CN209240260U - A kind of prefabricated case beam bellows coordinate location device - Google Patents

A kind of prefabricated case beam bellows coordinate location device Download PDF

Info

Publication number
CN209240260U
CN209240260U CN201821119455.5U CN201821119455U CN209240260U CN 209240260 U CN209240260 U CN 209240260U CN 201821119455 U CN201821119455 U CN 201821119455U CN 209240260 U CN209240260 U CN 209240260U
Authority
CN
China
Prior art keywords
bellows
pedestal
spacer bar
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821119455.5U
Other languages
Chinese (zh)
Inventor
李生财
陈宏忠
戴虎斌
魏红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tenth Engineering Co LtdOf Cccc Fourth Highway Engineering Co ltd
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
China Communications Four Public Bureau Bridge And Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Four Public Bureau Bridge And Tunnel Engineering Co Ltd filed Critical China Communications Four Public Bureau Bridge And Tunnel Engineering Co Ltd
Priority to CN201821119455.5U priority Critical patent/CN209240260U/en
Application granted granted Critical
Publication of CN209240260U publication Critical patent/CN209240260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of prefabricated case beam bellows coordinate location devices, belong to the technical field that science of bridge building prefabricated box -beam component uses utilizing prestressing force post tensioning method construction, utility model device includes pedestal, X, Y coordinates axis is provided on pedestal, round steel or angle steel are welded on X, Y coordinates axis, web reinforcement is placed with from X, Y-axis intersection point in X, Y plane, the duct position of bellows is located on pedestal, the anchor point i.e. spacer bar head as bellows spacer bar position is welded with around the duct position of bellows.The utility model can accurately find out position of the bellows in web reinforcement by the foundation of pedestal coordinate system;It is avoided by control point device in welding bellows spacer bar simultaneously because of deviation caused by human factor;Secondly, first machining bellows positioning bar, avoids the interference of other Reinforcing Steel Bar On Wave line pipe positioning bars welding;Improve the accuracy of bellows positioning bar installation effectiveness and corrugated pipe pipeline position.

Description

A kind of prefabricated case beam bellows coordinate location device
Technical field
The utility model belongs to the technical field that science of bridge building prefabricated box -beam component uses utilizing prestressing force post tensioning method construction, specifically It is related to a kind of prefabricated case beam bellows coordinate location device.
Background technique
Post-tensioned precast box girder is stringenter to the pipeline location requirement of bellows, and whether pipeline location accurately directly affects Whether the tension stress to post-tensioned precast box girder is able to satisfy design requirement, is related to the service life of box beam.It is constructing at present In the process to the control of pipeline location be by designing institute to pipeline coordinate realize, i.e., along beam length given in design drawing The X-coordinate in direction and Y-coordinate relative to box beam bottom plate.
The coordinate setting process sequence of existing bellows is, first mounting base, web reinforcement welding bellows groined type again Positioning bar finally wears bellows.
The prior art the disadvantage is that: the pipeline coordinate (position i.e. relative to box beam bottom plate) of bellows is to pass through groined type Positioning bar controls, and such method is carried out after bottom web reinforcement is installed, difficulty of construction and grid deviation are larger, Prior art process velocity is slow.
Utility model content
For the above-mentioned technical problems in the prior art, the utility model proposes a kind of prefabricated case beam bellows seats Positioning device is marked, design rationally, overcomes the deficiencies in the prior art, has good effect.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of prefabricated case beam bellows coordinate location device, including pedestal are provided with X, Y coordinates axis on pedestal, sit in X, Y It is welded with round steel or angle steel on parameter, is placed with web reinforcement from X, Y-axis intersection point in X, Y plane, wave is located on pedestal The duct position of line pipe, be welded with around the duct position of bellows as bellows spacer bar position anchor point i.e. Spacer bar head.
Preferably, pedestal is made of aluminum alloy plate materials or steel plate.
Preferably, spacer bar head can be replaced by same specification bolt.
Advantageous effects brought by the utility model:
The utility model is segmented a setting-out according to ripple pipeline type and welds sizing, for reusing, avoids every Secondary single-piece setting-out improves production efficiency to save manually.
Position of the bellows in web reinforcement can be accurately found out by the foundation of pedestal coordinate system;Pass through control simultaneously Point device is avoided in welding bellows spacer bar because of deviation caused by human factor;Secondly, by existing post-processing Bellows spacer bar (after web reinforcement installation) is changed to first machining bellows positioning bar, avoids other Reinforcing Steel Bar On Wave line pipes The interference of positioning bar welding.
Utility model device can the factorial production, control point can be fabricated to the dress of adjustable Y-coordinate in Y direction It sets;Substantially increase the accuracy of bellows positioning bar installation effectiveness and corrugated pipe pipeline position.
Detailed description of the invention
Fig. 1 is the reference axis schematic diagram established on pedestal.
Fig. 2 is that the web reinforcement processed puts schematic diagram from X, Y-axis intersection point in X, Y plane.
Fig. 3 for according to drawing the schematic diagram of bellows duct position is made to the Y-coordinate of bellows.
Fig. 4 is the positioning device schematic diagram of the utility model bellows.
Wherein: 1- pedestal;2- spacer bar head.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further detail the utility model:
Embodiment 1:
A kind of prefabricated case beam bellows coordinate location device is provided with X, Y seat as shown in figure 4, including pedestal 1 on pedestal 1 Parameter is welded with round steel or angle steel on X, Y coordinates axis, web reinforcement is placed with from X, Y-axis intersection point in X, Y plane, in platform The duct position of bellows is located on seat 1, is welded with around the duct position of bellows as bellows spacer bar The anchor point of position, that is, spacer bar head 2.
Pedestal 1 is made of aluminum alloy plate materials or steel plate.
Spacer bar head can be replaced by same specification bolt.
Embodiment 2:
On the basis of the above embodiments, the utility model is also mentioned that a kind of prefabricated case beam bellows coordinate location method, Include the following steps:
Step 1: pedestal production;Specifically comprise the following steps:
Step 1.1: establishing coordinate system
X, Y coordinates axis is drawn on pedestal, and round steel or angle steel are welded on X, Y coordinates axis;As shown in Figure 1;
Step 1.2: coordinate setting;
The web reinforcement processed is put in X, Y plane from X, Y-axis intersection point;As shown in Figure 2;
X, the y-coordinate of the bellows given according to drawing position the duct position of bellow respectively;As shown in Figure 3;
Step 2: welding bellows coordinate control point;
Anchor point of the spacer bar head as bellows spacer bar position is welded around the duct position of bellows, Spacer bar head line, which is formed by outside rectangle, is cut in bellows;
Step 3: repeating step 1-2, the bellows coordinate control point in remaining web reinforcement is made on pedestal;
Step 4: the web reinforcement of bellows spacer bar will have been welded, installed to steel bar framework of box beam;
Step 5: bellows being passed through into the web reinforcement on steel bar framework of box beam, that is, completes the accurate positionin of bellows.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model, are also answered Belong to the protection scope of the utility model.

