CN209228529U - A kind of high intensity hub of wind power generator - Google Patents
A kind of high intensity hub of wind power generator Download PDFInfo
- Publication number
- CN209228529U CN209228529U CN201821864914.2U CN201821864914U CN209228529U CN 209228529 U CN209228529 U CN 209228529U CN 201821864914 U CN201821864914 U CN 201821864914U CN 209228529 U CN209228529 U CN 209228529U
- Authority
- CN
- China
- Prior art keywords
- splicing
- shell
- main shaft
- mounting base
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Abstract
The utility model discloses a kind of high-intensitive hub of wind power generator, it is related to technical field of wind power generation, including transmission main shaft, transmission connecting mechanism is installed below the transmission main shaft, assembled mechanism is installed below the transmission connecting mechanism, deflector is installed below the assembly mechanism.The high intensity hub of wind power generator, pass through anti-skidding six flower trough and anti-skidding six line rod, it can prevent the problem of causing weak vibrations between connecting plate and fixed plate during use, improve the intensity of installation, installation can be fixed to the first splicing shell and the second splicing shell by screw thread pipe, and two groups of blade mounting bases is made to be spliced into three mounting bases, the ability to bear of hull outside can be enhanced by the installation of three groups of threaded rods, preferably pod can be mounted in water conservancy diversion mounting base, so as to carry out water conservancy diversion to air-flow, the problem for avoiding causing impact force excessive shell when wind-force is excessive, improve the use intensity of the device.
Description
Technical field
The utility model relates to technical field of wind power generation, specially a kind of high-intensitive hub of wind power generator.
Background technique
Wind-power electricity generation refers to that the kinetic energy kept watch switchs to electric energy, and wind is a kind of energy of not public hazards, non-using wind-power electricity generation
Chang Huanbao, and the electric energy that can be generated is very huge, therefore increasingly payes attention to wind-power electricity generation, and wind is inexhaustible, not with it
It exhausts, for water shortage, short bunker and the offshore islands having inconvenient traffic, Pastoral Areas, mountain area and plateau band, utilizes to adaptation to local conditions
Wind-power electricity generation is very suitble to, during installing and using, is influenced by weather in wind-driven generator, and hail is easy to generator
Wheel hub is hit, so that wheel hub intensity is easy to cause damage when lower.
During use, exposing to the weather is passed through on surface to hub of wind power generator, when by bad weather, easy pair
Wheel hub causes to impact, and damages wheel hub, and intensity is lower, affects the safety in utilization of hub of wind power generator.
Utility model content
The purpose of the utility model is to provide a kind of high-intensitive hub of wind power generator, have high-intensitive advantage, solve
Hub of wind power generator intensity lower problem.
Technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of high intensity hub of wind power generator, packet
Transmission main shaft is included, transmission connecting mechanism is installed below the transmission main shaft, is equipped with below the transmission connecting mechanism
Assembled mechanism is equipped with deflector below the assembly mechanism, and the assembly mechanism includes the first splicing shell, blade installation
Seat, the second splicing shell, main shaft mounting base, threaded rod, nut, the first splicing ring, the second splicing ring, the first installing pipe, the second peace
Tubulature and screwed pipe are placed with the first splicing shell below the transmission main shaft, be placed with below the first splicing shell with
The upper of shell outer surface is spliced in the compatible second splicing shell of first splicing shell, the lower part and second of first splicing shell outer surface
Portion is fixedly connected to the blade mounting base of circular array, and the lower part of first splicing shell outer surface is fixedly connected in ring
The top of first splicing ring of shape array, second splicing shell outer surface is fixedly connected with the second splicing of circular array
The upper surface of ring, each first splicing ring is placed with the nut being spaced substantially equidistant, the middle part of each nut bottom surface
It is fixedly connected to threaded rod, the upper surface of each first splicing ring is fixed to be inlaid with the first installation being spaced substantially equidistant
Pipe, the upper surface of each second splicing ring is fixed to be inlaid with the second installing pipe, and the first installing pipe and the second installing pipe
It is connected, the bottom end of each threaded rod sequentially passes through the first installing pipe and the second installing pipe and extends to the second splicing ring
Lower section, it is described first splicing shell upper surface be fixedly connected with main shaft mounting base.
