CN209244219U - A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead - Google Patents

A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead Download PDF

Info

Publication number
CN209244219U
CN209244219U CN201821937232.XU CN201821937232U CN209244219U CN 209244219 U CN209244219 U CN 209244219U CN 201821937232 U CN201821937232 U CN 201821937232U CN 209244219 U CN209244219 U CN 209244219U
Authority
CN
China
Prior art keywords
square tube
tube frame
square
aluminum alloy
alloy mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821937232.XU
Other languages
Chinese (zh)
Inventor
刘玉久
银克俭
马平
赵原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201821937232.XU priority Critical patent/CN209244219U/en
Application granted granted Critical
Publication of CN209244219U publication Critical patent/CN209244219U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead, square tube frame is formed by square tubes soldering, the front of square tube frame, 4 vertical square tubes and 1 lateral square tube being centrally located respectively is arranged in the back side, wherein the square steel of square tube frame four corners exposes upper end operating surface 150mm, checkered steel plate is equipped at the operating surface of square tube frame upper end, the bottom of square tube frame is provided with idler wheel, accommodation stairway is set to the side of square tube frame, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, other three side of the upper end of the square tube frame in addition to economy building side of the ladder is respectively and fixedly provided with guard rail.With solution is low using operation frame body safety when aluminum alloy mould plate assembling and disassembling, allocation and transportation are inconvenient, operation difficulty is big when construction worker's raising-plate template is installed, removed, and construction safety guarantees the problems such as property is low.Belong to technical field of building construction.

Description

A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead
Technical field
The utility model relates in aluminum alloy mould plate is constructed, the crosshead of raising-plate template installation and dismounting belongs to and builds Build technical field of construction.
Background technique
With the development of Building Trade in China, the especially national requirement in letter there won't be any problem industry to new technology, new process application is not It is disconnected to increase, how to guarantee the construction cost that economizes on resources, reduces, increases project benefit and become more and more important.In engineering construction, To improve engineering construction quality, shortens the construction period, reach four sections, one environmental requirement, novel process, Modularized aluminum alloy mould Plate is by more and more extensive popularization.Aluminum alloy mould plate system be suitable for the higher super high-rise building of standardization level or multilayer housing-group and Villa cluster uses Fast-dismantle system, all wall templates adjustment after, successively install flooring branch fastener, flooring keel and Floorboard.Template floorboard standard size is 600*1200mm, and the high 65mm of flooring ceiling profile, aluminium plate 4mm is thick, every piece of standard Aluminium sheet weight is about 25kg.Since engineering structure layer height is generally in 3m or more, construction worker is carrying out raising-plate Temporary construction operating platform must be set up when template installation, dismounting.The construction operation platform of one secure is aluminum alloy mould plate The premise and important leverage of assembling and disassembling, while being also the important prerequisite for ensureing safety of workers construction.
Summary of the invention
The purpose of this utility model is that: a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead are provided, to solve to adopt With operating when aluminum alloy mould plate assembling and disassembling, frame body safety is low, it is inconvenient to allocate and transport, the installation of construction worker's raising-plate template, dismounting When operation difficulty it is big, construction safety guarantee property it is low the problems such as.
To solve the above problems, such a aluminum alloy mould plate installation of proposed adoption and Demolition Construction crosshead, including square tube Frame, guard rail and accommodation stairway, square tube frame are formed by square tubes soldering, and 4 vertical square tubes are respectively arranged in front, the back side of square tube frame The lateral square tube being centrally located with 1, vertical square tube length are 1.2m, and wherein the square steel of square tube frame four corners exposes upper end behaviour Make face 150mm, for assigning for guard rail, checkered steel plate, checkered steel plate welding are equipped at the operating surface of square tube frame upper end It is fixed on square tube frame, the bottom of square tube frame is provided with idler wheel, strap brake piece, to fixed idler whell, the accommodation stairway side of being set to The side of pipe support, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, accommodation stairway is removed in the upper end of the square tube frame Other three side other than side is respectively and fixedly provided with guard rail.
In aforementioned operation frame, the guard rail is formed by 30*30*3mm square tubes soldering, high 1.2m, the master of guard rail Upright bar eye-splice is weldingly connected in the main upright bar of square tube frame, and the waist of guard rail is welded with one of square tube in the horizontal direction;
In aforementioned operation frame, accommodation stairway is made of regularization, length 1.85m, width 0.6m, in accommodation stairway Between position be provided with the drawknot bar being mounted on square tube frame, guarantee frame body globality and stability;
In aforementioned operation frame, square tube frame is formed by 40*40*3mm square tubes soldering, the high 1.2m of square tube frame, long 1.3m, width 0.7m;
In aforementioned operation frame, the checkered steel plate of 3mm thickness, 1.3*0.7m is equipped at the operating surface of square tube frame upper end.
Compared with prior art, the utility model is applied to during the installation of aluminum alloy mould plate beam-slab template, Demolition Construction, The technology is used widely in the project building of four innings of three company at present, and about 450 squares of application item building single story building area Rice, using pulling-on piece formula aluminum alloy mould plate, which plays an important role in template installation, demolishing process, portability, safety Being widely recognized as construction worker is obtained, which processes simple and convenient, and constructing operation is simple, and movement is efficient and convenient, safety Property it is high.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model;
Fig. 2 is the schematic view of the front view at square tube frame and stair.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type is described in further detail.
Embodiment:
Referring to Figures 1 and 2, the present embodiment provides a kind of installation of aluminum alloy mould plate and Demolition Construction crossheads, including square tube Frame 1, guard rail 2 and accommodation stairway 3, square tube frame 1 are formed by 40*40*3mm square tubes soldering, square tube frame 1 is 1.3m 1.2m high, long, Wide 0.7m, 4 vertical square tubes are respectively arranged in front, the back side of square tube frame 1 and 1 lateral square tube being centrally located, vertical square tube are long Degree is 1.2m, and wherein the square steel of 1 four corners of square tube frame exposes upper end operating surface 150mm, for assigning for guard rail, square tube The checkered steel plate 4 of 3mm thickness, 1.3*0.7m is equipped at the operating surface of 1 upper end of frame, checkered steel plate 4 is fixedly welded on square tube frame 1 On, the bottom of square tube frame 1 is provided with idler wheel 5, and strap brake piece, to fixed idler whell, accommodation stairway 3 is set to the side of square tube frame 1 Face, and the upper end of accommodation stairway 3 extends at 1 upper end operating surface of square tube frame, the upper end of the square tube frame 1 except 3 side of accommodation stairway with Outer other three side is respectively and fixedly provided with guard rail 2, and guard rail 2 is formed by 30*30*3mm square tubes soldering, high 1.2m, protective fence The main upright bar eye-splice of bar 2 is weldingly connected in the main upright bar of square tube frame 1, and the waist of guard rail 2 is welded with one in the horizontal direction Road square tube, accommodation stairway 3 are made of regularization, and the intermediate position of length 1.85m, width 0.6m, accommodation stairway 3 are provided with The drawknot bar 6 being mounted on square tube frame 1 guarantees frame body globality and stability.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (5)

1. a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead, it is characterised in that: including square tube frame, guard rail and simple Stair, square tube frame are formed by square tubes soldering, the transverse direction that the vertical square tube of root is respectively arranged in front, the back side of square tube frame and root is centrally located Square tube, vertical square tube length are 1.2m, wherein the square steel exposing upper end operating surface 150mm of square tube frame four corners, on square tube frame Checkered steel plate is equipped at the operating surface at end, checkered steel plate is fixedly welded on square tube frame, and the bottom of square tube frame is provided with idler wheel, Accommodation stairway is set to the side of square tube frame, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, the square tube frame Other three side of the upper end in addition to economy building side of the ladder be respectively and fixedly provided with guard rail.
2. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: the protection Railing is formed by 30*30*3mm square tubes soldering, high 1.2m, the main upright bar eye-splice of guard rail in the main upright bar of square tube frame, and It is weldingly connected, the waist of guard rail is welded with one of square tube in the horizontal direction.
3. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: accommodation stairway It is made of regularization, length 1.85m, width 0.6m, the intermediate position of accommodation stairway, which is provided with, to be mounted on square tube frame Drawknot bar.
4. a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead according to claim 1, it is characterised in that: square tube frame by 40*40*3mm square tubes soldering forms, the high 1.2m of square tube frame, long 1.3m, width 0.7m.
5. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: on square tube frame The checkered steel plate of 3mm thickness, 1.3*0.7m is equipped at the operating surface at end.
CN201821937232.XU 2018-11-23 2018-11-23 A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead Active CN209244219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821937232.XU CN209244219U (en) 2018-11-23 2018-11-23 A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821937232.XU CN209244219U (en) 2018-11-23 2018-11-23 A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead

Publications (1)

Publication Number Publication Date
CN209244219U true CN209244219U (en) 2019-08-13

Family

ID=67529222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821937232.XU Active CN209244219U (en) 2018-11-23 2018-11-23 A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead

Country Status (1)

Country Link
CN (1) CN209244219U (en)

Similar Documents

Publication Publication Date Title
CN204781881U (en) Elevartor shaft structure construction handling frame
CN109404010A (en) A kind of aluminum tunnel modular system and its operating method
CN205206284U (en) But detachably assembled formula elevartor shaft operation platform
CN202509754U (en) High-altitude steel structure node construction working platform
CN209244219U (en) A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead
CN204850285U (en) High -rise building glass guardrail system
CN202220434U (en) Aluminum-alloy building formwork component
CN206942099U (en) Modular assembly formula construction platform
CN202559618U (en) Multi-step connection type cage staircase
CN210216166U (en) T roof beam pours safety protection platform
CN212836354U (en) Steel construction stair
CN212478487U (en) Construction platform for building construction
CN209396010U (en) The new type scaffold that full angle uses during a kind of shipbuilding
CN207348787U (en) One kind maintenance cat ladder platform
CN102392534A (en) Aluminum alloy building template assembly
CN112746809A (en) Special ladder stand for mounting magnetic suspension track beam
CN204826758U (en) Novel movable board house of lightweight steel construction
CN210483133U (en) Novel ladder cage structure
CN204551271U (en) A kind of reinforcement type Hanging Basket
CN217602029U (en) Well operation platform for sizing narrow space
CN215595077U (en) Assembled building seat integral hoisting type shaping protection steel stair
CN210713578U (en) Modular building stair structure and container with same
CN105644736B (en) A kind of topside transverse joint construction platform
CN215212242U (en) Telescopic staircase operating platform
CN219653898U (en) High-altitude few-fulcrum steel platform of large-span concrete corridor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 "change of name, title or address"

Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee after: The Third Construction Co., Ltd. of China Construction Fourth Engineering Bureau

Address before: Beijing road 563003 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED

CP03 "change of name, title or address"