CN209199466U - A kind of project management construction speed comparison displaying device - Google Patents
A kind of project management construction speed comparison displaying device Download PDFInfo
- Publication number
- CN209199466U CN209199466U CN201820981745.4U CN201820981745U CN209199466U CN 209199466 U CN209199466 U CN 209199466U CN 201820981745 U CN201820981745 U CN 201820981745U CN 209199466 U CN209199466 U CN 209199466U
- Authority
- CN
- China
- Prior art keywords
- side wall
- wall
- bottom plate
- fixedly installed
- bull stick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It is compared the utility model discloses a kind of project management with construction speed and shows device, including bottom plate, the side wall of bottom plate is fixedly installed with frame, the front side wall of bottom plate is equipped with table line, the front side wall of bottom plate offers sliding slot, the inner sidewall of sliding slot slidably connects left slider and right sliding block, the left side wall of right sliding block offers cavity, the upper side wall of cavity offers circular hole, the inner sidewall of circular hole is rotatably connected to bull stick, the utility model passes through the construction Expected Number of Days and the amount of actually accomplishing by the connecting line representative between left slider and right sliding block, the progress of construction is enabled preferably to be shown and compare, while observing constructor preferably, also each in construction is needed into number of days, practice of construction number of days has carried out sufficient displaying, have the function that constructor is facilitated to understand construction speed, and pass through the height-regulating to bottom plate Structure, convenient for users to being operated to left slider and right sliding block.
Description
Technical field
The utility model relates to construction management technical field, specially a kind of project management is compared with construction speed and shows dress
It sets.
Background technique
In the work progress of building, we often be may require that the estimated cost time of each single item engineering and specific flower
It is time-consuming to be compared, just it is unlikely to interfere between each task in engineering in this way, in construction speed comparison process, I
Often record comparison method using gunter drawing, it is straight after collated the information for checking that actual progress is collected in project construction
Connect and be marked in the zebra crossing of original plan side by side with zebra crossing together, carry out intuitively comparing, thus more obviously to construction speed into
Row is shown, therefore we need a device that can intuitively show construction speed, to solve the above problems.
Utility model content
It is compared the purpose of this utility model is to provide a kind of project management construction speed and shows device, it is above-mentioned to solve
The problem of being proposed in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of project management is compared with construction speed
Show that device, including bottom plate, the side wall of the bottom plate are fixedly installed with frame, the front side wall of the bottom plate is equipped with table line, institute
The front side wall for stating bottom plate offers sliding slot, and the inner sidewall of the sliding slot slidably connects left slider and right sliding block, the right sliding block
Left side wall offer cavity, the upper side wall of the cavity offers circular hole, and the inner sidewall of the circular hole is rotatably connected to bull stick,
The lower wall of the bull stick is fixedly installed with rotating block, and the lateral wall of the rotating block is fixedly installed with one end of connecting line, institute
The other end for stating connecting line is fixedly connected with the right side wall of left slider.
Preferably, the upper and lower sides inner wall of the frame symmetrically offers guide slot, and the inner sidewall of two guide slots is sliding
It is dynamic to be connected with displacement bar.
Preferably, the front side wall of the bottom plate is blank.
Preferably, the rear wall of the bottom plate is fixedly installed with elevating lever, and the lower wall of the elevating lever is slidably connected to
Lifting groove, and lifting groove is opened in foundation base, the lower wall of the lifting groove offers longitudinal circular hole, the rear side of the foundation base
Wall offers lateral circular hole, and the inner sidewall of the longitudinal direction circular hole is rotatably connected to longitudinal bull stick, the inner sidewall of the transverse direction circular hole
It is rotatably connected to lateral bull stick, the lower wall of the longitudinal direction bull stick and the front side wall of lateral bull stick are fixedly installed with bevel gear,
And two bevel gear intermeshings, the upper side wall of the longitudinal direction bull stick are fixedly installed with lead screw, the lower wall of the elevating lever is opened
Inner sidewall equipped with threaded hole, and threaded hole is spirally connected lead screw.
