CN209208805U - A kind of construction equipment conveying equipment of bridge construction - Google Patents

A kind of construction equipment conveying equipment of bridge construction Download PDF

Info

Publication number
CN209208805U
CN209208805U CN201821793539.7U CN201821793539U CN209208805U CN 209208805 U CN209208805 U CN 209208805U CN 201821793539 U CN201821793539 U CN 201821793539U CN 209208805 U CN209208805 U CN 209208805U
Authority
CN
China
Prior art keywords
pedestal
equipment
conveying
fixedly connected
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821793539.7U
Other languages
Chinese (zh)
Inventor
张宏波
易心可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tong Hao Engineering Bureau Group Construction Engineering Co Ltd
Original Assignee
Tong Hao Engineering Bureau Group Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tong Hao Engineering Bureau Group Construction Engineering Co Ltd filed Critical Tong Hao Engineering Bureau Group Construction Engineering Co Ltd
Priority to CN201821793539.7U priority Critical patent/CN209208805U/en
Application granted granted Critical
Publication of CN209208805U publication Critical patent/CN209208805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to bridge construction haulage equipment technical fields, and disclose a kind of construction equipment conveying equipment of bridge construction, including pedestal, the bottom of the pedestal is fixedly installed with idler wheel, and the side of pedestal is fixedly connected with fixed block, the internal whorl of the fixed block is socketed with standing screw.The construction equipment conveying equipment of the bridge construction, pass through setting pedestal and idler wheel, it can be during bridge construction, convenient for being moved on the surface of bridge to the conveying equipment, so as to carry out fixed point conveying to small building equipment, solve the problems, such as that existing large-scale lifting appliance conveying distance is limited, not only save energy consumption, and accelerate conveying speed, simultaneously during conveying, since the weight of construction equipment itself will affect the stability of pedestal, and pass through setting fixed block and standing screw, the problem of being slided to avoid pedestal in conveying, improve the stability of the conveying equipment.

