CN209255156U - Powder screening plant for the preparation of iron hook castable - Google Patents

Powder screening plant for the preparation of iron hook castable Download PDF

Info

Publication number
CN209255156U
CN209255156U CN201822166875.5U CN201822166875U CN209255156U CN 209255156 U CN209255156 U CN 209255156U CN 201822166875 U CN201822166875 U CN 201822166875U CN 209255156 U CN209255156 U CN 209255156U
Authority
CN
China
Prior art keywords
fixed plate
fixedly installed
cylinder
motor
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822166875.5U
Other languages
Chinese (zh)
Inventor
郭永祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822166875.5U priority Critical patent/CN209255156U/en
Application granted granted Critical
Publication of CN209255156U publication Critical patent/CN209255156U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The utility model discloses the powder screening plants prepared for iron hook castable, including rack, first support plate, first fixed plate, first cylinder, second support plate, fixed block, fixing sleeve, pipeline, take out powder pump, first cabinet, first passage, first motor, collecting box, crushing shaft, second cabinet, second channel, third motor, installation space, second motor, shaft, second fixed plate, third fixed plate, 4th fixed plate, second cylinder, mesh screen, 5th fixed plate, third cylinder and the 6th fixed plate, one lateral roof of first support plate is fixedly installed with the first fixed plate, the other side of first fixed plate is fixedly installed with the first cylinder, the tailpiece of the piston rod of first cylinder is fixedly installed with fixed block.The bulky grain iron powder that second box house crushes again is pumped into mesh screen by pumping powder pump and is filtered again, realizes the utilization again of iron powder by the powder screening plant described in the utility model for the preparation of iron hook castable.