Preferably, the rear wall of the lateral bull stick is fixedly installed with limit plate, and the rear wall of the limit plate offers
Second threaded hole, the inner sidewall of second threaded hole are bolted with threaded rod, and the front side wall of the threaded rod is fixedly installed with rubber
Rubber mat.
Preferably, the lower wall of the foundation base is fixedly installed with universal wheel.
Compared with prior art, the utility model has the beneficial effects that the utility model passes through by left slider and right sliding block
Between connecting line represent construction Expected Number of Days and the amount of actually accomplishing, enable construction progress be preferably shown
Each in construction is also needed into number of days, practice of construction number of days while observing constructor preferably with comparison
Sufficient displaying has been carried out, has haved the function that constructor is facilitated to understand construction speed, and pass through the height-regulating structure to bottom plate, side
Just user operates left slider and right sliding block, avoids the problem that left slider and the uncomfortable closing operation of the locating height of right sliding block go out
It is existing, by the height fixed structure of elevating lever, avoid being displaced there is a situation where unexpected.
Detailed description of the invention
Fig. 1 is main view at the utility model bottom plate.
Fig. 2 is top cross-sectional view at the utility model sliding slot.
Fig. 3 is main view sectional view at the utility model sliding slot.
Fig. 4 is the utility model left view sectional view.
Fig. 5 is instance graph in the utility model use.
In figure: 1 bottom plate, 2 frames, 3 table lines, 4 sliding slots, 5 left sliders, 6 right sliding blocks, 7 cavitys, 8 circular holes, 9 bull sticks, 10 turns
Motion block, 11 connecting lines, 12 guide slots, 13 displacement bars, 14 elevating levers, 15 lifting grooves, 151 foundation bases, 16 longitudinal circular holes, 17 are laterally
Circular hole, 18 longitudinal bull sticks, 19 lateral bull sticks, 20 bevel gears, 21 lead screws, 22 threaded holes, 23 limit plates, 24 second threaded holes, 25
Threaded rod, 26 rubber pads, 27 universal wheels.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution: a kind of project management construction speed comparison displaying
Device, including bottom plate 1, the side wall of bottom plate 1 are fixedly installed with frame 2, and the front side wall of bottom plate 1 is equipped with table line 3, before bottom plate 1
Side wall offers sliding slot 4, and sliding slot 4 has even number, and every two sliding slot 4 is distributed in table line 3 in a lattice, sliding slot 4 it is interior
Side walls are connected with left slider 5 and right sliding block 6, and the left side wall of right sliding block 6 offers cavity 7, and the upper side wall of cavity 7 offers
Circular hole 8, the inner sidewall of circular hole 8 are rotatably connected to bull stick 9, and bull stick 9 leans out right 6 upper wall of sliding block, and the lower wall of bull stick 9 is fixedly mounted
There is rotating block 10, the lateral wall of rotating block 10 is fixedly installed with one end of connecting line 11, and the other end of connecting line 11 is fixedly connected
The right side wall of left slider 5, it is convenient that connecting line 11 is furled by can be realized the rotating block 10 of rotation, connecting line 11
Two kinds of thickness, and be spaced apart.
Specifically, in order to sufficiently show that duration practical progress number of days, the upper and lower sides inner wall of frame 2 symmetrically offer orientation
Slot 12, the inner sidewall of two guide slots 12 slidably connect displacement bar 13
Specifically, writing for convenience, the front side wall of bottom plate 1 is blank.
