CN209243730U - A kind of discharge structure of construction large-scale high-rise building deep basal pit part - Google Patents
A kind of discharge structure of construction large-scale high-rise building deep basal pit part Download PDFInfo
- Publication number
- CN209243730U CN209243730U CN201821311400.4U CN201821311400U CN209243730U CN 209243730 U CN209243730 U CN 209243730U CN 201821311400 U CN201821311400 U CN 201821311400U CN 209243730 U CN209243730 U CN 209243730U
- Authority
- CN
- China
- Prior art keywords
- deep basal
- basal pit
- fixed link
- fixed
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Special Spraying Apparatus (AREA)
Abstract
The utility model discloses a kind of construction discharge structures of large-scale high-rise building deep basal pit part, including deep basal pit ontology, traction rope and the first overflow pipe, the top two sides of the deep basal pit ontology are equipped with electric pushrod, and the top of electric pushrod is fixed with support rod, the intermediate bottom end of the support rod is connected with fixed link, and fixed link is mounted in loose slot, the bottom end of fixed link is arranged in the traction rope, and the bottom end two sides of loose slot are reserved with discharge outlet, first filter screen is installed on the outside of the discharge outlet, the bottom of the fixed link is fixed with card column, and card column is connected with card slot, and the lower end of card slot is reserved with water outlet, the lower end of the water outlet is provided with fixing groove.The discharge structure of the construction large-scale high-rise building deep basal pit part, not only facilitates and internal water source is discharged, prevent from blocking, while when water outlet blocks, convenient for repairing internal water source discharge.
Description
Technical field
The utility model relates to the construction discharge structure technical fields of large-scale high-rise building deep basal pit part, specifically
For a kind of discharge structure of construction large-scale high-rise building deep basal pit part.
Background technique
Deep basal pit refers to that the depth in the hole dug is greater than a kind of 5 meters of engineerings for packaging water source, current many buildings
It is frequently necessary to dig this deep basal pit in construction, with the development of science and technology, domestic building is increasing, therefore deep basal pit is in state
Inside it is widely used.
However the existing construction discharge structure of large-scale high-rise building deep basal pit part, inside to deep basal pit
Blocking is often met with when draining, and due to the depth of deep basal pit, inconvenience maintenance can not be incited somebody to action simultaneously for the deep basal pit after blocking
Internal water source discharge.In view of the above-mentioned problems, being badly in need of the row in original construction with large-scale high-rise building deep basal pit part
Innovative design is carried out on water-bound.
Utility model content
The purpose of this utility model is to provide a kind of construction draining knots of large-scale high-rise building deep basal pit part
Structure, to solve in above-mentioned background technique in the discharge structure deep basal pit of proposition construction large-scale high-rise building deep basal pit part
Blocking, inconvenient the problem of repairing and internal water source can not being discharged often are met with when the draining in portion.
To achieve the above object, the utility model provides the following technical solutions: a kind of large-scale high-rise building of construction
The discharge structure of deep basal pit part, including deep basal pit ontology, traction rope and the first overflow pipe, the top two of the deep basal pit ontology
Side is equipped with electric pushrod, and the top of electric pushrod is fixed with support rod, the intermediate bottom end of the support rod and fixed link phase
Connection, and fixed link is mounted in loose slot, the bottom end of fixed link is arranged in the traction rope, and the bottom end two sides of loose slot are pre-
There are discharge outlet, the first filter screen is installed on the outside of the discharge outlet, the bottom of the fixed link is fixed with card column, and card column
It is connected with card slot, and the lower end of card slot is reserved with water outlet, the lower end of the water outlet is provided with fixing groove, and fixing groove
Inside fixed column is installed, the outside of fixed column, and the first overflow pipe and the second overflow pipe is arranged in first overflow pipe
It is connected, the side of the deep basal pit ontology is fixed with support plate, and the centre of support plate is equipped with baffle, and baffle and
The preformed hole of two filter screens is connected, and the preformed hole is arranged in the top of the second filter screen, the deep basal pit ontology it is another
Side is equipped with dredge pump, and the bottom end of dredge pump is connected with blow-off line.
Preferably, the fixed link and loose slot composition are slidably connected, and the diameter and loose slot of the cross section of fixed link
The diameter of cross section is equal.
Preferably, the shape of first filter screen is designed as cylindric, and the diameter of the first filter screen is greater than discharge outlet
Diameter, and the distance apart from deep basal pit body bottom portion of discharge outlet is designed as 10cm.
Preferably, the distance that the card column rises is higher than the extreme lower position of discharge outlet, and card column and card slot constitute engaging peace
Detaching structure is filled, and the diameter of card slot cross section and the cross-sectional diameter of card column are equal.