Description

Powder screening plant for the preparation of iron hook castable
Technical field
The utility model relates to iron hook manufacture fields, in particular to the powder screening plant for the preparation of iron hook castable.
Background technique
When pouring steel, the personnel unrelated with casting work forbid standing near the melt pit being poured.The nozzle brick of ladle When misalignment feed trumpet, stopper rod must not be opened.It when badly bleeding occurs for chassis or feed trumpet, to use iron foam to block, be not allowed to use Thin mud to avoid explosion, and after having infused molten steel, the residual steel slag in ladle should slowly be poured on dry useless ingot mould and slag ladle Interior, all personnel should prevent that bits fly up and hurt sb.'s feelings far from slag ladle at this time, in casting process, in case of stopper rod closes incessantly and molten steel When flashing, it is necessary to correctly command driving by a people, remaining personnel should avoid rapidly;In order to facilitate the casting of iron hook, make iron hook Performance it is more preferable, for this purpose, we devise for iron hook castable preparation powder screening plant.
Utility model content
The main purpose of the utility model is to provide the powder screening plants prepared for iron hook castable, can be effective Solve the problems in background technique.
To achieve the above object, the technical solution that the utility model is taken are as follows:
For the powder screening plant of iron hook castable preparation, including rack, the first support plate, the first fixed plate, first Cylinder, the second support plate, fixed block, fixing sleeve, pipeline, take out powder pump, the first cabinet, first passage, first motor, collecting box, Crushing shaft, the second cabinet, second channel, third motor, installation space, the second motor, shaft, the second fixed plate, third are fixed Plate, the 4th fixed plate, the second cylinder, mesh screen, the 5th fixed plate, third cylinder and the 6th fixed plate, the top surface one of the rack Side is fixedly installed with the first support plate, and a lateral roof of first support plate is fixedly installed with the first fixed plate, and described first The other side of fixed plate is fixedly installed with the first cylinder, and the tailpiece of the piston rod of first cylinder is fixedly installed with fixed block, fixed The other side of block is fixedly installed with fixing sleeve, and a lateral roof of first support plate is fixedly installed with the second support plate, described The bottom surface of second support plate, which is fixedly installed with, takes out powder pump, and the top surface side of second support plate opens up fluted, the bottom of groove Face is fixedly installed with the first cabinet, and the side of groove offers first passage, and the top surface other side of the rack is fixedly installed with Second cabinet, a side bottom of second cabinet offer second channel, and the interior side of rack offers installation space, institute The bottom surface for stating installation space is fixedly installed with third motor, the fixed company of the output end of the third motor and one end of crushing shaft It connects, the other end of the crushing shaft enters the inside of the second cabinet, is fixedly installed with collecting box in the middle part of the top surface of the rack, institute The front end for stating the top surface side of collecting box is fixedly installed with first motor, and the rear end of the top surface side of the collecting box is fixedly mounted There is the second motor, the output end of the first motor and the second motor is fixedly connected with the two sides center of shaft respectively, and described turn The side of axis is fixedly installed with the second fixed plate, and other side one end of second fixed plate is fixedly installed with third fixed plate, The other side of the third fixed plate is fixedly installed with the second cylinder, and the tailpiece of the piston rod of second cylinder is fixedly installed with the 4th Fixed plate, the other end of the other side of second fixed plate are fixedly installed with the 5th fixed plate, the 5th fixed plate it is another Side is fixedly installed with third cylinder, and the tailpiece of the piston rod of the third cylinder is fixedly installed with the 6th fixed plate, and the described 4th is solid The other side of fixed board and the 6th fixed plate is respectively and fixedly installed to the both ends of mesh screen side.
Preferably, the pumping powder pump passes through first passage by pipeline and connect with the inside of the first cabinet.
Preferably, the pumping powder pump passes through second channel by pipeline and connect with the inside of the second cabinet.
Preferably, one end connection for taking out powder pump output terminal and pipeline, the other end of pipeline are fixedly mounted on fixing sleeve On.
Preferably, the bottom surface of the mesh screen offers several pores.
Compared with prior art, the utility model has the following beneficial effects: using powder pump is taken out by first case intracorporal iron Powder is sent into mesh screen by pipeline, and the other end of pipeline is sent into the surface of mesh screen, the winged of iron powder is prevented to be spread across net by the first cylinder Iron powder is filled into collecting box by the outside of sieve by the propulsion and contraction of the second cylinder and the tailpiece of the piston rod of third cylinder The output end rotation of portion, first motor and the second motor rotates mesh screen, and the bulky grain iron powder in mesh screen is made to fall into the second cabinet Inside, by third motor drive crushing shaft rotation, so that the iron powder of bulky grain is ground into smaller particle, pass through take out powder pump The bulky grain iron powder that second box house crushes again is pumped into mesh screen and is filtered again, the sharp again of iron powder is realized With.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the utility model for the powder screening plant of iron hook castable preparation;
Fig. 2 is the structural schematic diagram of the utility model mesh screen top view;
Fig. 3 is the structural schematic diagram of the utility model mesh screen side view;
Fig. 4 is the utility model partial structural diagram.
In figure: 1, rack;2, the first support plate;3, the first fixed plate;4, the first cylinder;5, the second support plate;6, fixed Block;7, fixing sleeve;8, pipeline;9, powder pump is taken out;10, the first cabinet;11, first passage;12, first motor;13, collecting box;14, Crushing shaft;15, the second cabinet;16, second channel;17, third motor;18, installation space;20, the second motor;21, shaft; 22, the second fixed plate;23, third fixed plate;24, the 4th fixed plate;25, the second cylinder;26, mesh screen;27, the 5th fixed plate; 28, third cylinder;29, the 6th fixed plate.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution;
For the powder screening plant of iron hook castable preparation, including rack 1, the first support plate 2, the first fixed plate 3, the One cylinder 4, fixed block 6, fixing sleeve 7, pipeline 8, takes out powder pump the 9, first cabinet 10, first passage 11, first at second support plate 5 Motor 12, collecting box 13, crushing shaft 14, the second cabinet 15, second channel 16, third motor 17, installation space 18, the second motor 20, shaft 21, the second fixed plate 22, third fixed plate 23, the 4th fixed plate 24, the second cylinder 25, mesh screen 26, the 5th fixed plate 27, third cylinder 28 and the 6th fixed plate 29, the top surface side of the rack 1 are fixedly installed with the first support plate 2, and described first One lateral roof of support plate 2 is fixedly installed with the first fixed plate 3, and the other side of first fixed plate 3 is fixedly installed with first Cylinder 4, the tailpiece of the piston rod of first cylinder 4 are fixedly installed with fixed block 6, and the other side of fixed block 6 is fixedly installed with fixation Set 7, a lateral roof of first support plate 2 is fixedly installed with the second support plate 5, and the bottom surface of second support plate 5 is fixed It is equipped with and takes out powder pump 9, the top surface side of second support plate 5 opens up fluted, and the bottom surface of groove is fixedly installed with the first case Body 10, the side of groove offer first passage 11, and the top surface other side of the rack 1 is fixedly installed with the second cabinet 15, institute The side bottom for stating the second cabinet 15 offers second channel 16, and the interior side of rack 1 offers installation space 18, the peace The bottom surface in dress space 18 is fixedly installed with third motor 17, and one end of the output end and crushing shaft 14 of the third motor 17 is fixed Connection, the other end of the crushing shaft 14 enter the inside of the second cabinet 15, are fixedly installed with receipts in the middle part of the top surface of the rack 1 Header 13, the front end of the top surface side of the collecting box 13 are fixedly installed with first motor 12, the top surface one of the collecting box 13 The rear end of side is fixedly installed with the second motor 20, the output end of the first motor 12 and the second motor 20 respectively with shaft 21 Two sides center is fixedly connected, and the side of the shaft 21 is fixedly installed with the second fixed plate 22, second fixed plate 22 it is another Side one end is fixedly installed with third fixed plate 23, and the other side of the third fixed plate 23 is fixedly installed with the second cylinder 25, The tailpiece of the piston rod of second cylinder 25 is fixedly installed with the 4th fixed plate 24, the other side of second fixed plate 22 it is another End is fixedly installed with the 5th fixed plate 27, and the other side of the 5th fixed plate 27 is fixedly installed with third cylinder 28, and described the The tailpiece of the piston rod of three cylinders 28 is fixedly installed with the 6th fixed plate 29, the 4th fixed plate 24 and the 6th fixed plate 29 it is another Side is respectively and fixedly installed to the both ends of 26 side of mesh screen.
The pumping powder pump 9 passes through first passage 11 by pipeline 8 and connect with the inside of the first cabinet 10, the pumping powder pump 9 It passes through second channel 16 by pipeline 8 to connect with the inside of the second cabinet 15, described one end for taking out powder pump 9 output ends and pipeline 8 Connection, the other end of pipeline 8 are fixedly mounted on fixing sleeve 7, and the bottom surface of the mesh screen 26 offers several pores.
It should be noted that the utility model is the powder screening plant prepared for iron hook castable, by taking out powder pump 9 Iron powder in first cabinet 10 is sent into mesh screen 26 by pipeline 8, the other end of pipeline 8 is sent into mesh screen 26 by the first cylinder 4 Surface prevents the winged outside for being spread across mesh screen 26 of iron powder, passes through pushing away for the tailpiece of the piston rod of the second cylinder 25 and third cylinder 28 Into the inside that iron powder is filled into collecting box 13 with contraction, the output end rotation of first motor 12 and the second motor 20 makes mesh screen 26 Rotation, makes the bulky grain iron powder in mesh screen 26 fall into the inside of the second cabinet 15, drives crushing shaft 14 by third motor 17 Rotation, makes the iron powder of bulky grain be ground into smaller particle, big will crushed again inside second cabinet 15 by taking out powder pump 9 Granulated iron powder is pumped into mesh screen 26 and is filtered again, realizes the utilization again of iron powder.
The basic principles and main features of the present invention and the advantages of the present invention, current row has been shown and described above The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention, the utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (5)

