CN209199466U - A kind of project management construction speed comparison displaying device - Google Patents

A kind of project management construction speed comparison displaying device Download PDF

Info

Publication number
CN209199466U
CN209199466U CN201820981745.4U CN201820981745U CN209199466U CN 209199466 U CN209199466 U CN 209199466U CN 201820981745 U CN201820981745 U CN 201820981745U CN 209199466 U CN209199466 U CN 209199466U
Authority
CN
China
Prior art keywords
side wall
wall
bottom plate
fixedly installed
bull stick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820981745.4U
Other languages
Chinese (zh)
Inventor
甘其利
王捷
李立仁
廖亚飞
赵仁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Real Estate College
Original Assignee
Chongqing Real Estate College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Real Estate College filed Critical Chongqing Real Estate College
Priority to CN201820981745.4U priority Critical patent/CN209199466U/en
Application granted granted Critical
Publication of CN209199466U publication Critical patent/CN209199466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is compared the utility model discloses a kind of project management with construction speed and shows device, including bottom plate, the side wall of bottom plate is fixedly installed with frame, the front side wall of bottom plate is equipped with table line, the front side wall of bottom plate offers sliding slot, the inner sidewall of sliding slot slidably connects left slider and right sliding block, the left side wall of right sliding block offers cavity, the upper side wall of cavity offers circular hole, the inner sidewall of circular hole is rotatably connected to bull stick, the utility model passes through the construction Expected Number of Days and the amount of actually accomplishing by the connecting line representative between left slider and right sliding block, the progress of construction is enabled preferably to be shown and compare, while observing constructor preferably, also each in construction is needed into number of days, practice of construction number of days has carried out sufficient displaying, have the function that constructor is facilitated to understand construction speed, and pass through the height-regulating to bottom plate Structure, convenient for users to being operated to left slider and right sliding block.