Preferably, the fixed column and fixing groove are to be connected together, and fixed column and the first overflow pipe are weldedization
Structure.
Preferably, the shape of the baffle is designed as " work " shape, and the bottom of baffle and discharge outlet are in same horizontal line
On.
Compared with prior art, the utility model has the beneficial effects that the large-scale high-rise building deep basal pit of the construction
The discharge structure of part not only facilitates and internal water source is discharged, prevents from blocking, while when water outlet blocks,
Convenient for internal water source discharge is repaired;
(1) fixed link is carried out in loose slot it is up and down, convenient for by internal water source by discharge outlet discharge, simultaneously
The internal blocking that stone occurs, while the design of outlet distance are prevented by the design of the first filter screen, prevents mud from entering;
(2) card column is stuck in card slot, convenient for fixed link is fixed, while fixed link passes through traction rope and fixing groove
Two sides connection, convenient for being pulled out card slot by fixed link, clears up inside, preventing from going down for a long time blocks;
(3) when water drainage hole plug, by extracting baffle, the water source of dell machine body interior is facilitated to be discharged, it is then right
The discharge outlet that inside blocks is cleared up.
Detailed description of the invention
Fig. 1 is the utility model positive structure diagram;
Fig. 2 is the first filter screen of the utility model overlooking structure diagram;
Fig. 3 is the utility model card column and card slot mounting structure schematic diagram;
Fig. 4 is the utility model baffle and the second filtering net installation schematic diagram.
In figure: 1, deep basal pit ontology;2, electric pushrod;3, support rod;4, fixed link;5, loose slot;6, dredge pump;7, it leads
Messenger;8, discharge outlet;9, the first filter screen;10, card column;11, card slot;12, water outlet;13, fixing groove;14, fixed column;15,
First overflow pipe;16, support plate;17, baffle;18, the second filter screen;19, the second overflow pipe;20, preformed hole;21, sewage pipe
Road.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of large-scale high-rise building depth base of construction
The discharge structure of part is cheated, including deep basal pit ontology 1, electric pushrod 2, support rod 3, fixed link 4, loose slot 5, dredge pump 6, is led
Messenger 7, discharge outlet 8, the first filter screen 9, card column 10, card slot 11, water outlet 12, fixing groove 13, fixed column 14, the first overflow pipe
15, support plate 16, baffle 17, the second filter screen 18, the second overflow pipe 19, preformed hole 20 and blow-off line 21, deep basal pit ontology 1
Top two sides electric pushrod 2 is installed, and the top of electric pushrod 2 is fixed with support rod 3, the intermediate bottom end of support rod 3 and
Fixed link 4 is connected, and fixed link 4 is mounted in loose slot 5, and traction rope 7 is arranged in the bottom end of fixed link 4, and loose slot 5
Bottom end two sides are reserved with discharge outlet 8, and the outside of discharge outlet 8 is equipped with the first filter screen 9, and the bottom of fixed link 4 is fixed with card column
10, and card column 10 is connected with card slot 11, and the lower end of card slot 11 is reserved with water outlet 12, the lower end of water outlet 12 is provided with
Fixing groove 13, and the inside of fixing groove 13 is equipped with fixed column 14, the outside of fixed column 14, and is arranged in the first overflow pipe 15
One overflow pipe 15 is connected with the second overflow pipe 19, and the side of deep basal pit ontology 1 is fixed with support plate 16, and in support plate 16
Between baffle 17 is installed, and baffle 17 is connected with the preformed hole 20 of the second filter screen 18, and preformed hole 20 is arranged in the second mistake
The top of strainer 18, the other side of deep basal pit ontology 1 is equipped with dredge pump 6, and the bottom end of dredge pump 6 is connected with blow-off line 21
It connects;
Fixed link 4 and the composition of loose slot 5 are slidably connected, and 5 cross section of the diameter of the cross section of fixed link 4 and loose slot
Diameter is equal, facilitates and moves up and down fixed link 4 in loose slot 5, so that water source is discharged from discharge outlet 8, more avoids
The case where discharge outlet 8 leak;
The shape of first filter screen 9 be designed as it is cylindric, and the diameter of the first filter screen 9 be greater than discharge outlet 8 diameter, and
And the distance apart from 1 bottom of deep basal pit ontology of discharge outlet 8 is designed as 10cm, prevents discharge outlet 8 in discharge, mud will drain
Mouth 8 blocks, and influences normally to drain;
The distance that card column 10 rises is higher than the extreme lower position of discharge outlet 8, and card column 10 and card slot 11 constitute engaging installation and tear open
Structure is unloaded, and the diameter of 11 cross section of card slot and the cross-sectional diameter of card column 10 are equal, the convenient rising for passing through card column 10 makes
Water source flows in card slot 11 from discharge outlet 8, so that water source is discharged, at the same also increase card slot 11 and card column 10 connect it is steady
It is fixed;
Fixed column 14 and fixing groove 13 are to be connected together, and fixed column 14 and the first overflow pipe 15 are weldedization knot
Structure strengthens the stability of fixed column 14, prevents fixed column 14 in water by the way that the upper end of fixed column 14 to be stuck in fixing groove 13
It is moved under the impact of stream, while also strengthening the stabilization of fixed column 14 and the connection of the first overflow pipe 15;
The shape of baffle 17 is designed as " work " shape, and the bottom of baffle 17 and discharge outlet 8 are in same horizontal line, baffle
17 shape prevents water source to be discharged from the second overflow pipe 19, simultaneously convenient for carrying out shutting fixation to one end of the second overflow pipe 19
Prevent mud from entering the second overflow pipe 19.
