CN209226603U - A kind of anti-clogging Water Tank - Google Patents
A kind of anti-clogging Water Tank Download PDFInfo
- Publication number
- CN209226603U CN209226603U CN201821463751.7U CN201821463751U CN209226603U CN 209226603 U CN209226603 U CN 209226603U CN 201821463751 U CN201821463751 U CN 201821463751U CN 209226603 U CN209226603 U CN 209226603U
- Authority
- CN
- China
- Prior art keywords
- built
- pipe
- blow
- draining exit
- sewage draining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of anti-clogging Water Tanks, belong to sewage treatment relevant device technical field.Including tank body, the sand washing port of tank base is set, first sewage draining exit, second sewage draining exit and blowdown Anti-blocking structure, first sewage draining exit and the external blow-off line of the second sewage draining exit, the blow-off line is connected with suction pump, the blowdown Anti-blocking structure is located therein in the blow-off line of a sewage draining exit, blowdown Anti-blocking structure includes built-in pipe and the locating flange for being welded on built-in pipe bottom, tank interior is equipped with fluid level transmitter, the built-in pipe upper end is higher by sewage draining exit and is arranged at the zero-bit of fluid level transmitter, locating flange lower end is located at the connecting flange of blow-off line, it is filled using preserving and sealing circle in gap between the built-in pipe and blow-off line, in built-in pipe, outer surface is coated with corrosion-inhibiting coating.Situations such as the utility model is low in cost, transformation is convenient, can effectively avoid blowdown pipeline blocking, sewage pump damage.
Description
Technical field
The utility model relates to sewage treatment relevant device technical fields, and in particular to a kind of anti-clogging Water Tank.
Background technique
The high sulfur Gas Fields such as general light, first dam are in the process of running, sewage surge tank, the fire of each station and gas collection master station
The easily vicidities substance such as the solid particle polluters such as sedimentary sulfur, silt and acid solution, drilling fluid in the containers such as torch liquid separation tank.Drain
Shi Jiyi blocks the structural members such as Drainage pipe and corresponding filter, pump.Pipeline is easily caused to be blocked, suction pump dry grinding causes
The problems such as damage.
Such as the sewage surge tank and torch liquid separation tank in the gas field Yuan Ba start to come into operation in December, 2014, are producing
Basket filter often blocks before tank bottom pumps in journey, and tank bottom pump damage phenomenon often occurs.It, must not for steady production
Infrequently disassembly, cleaning and maintenance.Wherein Yuan Ba gas collection master station sewage surge tank, only in November, 2017 ties up tank bottom magnetic drive pump
It repairs 2 times, cleans 18/time of basket filter;December repairs tank bottom magnetic drive pump 1 time, cleans 63/time of basket filter.
It also needs weekly to arrange professional contingent's sand washing 1 time in the case where equipment out of use, probably needs 2.5 ten thousand yuans of left sides every time
The right side was calculated according to 52 weeks, 1,300,000 yuan of expense or so of light separate unit container sand washing every year.This problem seriously affects high sulfur-bearing
The stable operation in gas field also causes very big waste during de-plugging to human and material resources, while there is also great safety for de-plugging
Risk.
There are also the improvement to blow-off line in the prior art come the case where blocking when preventing blowdown, such as patent Shen
Please number be " CN201711217241.1 ", publication date be on 04 06th, 2018, the patent of invention of entitled " anti-blocking sewage pipe "
Application, technical solution are as follows: the internal sleeve of a kind of anti-blocking sewage pipe, including outer tube body and interior tube body, outer tube body is equipped with interior tube body,
Be equipped with elastic mechanism between the outside and outer tube body of the interior tube body, the inner wall of interior tube body is equipped with spiral salient, at the top of outer tube body into
The inside thread of water end (W.E.) is equipped with a master collet, and the inside thread on interior tube body top is equipped with a nozzle insert, the set of master collet
Pipe inside thread is equipped with water part.
However above-mentioned utility model mainly has following deficiency: structure is complicated for the blow-off line, and production is inconvenient, in cost of manufacture
High, complex manufacturing technology is not suitable for actual production application.
Utility model content
The utility model aims to solve the problem that the blow-off line to solve the blocking of waste water container equipment blowdown pipeline in the prior art
The problems such as structure is complicated, at high cost, propose it is a kind of it is at low cost, transformation is convenient, can effectively avoid blowdown pipeline blocking, dirty
Water pump damage, the blowdown Anti-blocking structure for influencing the problems such as production.The structure can reduce production loss, and it is strong to mitigate hand labor
Degree.
