CN209225353U CN201821830789.3U CN201821830789U CN209225353U CN 209225353 U CN209225353 U CN 209225353U CN 201821830789 U CN201821830789 U CN 201821830789U CN 209225353 U CN209225353 U CN 209225353U
Authority
CN
China
Prior art keywords
floating drum
hole
side wall
taking
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821830789.3U
Other languages
Chinese (zh)
Inventor
周家豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Shuanglong Cultural Media Co Ltd
Original Assignee
Suzhou Shuanglong Cultural Media Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Shuanglong Cultural Media Co Ltd filed Critical Suzhou Shuanglong Cultural Media Co Ltd
Priority to CN201821830789.3U priority Critical patent/CN209225353U/en
Application granted granted Critical
Publication of CN209225353U publication Critical patent/CN209225353U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a kind of stages to build with floating drum, it is related to floating drum field, aim to solve the problem that traditional floating drum splices slow-footed problem, its key points of the technical solution are that a kind of stage is built with floating drum, including cylinder, the cylinder front side wall and right side wall are provided with the T-shaped sliding block in section, and the rear wall and left side wall of the cylinder are provided with the sliding slot that card sets sliding block, the upper and lower ends of the sliding slot have achieved the effect that improve floating drum splicing efficiency in setting, the utility model is opened.

