CN209244219U - A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead - Google Patents
A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead Download PDFInfo
- Publication number
- CN209244219U CN209244219U CN201821937232.XU CN201821937232U CN209244219U CN 209244219 U CN209244219 U CN 209244219U CN 201821937232 U CN201821937232 U CN 201821937232U CN 209244219 U CN209244219 U CN 209244219U
- Authority
- CN
- China
- Prior art keywords
- square tube
- tube frame
- square
- aluminum alloy
- alloy mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead, square tube frame is formed by square tubes soldering, the front of square tube frame, 4 vertical square tubes and 1 lateral square tube being centrally located respectively is arranged in the back side, wherein the square steel of square tube frame four corners exposes upper end operating surface 150mm, checkered steel plate is equipped at the operating surface of square tube frame upper end, the bottom of square tube frame is provided with idler wheel, accommodation stairway is set to the side of square tube frame, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, other three side of the upper end of the square tube frame in addition to economy building side of the ladder is respectively and fixedly provided with guard rail.With solution is low using operation frame body safety when aluminum alloy mould plate assembling and disassembling, allocation and transportation are inconvenient, operation difficulty is big when construction worker's raising-plate template is installed, removed, and construction safety guarantees the problems such as property is low.Belong to technical field of building construction.
Description
Technical field
The utility model relates in aluminum alloy mould plate is constructed, the crosshead of raising-plate template installation and dismounting belongs to and builds
Build technical field of construction.
Background technique
With the development of Building Trade in China, the especially national requirement in letter there won't be any problem industry to new technology, new process application is not
It is disconnected to increase, how to guarantee the construction cost that economizes on resources, reduces, increases project benefit and become more and more important.In engineering construction,
To improve engineering construction quality, shortens the construction period, reach four sections, one environmental requirement, novel process, Modularized aluminum alloy mould
Plate is by more and more extensive popularization.Aluminum alloy mould plate system be suitable for the higher super high-rise building of standardization level or multilayer housing-group and
Villa cluster uses Fast-dismantle system, all wall templates adjustment after, successively install flooring branch fastener, flooring keel and
Floorboard.Template floorboard standard size is 600*1200mm, and the high 65mm of flooring ceiling profile, aluminium plate 4mm is thick, every piece of standard
Aluminium sheet weight is about 25kg.Since engineering structure layer height is generally in 3m or more, construction worker is carrying out raising-plate
Temporary construction operating platform must be set up when template installation, dismounting.The construction operation platform of one secure is aluminum alloy mould plate
The premise and important leverage of assembling and disassembling, while being also the important prerequisite for ensureing safety of workers construction.
Summary of the invention
The purpose of this utility model is that: a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead are provided, to solve to adopt
With operating when aluminum alloy mould plate assembling and disassembling, frame body safety is low, it is inconvenient to allocate and transport, the installation of construction worker's raising-plate template, dismounting
When operation difficulty it is big, construction safety guarantee property it is low the problems such as.
To solve the above problems, such a aluminum alloy mould plate installation of proposed adoption and Demolition Construction crosshead, including square tube
Frame, guard rail and accommodation stairway, square tube frame are formed by square tubes soldering, and 4 vertical square tubes are respectively arranged in front, the back side of square tube frame
The lateral square tube being centrally located with 1, vertical square tube length are 1.2m, and wherein the square steel of square tube frame four corners exposes upper end behaviour
Make face 150mm, for assigning for guard rail, checkered steel plate, checkered steel plate welding are equipped at the operating surface of square tube frame upper end
It is fixed on square tube frame, the bottom of square tube frame is provided with idler wheel, strap brake piece, to fixed idler whell, the accommodation stairway side of being set to
The side of pipe support, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, accommodation stairway is removed in the upper end of the square tube frame
Other three side other than side is respectively and fixedly provided with guard rail.
In aforementioned operation frame, the guard rail is formed by 30*30*3mm square tubes soldering, high 1.2m, the master of guard rail
Upright bar eye-splice is weldingly connected in the main upright bar of square tube frame, and the waist of guard rail is welded with one of square tube in the horizontal direction;
In aforementioned operation frame, accommodation stairway is made of regularization, length 1.85m, width 0.6m, in accommodation stairway
Between position be provided with the drawknot bar being mounted on square tube frame, guarantee frame body globality and stability;
In aforementioned operation frame, square tube frame is formed by 40*40*3mm square tubes soldering, the high 1.2m of square tube frame, long 1.3m, width
0.7m;
In aforementioned operation frame, the checkered steel plate of 3mm thickness, 1.3*0.7m is equipped at the operating surface of square tube frame upper end.
Compared with prior art, the utility model is applied to during the installation of aluminum alloy mould plate beam-slab template, Demolition Construction,
The technology is used widely in the project building of four innings of three company at present, and about 450 squares of application item building single story building area
Rice, using pulling-on piece formula aluminum alloy mould plate, which plays an important role in template installation, demolishing process, portability, safety
Being widely recognized as construction worker is obtained, which processes simple and convenient, and constructing operation is simple, and movement is efficient and convenient, safety
Property it is high.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model;
Fig. 2 is the schematic view of the front view at square tube frame and stair.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer
Type is described in further detail.