The transmission connecting mechanism includes connecting plate, mounting hole, fixed plate, nut, shank of screw, anti-skidding six flower trough and anti-skidding
Six line rods, the bottom surface of the transmission main shaft are fixedly connected with connecting plate, and the upper surface of the main shaft mounting base is fixedly connected with
The upper surface of fixed board, the main shaft mounting base is fixedly connected with the shank of screw of circular array, and the bottom surface of the connecting plate opens up
There are the mounting hole of circular array, one end equal penetrating mounting holes of each shank of screw far from main shaft mounting base and the company of extending to
The top of fishplate bar offers anti-skidding six flower trough in the middle part of the fixed plate upper surface, and the middle part of the connecting plate bottom surface is fixed to be connected
It is connected to anti-skidding six line rod compatible with anti-skidding six flower trough, and anti-skidding six line rod extends to the inside of anti-skidding six flower trough.
The deflector includes water conservancy diversion mounting base, pod, mounting plate, supporting block and filled and process, and described second spells
The bottom surface of body contact is fixedly connected with water conservancy diversion mounting base, is placed with below the second splicing shell compatible with the second splicing shell
Pod, the inside of the pod are fixedly connected with the supporting block of circular array, and the inside of the pod is placed with peace
Loading board, each one end of the supporting block far from pod inner sidewall are fixedly connected with the bottom surface of mounting plate, and mounting plate
Upper surface is fixedly connected with the bottom surface of water conservancy diversion mounting base.
Further, the lower section of each second splicing ring is placed with screwed pipe compatible with threaded rod, and spiral shell
Line pipe is threadedly coupled with threaded rod, can be preferably by screwing each screwed pipe between the first splicing shell and the second splicing shell
It is installed, to enhance the anti-impact force of the hub shell.
Further, the upper surface of the connecting plate is placed with the nut of circular array, and nut and shank of screw screw thread
Connection, can preferably be installed and then screwing each nut to connecting plate between fixed plate, thus preferably to biography
Dynamic main shaft is sequentially connected.
Further, the inside of the pod is filled with filled and process, and the diameter value inside the pod top is small
Diameter value in the second splicing shell top can preferably enhance the anti-impact force of pod by filled and process, preferably logical
It crosses pod and carries out water conservancy diversion processing.
Further, the bottom surface of the connecting plate is parallel with the upper surface of main shaft mounting base, and the diameter value of connecting plate
Equal to the diameter value of main shaft mounting base, installation operation preferably can be carried out to connecting plate.
Further, the diameter value of the first splicing shell and the second splicing shell one side close to each other is equal, and described the
The quantity of one splicing ring and the second splicing ring is at least three, can preferably pacify to the first splicing shell and the second splicing shell
Dress avoids the problem that diameter is caused not wait and impact intensity during installation.
1, high intensity hub of wind power generator, by being provided with transmission main shaft, with the use of the first splicing shell, connection
Plate, mounting hole, fixed plate, nut, shank of screw, anti-skidding six flower trough and anti-skidding six line rod can preferably insert anti-skidding six line rod
Enter to the inside of anti-skidding six flower trough, and make each shank of screw penetrating mounting holes, to be carried out by tightening nut to transmission main shaft
Firm installation can preferably be prevented connecting plate during use and be consolidated by anti-skidding six flower trough and anti-skidding six line rod
The problem of weak vibrations are caused between fixed board improves the intensity of installation.
