these effects, this is just needed A kind of steel structure workshop.
Steel structure workshop refers to the workshop that main load-supporting part is made of steel, including steel column, girder steel, steel structure base, Steel roof truss and steel worm-gearing etc..Since China's steel output is big, so that many workshops have been all made of steel structure workshop, steel construction is built Build that light weight, intensity are big, span is big, steel building builds that the construction period is short, consuming cost is low, and it is all that fire line is high, corrosion resistance is strong etc. More advantages are more and more applied to factory building.
But since the structure limitation of itself is built in steel building, the generally existing drainage of roofing of steel structure workshop is guaranteeing Under the premise of steel structure workshop own advantages, its seepy question is solved, is that technical staff is innovating always and improved side in field To.
Utility model content
In order to solve the deficiencies in the prior art, on guaranteeing the stable advantage of steel structure mill construction, its seepy question is solved, The utility model proposes a kind of Novel steel structure workshops.
The technical problems to be solved in the utility model is achieved through the following technical solutions:
Novel steel structure workshop, including roof, wall and the steel column for supporting roof, in the present invention, the roof Be steel construction with steel column, the roof include the roof boarding of top layer, the girder steel supported by steel column, setting in roof boarding and Purlin between girder steel, the roof boarding and girder steel are in tilted layout, roof boarding bottom is located at using ridge as line of demarcation in symmetrical Above wall, relative to parapet is provided on the outside of workshop at the top of the wall, it is arranged between parapet bottom and roof boarding There is water discharge member, the water discharge member is the channel steel structure that both sides of the edge have extension edge, and one side extension edge is embedded into daughter It is fixedly connected within the walls, other side extension edge is overlapped at the lower edge of roof boarding and is fixedly connected, and the groove in the middle part of channel steel is as row The gutter of water component;The purlin is vertically arranged with girder steel, is evenly distributed on girder steel and connection fixed thereto, is supported whole A room panel structure.
In the present invention, the girder steel is H profile steel structure, and top flange is fixedly connected with purlin, lower flange and steel Column top is fixedly connected, and girder steel is provided with supporting element in the stitching portion of ridge and is mutually spliced by supporting element, girder steel relative to The other end of ridge is provided with supporting element.
Further, the supporting element includes two splice plates being fixed together that are spirally connected by panel, splice plate Top and bottom are respectively arranged with floor, the outside detour in the end of floor from splice plate, and top flange and lower flange with girder steel It is spirally connected respectively.
Further, the girder steel is provided with longitudinal girder steel at wall, and longitudinal girder steel is located in wall, and upper and lower two Side is provided with the steel plate being spirally connected with the splice plate of supporting element.
Further, longitudinal girder steel is located at below water discharge member, supports water discharge member, improves the knot of water discharge member Structure stability.
In the present invention, the girder steel is the H profile steel of variable cross-section, and the steel beam web plate height close to wall compares ridge Steel beam web plate height it is long, consumed with saving steel.
In the present invention, the tilt angle of the roof boarding is 5 °.
In the present invention, the junction of the water discharge member and parapet and roof boarding is set as sealing structure, Guarantee to prevent leak under the premise of roof drainage effect.
Compared with prior art, the utility model structure novel is skillfully constructed, and water discharge member is embedded close with other structures Envelope connection, effectively prevents leak, each component is mutually supported and is fixedly connected, greatly improves under the premise of guaranteeing drainage effect Whole structural stability, while whole steel construction has also effectively saved the consumption of material, improves construction efficiency, is used for Production workshop significant effect.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the partial enlarged view in Fig. 1.