1. for the powder screening plant of iron hook castable preparation, including rack (1), the first support plate (2), the first fixed plate (3), the first cylinder (4), the second support plate (5), fixed block (6), fixing sleeve (7), pipeline (8), pumping powder pump (9), the first cabinet (10), first passage (11), first motor (12), collecting box (13), crushing shaft (14), the second cabinet (15), second channel (16), third motor (17), installation space (18), the second motor (20), shaft (21), the second fixed plate (22), third are fixed Plate (23), the 4th fixed plate (24), the second cylinder (25), mesh screen (26), the 5th fixed plate (27), third cylinder (28) and the 6th Fixed plate (29), which is characterized in that the top surface side of the rack (1) is fixedly installed with the first support plate (2), and described first One lateral roof of fagging (2) is fixedly installed with the first fixed plate (3), and the other side of first fixed plate (3) is fixedly installed with The tailpiece of the piston rod of first cylinder (4), first cylinder (4) is fixedly installed with fixed block (6), and the other side of fixed block (6) is solid Dingan County is equipped with fixing sleeve (7), and a lateral roof of first support plate (2) is fixedly installed with the second support plate (5), and described second The bottom surface of support plate (5), which is fixedly installed with, takes out powder pump (9), and the top surface side of second support plate (5) opens up fluted, groove Bottom surface be fixedly installed with the first cabinet (10), the side of groove offers first passage (11), and the top surface of the rack (1) is another Side is fixedly installed with the second cabinet (15), and a side bottom of second cabinet (15) offers second channel (16), rack (1) interior side offers installation space (18), and the bottom surface of the installation space (18) is fixedly installed with third motor (17), The output end of the third motor (17) is fixedly connected with one end of crushing shaft (14), and the other end of the crushing shaft (14) enters The top surface middle part of the inside of second cabinet (15), the rack (1) is fixedly installed with collecting box (13), the collecting box (13) The front end of top surface side is fixedly installed with first motor (12), and the rear end of the top surface side of the collecting box (13) is fixedly installed with The output end of second motor (20), the first motor (12) and the second motor (20) is solid with the two sides center of shaft (21) respectively Fixed connection, the side of the shaft (21) are fixedly installed with the second fixed plate (22), the other side of second fixed plate (22) One end is fixedly installed with third fixed plate (23), and the other side of the third fixed plate (23) is fixedly installed with the second cylinder (25), the tailpiece of the piston rod of second cylinder (25) is fixedly installed with the 4th fixed plate (24), second fixed plate (22) The other end of the other side is fixedly installed with the 5th fixed plate (27), and the other side of the 5th fixed plate (27) is fixedly installed with Three cylinders (28), the tailpiece of the piston rod of the third cylinder (28) are fixedly installed with the 6th fixed plate (29), the 4th fixed plate (24) and the other side of the 6th fixed plate (29) is respectively and fixedly installed to the both ends of mesh screen (26) side.
2. the powder screening plant according to claim 1 for the preparation of iron hook castable, it is characterised in that: the pumping powder Pump (9) passes through first passage (11) by pipeline (8) and connect with the inside of the first cabinet (10).
3. the powder screening plant according to claim 1 for the preparation of iron hook castable, it is characterised in that: the pumping powder Pump (9) passes through second channel (16) by pipeline (8) and connect with the inside of the second cabinet (15).
4. the powder screening plant according to claim 1 for the preparation of iron hook castable, it is characterised in that: the pumping powder Pump (9) output end is connect with one end of pipeline (8), and the other end of pipeline (8) is fixedly mounted on fixing sleeve (7).
5. the powder screening plant according to claim 1 for the preparation of iron hook castable, it is characterised in that: the mesh screen (26) bottom surface offers several pores.
CN201822166875.5U 2018-12-24 2018-12-24 Powder screening plant for the preparation of iron hook castable Expired - Fee Related CN209255156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822166875.5U CN209255156U (en) 2018-12-24 2018-12-24 Powder screening plant for the preparation of iron hook castable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822166875.5U CN209255156U (en) 2018-12-24 2018-12-24 Powder screening plant for the preparation of iron hook castable