2, the high intensity hub of wind power generator, by be provided with the first splicing shell, blade mounting base, second splicing shell,
Threaded rod, nut, the first splicing ring, the second splicing ring, the first installing pipe, the second installing pipe and screwed pipe, can preferably by
Each threaded rod is inserted into the first installing pipe and the second installing pipe respectively, thus by screw thread pipe to first splicing shell and
Installation is fixed in second splicing shell, and two groups of blade mounting bases is made to be spliced into three mounting bases, thus preferably to blade into
Row is fixedly mounted, and can preferably enhance the ability to bear of hull outside by the installation of three groups of threaded rods, be led by being provided with
Mounting base, pod, mounting plate, supporting block and filled and process are flowed, preferably pod can be mounted in water conservancy diversion mounting base,
So as to preferably carry out water conservancy diversion to air-flow, the problem for avoiding causing impact force excessive shell when wind-force is excessive is improved
The use intensity of the device.
Detailed description of the invention
Fig. 1 is that the utility model first splices shell front view;
Fig. 2 is structure enlargement diagram at A in the utility model Fig. 1;
Fig. 3 is the utility model fixed plate top view;
Fig. 4 is that the utility model second splices shell bottom view.
In figure: 1 transmission main shaft, 2 transmission connecting mechanisms, 201 connecting plates, 202 mounting holes, 203 fixed plates, 204 nuts,
205 shanks of screw, 206 anti-skidding six flower troughs, 207 anti-skidding six line rods, 3 assembled mechanisms, 301 first splicing shells, 302 blade mounting bases,
303 second splicing shells, 304 main shaft mounting bases, 305 threaded rods, 306 nuts, 307 first splicing rings, 308 second splicing rings, 309
First installing pipe, 310 second installing pipes, 311 screwed pipes, 4 deflectors, 401 water conservancy diversion mounting bases, 402 pods, 403 installations
Plate, 404 supporting blocks, 405 filled and process.
Specific embodiment
As shown in Figs 1-4, the utility model provides a kind of technical solution: a kind of high intensity hub of wind power generator, including
Transmission main shaft 1, the lower section of transmission main shaft 1 are equipped with transmission connecting mechanism 2, and the lower section of transmission connecting mechanism 2 is equipped with assembling machine
Structure 3, the lower section of assembled mechanism 3 are equipped with deflector 4, assembled mechanism 3 include the first splicing shell 301, blade mounting base 302,
Second splicing shell 303, main shaft mounting base 304, threaded rod 305, nut 306, first splice ring 307, second and splice ring 308, the
One installing pipe 309, the second installing pipe 310 and screwed pipe 311, the lower section of transmission main shaft 1 are placed with the first splicing shell 301, and first
The lower section of splicing shell 301 is placed with second splicing shell 303 compatible with the first splicing shell 301, the first splicing 301 outer surface of shell
Lower part and the top of the second splicing 303 outer surface of shell be fixedly connected to the blade mounting base 302 of circular array, first spells
The lower part of 301 outer surface of body contact is fixedly connected with the first splicing ring 307 of circular array, the second splicing 303 outer surface of shell
Top is fixedly connected with the second splicing ring 308 of circular array, and the first splicing shell 301 and the second splicing shell 303 are close to each other
The diameter value of one side is equal, and the quantity of the first splicing ring 307 and the second splicing ring 308 is at least three, can be preferably right
First splicing shell 301 and the second splicing shell 303 are installed, and avoid that diameter is caused not wait and impact intensity during installation
The upper surface of problem, each first splicing ring 307 is placed with the nut 306 being spaced substantially equidistant, in each 306 bottom surface of nut
Portion is fixedly connected to threaded rod 305, and the upper surface fixation of each first splicing ring 307 is inlaid with first be spaced substantially equidistant
The upper surface fixation of installing pipe 309, each second splicing ring 308 is inlaid with the second installing pipe 310, and the first installing pipe 309
It is connected with the second installing pipe 310, the bottom end of each threaded rod 305 sequentially passes through the first installing pipe 309 and the second installing pipe
310 and the lower section of the second splicing ring 308 is extended to, the lower section of each second splicing ring 308 is placed with suitable with 305 phase of threaded rod
The screwed pipe 311 matched, and screwed pipe 311 is threadedly coupled with threaded rod 305, it can be preferably by screwing each screwed pipe 311
It is installed between the first splicing shell 301 and the second splicing shell 303, so that the anti-impact force of the hub shell is enhanced, the
The upper surface of one splicing shell 301 is fixedly connected with main shaft mounting base 304.