Description

A kind of stage, which is built, uses floating drum
Technical field
The utility model relates to the technical fields of floating drum, build more particularly, to a kind of stage and use floating drum.
Background technique
Existing floating drum is a kind of novel floating drum, using materials such as tough high molecular polythenes, has good anti-marquis's property And shock resistance is destructive, energy antiultraviolet, antifreeze, resistant to sea water chemical agent grease stain etc. corrode.Can with torrent fluctuation automatic lifting. It is widely used in pontoon bridge, floating wharf and the construction of the water floated platforms project such as set up a platform of stage on the water.
The Chinese patent of existing authorization public platform CN207399074U, discloses a kind of photovoltaic floating drum comprising photovoltaic panel With may float on buoy main body waterborne, the upper surface of the buoy main body offers recess portion, the recess portion and photovoltaic panel Constitute inlaid type cooperation.
Prior art among the above has the following deficiencies:
Between existing floating drum and floating drum, through the otic placode of floating drum side wall together with anchor bolts, wanted when connecting floating drum Then anchor bolt is interspersed between otic placode again and fixes, adjacent floating drum could link together by the keyhole being first aligned on otic placode, Floating drum splicing complex steps have slowed down floating drum splicing efficiency, this problems demand solves.
Utility model content
The purpose of the utility model is to provide a kind of floating drums set up a platform for improving splicing efficiency.
To achieve the above object, the utility model provides following technical solution:
A kind of stage is built with floating drum, including cylinder, and it is T-shaped that the cylinder front side wall and right side wall are provided with section Sliding block, the rear wall and left side wall of the cylinder are provided with the sliding slot that card sets sliding block, and the upper and lower ends of the sliding slot are in open to set It sets.
It by using above-mentioned technical proposal, needs when setting up a platform on the water surface, on the bottom surface contact water surface of floating drum, then When being connected with other floating drums, it is only necessary to which then the sliding slot for the floating drum side wall for being attached thereto the sliding block alignment of floating drum side wall presses Go down, linked together between floating drum and floating drum by the frictional force between sliding block and sliding slot, to play raising floating drum Connection speed effect, and then shorten the splicing time of stage.
Further, the opposite inner sidewall of the sliding slot is evenly equipped with several card holes along its length, and the sliding block is close The side wall of card hole opens up telescopic hole, push the spring is provided in the telescopic hole, the push the spring is far from telescopic hole bottom wall One end is provided with conflict bar, and the conflict bar offers close to the position of telescopic hole bottom wall and pulls hole, and the sliding block is far from the water surface One end setting card offer the drawing hole that connection pulls hole, the conflict bar is provided with pulling close to one end of push the spring Rope, the pulling rope are pierced by drawing hole.
By using above-mentioned technical proposal, but it is too troublesome when frictionally connection disassembling between sliding slot slide cartridge;And What is set up on floating drum is the very big stage of weight, only still there is risk by the frictional force between sliding slot and sliding block;In sliding slot Side wall is provided with card hole, and sliding block first wants pull to draw close to the side wall setting fixture block of card hole when spliced adjacent floating drum Running rope pulls the dynamic bar that contradicts of rope band to move into telescopic hole, and contradicting rod aperture can not contradict in card hole, and sliding block can be slided smoothly Enter into sliding slot, then decontrol and pull rope, will contradict the push the spring under the action of in bar push-in card hole, at this time adjacent floating drum Position is relatively fixed, to play the role of facilitating fixed adjacent floating drum relative position.
Further, the junction of the drawing hole inner sidewall and pulling hole inner sidewall is provided with pulley, and the pulley connects Touching pulls the side wall of rope to be provided with limiting groove.
By using above-mentioned technical proposal, pulley is arranged in drawing hole inner sidewall and pulls the intersection of hole inner sidewall, draws During running rope turns to drawing hole from pulling hole, inevitably rub drawing hole inner sidewall and pulling hole inner sidewall connect Position, to reduce the service life for pulling rope, but the sliding friction that pulley can pull on rope becomes rolling friction, subtracts The slow rate of decay for pulling rope, and then play the role of extending and pull rope service life.
Further, one end that the withdrawal cord stretches out drawing hole is provided with pull ring.
By using above-mentioned technical proposal, the diameter of pull ring is greater than the diameter of drawing hole, and one side pull ring can prevent from drawing For running rope from falling into stretchable holes, another aspect pull ring can be to pull rope to provide impetus, when pull being needed to pull rope, it is only necessary to Pull ring is caught on hand and lifts pull ring upwards, to play the role of that twitch is facilitated to pull rope.
Further, the cylinder roof is provided with taking and placing handle.
By using above-mentioned technical proposal, although cylinder does not weigh, the space that cylinder occupies is very big, moves to operator Dynamic cylinder brings great trouble, and when the appearance of handle, operator can be held mobile floating drum, and when needs while movement is very More floating drums are can also to be threaded through in all handles by rope, rope are being moved by mobile device, thus the side of playing Just the effect of multiple floating drums is moved.
Further, the position that the cylinder roof is located at taking and placing handle is provided with taking and placing groove, the taking and placing handle hinge It connects in taking and placing groove inner sidewall.
By using above-mentioned technical proposal, handle is located at the one end of floating drum far from the water surface, and the handle of standing can hinder to operate The action of personnel also will affect building for subsequent stage;When handle is hinged in taking and placing groove, when not needing mobile floating drum, It only needs to overturn handle in taking and placing groove, the handle being placed in taking and placing groove both will not influence the logical of operator Row will not be built to subsequent stage and bring big influence.
Further, the taking and placing recess sidewall offers storage cavity, and sliding is provided with cover board in storage cavity, described The fixture block of side wall setting wedge shape of the cover board far from storage cavity, the taking and placing recess sidewall offer the card slot for blocking fixture block.
By using above-mentioned technical proposal, after handle overturning is in taking and placing groove, operator pushes cover board by cover plate lid It closes on taking and placing groove, handle and external environment is separated, to play the role of further protecting handle.
Further, the cover board is provided with anti-skid bulge far from taking and placing groove on one side.
By using above-mentioned technical proposal, anti-skid bulge can increase the frictional force between hand and cover board, and then the side of playing Just the effect of cover board is pushed.
In conclusion the advantageous effects of the utility model are as follows:
1, sliding block and sliding slot are used, to generate the effect for facilitating splicing floating drum;
2, card hole is used, bar, telescopic hole is contradicted, pulls hole, drawing hole, push the spring and pull rope, to generate solid The effect of fixed adjacent floating drum;
3, handle and taking and placing groove are used, to generate the effect for being moved easily floating drum.
Detailed description of the invention
Fig. 1 is the overall structure diagram in the utility model embodiment;
Fig. 2 is the schematic diagram of the section structure in the utility model embodiment at sliding block;
Fig. 3 is the enlarged structure schematic diagram of A in Fig. 2;
Fig. 4 is the partial structural diagram of the utility model embodiment middle cylinder body top surface taking and placing groove.
In figure, 1, cylinder;11, sliding slot;12, card hole;2, sliding block;21, telescopic hole;22, pulley;23, limiting groove;24, Push the spring;3, taking and placing groove;31, handle;32, card slot;33, bayonet;4, storage cavity;41, cover board;42, recessing groove;43, Fixture block;44, taking and placing block;45, anti-skid bulge;5, bar is contradicted;51, hole is pulled;52, drawing hole;53, rope is pulled;54, pull ring.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Fig.1, build for a kind of stage disclosed by the utility model with floating drum, including cylinder 1,1 front side wall of cylinder and Right side wall is respectively provided with the T-shaped sliding block 2 in section, and 1 left side wooden partition of cylinder and rear wall are respectively provided with the T-shaped sliding slot 11 in section, sliding 11 upper and lower side of slot is built when on the water surface in setting, stage needs are opened, and floating drum will first splice on the water surface, to building for stage Create a flat supporting plane;The worker before starting that sets up a platform splices cylinder 1 on the water surface, it is only necessary to by a cylinder 1 Sliding block 2 be directed at the sliding slot 11 of another cylinder 1, sliding block 2 is inserted into sliding slot 11, adjacent cylinder 1 by sliding block 2 and sliding slot 11 it Between frictional force link together, the splicing speed of water surface upper shell 1 is substantially increased, to improve building for stage Speed.
Referring to Fig. 2 and Fig. 3, the opposite inner sidewall of sliding slot 11 is evenly equipped with several card holes 12 along its length, and sliding block 2 is inserted into Sliding block 2 opens up telescopic hole 21 close to the side wall of card hole 12 in sliding slot 11, and sliding, which is worn, in telescopic hole 21 contradicts bar 5, telescopic hole Push the spring 24 is set on 21 bottom walls, and 24 one end of push the spring is connected to 21 bottom wall of telescopic hole, and the other end, which contradicts, is contradicting bar 5 On;21 bottom wall of telescopic hole, which is opened, pulls hole 51, and sliding block 2 opens up drawing hole 52 far from one end of the water surface, and the connection of drawing hole 52 pulls Hole 51 wears pulling rope 53 in drawing hole 52, pulls rope 53 to extend to along drawing hole 52 and pulls at hole 51, due to pulling hole 51 to have Two, rope 53 is pulled to be branched into two parts, and passes through and hole 51 and spring is pulled to be connected on conflict bar 5;Pull hole 51 and pull The position rotation setting pulley 22 of 52 inner sidewall of hole handover, the curved surface sidewall of pulley 22 open up limiting groove 23, pull rope 53 embedding It is located in limiting groove 23, the one end for pulling rope 53 to stretch out drawing hole 52 connects pull ring 54, since the presence of push the spring 24 is drawn Running rope 53 is in exceptionally straight state always.