Description

A kind of project management construction speed comparison displaying device
Technical field
The utility model relates to construction management technical field, specially a kind of project management is compared with construction speed and shows dress It sets.
Background technique
In the work progress of building, we often be may require that the estimated cost time of each single item engineering and specific flower It is time-consuming to be compared, just it is unlikely to interfere between each task in engineering in this way, in construction speed comparison process, I Often record comparison method using gunter drawing, it is straight after collated the information for checking that actual progress is collected in project construction Connect and be marked in the zebra crossing of original plan side by side with zebra crossing together, carry out intuitively comparing, thus more obviously to construction speed into Row is shown, therefore we need a device that can intuitively show construction speed, to solve the above problems.
Utility model content
It is compared the purpose of this utility model is to provide a kind of project management construction speed and shows device, it is above-mentioned to solve The problem of being proposed in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of project management is compared with construction speed Show that device, including bottom plate, the side wall of the bottom plate are fixedly installed with frame, the front side wall of the bottom plate is equipped with table line, institute The front side wall for stating bottom plate offers sliding slot, and the inner sidewall of the sliding slot slidably connects left slider and right sliding block, the right sliding block Left side wall offer cavity, the upper side wall of the cavity offers circular hole, and the inner sidewall of the circular hole is rotatably connected to bull stick, The lower wall of the bull stick is fixedly installed with rotating block, and the lateral wall of the rotating block is fixedly installed with one end of connecting line, institute The other end for stating connecting line is fixedly connected with the right side wall of left slider.
Preferably, the upper and lower sides inner wall of the frame symmetrically offers guide slot, and the inner sidewall of two guide slots is sliding It is dynamic to be connected with displacement bar.
Preferably, the front side wall of the bottom plate is blank.
Preferably, the rear wall of the bottom plate is fixedly installed with elevating lever, and the lower wall of the elevating lever is slidably connected to Lifting groove, and lifting groove is opened in foundation base, the lower wall of the lifting groove offers longitudinal circular hole, the rear side of the foundation base Wall offers lateral circular hole, and the inner sidewall of the longitudinal direction circular hole is rotatably connected to longitudinal bull stick, the inner sidewall of the transverse direction circular hole It is rotatably connected to lateral bull stick, the lower wall of the longitudinal direction bull stick and the front side wall of lateral bull stick are fixedly installed with bevel gear, And two bevel gear intermeshings, the upper side wall of the longitudinal direction bull stick are fixedly installed with lead screw, the lower wall of the elevating lever is opened Inner sidewall equipped with threaded hole, and threaded hole is spirally connected lead screw.
Preferably, the rear wall of the lateral bull stick is fixedly installed with limit plate, and the rear wall of the limit plate offers Second threaded hole, the inner sidewall of second threaded hole are bolted with threaded rod, and the front side wall of the threaded rod is fixedly installed with rubber Rubber mat.
Preferably, the lower wall of the foundation base is fixedly installed with universal wheel.
Compared with prior art, the utility model has the beneficial effects that the utility model passes through by left slider and right sliding block Between connecting line represent construction Expected Number of Days and the amount of actually accomplishing, enable construction progress be preferably shown Each in construction is also needed into number of days, practice of construction number of days while observing constructor preferably with comparison Sufficient displaying has been carried out, has haved the function that constructor is facilitated to understand construction speed, and pass through the height-regulating structure to bottom plate, side Just user operates left slider and right sliding block, avoids the problem that left slider and the uncomfortable closing operation of the locating height of right sliding block go out It is existing, by the height fixed structure of elevating lever, avoid being displaced there is a situation where unexpected.
Detailed description of the invention
Fig. 1 is main view at the utility model bottom plate.
Fig. 2 is top cross-sectional view at the utility model sliding slot.
Fig. 3 is main view sectional view at the utility model sliding slot.
Fig. 4 is the utility model left view sectional view.
Fig. 5 is instance graph in the utility model use.
In figure: 1 bottom plate, 2 frames, 3 table lines, 4 sliding slots, 5 left sliders, 6 right sliding blocks, 7 cavitys, 8 circular holes, 9 bull sticks, 10 turns Motion block, 11 connecting lines, 12 guide slots, 13 displacement bars, 14 elevating levers, 15 lifting grooves, 151 foundation bases, 16 longitudinal circular holes, 17 are laterally Circular hole, 18 longitudinal bull sticks, 19 lateral bull sticks, 20 bevel gears, 21 lead screws, 22 threaded holes, 23 limit plates, 24 second threaded holes, 25 Threaded rod, 26 rubber pads, 27 universal wheels.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution: a kind of project management construction speed comparison displaying Device, including bottom plate 1, the side wall of bottom plate 1 are fixedly installed with frame 2, and the front side wall of bottom plate 1 is equipped with table line 3, before bottom plate 1 Side wall offers sliding slot 4, and sliding slot 4 has even number, and every two sliding slot 4 is distributed in table line 3 in a lattice, sliding slot 4 it is interior Side walls are connected with left slider 5 and right sliding block 6, and the left side wall of right sliding block 6 offers cavity 7, and the upper side wall of cavity 7 offers Circular hole 8, the inner sidewall of circular hole 8 are rotatably connected to bull stick 9, and bull stick 9 leans out right 6 upper wall of sliding block, and the lower wall of bull stick 9 is fixedly mounted There is rotating block 10, the lateral wall of rotating block 10 is fixedly installed with one end of connecting line 11, and the other end of connecting line 11 is fixedly connected The right side wall of left slider 5, it is convenient that connecting line 11 is furled by can be realized the rotating block 10 of rotation, connecting line 11 Two kinds of thickness, and be spaced apart.
Specifically, in order to sufficiently show that duration practical progress number of days, the upper and lower sides inner wall of frame 2 symmetrically offer orientation Slot 12, the inner sidewall of two guide slots 12 slidably connect displacement bar 13
Specifically, writing for convenience, the front side wall of bottom plate 1 is blank.