Claims (3)

1. a kind of prefabricated case beam bellows coordinate location device, it is characterised in that: including pedestal, be provided with X, Y coordinates on pedestal Axis is welded with round steel or angle steel on X, Y coordinates axis, web reinforcement is placed with from X, Y-axis intersection point in X, Y plane, in pedestal On the duct position of bellows is located, be welded with around the duct position of bellows as bellows spacer bar position Anchor point, that is, spacer bar head.
2. prefabricated case beam bellows coordinate location device according to claim 1, it is characterised in that: pedestal is by aluminium alloy plate Material or steel plate are made.
3. prefabricated case beam bellows coordinate location device according to claim 1, it is characterised in that: spacer bar head can It is replaced using same specification bolt.
CN201821119455.5U 2018-07-16 2018-07-16 A kind of prefabricated case beam bellows coordinate location device Active CN209240260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821119455.5U CN209240260U (en) 2018-07-16 2018-07-16 A kind of prefabricated case beam bellows coordinate location device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821119455.5U CN209240260U (en) 2018-07-16 2018-07-16 A kind of prefabricated case beam bellows coordinate location device

Publications (1)

Publication Number Publication Date
CN209240260U true CN209240260U (en) 2019-08-13

Family

ID=67516701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821119455.5U Active CN209240260U (en) 2018-07-16 2018-07-16 A kind of prefabricated case beam bellows coordinate location device

Country Status (1)

Country Link
CN (1) CN209240260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108705669A (en) * 2018-07-16 2018-10-26 中交四公局桥隧工程有限公司 A kind of prefabricated case beam bellows coordinate location device and localization method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108705669A (en) * 2018-07-16 2018-10-26 中交四公局桥隧工程有限公司 A kind of prefabricated case beam bellows coordinate location device and localization method

Similar Documents

Publication Publication Date Title
CN101736698B (en) Accurate positioning method for cable-stayed bridge pylon cable guide pipe
CN209240260U (en) A kind of prefabricated case beam bellows coordinate location device
CN205975382U (en) Adjustable device of cast -in -situ box girder prestressing force bellows coordinate
CN103255918B (en) Concrete double-curved-surface thin shell cylinder construction method
CN108705669A (en) A kind of prefabricated case beam bellows coordinate location device and localization method
CN105317052A (en) Tower crane foundation bolt fixing method
CN108972872A (en) A kind of mesh sheet steel reinforcement framework cage for bridge member
CN111519910B (en) Multi-angle large-slope steel column hoisting method and protection frame body assembly used in cooperation with same
CN206815542U (en) A kind of portable bracket pre-embedded bolt fixed structure
CN203391095U (en) Strapping mold for rebar framework of box girder
CN105113799A (en) Prearranged adjustable clamping fixture of large embedded part and construction method thereof
CN203066491U (en) Locator for installing round tube type connection member
CN206769195U (en) Tension rib exempts from the shaped steel crossed and Steel Reinforced Concrete Beams
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN211775082U (en) Jig frame for large-span pipe truss
CN210134525U (en) Connecting structure capable of quickly mounting steel beam
CN113699961A (en) Pile-beam connecting structure and method for offshore independent fixed concrete mixing station
CN219528123U (en) Special-shaped grid suspended ceiling structure
CN220954534U (en) High-altitude overlength cantilever supporting system based on BIM
CN207314532U (en) A kind of box column-H-type joist steel frame joint
CN220847059U (en) Fish biogas flying beam based on BIM technology hoisting construction
CN220280009U (en) Precast beam prestressing force pipeline reinforcing bar location bed-jig
CN102720361A (en) Wide-span steel pipe hollow concrete floor plate lower suspending type truss moulding board construction method
CN217998153U (en) Positioning device for tensioning buried pipe in mixed tower fan foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 101101, 11 floor, long Fu Building, 432 East Road, Tongzhou District, Beijing.

Patentee after: THE TENTH ENGINEERING CO., LTD.OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

Address before: 101101, 11 floor, long Fu Building, 432 East Road, Tongzhou District, Beijing.

Patentee before: CCCC FOURTH HIGHWAY ENGINEERING BRIDGE AND TUNNEL ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190912

Address after: 100010 Beijing city Dongcheng District Jiaodaokou South Street No. 114

Co-patentee after: THE TENTH ENGINEERING CO., LTD.OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

Address before: 101101, 11 floor, long Fu Building, 432 East Road, Tongzhou District, Beijing.

Patentee before: THE TENTH ENGINEERING CO., LTD.OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.