Referring to Fig. 2 and Fig. 3, need for be inserted into sliding slot 11 sliding block 2, operator will first be affectedly bashful pull ring 54, draw simultaneously Dynamic pull ring 54, pull ring 54, which drives, pulls 53 movement of rope, pulls rope 53 to drive and contradicts bar 5 to the movement of 21 bottom wall direction of telescopic hole, together When contradict bar 5 be contracted in telescopic hole 21, sliding block 2 can be smoothly inserted into sliding slot 11 at this time, then decontrol pull ring 54, push bullet Spring 24 will contradict bar 5 and push on 11 side wall of sliding slot, then move up and down cylinder 1, when conflict bar 5 is just aligned card hole 12, Bar 5 is contradicted under the action of push the spring 24 can be pushed into card hole 12, to play fixed chute 11 and 2 relative position of sliding block Effect, cylinder 1 adjacent at this time will not both be sent out to be moved in the vertical direction, will not be moved in the horizontal direction, due to whole A process pulls rope 53 to be in exceptionally straight state, so pulling rope 53 that will not be detached from from limiting groove 23 because of fluffing.
Referring to Fig. 4,1 top surface of cylinder opens up rectangular taking and placing groove 3, and the opposite inner sidewall hinged handle 31 of taking and placing groove 3 is taken It puts groove 3 and opens up storage cavity 4 perpendicular to the inner sidewall of 31 place side wall of handle, sliding setting cover board 41, lid in storage cavity 4 Taking and placing block 44 is arranged far from the one side of taking and placing groove 3 in plate 41, and storage cavity 4 opens up the recessing groove 42 slided for taking and placing block 44, takes Put the anti-skid bulge 45 of one side setting bar shaped of the block 44 far from taking and placing groove 3;3 inner sidewall of taking and placing groove is with respect to storage cavity 4 Side wall opens up card slot 32, and 32 roof of card slot opens up bayonet 33, fixture block 43 of the cover board 41 close to one end of card slot 32 setting wedge shape.
Referring to Fig. 4, when needing mobile cylinder 1, operator will first press fixture block 43 from bayonet 33, while empty to storage 4 direction slide cover 41 of chamber, cover board 41 is retracted in storage cavity 4, handle 31 is then produced, and holding handle 31 can be by cylinder Body 1 is carried away, multiple handles 31 can also be worn together by rope, disposably be transported a large amount of floating drum by lifting machine To destination, after the completion of the splicing of cylinder 1 by the fold of handle 31 in taking and placing groove 3, then pushes cover board 41 to be covered conjunction and exist On taking and placing groove 3, and cover board 41 is fixed on taking and placing groove 3 by fixture block 43.
The implementation principle of the present embodiment are as follows:
In the T-shaped sliding block 2 in front side wall and right side wall the setting section of cylinder 1, opened in the left side wall and rear wall of cylinder 1 It, only need to be by the cunning in the alignment adjacent cylinder 1 of the sliding block 2 on 1 side wall of cylinder when needing for cylinder 1 to be spliced together if sliding slot 11 Slot 11 is inserted into, and the utility model has achieved the effect that improve floating drum splicing efficiency.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of stage is built with floating drum, including cylinder (1), it is characterised in that: cylinder (1) front side wall and right side wall are all provided with It is equipped with the T-shaped sliding block in section (2), the rear wall and left side wall of the cylinder (1) are provided with the sliding slot for blocking sliding block (2) (11), the upper and lower ends of the sliding slot (11) are in open setting.
2. stage according to claim 1 is built with floating drum, it is characterised in that: the opposite inner sidewall edge of the sliding slot (11) Its length direction is evenly equipped with several card holes (12), and side wall of the sliding block (2) close to card hole (12) opens up telescopic hole (21), described It is provided with push the spring (24) in telescopic hole (21), the push the spring (24) is provided with far from one end of telescopic hole (21) bottom wall It contradicts bar (5), the position for contradicting bar (5) close telescopic hole (21) bottom wall, which offers, pulls hole (51), and the sliding block (2) is remote One end from the water surface offers the drawing hole (52) that connection pulls hole (51), and contradict bar (5) are close to push the spring (24) One end is provided with pulling rope (53), and the pulling rope (53) is pierced by drawing hole (52).
3. stage according to claim 2 is built with floating drum, it is characterised in that: drawing hole (52) inner sidewall and pulling The junction of hole (51) inner sidewall is provided with pulley (22), and pulley (22) contact pulls the side wall of rope (53) to be provided with limit Groove (23).
4. stage according to claim 3 is built with floating drum, it is characterised in that: the pulling rope (53) stretches out drawing hole (52) one end is provided with pull ring (54).
5. stage according to claim 1 is built with floating drum, it is characterised in that: cylinder (1) roof is provided with taking and placing Handle (31).
6. stage according to claim 5 is built with floating drum, it is characterised in that: cylinder (1) roof is located at taking and placing handle The position of hand (31) is provided with taking and placing groove (3), and the taking and placing handle (31) is hinged on taking and placing groove (3) inner sidewall.
7. stage according to claim 6 is built with floating drum, it is characterised in that: taking and placing groove (3) side wall offers Storage cavity (4), the interior sliding of storage cavity (4) are provided with cover board (41), side wall of the cover board (41) far from storage cavity (4) The fixture block (43) of wedge shape is set, and taking and placing groove (3) side wall offers the card slot (32) for blocking fixture block (43).
8. stage according to claim 7 is built with floating drum, it is characterised in that: the cover board (41) is far from taking and placing groove (3) be provided with anti-skid bulge (45) on one side.
CN201821830789.3U 2018-11-07 2018-11-07 A kind of stage, which is built, uses floating drum Expired - Fee Related CN209225353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821830789.3U CN209225353U (en) 2018-11-07 2018-11-07 A kind of stage, which is built, uses floating drum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821830789.3U CN209225353U (en) 2018-11-07 2018-11-07 A kind of stage, which is built, uses floating drum