In figure: roof 1, wall 2, steel column 3, roof boarding 4, purlin 5, girder steel top flange 6, girder steel lower flange 7, parapet 8, Gutter 9, water discharge member 10, supporting element 11, splice plate 12, floor 13, longitudinal girder steel 14.
Specific embodiment
The utility model is further described below in conjunction with Figure of description and specific preferred embodiment, but not because This and limit the protection scope of the utility model.
It is described including roof 1, wall 2 and the steel column 3 for supporting roof 1 referring to Novel steel structure workshop shown in Fig. 1 and 2 Roof 1 and steel column 3 are steel construction, the roof boarding 4 on the roof 1 including top layer, the girder steel supported by steel column 3, setting Purlin 5 between roof boarding 4 and girder steel, the roof boarding 4 and girder steel tilt 5 ° of arrangements, and 4 bottom of roof boarding is located at wall 2 Top, 2 top outer of wall are provided with parapet 8, are provided with water discharge member 10 between 8 bottom of parapet and roof boarding 4, The water discharge member 10 is the channel steel structure that both sides of the edge have extension edge, and one side extension edge is embedded into parapet 8 fixed Connection, other side extension edge are overlapped at the lower edge of roof boarding 4 and are fixedly connected, and the groove in the middle part of channel steel is as water discharge member 10 Gutter 9, the water discharge member 10 and the junction of parapet 8 and roof boarding 4 are set as sealing structure;The purlin 5 with Girder steel is vertically arranged, and is evenly distributed on girder steel and connection fixed thereto, and entire room panel structure is supported;The girder steel is H Formed steel construction, girder steel top flange 6 are fixedly connected with purlin 5, are fixedly connected at the top of girder steel lower flange 7 and steel column 3, girder steel is in ridge Stitching portion be provided with supporting element 11 and mutually spliced by supporting element 11, girder steel is provided with support relative to the other end of ridge Part 11, supporting element 11 include two splice plates 12 being fixed together that are spirally connected by panel, the top and bottom of splice plate 12 Be respectively arranged with floor 13, the outside detour in the end of floor 13 from splice plate 12, and with girder steel top flange 6 and girder steel lower flange 7 It is spirally connected respectively, girder steel is provided with longitudinal girder steel 14 at wall 2, and longitudinal girder steel 14 is located in wall 2, and upper and lower two sides are all provided with It is equipped with the steel plate being spirally connected with the splice plate 12 of supporting element 11, longitudinal girder steel 14 is located at 10 lower section of water discharge member, supports draining structure Part 10 improves the structural stability of water discharge member 10.
In the present invention, the girder steel is the H profile steel of variable cross-section, and the steel beam web plate height close to wall 2 compares ridge The steel beam web plate height at place is long, is consumed with saving steel.
When the utility model is applied to production factory building, the roof boarding 4 on roof 1 is located at workshop top layer, 1 side of roof Edge is set as parapet 8, improves the safety of construction, while pushing down 1 edge of roof, sets between parapet 8 and roof boarding 4 Be set to gutter 9, gutter 9 is built by water discharge member 10, the two sides of water discharge member 10 respectively with parapet 8 and roof boarding 4 are fixedly connected, and then have prevented water from splashing out or revealing on the basis of realization 9 proper drainage effect of gutter;Be under roof boarding 4 with The purlin 5 that girder steel is fixedly connected, purlin 5 on roof 1 in squamous arrange, be uniformly fixed on girder steel top flange 6 and and girder steel Top flange 6 is vertical, has carried entire 4 structure of roof boarding;Girder steel is the variable section H-type steel connected by supporting element 11, close to wall Height at body 2 is higher than the height of ridge, not only enhances weight bearing ability, extends roof structure space, and other It the interaction of structure and is connected and fixed and even more improves the integrally-built stability in roof.
Therefore, in conjunction with above-mentioned construction it can be found that Novel steel structure workshop described in the utility model, structure novel, design It is ingenious, leak is effectively prevented under the premise of guaranteeing drainage effect, each component is mutually supported and is fixedly connected, and is greatly improved whole The structural stability of body, while whole steel construction has also effectively saved the consumption of material, construction efficiency is improved, for giving birth to It produces and uses workshop significant effect.

