CN209223136U - A kind of cooling water system for conticaster - Google Patents

A kind of cooling water system for conticaster Download PDF

Info

Publication number
CN209223136U
CN209223136U CN201821530568.4U CN201821530568U CN209223136U CN 209223136 U CN209223136 U CN 209223136U CN 201821530568 U CN201821530568 U CN 201821530568U CN 209223136 U CN209223136 U CN 209223136U
Authority
CN
China
Prior art keywords
pipeline
water
conticaster
crystallizer
inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821530568.4U
Other languages
Chinese (zh)
Inventor
黄弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
To Force Machinery (fujian) Group Co Ltd
Original Assignee
To Force Machinery (fujian) Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by To Force Machinery (fujian) Group Co Ltd filed Critical To Force Machinery (fujian) Group Co Ltd
Priority to CN201821530568.4U priority Critical patent/CN209223136U/en
Application granted granted Critical
Publication of CN209223136U publication Critical patent/CN209223136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of cooling water system for conticaster, including conticaster ontology, a crystallizer is provided on the conticaster ontology, the crystallizer is equipped with a water inlet, the water inlet connects an inlet pipeline, the inlet pipeline is separately connected one end of the first pipeline and one end of the second pipeline, the other end of first pipeline connects circulating water supply pond, the other end of second pipeline connects a water tank, the inlet pipeline is horizontally or vertically connect with second pipeline, and the installation site of the water tank is higher than the installation site of the crystallizer.Cooling water system provided by the utility model can solve paroxysmal disconnection fault, when burst power-off, circulating water supply pond stops supplying water, first overpressure disappears, water of meeting an urgent need relies on the pressure of high water tank self weight, crystallizer is flowed into rapidly, to will not thus have any impact to equipment to the steel ladle in operator's time enough distancing conticaster ontology.