Specifically, the height of bottom plate 1 is adjusted for convenience, so that user's left slider 5 easy to operate and right sliding block 6,
The rear wall of bottom plate 1 is fixedly installed with elevating lever 14, and the lower wall of elevating lever 14 is slidably connected to lifting groove 15, elevating lever 14 with
The section of lifting groove 15 is rectangular, and lifting groove 15 is opened in foundation base 151, and the lower wall of lifting groove 15 offers longitudinal circle
Hole 16, the rear wall of foundation base 151 offer lateral circular hole 17, and the inner sidewall of longitudinal circular hole 16 is rotatably connected to longitudinal bull stick
18, the inner sidewall of lateral circular hole 17 is rotatably connected to lateral bull stick 19, and lateral bull stick 19 leans out 151 rear wall of foundation base, longitudinal
The front side wall of the lower wall of bull stick 18 and lateral bull stick 19 is fixedly installed with bevel gear 20, and two bevel gears 20 mutually nibble
It closes, so that lateral bull stick 19 can drive longitudinal bull stick 18 to rotate after rotating, the upper side wall of longitudinal bull stick 18 is fixedly installed with silk
Thick stick 21, the lower wall of elevating lever 14 offer threaded hole 22, and the inner sidewall of threaded hole 22 is spirally connected lead screw 21, passes through threaded hole 22
With the cooperation of lead screw 21 so that elevating lever 14 can be gone up and down in lifting groove 15 after lateral bull stick 19 rotates.
Specifically, avoid elevating lever 14 from unexpected displacement occur in order to which the rotational angle to lateral bull stick 19 is fixed,
The rear wall of lateral bull stick 19 is fixedly installed with limit plate 23, and the rear wall of limit plate 23 offers the second threaded hole 24, and second
The inner sidewall of threaded hole 24 is bolted with threaded rod 25, and the front side wall of threaded rod 25 is fixedly installed with rubber pad 26.
In order to facilitate movement, the lower wall of foundation base 151 is fixedly installed with universal wheel 27.
Working principle: the utility model is that a kind of comparison of project management construction speed shows that device, Fig. 5 are to use Fig. 1
The state of situation demonstration is carried out, the lateral column with number represents number of days needed for the duration, and filament, which represents, to be expected to complete number of days, slightly
Line representative actually used how many days, the position of displacement bar 13 represents the same day be in the duration the how many days, as shown in figure 5, the duration
It is indicated in the 8th day, the lattice that ' earth excavation ' represents, it is contemplated that the duration needs 6 days, has actually used 6 days, can identify and ' cut the earth
Side ' it has completed, still ' formwork supporting plate ' is completed for estimated 8th day, but real work amount indicates work only to the 7th day amount
Phase does not complete, and more intuitive can compare in this way to construction speed, and connecting line 11 can be by turning
Length adjustment is completed in retracting on motion block 10, so that connecting line 11 is in straight configuration always, and number of days is represented with it, due to cunning
The distribution height of slot 4 is different, it would be desirable to be adjusted to the height of bottom plate 1, need to only rotate lateral bull stick 19 at this time, pass through cone
The cooperation of cooperation and threaded hole 22 and lead screw 21 between gear 20, elevating lever 14 can upper and lower displacement, facilitate people to left cunning
Block 5 and right sliding block 6 are operated, when the height of bottom plate 1 it needs to be determined that when, only need to rotate threaded rod 25 by rubber pad 26 and basis
The rear wall fitting of seat 151 can guarantee that lateral bull stick 19 will not rotate easily, and the height of such elevating lever 14 can be obtained solid
It is fixed.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of project management is compared with construction speed and shows device, it is characterised in that: including bottom plate (1), the bottom plate (1)
Side wall is fixedly installed with frame (2), and the front side wall of the bottom plate (1) is equipped with table line (3), and the front side wall of the bottom plate (1) is opened
Equipped with sliding slot (4), the inner sidewall of the sliding slot (4) slidably connects left slider (5) and right sliding block (6), the right sliding block (6)
Left side wall offers cavity (7), and the upper side wall of the cavity (7) offers circular hole (8), the inner sidewall rotation of the circular hole (8)
It is connected with bull stick (9), the lower wall of the bull stick (9) is fixedly installed with rotating block (10), the lateral wall of the rotating block (10)
It is fixedly installed with one end of connecting line (11), the other end of the connecting line (11) is fixedly connected with the right side wall of left slider (5).
2. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the side
The upper and lower sides inner wall of frame (2) symmetrically offers guide slot (12), and the inner sidewall of two guide slots (12) slidably connects position
It moves bar (13).
3. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the bottom
The front side wall of plate (1) is blank.
4. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the bottom
The rear wall of plate (1) is fixedly installed with elevating lever (14), and the lower wall of the elevating lever (14) is slidably connected to lifting groove (15),
And lifting groove (15) is opened in foundation base (151), the lower wall of the lifting groove (15) offers longitudinal circular hole (16), the base
The rear wall of plinth seat (151) offers lateral circular hole (17), and the inner sidewall of the longitudinal direction circular hole (16) is rotatably connected to longitudinal turn
The inner sidewall of bar (18), the transverse direction circular hole (17) is rotatably connected to lateral bull stick (19), the downside of the longitudinal direction bull stick (18)
Wall and the front side wall of lateral bull stick (19) are fixedly installed with bevel gear (20), and two bevel gear (20) intermeshings, described
The upper side wall of longitudinal bull stick (18) is fixedly installed with lead screw (21), and the lower wall of the elevating lever (14) offers threaded hole
(22), and the inner sidewall of threaded hole (22) is spirally connected lead screw (21).
5. a kind of project management according to claim 4 is compared with construction speed and shows device, it is characterised in that: the cross
It is fixedly installed with limit plate (23) to the rear wall of bull stick (19), the rear wall of the limit plate (23) offers the second threaded hole
(24), the inner sidewall of second threaded hole (24) is bolted with threaded rod (25), the fixed peace of the front side wall of the threaded rod (25)
Equipped with rubber pad (26).
6. a kind of project management according to claim 5 is compared with construction speed and shows device, it is characterised in that: the base
The lower wall of plinth seat (151) is fixedly installed with universal wheel (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820981745.4U CN209199466U (en) | 2018-06-25 | 2018-06-25 | A kind of project management construction speed comparison displaying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820981745.4U CN209199466U (en) | 2018-06-25 | 2018-06-25 | A kind of project management construction speed comparison displaying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209199466U true CN209199466U (en) | 2019-08-02 |
Family
ID=67404685
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820981745.4U Expired - Fee Related CN209199466U (en) | 2018-06-25 | 2018-06-25 | A kind of project management construction speed comparison displaying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209199466U (en) |
-
2018
- 2018-06-25 CN CN201820981745.4U patent/CN209199466U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207016289U (en) | A kind of height-adjustable twisted and released of the cable frame | |
CN203739306U (en) | Folding and shaping device of bag making machine | |
CN209199466U (en) | A kind of project management construction speed comparison displaying device | |
CN106419082A (en) | Comprehensive office supplies rack device | |
CN205266189U (en) | Tree planting earth auger | |
CN208403620U (en) | A kind of high-availability computer teaching outfit device | |
CN209283693U (en) | A kind of ditching device for planting fruit trees | |
CN209958818U (en) | Reinforcing apparatus of ancient building | |
CN209924494U (en) | Assembled building construction strutting arrangement | |
CN209674758U (en) | A kind of mobile adjustable type hospital financial statistic device | |
CN215011383U (en) | Planting tool | |
CN213654759U (en) | Excavating device for civil engineering vertical foundation pit | |
CN209648680U (en) | A kind of architectural engineering technology profession account valuation case | |
CN208377632U (en) | A kind of transport establishment's blanking slide | |
CN206515163U (en) | Strain controlling formula direct shear apparatus | |
CN207189746U (en) | A kind of waterproof roll cutting means | |
CN218324700U (en) | Multifunctional garden ladder | |
CN207043065U (en) | A kind of shape straightener | |
CN206464474U (en) | A kind of steel wire bending device | |
CN206679046U (en) | A kind of profile blanking device | |
CN111810803B (en) | Supporting device for computer display | |
CN208882435U (en) | Concrete block rack | |
CN207037365U (en) | A kind of easy-to-mount stable type wall-hanging controller | |
CN212160487U (en) | Adjustable computer display | |
CN209625157U (en) | A kind of multi-action computer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190802 Termination date: 20200625 |
|