Description

A kind of construction equipment conveying equipment of bridge construction
Technical field
The utility model relates to bridge construction haulage equipment technical field, specially a kind of construction equipment of bridge construction Conveying equipment.
Background technique
Bridge refers to the building current convenient for vehicles or pedestrians set up to overcome the unfavorable geologies such as mountain stream and rivers and lakes Object usually requires to carry out carrying conveying to construction equipment with boom hoisting during bridge construction, and for some small For type construction equipment, if being conveyed using large-scale lifting appliance to it, not only can waste of energy, but also but also conveying speed Degree is slow, while most of large-scale lifting appliance is all fixedly disposed near bridge, and distance of its conveying is limited, nothing Method carries out fixed point conveying to construction equipment for the position of construction in bridge construction, it is therefore desirable to which what one kind can be easy to remove is small Type construction equipment conveying equipment.
Utility model content
For the deficiency that above-mentioned background technique proposes, the construction equipment that the utility model provides a kind of bridge construction is defeated Equipment is sent, solves the problems, such as that above-mentioned background technique proposes.
The utility model provides the following technical solutions: a kind of construction equipment conveying equipment of bridge construction, including pedestal, The bottom of the pedestal is fixedly installed with idler wheel, and the side of pedestal is fixedly connected with fixed block, the inside spiral shell of the fixed block Line is socketed with standing screw, and the side of the base top is fixedly connected with support rod, the top setting of the support rod side There is telescopic device, and be fixedly connected with connector sleeve at the top of the support rod other side, the internal activity of the connector sleeve is socketed with work Lever, the outside of described motion bar one end are fixedly connected with locating piece, and the locating piece is located at the inside of locating slot, the positioning Slot is provided with the inner wall of connector sleeve, and the bottom of the motion bar other end is fixedly installed with transmission device.
Further, the external screw thread outside the standing screw is adapted with the internal screw thread inside fixed block, and fixed spiral shell The quantity of bar is two, and two standing screws are symmetrical as symmetrical centre using the middle part of pedestal.
Further, the telescopic device includes bearing plate, and the side of the bearing plate and the top of support rod side are solid Fixed connection, and fixed frame is fixedly connected at the top of bearing plate, the inside fixing sleeve of the fixed frame is connected to fuel tank, the fuel tank Side fixing sleeve be connected to hydraulic stem, one end of the hydraulic stem is through support rod and extends to the inside of connector sleeve, and hydraulic One end that bar is located inside connector sleeve is fixedly connected with one end of motion bar.
Further, fixing sleeve is connected to oil inlet pipe and flowline, and oil respectively for the top and bottom of the fuel tank other side Case is located at the surface of bearing plate.
Further, the transmission device includes support plate and shaft joint, the bottom of the support plate and the top of pedestal It is fixedly connected, and the internal activity of support plate is socketed with rotary shaft, one end of the rotary shaft passes through shaft joint and driving motor Output shaft be fixedly connected, the driving motor is fixedly mounted on the other side of base top, the rotary shaft it is external fixed It is socketed with winding plate, the winding plate has been externally wrapped with rope, and one end of the rope is fixedly connected with hook, and rope External activity is socketed with pulley blocks.
Further, the pulley blocks are made of connecting plate, movable axis and pulley, and the quantity of pulley blocks be two, one A pulley blocks are fixedly mounted on the side of connector sleeve bottom, another described pulley blocks is fixedly mounted on the motion bar other end Bottom.
Be compared with the prior art, the utility model have it is following the utility model has the advantages that
1, the construction equipment conveying equipment of the bridge construction can be in bridge construction by setting pedestal and idler wheel In the process, defeated so as to pinpoint to small building equipment convenient for being moved on the surface of bridge to the conveying equipment It send, solves the problems, such as that existing large-scale lifting appliance conveying distance is limited, not only save energy consumption, and accelerate conveying Speed, at the same during conveying, since the weight of construction equipment itself will affect the stability of pedestal, and it is solid by setting The problem of determining block and standing screw, can sliding to avoid pedestal in conveying, improves the stability of the conveying equipment.
2, the construction equipment conveying equipment of the bridge construction can be in bridge by telescopic device, connector sleeve and motion bar During beam is built, the spacing between construction equipment and bridge is adjusted according to the size of construction equipment, avoids and builds Build the problem of equipment and bridge collide in conveying, it is ensured that the safety in construction equipment transmission process, while in work During lever is mobile, by setting locating piece and locating slot, positioning can be played the role of to the direction of motion of motion bar, The problem of motion bar shifts is avoided, stability when motion bar movement is improved.
Detailed description of the invention
Fig. 1 is the front schematic view of the utility model structure;
Fig. 2 is the enlarged diagram of the utility model structure.
In figure: 1, pedestal;2, idler wheel;3, fixed block;4, standing screw;5, support rod;6, telescopic device;61, bearing plate; 62, fixed frame;63, fuel tank;64, hydraulic stem;7, connector sleeve;8, motion bar;9, locating piece;10, locating slot;11, transmission device; 111, support plate;112, rotary shaft;113, shaft joint;114, driving motor;115, winding plate;116, rope;117, it links up with; 118, pulley blocks.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The bottom of the construction equipment conveying equipment of a kind of bridge construction referring to FIG. 1-2, including pedestal 1, pedestal 1 is solid Dingan County is equipped with idler wheel 2, and the side of pedestal 1 is fixedly connected with fixed block 3, and the quantity of this fixed block 3 is two, two fixed blocks 3 size is identical, and the internal whorl of fixed block 3 is socketed with standing screw 4, and the side at 1 top of pedestal is fixedly connected with support rod 5, telescopic device 6 is fixedly connected at the top of 5 side of support rod, and is fixedly connected with connector sleeve at the top of 5 other side of support rod 7, the internal activity of connector sleeve 7 is socketed with motion bar 8, and the outside of 8 one end of motion bar is fixedly connected with locating piece 9, this locating piece 9 Quantity be two, and two locating pieces 9 are located at the top and bottom of motion bar 8, and locating piece 9 is located at the interior of locating slot 10 Portion, locating slot 10 are provided with the inner wall of connector sleeve 7, and the bottom of 8 other end of motion bar is fixedly installed with transmission device 11.