Specifically, the height of bottom plate 1 is adjusted for convenience, so that user's left slider 5 easy to operate and right sliding block 6, The rear wall of bottom plate 1 is fixedly installed with elevating lever 14, and the lower wall of elevating lever 14 is slidably connected to lifting groove 15, elevating lever 14 with The section of lifting groove 15 is rectangular, and lifting groove 15 is opened in foundation base 151, and the lower wall of lifting groove 15 offers longitudinal circle Hole 16, the rear wall of foundation base 151 offer lateral circular hole 17, and the inner sidewall of longitudinal circular hole 16 is rotatably connected to longitudinal bull stick 18, the inner sidewall of lateral circular hole 17 is rotatably connected to lateral bull stick 19, and lateral bull stick 19 leans out 151 rear wall of foundation base, longitudinal The front side wall of the lower wall of bull stick 18 and lateral bull stick 19 is fixedly installed with bevel gear 20, and two bevel gears 20 mutually nibble It closes, so that lateral bull stick 19 can drive longitudinal bull stick 18 to rotate after rotating, the upper side wall of longitudinal bull stick 18 is fixedly installed with silk Thick stick 21, the lower wall of elevating lever 14 offer threaded hole 22, and the inner sidewall of threaded hole 22 is spirally connected lead screw 21, passes through threaded hole 22 With the cooperation of lead screw 21 so that elevating lever 14 can be gone up and down in lifting groove 15 after lateral bull stick 19 rotates.
Specifically, avoid elevating lever 14 from unexpected displacement occur in order to which the rotational angle to lateral bull stick 19 is fixed, The rear wall of lateral bull stick 19 is fixedly installed with limit plate 23, and the rear wall of limit plate 23 offers the second threaded hole 24, and second The inner sidewall of threaded hole 24 is bolted with threaded rod 25, and the front side wall of threaded rod 25 is fixedly installed with rubber pad 26.
In order to facilitate movement, the lower wall of foundation base 151 is fixedly installed with universal wheel 27.
Working principle: the utility model is that a kind of comparison of project management construction speed shows that device, Fig. 5 are to use Fig. 1 The state of situation demonstration is carried out, the lateral column with number represents number of days needed for the duration, and filament, which represents, to be expected to complete number of days, slightly Line representative actually used how many days, the position of displacement bar 13 represents the same day be in the duration the how many days, as shown in figure 5, the duration It is indicated in the 8th day, the lattice that ' earth excavation ' represents, it is contemplated that the duration needs 6 days, has actually used 6 days, can identify and ' cut the earth Side ' it has completed, still ' formwork supporting plate ' is completed for estimated 8th day, but real work amount indicates work only to the 7th day amount Phase does not complete, and more intuitive can compare in this way to construction speed, and connecting line 11 can be by turning Length adjustment is completed in retracting on motion block 10, so that connecting line 11 is in straight configuration always, and number of days is represented with it, due to cunning The distribution height of slot 4 is different, it would be desirable to be adjusted to the height of bottom plate 1, need to only rotate lateral bull stick 19 at this time, pass through cone The cooperation of cooperation and threaded hole 22 and lead screw 21 between gear 20, elevating lever 14 can upper and lower displacement, facilitate people to left cunning Block 5 and right sliding block 6 are operated, when the height of bottom plate 1 it needs to be determined that when, only need to rotate threaded rod 25 by rubber pad 26 and basis The rear wall fitting of seat 151 can guarantee that lateral bull stick 19 will not rotate easily, and the height of such elevating lever 14 can be obtained solid It is fixed.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of project management is compared with construction speed and shows device, it is characterised in that: including bottom plate (1), the bottom plate (1) Side wall is fixedly installed with frame (2), and the front side wall of the bottom plate (1) is equipped with table line (3), and the front side wall of the bottom plate (1) is opened Equipped with sliding slot (4), the inner sidewall of the sliding slot (4) slidably connects left slider (5) and right sliding block (6), the right sliding block (6) Left side wall offers cavity (7), and the upper side wall of the cavity (7) offers circular hole (8), the inner sidewall rotation of the circular hole (8) It is connected with bull stick (9), the lower wall of the bull stick (9) is fixedly installed with rotating block (10), the lateral wall of the rotating block (10) It is fixedly installed with one end of connecting line (11), the other end of the connecting line (11) is fixedly connected with the right side wall of left slider (5).
2. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the side The upper and lower sides inner wall of frame (2) symmetrically offers guide slot (12), and the inner sidewall of two guide slots (12) slidably connects position It moves bar (13).
3. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the bottom The front side wall of plate (1) is blank.
4. a kind of project management according to claim 1 is compared with construction speed and shows device, it is characterised in that: the bottom The rear wall of plate (1) is fixedly installed with elevating lever (14), and the lower wall of the elevating lever (14) is slidably connected to lifting groove (15), And lifting groove (15) is opened in foundation base (151), the lower wall of the lifting groove (15) offers longitudinal circular hole (16), the base The rear wall of plinth seat (151) offers lateral circular hole (17), and the inner sidewall of the longitudinal direction circular hole (16) is rotatably connected to longitudinal turn The inner sidewall of bar (18), the transverse direction circular hole (17) is rotatably connected to lateral bull stick (19), the downside of the longitudinal direction bull stick (18) Wall and the front side wall of lateral bull stick (19) are fixedly installed with bevel gear (20), and two bevel gear (20) intermeshings, described The upper side wall of longitudinal bull stick (18) is fixedly installed with lead screw (21), and the lower wall of the elevating lever (14) offers threaded hole (22), and the inner sidewall of threaded hole (22) is spirally connected lead screw (21).
5. a kind of project management according to claim 4 is compared with construction speed and shows device, it is characterised in that: the cross It is fixedly installed with limit plate (23) to the rear wall of bull stick (19), the rear wall of the limit plate (23) offers the second threaded hole (24), the inner sidewall of second threaded hole (24) is bolted with threaded rod (25), the fixed peace of the front side wall of the threaded rod (25) Equipped with rubber pad (26).
6. a kind of project management according to claim 5 is compared with construction speed and shows device, it is characterised in that: the base The lower wall of plinth seat (151) is fixedly installed with universal wheel (27).
CN201820981745.4U 2018-06-25 2018-06-25 A kind of project management construction speed comparison displaying device Expired - Fee Related CN209199466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820981745.4U CN209199466U (en) 2018-06-25 2018-06-25 A kind of project management construction speed comparison displaying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820981745.4U CN209199466U (en) 2018-06-25 2018-06-25 A kind of project management construction speed comparison displaying device