Working principle: the construction uses the discharge structure of large-scale high-rise building deep basal pit part when in use, according to figure
1, Fig. 2 and Fig. 4 runs the electric pushrod 2 of model ANT-26 when the water source in deep basal pit ontology 1 needs to be discharged, electronic to push away
Bar 2 drives fixed link 4 to be risen by support rod 3, and fixed link 4 is gone up and down in loose slot 5 at this time, when fixed link 4
Bottom rise distance be more than 8 bottom of discharge outlet apart from when, the water in deep basal pit ontology 1 is discharged since discharge outlet 8 at this time,
Simultaneously the first filter screen 9 the biggish stone of volume in water will be intercepted, prevent stone block discharge outlet 8, and discharge outlet 8 away from
It is 10cm with a distance from 1 bottom of deep basal pit ontology, prevents internal mud from blocking discharge outlet 8, water source is by discharge outlet 8 through card
It flows down inside slot 11, is flowed in the first overflow pipe 15 by water outlet 12, so as to which water flow to be discharged, while when internal water source
Height stops flowing lower than discharge outlet 8, runs the blow-off line 21 of model ZBCY25-8-15 at this time, can be by deep basal pit ontology 1
The mud of bottom is taken away through blow-off line 21, when discharge outlet 8 meet with block when, can by the way that baffle 17 is pulled out from support plate 16,
To which water source deep basal pit ontology 1 inside is discharged by the second overflow pipe 19, then discharge outlet 8 can be repaired with clearly
Reason;
It, first will be in fixed link 4 when the water source inside deep basal pit ontology 1 needs to be discharged from discharge outlet 8 according to Fig. 1 and Fig. 3
It rises, then card column 10 and card slot 11 separate, and water source is flowed out by 8 approach card slot 11 of discharge outlet from water outlet 12, while working as the row
When needing to clear up inside the mouth of a river 8, by the rising of electric pushrod 2, fixed link 4 is driven, while fixed link 4 passes through 7 band of traction rope
Interlacing on dynamic 11 mountain of card slot, so that whole taking-up is cleared up, when needing to put back to fixed link 4, by that will fix
Slot 13 and fixed column 14 are aligned, so as to which fixed link 4 to be fixed.
Finally it should be noted that the above content is only to illustrate the technical solution of the utility model, rather than it is practical to this
The limitation of novel protected range, those skilled in the art to the technical solution of the utility model carry out it is simple modification or
Person's equivalent replacement, all without departing from the spirit and scope of technical solutions of the utility model.
Claims (6)
1. a kind of construction discharge structure of large-scale high-rise building deep basal pit part, including deep basal pit ontology (1), traction rope
(7) and the first overflow pipe (15), it is characterised in that: the top two sides of the deep basal pit ontology (1) are equipped with electric pushrod (2),
And the top of electric pushrod (2) is fixed with support rod (3), the intermediate bottom end of the support rod (3) is connected with fixed link (4),
And fixed link (4) is mounted in loose slot (5), traction rope (7) setting is in the bottom end of fixed link (4), and loose slot (5)
Bottom end two sides are reserved with discharge outlet (8), are equipped with the first filter screen (9) on the outside of the discharge outlet (8), the fixed link (4)
Bottom be fixed with card column (10), and card column (10) is connected with card slot (11), and the lower end of card slot (11) is reserved with water outlet
Mouth (12), the lower end of the water outlet (12) is provided with fixing groove (13), and the inside of fixing groove (13) is equipped with fixed column
(14), first overflow pipe (15) is arranged in the outside of fixed column (14), and the first overflow pipe (15) and the second overflow pipe
(19) it is connected, the side of the deep basal pit ontology (1) is fixed with support plate (16), and the centre of support plate (16) is equipped with gear
Plate (17), and baffle (17) is connected with the preformed hole (20) of the second filter screen (18), preformed hole (20) setting is the
The other side on the top of two filter screens (18), the deep basal pit ontology (1) is equipped with dredge pump (6), and the bottom end of dredge pump (6)
It is connected with blow-off line (21).