Claims (8)

1. Novel steel structure workshop, including roof, wall and the steel column for supporting roof, it is characterised in that: the roof and steel column Be steel construction, the roof include the roof boarding of top layer, the girder steel supported by steel column, setting roof boarding and girder steel it Between purlin, the roof boarding and girder steel are in tilted layout, roof boarding bottom is located on wall using ridge as line of demarcation in symmetrical Side, the wall top are provided with draining relative to parapet is provided on the outside of workshop between parapet bottom and roof boarding Component, the water discharge member are the channel steel structure that both sides of the edge have extension edge, and one side extension edge is embedded into parapet solid Fixed connection, other side extension edge are overlapped at the lower edge of roof boarding and are fixedly connected, and the groove in the middle part of channel steel is as water discharge member Gutter;The purlin is vertically arranged with girder steel, is evenly distributed on girder steel and connection fixed thereto, and entire roofing is supported Hardened structure.
2. Novel steel structure workshop according to claim 1, it is characterised in that: the girder steel is H profile steel structure, top flange It is fixedly connected, is fixedly connected at the top of lower flange and steel column, girder steel is provided with supporting element in the stitching portion of ridge and passes through with purlin Supporting element mutually splices, and girder steel is provided with supporting element relative to the other end of ridge.
3. Novel steel structure workshop according to claim 2, it is characterised in that: the supporting element includes two and passes through panel spiral shell The splice plate for connecing and being fixed together, the top and bottom of splice plate are respectively arranged with floor, floor from the end of splice plate to Outer detour, and be spirally connected respectively with the top flange of girder steel and lower flange.
4. Novel steel structure workshop according to claim 3, it is characterised in that: the girder steel is provided with longitudinal direction at wall Girder steel, longitudinal girder steel are located in wall, and upper and lower two sides are provided with the steel plate being spirally connected with the splice plate of supporting element.
5. Novel steel structure workshop according to claim 4, it is characterised in that: the longitudinal direction girder steel is located under water discharge member Side, supports water discharge member.
6. Novel steel structure workshop according to claim 1, it is characterised in that: the girder steel is the H profile steel of variable cross-section, close The steel beam web plate height of wall is longer than the steel beam web plate height of ridge.
7. Novel steel structure workshop according to claim 1, it is characterised in that: the tilt angle of the roof boarding is 5 °.
8. Novel steel structure workshop according to claim 1, it is characterised in that: the water discharge member and parapet and roof boarding Junction be set as sealing structure.
CN201822189192.1U 2018-12-25 2018-12-25 A kind of Novel steel structure workshop Expired - Fee Related CN209261282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822189192.1U CN209261282U (en) 2018-12-25 2018-12-25 A kind of Novel steel structure workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822189192.1U CN209261282U (en) 2018-12-25 2018-12-25 A kind of Novel steel structure workshop

Publications (1)

Publication Number Publication Date
CN209261282U true CN209261282U (en) 2019-08-16

Family

ID=67561639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822189192.1U Expired - Fee Related CN209261282U (en) 2018-12-25 2018-12-25 A kind of Novel steel structure workshop

Country Status (1)

Country Link
CN (1) CN209261282U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379437A (en) * 2020-04-21 2020-07-07 郎佃富 Steel construction factory building and controlling means

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379437A (en) * 2020-04-21 2020-07-07 郎佃富 Steel construction factory building and controlling means

Similar Documents

Publication Publication Date Title
CN103711262B (en) A kind of curved surface aluminum-magnesium-manganese alloy roof plate system construction method
CN205637106U (en) Building structure system of completely assembling formula steel construction
CN205276709U (en) Industry factory building building integrated photovoltaic roof power generation system
CN206752676U (en) Assembled architecture agent structure
CN204738462U (en) Portable building photovoltaic roofing
CN209261282U (en) A kind of Novel steel structure workshop
CN203821596U (en) Assembled house system built by prefabricated slabs
CN203878838U (en) Gutter joint mechanism used for externally hanging colorful board
CN109457876B (en) Metal roof system with hidden maintenance horse way
CN217999101U (en) Container type modular building
CN207453284U (en) A kind of roofing bottom plate and roof board system for improving water resistance
CN207296121U (en) A kind of Roof system and low-rise building
CN206707354U (en) A kind of light-duty workshop steel structure
CN214784732U (en) Roof structure of prefabricated shaped steel combination
CN209703854U (en) Steel structure building top waterproof construction
CN212358796U (en) Combined roof for emergency engineering
CN210507985U (en) Environment-friendly energy-saving cold-formed thin-wall light steel roof
CN204326556U (en) A kind of large-span truss for both wired upper bridge constructions is safe guarding shed
CN202945723U (en) Arch-shaped corrugated steel roof with truss type ventilation clerestory
CN209261281U (en) A kind of steel structure workshop of insulation
CN201202223Y (en) Prestressed concrete double T folded plate
CN211775208U (en) Waterproof treatment node for upper and lower end surfaces of steel structure downslope dormer and roof outer plate
CN219298558U (en) Node waterproof construction based on roofing
CN214364497U (en) Connection structure for adjusting roof arc pipe truss cornice ditch
CN219448125U (en) Corrosion-resistant and strong wind-resistant belt corridor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20201225