Embodiment:
Referring to Figures 1 and 2, the present embodiment provides a kind of installation of aluminum alloy mould plate and Demolition Construction crossheads, including square tube
Frame 1, guard rail 2 and accommodation stairway 3, square tube frame 1 are formed by 40*40*3mm square tubes soldering, square tube frame 1 is 1.3m 1.2m high, long,
Wide 0.7m, 4 vertical square tubes are respectively arranged in front, the back side of square tube frame 1 and 1 lateral square tube being centrally located, vertical square tube are long
Degree is 1.2m, and wherein the square steel of 1 four corners of square tube frame exposes upper end operating surface 150mm, for assigning for guard rail, square tube
The checkered steel plate 4 of 3mm thickness, 1.3*0.7m is equipped at the operating surface of 1 upper end of frame, checkered steel plate 4 is fixedly welded on square tube frame 1
On, the bottom of square tube frame 1 is provided with idler wheel 5, and strap brake piece, to fixed idler whell, accommodation stairway 3 is set to the side of square tube frame 1
Face, and the upper end of accommodation stairway 3 extends at 1 upper end operating surface of square tube frame, the upper end of the square tube frame 1 except 3 side of accommodation stairway with
Outer other three side is respectively and fixedly provided with guard rail 2, and guard rail 2 is formed by 30*30*3mm square tubes soldering, high 1.2m, protective fence
The main upright bar eye-splice of bar 2 is weldingly connected in the main upright bar of square tube frame 1, and the waist of guard rail 2 is welded with one in the horizontal direction
Road square tube, accommodation stairway 3 are made of regularization, and the intermediate position of length 1.85m, width 0.6m, accommodation stairway 3 are provided with
The drawknot bar 6 being mounted on square tube frame 1 guarantees frame body globality and stability.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (5)
1. a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead, it is characterised in that: including square tube frame, guard rail and simple
Stair, square tube frame are formed by square tubes soldering, the transverse direction that the vertical square tube of root is respectively arranged in front, the back side of square tube frame and root is centrally located
Square tube, vertical square tube length are 1.2m, wherein the square steel exposing upper end operating surface 150mm of square tube frame four corners, on square tube frame
Checkered steel plate is equipped at the operating surface at end, checkered steel plate is fixedly welded on square tube frame, and the bottom of square tube frame is provided with idler wheel,
Accommodation stairway is set to the side of square tube frame, and the upper end of accommodation stairway extends at the operating surface of square tube frame upper end, the square tube frame
Other three side of the upper end in addition to economy building side of the ladder be respectively and fixedly provided with guard rail.
2. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: the protection
Railing is formed by 30*30*3mm square tubes soldering, high 1.2m, the main upright bar eye-splice of guard rail in the main upright bar of square tube frame, and
It is weldingly connected, the waist of guard rail is welded with one of square tube in the horizontal direction.
3. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: accommodation stairway
It is made of regularization, length 1.85m, width 0.6m, the intermediate position of accommodation stairway, which is provided with, to be mounted on square tube frame
Drawknot bar.
4. a kind of installation of aluminum alloy mould plate and Demolition Construction crosshead according to claim 1, it is characterised in that: square tube frame by
40*40*3mm square tubes soldering forms, the high 1.2m of square tube frame, long 1.3m, width 0.7m.
5. a kind of aluminum alloy mould plate installation and Demolition Construction crosshead according to claim 1, it is characterised in that: on square tube frame
The checkered steel plate of 3mm thickness, 1.3*0.7m is equipped at the operating surface at end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821937232.XU CN209244219U (en) | 2018-11-23 | 2018-11-23 | A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821937232.XU CN209244219U (en) | 2018-11-23 | 2018-11-23 | A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209244219U true CN209244219U (en) | 2019-08-13 |
Family
ID=67529222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821937232.XU Active CN209244219U (en) | 2018-11-23 | 2018-11-23 | A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209244219U (en) |
-
2018
- 2018-11-23 CN CN201821937232.XU patent/CN209244219U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204781881U (en) | Elevartor shaft structure construction handling frame | |
CN109404010A (en) | A kind of aluminum tunnel modular system and its operating method | |
CN205206284U (en) | But detachably assembled formula elevartor shaft operation platform | |
CN202509754U (en) | High-altitude steel structure node construction working platform | |
CN209244219U (en) | A kind of installation of aluminum alloy mould plate and Demolition Construction crosshead | |
CN204850285U (en) | High -rise building glass guardrail system | |
CN202220434U (en) | Aluminum-alloy building formwork component | |
CN206942099U (en) | Modular assembly formula construction platform | |
CN202559618U (en) | Multi-step connection type cage staircase | |
CN210216166U (en) | T roof beam pours safety protection platform | |
CN212836354U (en) | Steel construction stair | |
CN212478487U (en) | Construction platform for building construction | |
CN209396010U (en) | The new type scaffold that full angle uses during a kind of shipbuilding | |
CN207348787U (en) | One kind maintenance cat ladder platform | |
CN102392534A (en) | Aluminum alloy building template assembly | |
CN112746809A (en) | Special ladder stand for mounting magnetic suspension track beam | |
CN204826758U (en) | Novel movable board house of lightweight steel construction | |
CN210483133U (en) | Novel ladder cage structure | |
CN204551271U (en) | A kind of reinforcement type Hanging Basket | |
CN217602029U (en) | Well operation platform for sizing narrow space | |
CN215595077U (en) | Assembled building seat integral hoisting type shaping protection steel stair | |
CN210713578U (en) | Modular building stair structure and container with same | |
CN105644736B (en) | A kind of topside transverse joint construction platform | |
CN215212242U (en) | Telescopic staircase operating platform | |
CN219653898U (en) | High-altitude few-fulcrum steel platform of large-span concrete corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | "change of name, title or address" |
Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee after: The Third Construction Co., Ltd. of China Construction Fourth Engineering Bureau Address before: Beijing road 563003 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED |
|
CP03 | "change of name, title or address" |