In order to achieve the above-mentioned object of the invention, the technical solution of the utility model is as follows:
The feed liquor pipeline and blow-down pipe of top of the tank is arranged in a kind of anti-clogging Water Tank, including tank body, is arranged in tank
The sand washing port of body bottom, the first sewage draining exit and the second sewage draining exit, it is characterised in that: first sewage draining exit and the second sewage draining exit are equal
External blow-off line, blow-off line are connected with suction pump, and blowdown Anti-blocking structure, the blowdown are equipped in one of blow-off line
Anti-blocking structure includes built-in pipe and the locating flange for being welded on built-in pipe bottom, and tank interior is equipped with fluid level transmitter, institute
It states built-in pipe upper end to be higher by sewage draining exit and be arranged at the zero-bit of fluid level transmitter, the locating flange lower end is located at sewage pipe
At the connecting flange in road, the gap between built-in pipe and blow-off line is filled with preserving and sealing circle, built-in pipe inner and outer surfaces
It is coated with corrosion-inhibiting coating.
The connecting flange is sealed with built-in pipe junction by welding.
Preserving and sealing circle overlapping is placed and is covered in built-in pipeline outer wall, preserving and sealing circle and blow-off line inner wall and interior
It sets pipeline outer wall to be bonded, the length of preserving and sealing circle setting is consistent with the length of sewage draining exit to locating flange.
Inflated diameter among the locating flange is identical with the internal diameter of built-in pipe.
The corrosion-inhibiting coating thickness is not less than 200mm.
The utility model has the beneficial effects that
(1) the utility model structure is simple and easy to operate, is able to solve the machined sewage for finishing and coming into operation and holds
Device equipment blowdown pipeline frequent jams problem, equipment live can repeat on the spot to dismount without returning factory's production, and do not influence other and set
Standby normal work.
(2) the utility model is low in cost, and each container transformation only needs 10,000 yuan or so of expense, the material including element
Artificial, small investment when material, processing and fabricating and transformation, transformation are simple.
(3) the utility model avoids the damage of the blocking of blowdown pipeline, the frequent clean of filter and tank bottom magnetic drive pump
Bad, separate unit Water Tank can save 400,000 yuan or so of cleaning and maintenance.
(4) the utility model may make the sand washing time of single device that can save from every half a year 1 time is extended to 1 times a week
About 1,200,000 yuan of sand washing expense or so;It is also effectively reduced simultaneously and relates to sulphur operations number, reduce the safety wind for relating to sulphur operation
Danger, alleviates the labor intensity of operator, maintains the stable operation of system.
(5) the built-in pipe liquid sucting port of the utility model is arranged at " 0 " position of fluid level transmitter, passes through fluid level transmitter pair
The monitoring that liquid level changes in tank, can judge whether sewage draining exit occurs blocking to close pump in time in time, anti-blocking to blowdown
Structure is cleared up and is overhauled.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the enlarged diagram of blowdown Anti-blocking structure;
Wherein,
1, tank body;2, sand washing port;3, the first sewage draining exit;4, the second sewage draining exit;5, blow-off line;6, suction pump;7, built-in
Pipeline;8, locating flange;9, fluid level transmitter;10, connecting flange;11, preserving and sealing circle;12, blowdown Anti-blocking structure.
Specific embodiment
The utility model is described in further detail below with reference to embodiment, but the embodiments of the present invention is not
It is limited to this.
Embodiment 1
The present embodiment is most basic embodiment.
As shown in Figs. 1-2, a kind of anti-clogging Water Tank, including tank body 1 are arranged in the feed liquor pipeline at 1 top of tank body and put
The sand washing port 2, the first sewage draining exit 3 and the second sewage draining exit 4 of 1 bottom of tank body, first sewage draining exit 3 and is arranged in blank pipe line
The external blow-off line 5 of two sewage draining exits 4, blow-off line 5 are connected with suction pump 6, anti-equipped with blowdown in one of blow-off line 5
Bridging structure 12, the blowdown Anti-blocking structure 12 include built-in pipe 7 and the locating flange 8 for being welded on 7 bottom of built-in pipe, tank body
1 inside is equipped with fluid level transmitter 9, and 7 upper end of built-in pipe is higher by sewage draining exit and is arranged at the zero-bit of fluid level transmitter 9,
8 lower end of locating flange is located at the connecting flange 10 of blow-off line 5, and the gap between built-in pipe 7 and blow-off line 5 is filled out
Filled with preserving and sealing circle 11,7 inner and outer surfaces of built-in pipe are coated with corrosion-inhibiting coating.