Transmission connecting mechanism 2 includes connecting plate 201, mounting hole 202, fixed plate 203, nut 204, shank of screw 205, anti-skidding
Six flower troughs 206 and anti-skidding six line rod 207, the bottom surface of transmission main shaft 1 are fixedly connected with connecting plate 201, the bottom surface of connecting plate 201 with
The upper surface of main shaft mounting base 304 is parallel, and the diameter value of connecting plate 201 is equal to the diameter value of main shaft mounting base 304, can
Installation operation preferably is carried out to connecting plate 201, the upper surface of main shaft mounting base 304 is fixedly connected with fixed plate 203, main shaft peace
The upper surface of dress seat 304 is fixedly connected with the shank of screw 205 of circular array, and the bottom surface of connecting plate 201 offers battle array in a ring
The mounting hole 202 of column, the equal penetrating mounting holes 202 in the one end of each shank of screw 205 far from main shaft mounting base 304 simultaneously extend to connection
The top of plate 201, the upper surface of connecting plate 201 are placed with the nut 204 of circular array, and nut 204 and 205 spiral shell of shank of screw
Line connection, can preferably be installed between fixed plate 203 and then screwing each nut 204 to connecting plate 201, thus
It is preferably sequentially connected to transmission main shaft 1, anti-skidding six flower trough 206, connecting plate is offered in the middle part of 203 upper surface of fixed plate
Anti-skidding six line rod 207 compatible with anti-skidding six flower trough 206 is fixedly connected in the middle part of 201 bottom surfaces, and anti-skidding six line rod 207 prolongs
Extend to the inside of anti-skidding six flower trough 206.
Deflector 4 includes water conservancy diversion mounting base 401, pod 402, mounting plate 403, supporting block 404 and filled and process
405, the bottom surface of the second splicing shell 303 is fixedly connected with water conservancy diversion mounting base 401, and the lower section of the second splicing shell 303 is placed with and the
The two splicing compatible pods 402 of shell 303, the inside of pod 402 are fixedly connected with the supporting block 404 of circular array,
The inside of pod 402 is placed with mounting plate 403, the one end of each supporting block 404 far from 402 inner sidewall of pod with installation
The bottom surface of plate 403 is fixedly connected, and the upper surface of mounting plate 403 is fixedly connected with the bottom surface of water conservancy diversion mounting base 401, pod
402 inside is filled with filled and process 405, and the diameter value inside 402 top of pod is straight less than the second splicing 303 top of shell
Diameter value can preferably be enhanced the anti-impact force of pod 402 by filled and process 405, preferably be carried out by pod 402
Water conservancy diversion processing.
In use, anti-skidding six line rod 207 to be inserted into the inside of anti-skidding six flower trough 206, and run through each shank of screw 205
Mounting hole 202 by anti-skidding six line rod 207 and is prevented to firmly be installed by tightening nut 204 to transmission main shaft 1
Sliding six flower troughs 206 can prevent the problem of causing transmission to shake when in use, and each threaded rod 305 is inserted into first respectively
Installing pipe 309 and the second installing pipe 310, thus by screw thread pipe 311 to the first splicing shell 301 and the second splicing shell 303
Installation is fixed, and two groups of blade mounting bases 302 is made to be spliced into three mounting bases, so that peace preferably be fixed to blade
Dress, can preferably be enhanced the ability to bear of hull outside by the installation of three groups of threaded rods 305, pod 402 is mounted on
In water conservancy diversion mounting base 401, so as to preferably carry out water conservancy diversion to air-flow, avoid causing impact force to shell when wind-force is excessive
Excessive problem improves the use intensity of the hub of wind power generator.