Publications (1)

Publication Number Publication Date
CN209225353U true CN209225353U (en) 2019-08-09

Family

ID=67502102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821830789.3U Expired - Fee Related CN209225353U (en) 2018-11-07 2018-11-07 A kind of stage, which is built, uses floating drum

Country Status (1)

Country Link
CN (1) CN209225353U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113524112A (en) * 2021-08-27 2021-10-22 宁波舜宇贝尔自动化有限公司 Floating assembling table for AGV jacking assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113524112A (en) * 2021-08-27 2021-10-22 宁波舜宇贝尔自动化有限公司 Floating assembling table for AGV jacking assembly

Similar Documents

Publication Publication Date Title
CN209225353U (en) A kind of stage, which is built, uses floating drum
CN108802572B (en) Distribution lines fault diagnosis device
CN208468355U (en) A kind of foldable inspection platform
CN209799316U (en) Safe type scaffold frame for construction
CN111493479A (en) Suitcase with wheel lock is dead with helping hand function
CN201703944U (en) Aggregate hoister
CN108193586B (en) Camouflage type large-span automatic quick-connection type extension emergency bridge
CN213505820U (en) Aerated concrete block packing loading attachment
CN214497387U (en) Device is binded with willow stone pillow to flood prevention
CN211078191U (en) Coal mine electromechanical machine transportation hoisting accessory
CN209339629U (en) A kind of construction discharging platform
CN209875129U (en) Cantilever turnover mechanism of tower type pumping unit
CN208789883U (en) A kind of ship hawser wrap-up
CN206787175U (en) A kind of hot blast whizzer
CN112374365A (en) Overhead travelling crane
CN108773785A (en) A kind of cable channel cover plate lifting device convenient for folding storage
CN214615336U (en) A safety protection structure for water conservancy construction
CN109650289B (en) Handling device
CN214653310U (en) Jacking device of architectural decoration engineering design
CN210033147U (en) Manhole cover plate on translation type roof
CN211733710U (en) Be used for subway hoisting device
CN213062989U (en) Quick discharge mechanism of hanging flower basket for construction
CN220868658U (en) Dampproofing high strength is assembled wallboard
CN205309217U (en) Anchor chain hot -drawn make -up machine
CN210953479U (en) Sampling device for surface water quality monitoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809

Termination date: 20211107

CF01 Termination of patent right due to non-payment of annual fee