Description

A kind of cooling water system for conticaster
Technical field
The utility model relates to conticaster ontology field more particularly to a kind of cooling water systems for conticaster.
Background technique
As modernization industry develops rapidly, production safety is always that our these industrial equipment producers and equipment use factory Research topic of the family as the most important thing.Ensure that the vast masses all ensure that operation in a safe environment all the time.
Crystallizer is the initial plant of steel billet as the place of conticaster ontology core the most and molten steel solidification.In life Up to 1580 degrees Celsius of high-temperature molten steel is provided by converter in production, is flowed into crystallizer by the mouth of a river of special substance.Work as steel After water enters crystallizer, when encountering the copper pipe inner wall for being with cooling jacket encirclement outside, molten steel starts to solidify, by withdrawal straightening machine by steel billet It pulls out.Crystallizer copper pipe periphery cooling water plays the role of vital at this time.Cooling water does not meet production technology still must Standby condition, while being also the necessary condition of protection and the operator's personal safety of equipment.Entire factory is in production operation When, it can often run into power failure, trip and circulating water pool water pump is caused to stop working, can not supply water.Water pump oneself can also occur simultaneously Failure emergentness itself can not supply water.Crystallizer has been directly affected since in this way produces necessary cooling condition.Cut off the water suddenly In a flash, in the case where operator's reaction not in time, the high water of high temperature is also flowing in crystallizer electricity, and less serious case causes crystallizer to set Standby damage is scrapped, and economic loss is serious, heavy then have an impact safely to operator.
Summary of the invention
In order to solve the above technical problems, the utility model provides a kind of cooling water system for conticaster, this is practical new The technical solution that type provides is as follows:
A kind of cooling water system for conticaster, including conticaster ontology are provided with a knot on the conticaster ontology Brilliant device, the crystallizer are equipped with a water inlet, and the water inlet connects an inlet pipeline, and the inlet pipeline connects the first pipeline One end, the other end of first pipeline connects circulating water supply pond, and the inlet pipeline is also connected with one end of the second pipeline, institute The other end for stating the second pipeline connects a water tank, and the inlet pipeline is horizontally or vertically connect with second pipeline, the water The installation site of case is higher than the installation site of the crystallizer.
Further, 30% of water total capacity needed for the water tank water capacity is no less than the crystallizer.
Further, a Hand-operated butterfly valve is provided on second pipeline.
Further, first pipeline with the inlet pipeline connect end and is equipped with first and stops in first pipeline Return valve.
Further, second pipeline with the inlet pipeline connect end and is equipped with second and stops in second pipeline Return valve.
Further, the inlet pipeline is horizontally or vertically connect with first pipeline.
The utility model can solve paroxysmal disconnection fault by the way that cooling water system is arranged, when burst powers off, circulation Feed cistern stops supplying water, and the first overpressure disappears, and emergency water relies on the pressure of high water tank self weight, flows into crystallizer rapidly, To will not thus cause any shadow to equipment to the steel ladle in operator's time enough distancing conticaster ontology Ring, will not cause other safety accidents, at the same can also horse back stop production to overhaul, reply and produce in the shortest time, while this system Self structure is simple, easy for installation, low in cost.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is a kind of structural schematic diagram of cooling water system for conticaster of the utility model;
In the figure, it is marked as
1, conticaster ontology, 2, water tank, 3, Hand-operated butterfly valve, 4, second check-valve, 5, first check-valve, the 6, first pipeline, 7, circulating water supply pond, the 8, second pipeline, 9, inlet pipeline, 11, crystallizer, 111, water inlet.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, below in conjunction with the application reality The attached drawing in example is applied, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described implementation Example is merely a part but not all of the embodiments of the present application.Based on the embodiment in the application, this field is common The application protection all should belong in technical staff's every other embodiment obtained without making creative work Range.
Referring to Fig. 1, be a kind of cooling water system for conticaster of the most preferred embodiment as the utility model, packet Conticaster ontology 1 is included, a crystallizer 11 is provided on conticaster ontology 1, crystallizer 11 is equipped with a water inlet 111, water inlet 111 An inlet pipeline 9 is connected, inlet pipeline 9 connects one end of the first pipeline 6, and the other end of the first pipeline 6 connects circulating water supply pond 7, inlet pipeline 9 is also connected with one end of the second pipeline 8, and the other end of the second pipeline 8 connects a water tank 2, inlet pipeline 9 and second Pipeline 8 horizontally or vertically connects, and the installation site of water tank 2 is higher than the installation site of crystallizer 11.
In entire plant and equipment installation process, one directly is done in the relatively high place in position on workshop top or remoter A water tank 2,30% of water total capacity needed for 2 water capacity of water tank is no less than crystallizer 11, when circulating water supply pond 7 stops supplying water suddenly When, pressure suddenly disappears in the first pipeline 6, and the water in water tank 2 relies on the pressure of itself high water tank 2 itself, and cooling water is by water Case 2 flows into rapidly crystallizer 11;It just can ensure that operator has the molten steel in time enough distancing conticaster ontology 1 in this way Packet, avoids equipment damage from scrapping, and reduces economic loss, ensures the life security of operator.
Optionally, it is provided with a Hand-operated butterfly valve 3 on the second pipeline 8, when 7 normal water supply of circulating water supply pond, can closed Hand-operated butterfly valve 3 is only supplied water by circulating water supply pond 7, thus can be to avoid multiple past water tank 2 plus water, and water in water tank 2 can be It is in emergency circumstances using, is saving manpower, while inlet pipeline 9 is horizontally or vertically connect with the first pipeline 6, piping connection uses Connection type horizontally or vertically can reduce the resistance of water flowing, guarantee that flow of cooling water is smooth.
Optionally, the first pipeline 6 connect end with inlet pipeline 9 in the first pipeline 6 and is equipped with first check-valve 5;Second Pipeline 8 connect end with inlet pipeline 9 in the second pipeline 8 and is equipped with second check-valve 4;Check-valves can guarantee cooling water toward one A direction flowing, i.e., flow toward 11 direction of crystallizer, prevent cooling water reverse flow, while check-valves is automatic work, when When water is flowed toward 11 direction of crystallizer under effect of water pressure, flap is opened, when water opposite direction flowing, by water pressure and flap From be overlapped flap act on valve seat, to cut off flowing.
In conclusion the utility model can solve paroxysmal disconnection fault by the way that cooling water system is arranged, burst is disconnected When electric, circulating water supply pond stops supplying water, and the first overpressure disappears, and emergency water relies on the pressure of high water tank self weight, flows rapidly Enter crystallizer, to will not thus make to equipment to the steel ladle in operator's time enough distancing conticaster ontology At any influence, other safety accidents will not be caused, at the same can also horse back stop production to overhaul, reply and produce in the shortest time, together When this system self structure it is simple, it is easy for installation, it is low in cost.
The utility model is exemplarily described above in conjunction with attached drawing, it is clear that the utility model specific implementation not by The limitation of aforesaid way, as long as the various unsubstantialities carried out using the method concept and technical solution of the utility model change Into, or it is not improved the conception and technical scheme of the utility model are directly applied into other occasions, in the utility model Protection scope within.