As shown in Figs. 1-2, the working principle of anti-clogging Water Tank are as follows: increase in one of blow-off line 5 of Water Tank
Add a built-in pipe 7, built-in length, that is, liquid taking port of built-in pipe 7 is arranged at " 0 " position of fluid level transmitter 9, the liquid level
" 0 " position of transmitter 9 is set according to on-site solids object deposition rule, is generally determined by the deposition of half a year, and built-in pipe 7 is logical
Locating flange 8 are crossed to be fixed in blow-off line 5, it is convenient for disassembly and assembly.After sewage enters in tank, solid impurity deposits to tank bottom, high
Liquid in fluid level transmitter 9 " 0 " position enters blow-off line 5, effectively prevents solid impurity blocking pipeline, damages pump;It is heavy
Effective solution can be obtained by another sewage draining exit of tank body 1 by periodical blowdown and container sand washing to tank bottom solid impurity in product.
The utility model is of simple structure and low cost and easy to operate, is able to solve and machined finish and come into operation
Waste water container equipment blowdown pipeline frequent jams problem, equipment live can repeat on the spot to dismount without returning factory's production, and not influence
The normal work of other equipment.
Embodiment 2
The present embodiment is preferred embodiment.
As shown in Figs. 1-2, a kind of anti-clogging Water Tank, including tank body 1 are arranged in the feed liquor pipeline at 1 top of tank body and put
The sand washing port 2, the first sewage draining exit 3 and the second sewage draining exit 4 of 1 bottom of tank body, first sewage draining exit 3 and is arranged in blank pipe line
The external blow-off line 5 of two sewage draining exits 4, blow-off line 5 are connected with suction pump 6, anti-equipped with blowdown in one of blow-off line 5
Bridging structure 12, the blowdown Anti-blocking structure 12 include built-in pipe 7 and the locating flange 8 for being welded on 7 bottom of built-in pipe, tank body
1 inside is equipped with fluid level transmitter 9, and 7 upper end of built-in pipe is higher by sewage draining exit and is arranged at the zero-bit of fluid level transmitter 9,
8 lower end of locating flange is located at the connecting flange 10 of blow-off line 5, and the gap between built-in pipe 7 and blow-off line 5 is filled out
Filled with preserving and sealing circle 11,7 inner and outer surfaces of built-in pipe are coated with corrosion-inhibiting coating.
The built-in pipe 7 is not less than 200mm and coating using L360QS seamless steel pipe, the corrosion-inhibiting coating thickness
Performance parameter and adhesion strength are able to satisfy material requirement.
The connecting flange 10 is sealed with 7 junction of built-in pipe by welding.
The overlapping of preserving and sealing circle 11 is placed and is covered in 7 outer wall of built-in pipe, preserving and sealing circle 11 and blow-off line 5
Wall and 7 outer wall of built-in pipe are bonded, and the length that preserving and sealing circle 11 is arranged is consistent with the length of sewage draining exit to locating flange 8.
Preserving and sealing circle described in the present embodiment 11 be using hydrogenation nitrile rubber be made, can effectively prevent high-hydrogen sulfide,
In the environment of carbon dioxide and water, sewage and impurity extended stationary periods cause pipeline rotten between built-in pipe 7 and blowdown Outer Tube
Erosion.
The fluid level transmitter 9 changes for monitoring in tank liquid level, can judge in time sewage draining exit whether occur blocking with
Just pump is closed in time, and blowdown Anti-blocking structure 12 is cleared up and overhauled.
The length that the built-in pipe 7 protrudes into inside tank body 1 changes as the zero-bit of fluid level transmitter 9 changes.Due to
By the different time, the solid deposits height in tank body 1 is also different, and by taking the deposition of half a year as an example, built-in pipe 7 is total
Length is 240mm, " 0 " position measured according to fluid level transmitter 9, and the length protruded into inside tank body 1 is 140mm.
Embodiment 3
The utility model avoids the damage of the blocking of blowdown pipeline, the frequent clean of filter and tank bottom magnetic drive pump,
Separate unit Water Tank can save 400,000 yuan or so of cleaning and maintenance.The utility model may make that the sand washing time of single device can be from every
It extends to every half a year 1 time week for 1 time, 1,200,000 yuan of sand washing expense or so can be saved;It is also effectively reduced simultaneously and relates to sulphur operation time
Number, reduces the security risk for relating to sulphur operation, alleviates the labor intensity of operator, maintain the stable operation of system.
The above is only the preferred embodiment of the utility model, not does limit in any form to the utility model
System, any simple modification made by the above technical examples according to the technical essence of the present invention, equivalent variations, each falls within
Within the protection scope of the utility model.