Wherein, the external screw thread outside standing screw 4 is adapted with the internal screw thread inside fixed block 3, and the number of standing screw 4 Amount is two, and two standing screws 4 are symmetrical as symmetrical centre using the middle part of pedestal 1.
Wherein, telescopic device 6 includes bearing plate 61, is fixedly connected at the top of the side and 5 side of support rod of bearing plate 61, And the top of bearing plate 61 is fixedly connected with fixed frame 62, and the inside fixing sleeve of fixed frame 62 is connected to fuel tank 63, and the one of fuel tank 63 Side fixing sleeve is connected to hydraulic stem 64, and the working principle of this hydraulic stem 64 is identical as the working principle of existing hydraulic device, is existing One end of disclosed technology, hydraulic stem 64 runs through support rod 5 and extends to the inside of connector sleeve 7, and hydraulic stem 64 is located at connection One end inside set 7 is fixedly connected with one end of motion bar 8.
Wherein, fixing sleeve is connected to oil inlet pipe and flowline, and fuel tank 63 respectively for the top and bottom of 63 other side of fuel tank In the surface of bearing plate 61.
Wherein, transmission device 11 includes support plate 111 and shaft joint 113, the bottom and the top of pedestal 1 of support plate 111 Be fixedly connected, and the internal activity of support plate 111 is socketed with rotary shaft 112, one end of rotary shaft 112 by shaft joint 113 with The output shaft of driving motor 114 is fixedly connected, this driving motor 114 is suitable for the motor of model Y100L-2, driving motor 114 are fixedly mounted on the other side at 1 top of pedestal, and the external fixing sleeve of rotary shaft 112 is connected to winding plate 115, winding plate 115 It is externally wrapped with rope 116, one end of rope 116 is fixedly connected with hook 117, and the external activity of rope 116 is socketed with cunning Wheel group 118.
Wherein, pulley blocks 118 are made of connecting plate, movable axis and pulley, and the quantity of pulley blocks 118 is two, one Pulley blocks 118 are fixedly mounted on the side of 7 bottom of connector sleeve, another pulley blocks 118 is fixedly mounted on 8 other end of motion bar Bottom.
In construction equipment conveying, promotion pedestal 1 first so that pedestal 1 be moved in the drive of idler wheel 2 it is corresponding defeated Place is sent, standing screw 4 is rotated further by, so that standing screw 4 moves down, and is in contact with bridge surface, to consolidate to pedestal 1 It is fixed, then start fuel tank 63, so that telescopic moving occurs under the action of oil pressure for hydraulic stem 64, and pushes motion bar 8 mobile, together When motion bar 8 is mobile, will drive locating piece 9 and slided in the inside of locating slot 10, thus to the movement side of motion bar 8 To positioning is played the role of, finally construction equipment is suspended on hook 117, and open driving motor 114, so that rotary shaft 112 rotations, and winding plate 115 is driven to rotate, contraction is wound to rope 116, rope 116 can be in pulley blocks at this time Stable movement under the action of 118, and hook 117 is driven slowly to move up, consequently facilitating construction equipment is sling, and stablize conveying To bridge surface.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction equipment conveying equipment of bridge construction, including pedestal (1), it is characterised in that: the bottom of the pedestal (1) Portion is fixedly installed with idler wheel (2), and the side of pedestal (1) is fixedly connected with fixed block (3), the inside spiral shell of the fixed block (3) Line is socketed with standing screw (4), and the side at the top of the pedestal (1) is fixedly connected with support rod (5), the support rod (5) one It is provided at the top of side telescopic device (6), and is fixedly connected with connector sleeve (7), the connection at the top of support rod (5) other side The internal activity of set (7) is socketed with motion bar (8), and the outside of described motion bar (8) one end is fixedly connected with locating piece (9), institute The inside that locating piece (9) is located at locating slot (10) is stated, the locating slot (10) is provided with the inner wall of connector sleeve (7), the activity The bottom of bar (8) other end is fixedly installed with transmission device (11).
2. a kind of construction equipment conveying equipment of bridge construction according to claim 1, it is characterised in that: the fixation The external external screw thread of screw rod (4) internal screw thread internal with fixed block (3) is adapted, and the quantity of standing screw (4) is two, and two A standing screw (4) is symmetrical as symmetrical centre using the middle part of pedestal (1).
3. a kind of construction equipment conveying equipment of bridge construction according to claim 1, it is characterised in that: described flexible Device (6) includes bearing plate (61), is fixedly connected at the top of the side and support rod (5) side of the bearing plate (61), and hold It is fixedly connected with fixed frame (62) at the top of weight plate (61), the inside fixing sleeve of the fixed frame (62) is connected to fuel tank (63), institute The side fixing sleeve for stating fuel tank (63) is connected to hydraulic stem (64), and one end of the hydraulic stem (64) through support rod (5) and extends To the inside of connector sleeve (7), and hydraulic stem (64) is located at one end of the internal one end of connector sleeve (7) and motion bar (8) and fixed connects It connects.
4. a kind of construction equipment conveying equipment of bridge construction according to claim 3, it is characterised in that: the fuel tank (63) fixing sleeve is connected to oil inlet pipe and flowline respectively for the top and bottom of the other side, and fuel tank (63) is located at bearing plate (61) Surface.
5. a kind of construction equipment conveying equipment of bridge construction according to claim 1, it is characterised in that: the transmission Device (11) includes support plate (111) and shaft joint (113), and the bottom of the support plate (111) and the top of pedestal (1) are fixed Connection, and the internal activity of support plate (111) is socketed with rotary shaft (112), one end of the rotary shaft (112) passes through shaft joint (113) it is fixedly connected with the output shaft of driving motor (114), the driving motor (114) is fixedly mounted at the top of pedestal (1) The external fixing sleeve of the other side, the rotary shaft (112) is connected to winding plate (115), and winding plate (115) have been externally wrapped with One end of rope (116), the rope (116) is fixedly connected with hook (117), and the external activity of rope (116) is socketed with Pulley blocks (118).
6. a kind of construction equipment conveying equipment of bridge construction according to claim 5, it is characterised in that: the pulley Group (118) is made of connecting plate, movable axis and pulley, and the quantity of pulley blocks (118) is two, the pulley blocks (118) it is fixedly mounted on the side of connector sleeve (7) bottom, it is another that another described pulley blocks (118) is fixedly mounted on motion bar (8) The bottom of one end.
CN201821793539.7U 2018-11-01 2018-11-01 A kind of construction equipment conveying equipment of bridge construction Active CN209208805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821793539.7U CN209208805U (en) 2018-11-01 2018-11-01 A kind of construction equipment conveying equipment of bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821793539.7U CN209208805U (en) 2018-11-01 2018-11-01 A kind of construction equipment conveying equipment of bridge construction