Publications (1)

Publication Number Publication Date
CN209199466U true CN209199466U (en) 2019-08-02

Family

ID=67404685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820981745.4U Expired - Fee Related CN209199466U (en) 2018-06-25 2018-06-25 A kind of project management construction speed comparison displaying device

Country Status (1)

Country Link
CN (1) CN209199466U (en)

Similar Documents

Publication Publication Date Title
CN207016289U (en) A kind of height-adjustable twisted and released of the cable frame
CN203739306U (en) Folding and shaping device of bag making machine
CN209199466U (en) A kind of project management construction speed comparison displaying device
CN106419082A (en) Comprehensive office supplies rack device
CN205266189U (en) Tree planting earth auger
CN208403620U (en) A kind of high-availability computer teaching outfit device
CN209283693U (en) A kind of ditching device for planting fruit trees
CN209958818U (en) Reinforcing apparatus of ancient building
CN209924494U (en) Assembled building construction strutting arrangement
CN209674758U (en) A kind of mobile adjustable type hospital financial statistic device
CN215011383U (en) Planting tool
CN213654759U (en) Excavating device for civil engineering vertical foundation pit
CN209648680U (en) A kind of architectural engineering technology profession account valuation case
CN208377632U (en) A kind of transport establishment's blanking slide
CN206515163U (en) Strain controlling formula direct shear apparatus
CN207189746U (en) A kind of waterproof roll cutting means
CN218324700U (en) Multifunctional garden ladder
CN207043065U (en) A kind of shape straightener
CN206464474U (en) A kind of steel wire bending device
CN206679046U (en) A kind of profile blanking device
CN111810803B (en) Supporting device for computer display
CN208882435U (en) Concrete block rack
CN207037365U (en) A kind of easy-to-mount stable type wall-hanging controller
CN212160487U (en) Adjustable computer display
CN209625157U (en) A kind of multi-action computer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190802

Termination date: 20200625

CF01 Termination of patent right due to non-payment of annual fee