Publications (1)

Publication Number Publication Date
CN209255156U true CN209255156U (en) 2019-08-16

Family

ID=67560856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822166875.5U Expired - Fee Related CN209255156U (en) 2018-12-24 2018-12-24 Powder screening plant for the preparation of iron hook castable

Country Status (1)

Country Link
CN (1) CN209255156U (en)

Similar Documents

Publication Publication Date Title
CN209699914U (en) A kind of kitchen garbage squash type equipment for separating liquid from solid
CN209255156U (en) Powder screening plant for the preparation of iron hook castable
CN109396006A (en) Powder screening plant for the preparation of iron hook castable
CN208446424U (en) A kind of snail, shellfish dredger
CN207951670U (en) A kind of veterinary drug processing unit (plant)
CN206606357U (en) New unmanned plane propeller protection device
CN107694906B (en) A kind of concrete is with can quantitative gravel multilevel screening device
CN207617176U (en) A kind of oil press anti-blocking device in feeding
CN203469852U (en) Slurry agitating device with iron removing function
CN109436063A (en) A kind of damping rain-proof type engineering explosion transport device
CN206048484U (en) A kind of lightweight plate pours device
CN108422532A (en) A kind of refractory material casting device
CN104741598A (en) Absorbing casting pipe for vacuum ingot casting and use method of absorbing casting pipe
CN209426811U (en) A kind of damping rain-proof type engineering explosion transport device
CN208493874U (en) Cooling cylinder is used in a kind of production of compound fertilizer
CN207635808U (en) A kind of Chinese medicine dreg drier
CN201192729Y (en) Slag harrow special for molten iron slag-cleaning machine
CN210658203U (en) Broadcast seeder for skid-steer loader
CN208853691U (en) The high-intensitive Anti-radiation type steel casting system of nuclear power
CN213437052U (en) Molten iron stream inoculation feeding device
CN218564440U (en) High-aluminum-degree wear-resistant flashboard for tertiary air duct
CN206924637U (en) A kind of buffer pool agitator
CN208267429U (en) A kind of traffic route traffic police on duty rest equipment
CN207259536U (en) A kind of metallurgical charging sieve
CN208684803U (en) A kind of production raw material melting plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20191224

CF01 Termination of patent right due to non-payment of annual fee