Claims (6)
1. a kind of high intensity hub of wind power generator, including transmission main shaft (1) is equipped with biography below the transmission main shaft (1)
It moves bindiny mechanism (2), is equipped with assembled mechanism (3) below the transmission connecting mechanism (2), under the assembly mechanism (3)
Side is equipped with deflector (4), it is characterised in that: the assembly mechanism (3) includes the first splicing shell (301), blade mounting base
(302), second splicing shell (303), main shaft mounting base (304), threaded rod (305), nut (306), first splicing ring (307),
Second splicing ring (308), the first installing pipe (309), the second installing pipe (310) and screwed pipe (311), the transmission main shaft (1)
Lower section be placed with the first splicing shell (301), be placed with below first splicing shell (301) and the first splicing shell (301)
Compatible second splicing shell (303), the lower part of first splicing shell (301) outer surface and second splicing shell (303) appearance
The top in face is fixedly connected to the blade mounting base (302) of circular array, and described first splices under shell (301) outer surface
Portion is fixedly connected with the first splicing ring (307) of circular array, and the top of second splicing shell (303) outer surface is fixed to be connected
It is connected to the second splicing ring (308) of circular array, the upper surface of each first splicing ring (307) is placed with equidistant
The nut (306) of arrangement is fixedly connected to threaded rod (305) in the middle part of each nut (306) bottom surface, each described
The upper surface of one splicing ring (307) is fixed to be inlaid with the first installing pipe (309) being spaced substantially equidistant, each second splicing
The fixation of the upper surface of ring (308) is inlaid with the second installing pipe (310), and the first installing pipe (309) and the second installing pipe (310)
It is connected, the bottom end of each threaded rod (305) sequentially passes through the first installing pipe (309) and the second installing pipe (310) simultaneously
The lower section of the second splicing ring (308) is extended to, the upper surface of first splicing shell (301) is fixedly connected with main shaft mounting base
(304);
The transmission connecting mechanism (2) includes connecting plate (201), mounting hole (202), fixed plate (203), nut (204), screw
The bottom surface of bar (205), anti-skidding six flower trough (206) and anti-skidding six line rod (207), the transmission main shaft (1) is fixedly connected with connection
The upper surface of plate (201), the main shaft mounting base (304) is fixedly connected with fixed plate (203), the main shaft mounting base (304)
Upper surface be fixedly connected with the shank of screw (205) of circular array, the bottom surface of the connecting plate (201) offers battle array in a ring
The mounting hole (202) of column, one end equal penetrating mounting holes (202) of each shank of screw (205) far from main shaft mounting base (304)
And the top of connecting plate (201) is extended to, anti-skidding six flower trough (206), institute are offered in the middle part of fixed plate (203) upper surface
It states and is fixedly connected with compatible anti-skidding six line rod (207) with anti-skidding six flower trough (206) in the middle part of connecting plate (201) bottom surface, and
Anti-skidding six line rod (207) extends to the inside of anti-skidding six flower trough (206);
The deflector (4) include water conservancy diversion mounting base (401), pod (402), mounting plate (403), supporting block (404) and
The bottom surface of filled and process (405), second splicing shell (303) is fixedly connected with water conservancy diversion mounting base (401), second splicing
Compatible pod (402), the inside of the pod (402) with the second splicing shell (303) are placed with below shell (303)
It is fixedly connected with the supporting block (404) of circular array, the inside of the pod (402) is placed with mounting plate (403), each
The supporting block (404) is fixedly connected with the bottom surface of mounting plate (403) far from one end of pod (402) inner sidewall, and pacifies
The upper surface of loading board (403) is fixedly connected with the bottom surface of water conservancy diversion mounting base (401).