Publications (1)

Publication Number Publication Date
CN209208805U true CN209208805U (en) 2019-08-06

Family

ID=67457998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821793539.7U Active CN209208805U (en) 2018-11-01 2018-11-01 A kind of construction equipment conveying equipment of bridge construction

Country Status (1)

Country Link
CN (1) CN209208805U (en)

Similar Documents

Publication Publication Date Title
CN209556114U (en) A kind of municipal pipeline dredging device
CN108147273A (en) A kind of adjustable large-scale steel pipe suspender
CN103821464A (en) Tubing string vertical vehicular full-automatic smart hydraulic workover rig
CN201802360U (en) Crank pumping unit without beam
CN209193456U (en) A kind of construction lifting protective device
CN208980288U (en) A kind of Mobile hydraulic elevating platform
CN209208805U (en) A kind of construction equipment conveying equipment of bridge construction
CN207030272U (en) A kind of rollgang suitable for steel pipe transmission
CN203684305U (en) Inspection shaft sludge lifting stranding cage with mechanical shovel
CN104847112A (en) Crane with function of concrete conveying pump truck
CN109267730A (en) A kind of automatic plastering machine
CN203742563U (en) Ultra-long-stoke four-chain thickened oil exploitation double-well pumping unit
CN203668998U (en) Urban inspection well dredging mechanical arm
CN209835468U (en) Submersible sewage pump hanger
CN207710766U (en) A kind of coupling type bent axle rack
CN202290675U (en) Ball pitching/collecting operation auxiliary device for long distance pipeline
CN211494133U (en) Conveyer of nylon pipeline
CN209556971U (en) A kind of conduit cleaning sediment case
CN201436007U (en) Electric turning leveling arm head structure of double-arm window cleaning machine
CN204730221U (en) A kind of two grey pump mortar pool
CN205743024U (en) A kind of fluid delivery system
CN210795573U (en) Hot rolling line slag flushing ditch cleaning device
CN210150575U (en) Tool for hoisting vertical well pipe in place
CN108166530A (en) A kind of well lid of the length of the service life with anti-congestion for wisdom piping lane
CN204486350U (en) Construction site steel pile casting cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant