CN209237628U - The construction site depositing dust circulatory system - Google Patents
The construction site depositing dust circulatory system Download PDFInfo
- Publication number
- CN209237628U CN209237628U CN201822117864.8U CN201822117864U CN209237628U CN 209237628 U CN209237628 U CN 209237628U CN 201822117864 U CN201822117864 U CN 201822117864U CN 209237628 U CN209237628 U CN 209237628U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- spray
- water storage
- storage cavity
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Separation Of Particles Using Liquids (AREA)
Abstract
The utility model designs dust-settling technology field, more particularly to a kind of construction site depositing dust circulatory system, including mobile base, mobile base is equipped with cabinet, it is purify cavity that lower part, which is water storage cavity top, in cabinet, storing up is spray chamber on the left of purify cavity, right side is mud chamber, spray chamber is connected to lower part with mud chamber top and is separated with baffle, air-introduced machine I is equipped in spray chamber, air-introduced machine II is equipped in mud chamber, filter plate is equipped in water storage cavity, cabinet left side wall is equipped with sewage draining exit, plug I is equipped at sewage draining exit, the right side wall top of water storage cavity is equipped with water inlet, the bottom of water storage cavity is equipped with water outlet, micropump is additionally provided in water storage cavity, micropump is connected with spray tube, spray tube extends to spray chamber top, the part being located in spray chamber on spray tube is additionally provided with spray port, the utility model effectively indoor fugitive dust can dropped Dirt processing, while water resource can be recycled in depositing dust processing, save resource.
Description
Technical field
The utility model designs dust-settling technology field more particularly to a kind of construction site depositing dust circulatory system.
Background technique
For Optimizing City air environment, people's lives environmental quality is improved, the fugitive dust of current construction site is prevented and treated, especially
It is that aerial fugitive dust prevents and treats emphasis, the difficulties having become in construction management work, and present government department has been directed to city
Political affairs class construction is defined, and needs to guarantee being effectively treated for dust, present construction site when carrying out dust processing,
It is mostly cleared up by spray water, during spray water, most of moisture is all directly to be sprayed now,
Moisture after sprinkling is directly fallen, and this method plays certain effect to Dust Improvement really, but existing in construction
It is indoor also to generate a large amount of dust, especially indoor cement flooring, when interior architecture is constructed, can there are many building rubbish
Rubbish generates, and when handling flooring, needs to clear up building waste, inherently generates when cleaning and largely raises
Dirt, fugitive dust can affect the health of construction personnel, but existing indoor fugitive dust is with device is inhibited, and is using spray mostly
The mode of water inhibits indoor fugitive dust, and this mode is after use, will cause fugitive dust and water is mixed to form muddy water collection
On poly- ground indoors, to cause ground more dirty, user is extremely inconvenient when sweeping interior, existing simultaneously
Some apparatus structures are complex, after device use, it is difficult to the fugitive dust that apparatus main body inside is gathered timely is handled,
To easily be damaged to device and user is more inconvenient in operation.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of construction site depositing dust circulation
System can effectively carry out indoor fugitive dust carrying out depositing dust processing, while can follow to water resource in depositing dust processing
Ring utilizes, and has saved resource.
The utility model is achieved through the following technical solutions: a kind of construction site depositing dust circulatory system, including
Mobile base is provided with cabinet in the mobile base, and the cabinet left upper portion is provided with air inlet, lower part in the cabinet
It is purify cavity for water storage cavity top, double-edged fine-toothed comb is provided between the water storage cavity and purify cavity, is spray chamber on the left of the purify cavity,
Right side is mud chamber, and the spray chamber is connected to lower part with mud chamber top and is separated with baffle, and left side is provided in the spray chamber
Air-introduced machine I, right side is provided with air-introduced machine II in the mud chamber, and air outlet, institute are additionally provided on the right side wall of the mud chamber
It states water storage cavity high inside and is additionally provided with filter plate, the cabinet left side wall and filter plate between cabinet left side wall and blower II
Junction be additionally provided with sewage draining exit, be provided with plug I at the sewage draining exit, the right side wall top of the water storage cavity be provided with into
The mouth of a river, the bottom of the water storage cavity are provided with water outlet, and micropump is additionally provided in the water storage cavity, and the micropump goes out
Spray tube is connected at the mouth of a river, the spray tube extends to spray chamber top, the part in spray chamber is located on the spray tube
It is additionally provided with spray port.
Further, the air inlet is additionally provided with filter screen.
Further, the blower I is tilted to the left setting.
Further, the filter plate inclination installation, the right end of the filter plate are higher than the left end of filter plate.
Further, solid slab is also equipped on the part on the double-edged fine-toothed comb between baffle and cabinet right side wall.
Further, the water outlet is tilted to the left setting, is provided with and identical as water outlet inclines on the cabinet left side wall
Rake angle and the tapped through hole being located along the same line are coated with plug II, the right end of the plug II in the tapped through hole
Extend to the bottom end of water outlet.
Further, it is additionally provided with scraper plate holder on the right side of the cabinet, is placed with scraper plate in the scraper plate holder,
The scraper plate is rectangle, and the length value of the scraper plate is less than the diameters of sewage draining exit, is additionally provided with drawing on the scraper plate
Bar.
The utility model has the beneficial effects that: the utility model effectively can carry out at depositing dust to indoor fugitive dust
Reason, mobile base can be convenient movement, and filter screen can stop bulkrage to enter in cabinet, box inner structure is avoided to damage
It is bad, durability is enhanced, baffle can be directly entered in air-introduced machine II after coming out in air-introduced machine I to avoid wind, and baffle can also be kept off
Firmly a part of dust, filter plate can be filtered the water containing dust, recycling for water may be implemented, scraper plate can be right
Meeting dust is cleared up on filter plate, and simple and convenient, the design of plug II can make one in the i.e. openable water outlet in the side of cabinet
Mouthful, it is more convenient.
Detailed description of the invention
Fig. 1 is the schematic diagram of the main view of the utility model embodiment 1;
Fig. 2 is the scraper plate of the utility model embodiment 1 and the structure chart of pull rod;
Wherein: 1- mobile base, 2- filter plate, 3- baffle, 4- micropump, 5- pull rod, 6- water inlet, 7- scraper plate are placed
Frame, 8- air outlet, 9- scraper plate, 10- air-introduced machine II, 11- spray tube, 12- spray head, 13- air-introduced machine I, 14- air inlet, 15- filtering
Net, 16- cabinet, 17- plug I, 18- plug II.
Specific embodiment
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection,
Or it is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediary can also be passed through
It is indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, it can be managed with concrete condition
Solve the concrete meaning of above-mentioned term in the present invention.
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment 1
A kind of construction site depositing dust circulatory system as shown in Figs. 1-2, including mobile base 1 are equipped in mobile base 1
Rectangular cabinet 16, the left upper portion of cabinet 16 are machined with air inlet 14, and filter screen 15 is also equipped at air inlet 14, filtering
Net 15 is divided into the purify cavity on top and the water storage cavity of lower part, purifies for stopping bulkrage to enter in cabinet 16 in cabinet 16
Double-edged fine-toothed comb is installed, wherein left part is spray chamber in purify cavity, and right part is mud chamber, spray chamber and mud chamber between chamber and water storage cavity
Between air-introduced machine I 13 is installed, the upper end of air-introduced machine I 13 is fixed on the upper end medial surface of cabinet 16 by connecting plate, air inducing
The lower end of machine I 13 is fixed on double-edged fine-toothed comb, and air-introduced machine II 10 is equipped in mud chamber, and air-introduced machine II 10 is fixed on double-edged fine-toothed comb, air inducing
The air outlet 8 of machine is located on the right side wall of cabinet 16, and the left side of air-introduced machine II 10 is also equipped with baffle 3, the height of baffle 3 and draws
The mounting height of blower II 10 is identical, and the bottom end of baffle 3 is mounted on double-edged fine-toothed comb, and the side of baffle 3 is fixed on the side wall of cabinet 16
On, baffle 3, which can be first encountered, from the wind come out in air-introduced machine I 13 so then enters baffle 3 and air-introduced machine II 10 above baffle 3
Between, it is finally inhaled into air-introduced machine II 10 and is discharged outside cabinet 16, the part on 3 right side of air-introduced machine baffle is wherein located on double-edged fine-toothed comb
On be also equipped with one layer of transverse slat, transverse slat enters water storage cavity for preventing wind from passing through double-edged fine-toothed comb after coming out in blower I, is then passed through baffle
3 and the double-edged fine-toothed comb on the right side of cabinet 16 be directly entered blower II.
Water storage cavity top is also equipped with filter plate 2, and filter plate 2 is due to the dust in filtered points water, the installation of 2 left end of filter plate
On the left side wall of cabinet 16, right end is mounted on double-edged fine-toothed comb and corresponding with the position where baffle 3,16 left side of cabinet and filter plate
It is machined with sewage draining exit above 2 junction, plug I 17 is installed on sewage draining exit, micropump 4 is installed on the right side of water storage cavity, it is micro-
The water outlet of type pump 4 is connected with spray tube 11, and spray tube 11 extends to spray chamber top along the inner sidewall of cabinet 16 and connects
There is spray head 12, such wind enters spray chamber from air inlet 14, and dust in wind is met the water quality a part that becomes larger and can be fallen directly on
It being fallen on filter plate 2 again on double-edged fine-toothed comb, another part can be sucked in mud chamber by air-introduced machine I 13, then due to the presence of baffle 3,
Wind can only enter in air-introduced machine II 10 from above baffle 3, and in this process, another part dust in wind is some due to gravity
It falls directly on filter plate 2, another part is blown on baffle 3, is finally also fallen on filter plate 2.
Right side in mobile base 1 positioned at cabinet 16 is also equipped with 9 rack 7 of scraper plate, is placed on 9 rack 7 of scraper plate
Rectangular scraper plate 9 is connected with pull rod 5 on scraper plate 9, and wherein the catercorner length numerical value of scraper plate 9 is less than the length number of sewage draining exit
Value, when needing to clear up filter plate 2, scraper plate 9 can be lifted down from 9 rack 7 of scraper plate, water storage cavity is protruded into out of sewage draining exit
It is interior, it then holds pull rod 5 and cleans up the dust on filter plate 2 from sewage draining exit, while can be with right end when the installation of filter plate 2
It higher than left end, is convenient to clean in this way, water inlet 6 is machined on the right side wall of water storage cavity, the bottom surface of water storage cavity is left close to cabinet 16
Water outlet is machined at the position of side wall, water outlet is tilted to the left, and is machined on 16 left side wall of cabinet and water outlet same tilt
Angle and the tapped through hole being located along the same line are coated with plug II 18 in tapped through hole, and the right end of plug II 18 extends to
The bottom end of water outlet, preferably the water in water storage cavity can be discharged for the bottom surface that water outlet is located at cabinet 16, while only need
In side, rotation plug II 18 can make the water outlet of bottom, convenient and practical.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (7)
1. a kind of construction site depositing dust circulatory system, including mobile base, it is provided with cabinet in the mobile base, it is special
Sign is: the cabinet left upper portion is provided with air inlet, and it is purify cavity that lower part, which is water storage cavity top, in the cabinet, the storage
It is provided with double-edged fine-toothed comb between water cavity and purify cavity, is spray chamber on the left of the purify cavity, right side is mud chamber, the spray chamber and heavy
Shallow lake room top connection lower part is separated with baffle, and left side is provided with air-introduced machine I in the spray chamber, right side setting in the mud chamber
There is air-introduced machine II, air outlet is additionally provided on the right side wall of the mud chamber, the water storage cavity high inside is in cabinet left side wall
It is additionally provided with filter plate between blower II, the junction of the cabinet left side wall and filter plate is additionally provided with sewage draining exit, described
Plug I is provided at sewage draining exit, the right side wall top of the water storage cavity is provided with water inlet, and the bottom of the water storage cavity is provided with
Water outlet is additionally provided with micropump in the water storage cavity, and the water outlet of the micropump is connected with spray tube, the spray tube
Spray chamber top is extended to, the part being located in spray chamber on the spray tube is additionally provided with spray port.
2. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: the air inlet is also set
It is equipped with filter screen.
3. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: the blower I inclines to the left
Tiltedly setting.
4. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: the filter plate inclination peace
Dress, the right end of the filter plate are higher than the left end of filter plate.
5. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: be located at gear on the double-edged fine-toothed comb
Solid slab is also equipped on part between plate and cabinet right side wall.
6. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: the water outlet inclines to the left
Tiltedly setting, be provided on the cabinet left side wall with water outlet same tilt angle and the tapped through hole that is located along the same line,
Plug II is coated in the tapped through hole, the right end of the plug II extends to the bottom end of water outlet.
7. the construction site depositing dust circulatory system according to claim 1, it is characterised in that: the right side of the cabinet is also
It is provided with scraper plate holder, scraper plate is placed in the scraper plate holder, the scraper plate is rectangle, the length number of the scraper plate
Value is less than the diameters of sewage draining exit, is additionally provided with pull rod on the scraper plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822117864.8U CN209237628U (en) | 2018-12-17 | 2018-12-17 | The construction site depositing dust circulatory system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822117864.8U CN209237628U (en) | 2018-12-17 | 2018-12-17 | The construction site depositing dust circulatory system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209237628U true CN209237628U (en) | 2019-08-13 |
Family
ID=67533116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822117864.8U Expired - Fee Related CN209237628U (en) | 2018-12-17 | 2018-12-17 | The construction site depositing dust circulatory system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209237628U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111346458A (en) * | 2020-03-19 | 2020-06-30 | 合肥潜望镜机械科技有限公司 | Dust fall structure for building engineering |
CN112844801A (en) * | 2020-12-07 | 2021-05-28 | 上海建工五建集团有限公司 | Hydraulic separation vertical transportation system and method for solid wastes in construction site |
CN115518477A (en) * | 2022-03-08 | 2022-12-27 | 戴清伟 | Indoor dust-reducing device for building construction and use method thereof |
-
2018
- 2018-12-17 CN CN201822117864.8U patent/CN209237628U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111346458A (en) * | 2020-03-19 | 2020-06-30 | 合肥潜望镜机械科技有限公司 | Dust fall structure for building engineering |
CN112844801A (en) * | 2020-12-07 | 2021-05-28 | 上海建工五建集团有限公司 | Hydraulic separation vertical transportation system and method for solid wastes in construction site |
CN115518477A (en) * | 2022-03-08 | 2022-12-27 | 戴清伟 | Indoor dust-reducing device for building construction and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209237628U (en) | The construction site depositing dust circulatory system | |
CN211142947U (en) | Urban road sweeper with dust fall effect | |
CN211143223U (en) | Sponge city rainwater shunting hinders dirty anti-reflux discharging equipment | |
CN210654708U (en) | Take dust collection structure and deodorization function's garbage collection box | |
CN210386341U (en) | Vertical cabinet that sprays paint with dust removal structure | |
CN209696586U (en) | A kind of deduster | |
CN207871821U (en) | A kind of air device for reducing dust | |
CN207584708U (en) | Decoration furred ceiling light trough | |
CN209425870U (en) | A kind of cleaner in concrete production | |
CN210917164U (en) | Building road raise dust administers device | |
CN209612464U (en) | A kind of interior decoration construction dust isolating device | |
CN209278027U (en) | A kind of air cleaner of commercial car | |
CN209900966U (en) | Environment-friendly construction dust collector | |
CN212223712U (en) | Garbage collection device of sweeper | |
CN208363000U (en) | A kind of novel road vacuum sweeper | |
CN208533430U (en) | A kind of dust control device and road sweeper | |
CN210097166U (en) | Dust collector convenient to clearance | |
CN209352861U (en) | A kind of collection device | |
CN211328689U (en) | On-spot dust collector for construction | |
CN216170791U (en) | A air purification device that is used for intelligent building that filter effect is good | |
CN220215472U (en) | Fountain structure | |
CN109276966A (en) | A kind of environmental protection equipment for waste incinerator | |
CN219023759U (en) | High-efficient air filtration's wind revolves waste gas tower structure | |
CN210538159U (en) | Excrement cleaning device for chicken coop | |
CN214764194U (en) | Dust device is used in road construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190813 Termination date: 20201217 |