2. a kind of high-intensitive hub of wind power generator according to claim 1, it is characterised in that: each second splicing
The lower section of ring (308) is placed with and threaded rod (305) compatible screwed pipe (311), and screwed pipe (311) and threaded rod
(305) it is threadedly coupled.
3. a kind of high-intensitive hub of wind power generator according to claim 1, it is characterised in that: the connecting plate (201)
Upper surface be placed with the nut (204) of circular array, and nut (204) is threadedly coupled with shank of screw (205).
4. a kind of high-intensitive hub of wind power generator according to claim 1, it is characterised in that: the pod (402)
Inside be filled with filled and process (405), the diameter value inside pod (402) top is less than the second splicing shell (303)
The diameter value on top.
5. a kind of high-intensitive hub of wind power generator according to claim 1, it is characterised in that: the connecting plate (201)
Bottom surface it is parallel with the upper surface of main shaft mounting base (304), and the diameter value of connecting plate (201) be equal to main shaft mounting base
(304) diameter value.
6. a kind of high-intensitive hub of wind power generator according to claim 1, it is characterised in that: the first splicing shell
(301) and the diameter value of second splicing shell (303) one side close to each other is equal, and first splicing ring (307) and second is spelled
The quantity for connecing ring (308) is at least three.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821864914.2U CN209228529U (en) | 2018-11-13 | 2018-11-13 | A kind of high intensity hub of wind power generator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821864914.2U CN209228529U (en) | 2018-11-13 | 2018-11-13 | A kind of high intensity hub of wind power generator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209228529U true CN209228529U (en) | 2019-08-09 |
Family
ID=67502678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821864914.2U Expired - Fee Related CN209228529U (en) | 2018-11-13 | 2018-11-13 | A kind of high intensity hub of wind power generator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209228529U (en) |
-
2018
- 2018-11-13 CN CN201821864914.2U patent/CN209228529U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205657609U (en) | Wave energy piezoelectricity generator | |
AU2010312204A1 (en) | Tower barrel for wind electric power generation | |
CN208203475U (en) | A kind of complementary power generator of scene water | |
CN206629010U (en) | A kind of generation of electricity by new energy device | |
CN202769541U (en) | Efficient energy gathering device of solar streetlamp | |
CN209228529U (en) | A kind of high intensity hub of wind power generator | |
CN107040192A (en) | A kind of adjustable angle and solar panel easy for installation | |
CN210640830U (en) | Solar photovoltaic board fixed knot constructs | |
CN210637189U (en) | High-efficiency wind power generation device | |
CN204669289U (en) | A kind of photovoltaic solar board mount of adjustable-angle | |
CN211296628U (en) | Photovoltaic power station for photovoltaic power generation | |
CN205064188U (en) | Solar cell panel fixing device and including its aerogenerator pylon | |
CN215927658U (en) | Domestic aerogenerator fixed mounting frame | |
CN206379486U (en) | Earthing or grounding means for wind-driven generator | |
CN214221404U (en) | Wind energy and photovoltaic complementary wind turbine tower | |
CN204993193U (en) | Solar cell panel fixing device and including its aerogenerator pylon | |
CN108001635B (en) | A kind of flotation gear in floating on water surface power station | |
CN201025231Y (en) | Wave energy generator | |
CN204190682U (en) | Solar energy tracking two dimensional scaffold and hooping structure thereof | |
CN207910713U (en) | A kind of basis of photovoltaic power generation apparatus waterborne | |
CN208041954U (en) | A kind of solar street light being convenient for changing solar panels | |
CN112443460B (en) | Wind energy photovoltaic complementary wind turbine tower | |
CN216767632U (en) | Wind power generation device convenient to install | |
CN217154016U (en) | New forms of energy street lamp | |
CN203038901U (en) | Novel graphite boat sticking point |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190809 Termination date: 20211113 |
|
CF01 | Termination of patent right due to non-payment of annual fee |