Claims (6)

1. a kind of cooling water system for conticaster, which is characterized in that including conticaster ontology, set on the conticaster ontology It is equipped with a crystallizer, the crystallizer is equipped with a water inlet, and the water inlet connects an inlet pipeline, the inlet pipeline connection The other end of one end of the first pipeline, first pipeline connects circulating water supply pond, and the inlet pipeline is also connected with the second pipeline One end, the other end of second pipeline connects a water tank, and the inlet pipeline horizontally or vertically connects with second pipeline It connects, the installation site of the water tank is higher than the installation site of the crystallizer.
2. a kind of cooling water system for conticaster according to claim 1, which is characterized in that the water tank water capacity 30% of water total capacity needed for the no less than described crystallizer.
3. a kind of cooling water system for conticaster according to claim 2, which is characterized in that on second pipeline It is provided with a Hand-operated butterfly valve.
4. a kind of cooling water system for conticaster according to claim 3, which is characterized in that first pipeline exists First pipeline connect end with the inlet pipeline and is equipped with first check-valve.
5. a kind of cooling water system for conticaster according to claim 4, which is characterized in that second pipeline exists Second pipeline connect end with the inlet pipeline and is equipped with second check-valve.
6. a kind of cooling water system for conticaster according to claim 5, which is characterized in that the inlet pipeline with First pipeline horizontally or vertically connects.
CN201821530568.4U 2018-09-19 2018-09-19 A kind of cooling water system for conticaster Active CN209223136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821530568.4U CN209223136U (en) 2018-09-19 2018-09-19 A kind of cooling water system for conticaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821530568.4U CN209223136U (en) 2018-09-19 2018-09-19 A kind of cooling water system for conticaster

Publications (1)

Publication Number Publication Date
CN209223136U true CN209223136U (en) 2019-08-09

Family

ID=67498843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821530568.4U Active CN209223136U (en) 2018-09-19 2018-09-19 A kind of cooling water system for conticaster

Country Status (1)

Country Link
CN (1) CN209223136U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112045167A (en) * 2020-08-04 2020-12-08 云南云铝涌鑫铝业有限公司 Control method of internal guide type semi-continuous deep well casting machine and semi-continuous deep well casting machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112045167A (en) * 2020-08-04 2020-12-08 云南云铝涌鑫铝业有限公司 Control method of internal guide type semi-continuous deep well casting machine and semi-continuous deep well casting machine

Similar Documents

Publication Publication Date Title
CN102867549A (en) Reactor cavity water injection cooling system with combination of active and passive power
CN210949379U (en) Fluid rapid cooling type hydraulic pump station
CN106400882B (en) Device for protecting water hammer of long-distance pump water supply system
CN209223136U (en) A kind of cooling water system for conticaster
CN204010702U (en) A kind of steam generator emergency feedwater supply system
CN203386481U (en) Nuclear power station essential service water system
CN102425794B (en) Burner nozzle cooling water system
CN204040107U (en) A kind of water delivery pumping station system
KR20140122979A (en) Cooling system for nuclear power plant by using water
CN204034106U (en) Nuclear power station fire water distribution system
CN101658926B (en) Hydraulic control system of tundish water gap of continuous casting machine
CN202102729U (en) Backup reactor core cooling and reactor cavity water filling system
CN106930919A (en) A kind of seawater cooling line automatic control system and its control method
CN215719445U (en) External machine of desulfurization thick liquid pump seals cooling water standby system
CN206409296U (en) A kind of host high-temperature cooling system of fresh water
CN204806758U (en) Circulative cooling water supply system outside hydroelectric power plant
CN206902822U (en) booster pump room with water level monitoring function
CN105179301B (en) Core main pump is with passive urgent injection water supply system
CN204046399U (en) Mining high-voltage three combines explosion-proof frequency converter water-cooling system control device
CN201543798U (en) Continuous casting machine tundish nozzle hydraulic control system
CN218544973U (en) Circulating cooling water system
CN214694022U (en) Desulfurization system circulating liquid phase automatic cut-off interlocking protection device
CN207229515U (en) Construction machinery hydraulic system Portable type pipeline rinses and filtration apparatus
CN104595287A (en) Energy-reclaiming constant deceleration hydraulic station
CN203366762U (en) Emergency water supply system of steam generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A cooling water system for continuous caster

Effective date of registration: 20220718

Granted publication date: 20190809

Pledgee: Putian Xianyou sub branch of Industrial Bank Co.,Ltd.

Pledgor: To force machinery (Fujian) Group Co.,Ltd.

Registration number: Y2022980010697

PE01 Entry into force of the registration of the contract for pledge of patent right