2. a kind of discharge structure of construction large-scale high-rise building deep basal pit part according to claim 1, special
Sign is: the fixed link (4) and loose slot (5) composition are slidably connected, and the diameter and loose slot of the cross section of fixed link (4)
(5) diameter of cross section is equal.
3. a kind of discharge structure of construction large-scale high-rise building deep basal pit part according to claim 1, special
Sign is: the shape of first filter screen (9) be designed as it is cylindric, and the diameter of the first filter screen (9) be greater than discharge outlet (8)
Diameter, and the distance apart from deep basal pit ontology (1) bottom of discharge outlet (8) is designed as 10cm.
4. a kind of discharge structure of construction large-scale high-rise building deep basal pit part according to claim 1, special
Sign is: the distance that the card column (10) rises is higher than the extreme lower position of discharge outlet (8), and card column (10) and card slot (11) are constituted
Engage installing and dismounting structure, and the diameter of card slot (11) cross section and the cross-sectional diameter of card column (10) are equal.
5. a kind of discharge structure of construction large-scale high-rise building deep basal pit part according to claim 1, special
Sign is: the fixed column (14) and fixing groove (13) is are connected together, and fixed column (14) and the first overflow pipe (15) are weldering
Connect integral structure.
6. a kind of discharge structure of construction large-scale high-rise building deep basal pit part according to claim 1, special
Sign is: the shape of the baffle (17) is designed as " work " shape, and the bottom of baffle (17) and discharge outlet (8) are in same level
On line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821311400.4U CN209243730U (en) | 2018-08-15 | 2018-08-15 | A kind of discharge structure of construction large-scale high-rise building deep basal pit part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821311400.4U CN209243730U (en) | 2018-08-15 | 2018-08-15 | A kind of discharge structure of construction large-scale high-rise building deep basal pit part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209243730U true CN209243730U (en) | 2019-08-13 |
Family
ID=67516416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821311400.4U Expired - Fee Related CN209243730U (en) | 2018-08-15 | 2018-08-15 | A kind of discharge structure of construction large-scale high-rise building deep basal pit part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209243730U (en) |
-
2018
- 2018-08-15 CN CN201821311400.4U patent/CN209243730U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204163745U (en) | A kind of tunnel props up hole counter-slope drainage system | |
CN205088779U (en) | PPS (Prefabricated pump station) | |
CN105625557B (en) | Integrated sewage disposal pumping plant | |
CN210562532U (en) | Sewage well for municipal engineering road | |
CN209243730U (en) | A kind of discharge structure of construction large-scale high-rise building deep basal pit part | |
CN209194557U (en) | A kind of Groundwater Lowering During Deep Foundation Pit Excavation device | |
CN110374124B (en) | Subway construction drainage system | |
CN208379752U (en) | A kind of pumping plant coupling device | |
CN108286259B (en) | A kind of soft soil foundation base pit dewatering device | |
CN214695685U (en) | Deep foundation pit drainage system | |
CN214116927U (en) | Roadbed drainage structure for municipal road construction | |
CN216108848U (en) | A energy-conserving integration sewage pump station for crossing a river | |
CN104563404B (en) | A kind of drop case for building | |
CN208493624U (en) | A kind of wet precipitator | |
CN211057991U (en) | Prefabricated pump station with self-cleaning function | |
CN211172312U (en) | Low-grade highway drainage ditch | |
CN211597022U (en) | Prevent blockking up sump pit | |
CN209854460U (en) | Novel railway roadbed drainage device | |
CN209620172U (en) | Novel inverted siphon water pipeline mud discharging and emptying structure | |
CN208763034U (en) | Foundation pit water resource is collected and recycling device | |
CN206337626U (en) | A kind of Urban Underground intelligent comprehensive piping lane | |
CN108360568B (en) | A prevent flowing backward device for in cable well | |
CN208416915U (en) | A kind of anti-dry immersible pump | |
CN206768453U (en) | A kind of washing machine adjutage filter | |
CN216379872U (en) | Clean inlet for stom water with oil-blocking measure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190813 Termination date: 20200815 |
|
CF01 | Termination of patent right due to non-payment of annual fee |