Claims (5)
1. a kind of anti-clogging Water Tank, including tank body (1), the feed liquor pipeline and blow-down pipe being arranged at the top of tank body (1), setting
Sand washing port (2), the first sewage draining exit (3) and the second sewage draining exit (4) in tank body (1) bottom, it is characterised in that: first blowdown
Mouth (3) and the external blow-off line (5) of the second sewage draining exit (4), blow-off line (5) are connected with suction pump (6), one of blowdown
Blowdown Anti-blocking structure (12) are equipped in pipeline (5), the blowdown Anti-blocking structure (12) includes built-in pipe (7) and is welded on built-in
The locating flange (8) of pipeline (7) bottom, tank body (1) is internal to be equipped with fluid level transmitter (9), and built-in pipe (7) upper end is higher by
Sewage draining exit and be arranged at the zero-bit of fluid level transmitter (9), locating flange (8) lower end is located at the connection of blow-off line (5)
At flange (10), the gap between built-in pipe (7) and blow-off line (5) is filled with preserving and sealing circle (11), built-in pipe (7)
Inner and outer surfaces are coated with corrosion-inhibiting coating.
2. a kind of anti-clogging Water Tank according to claim 1, it is characterised in that: the connecting flange (10) and built-in pipe
Road (7) junction is sealed by welding.
3. a kind of anti-clogging Water Tank according to claim 2, it is characterised in that: preserving and sealing circle (11) overlapping is put
It sets and covers in built-in pipe (7) outer wall, preserving and sealing circle (11) is pasted with blow-off line (5) inner wall and built-in pipe (7) outer wall
It closes, the length of preserving and sealing circle (11) setting is consistent with the length of sewage draining exit to locating flange (8).
4. a kind of anti-clogging Water Tank according to claim 3, it is characterised in that: the intermediate sky of the locating flange (8)
Core diameter is identical with the internal diameter of built-in pipe (7).
5. a kind of anti-clogging Water Tank according to any one of claims 1-4, it is characterised in that: the corrosion-inhibiting coating is thick
Degree is not less than 200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463751.7U CN209226603U (en) | 2018-09-07 | 2018-09-07 | A kind of anti-clogging Water Tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821463751.7U CN209226603U (en) | 2018-09-07 | 2018-09-07 | A kind of anti-clogging Water Tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209226603U true CN209226603U (en) | 2019-08-09 |
Family
ID=67498467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821463751.7U Active CN209226603U (en) | 2018-09-07 | 2018-09-07 | A kind of anti-clogging Water Tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209226603U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112624215A (en) * | 2019-09-24 | 2021-04-09 | 世朗(上海)环保科技有限公司 | Water purification management system and control method thereof |
-
2018
- 2018-09-07 CN CN201821463751.7U patent/CN209226603U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112624215A (en) * | 2019-09-24 | 2021-04-09 | 世朗(上海)环保科技有限公司 | Water purification management system and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209226603U (en) | A kind of anti-clogging Water Tank | |
CN106540810B (en) | A kind of boiler dusting circulating treating system | |
CN208742240U (en) | A kind of carbide slag high-efficiency desulfurization system | |
CN107854880B (en) | Horizontal type pipeline trash device and sewage recycling system | |
CN108360005A (en) | A kind of online cycle pickling passivating method of carbon steel piping | |
CN103830960B (en) | Acid purification system wastewater zero discharge system and technique thereof | |
CN208389768U (en) | A kind of erosion protection system of flue gas desulfurization inner wall of tower | |
CN207266960U (en) | Produce pond product ore deposit cleaning and recovery system | |
CN207866794U (en) | A kind of Desulfurization tower slurry pH value measuring device | |
CN212296333U (en) | Scour prevention fluid-discharge tube and three-phase separator | |
CN209205981U (en) | A kind of liquid level self-controlling type rushes mine device | |
CN208626718U (en) | Treated sewage reusing filter device | |
CN209143703U (en) | A kind of activated carbon of phosphoric acid method workshop high efficiente callback phosphoric acid plant | |
CN209530524U (en) | A kind of desulfuration absorbing tower slurries pH and density measuring equipment | |
CN207091374U (en) | A kind of scrubbing tower automatic dosing control system | |
CN208082148U (en) | A kind of chloropropyl alcohol acidic tail gas absorbing device | |
CN205896545U (en) | Unloading device is changed to submarine pipeline riser | |
CN206098532U (en) | Battery acidification machine washs structure | |
CN220770822U (en) | Novel gas pipeline drainage device | |
CN110482726A (en) | It is a kind of using city medium or smallsized river as the purification system at water source and method | |
CN219335249U (en) | Cleaning device for oil field water storage tank without stopping production | |
CN205313673U (en) | Belt cleaning device of belted steel | |
CN218121100U (en) | Prevent magnetism of jam and turn over board level gauge | |
CN201625463U (en) | Vertical expanding-type dirt separator | |
CN212663030U (en) | Pre-separation acid mist filtering and recycling independent circulation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |