CN209196406U - A kind of choke device for natural gas line rapid rush-repair - Google Patents

A kind of choke device for natural gas line rapid rush-repair Download PDF

Info

Publication number
CN209196406U
CN209196406U CN201822100002.4U CN201822100002U CN209196406U CN 209196406 U CN209196406 U CN 209196406U CN 201822100002 U CN201822100002 U CN 201822100002U CN 209196406 U CN209196406 U CN 209196406U
Authority
CN
China
Prior art keywords
chock flap
telescopic rod
natural gas
explosion
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822100002.4U
Other languages
Chinese (zh)
Inventor
项阳智
周新华
龚威威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Natural Gas (gan Investment And Ventilation) Holding Co Ltd
Original Assignee
Jiangxi Natural Gas (gan Investment And Ventilation) Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Natural Gas (gan Investment And Ventilation) Holding Co Ltd filed Critical Jiangxi Natural Gas (gan Investment And Ventilation) Holding Co Ltd
Priority to CN201822100002.4U priority Critical patent/CN209196406U/en
Application granted granted Critical
Publication of CN209196406U publication Critical patent/CN209196406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of choke devices for natural gas line rapid rush-repair, including telescopic rod and sizing bar, the telescopic rod is mounted on the inside of sizing bar, and one end of telescopic rod extends to the top of sizing bar, shell is mounted on the two sides outer wall of the sizing bar, spring is mounted on the two sides outer wall of the telescopic rod, chock flap a and chock flap b are separately installed in being arranged above and below on the outer wall of the sizing bar, explosion-proof air cushion is mounted on the outer wall of the chock flap a and chock flap b, it is connected between the explosion-proof air cushion installed on the chock flap a and chock flap b by gas pipeline.The utility model passes through two chock flaps of installation, and inflatable explosion-proof air cushion is installed outside chock flap, after installing chock flap to pipeline, suitable nitrogen can be filled with into explosion-proof air cushion, to make explosion-proof air cushion be close to pipeline, to achieve the purpose that the choke effect of the device has been effectively ensured in choke, two layers of chock flap.

Description

A kind of choke device for natural gas line rapid rush-repair
Technical field
The utility model belongs to technical field of pipeline emergency maintenance, and in particular to a kind of resistance for natural gas line rapid rush-repair Device of air.
Background technique
Natural gas line, which refers to, is transported to city from exploitation ground or treatment plant for natural gas (associated gas including oil field production) The pipeline of city's air distribution center or Industry enterprise customer, also known as gas pipeline, when natural gas line such as leaks air at the failures Shi Zexu It is repaired, need a kind of choke device to completely cut off natural gas during repairing, to guarantee repair personnel Safety.
Traditional choke mode is to complete to prevent to pipeline internal plug fire clay, and fire clay is by the resistance to of certain granules proportion Fiery powder and bonding agent, additive composition, the pug for adding water or liquid bonding agent to be tuned into, but fill in fire clay choke and there is safety Hidden danger, and add every time very troublesome time-consuming, it is therefore desirable to a kind of portable choke device that effect is good.
Utility model content
The purpose of this utility model is to provide a kind of choke devices for natural gas line rapid rush-repair, on solving State the problem of proposing in background technique.
To achieve the above object, the utility model provides the following technical solutions: one kind being used for natural gas line rapid rush-repair Choke device, including telescopic rod and sizing bar, the telescopic rod be mounted on sizing bar inside, and telescopic rod one end extend To the top of sizing bar, it is mounted on shell on the two sides outer wall of the sizing bar, is pacified on the two sides outer wall of the telescopic rod Equipped with spring, be separately installed with chock flap a and chock flap b in being arranged above and below on the outer wall of the sizing bar, the chock flap a and It is mounted on explosion-proof air cushion on the outer wall of chock flap b, passes through between the explosion-proof air cushion installed on the chock flap a and chock flap b It is offered in gas pipeline connection, the chock flap a and chock flap b and inner cavity is installed, it is intracavitary in the installation to be placed with heat preservation Pad.
Preferably, rotational handle is installed at the top of the telescopic rod.
Preferably, when the position of the telescopic rod is fixed, in the Spring Card insertion shell.
Preferably, the inner wall of the shell is slidably fitted with pressing key by sliding rail, and the one end for pressing key connects with spring Touching.
Preferably, the inflating port being arranged on the gas pipeline and explosion-proof air cushion is connect.
Preferably, one end of the gas pipeline is provided with gas nozzle, and air seal piece is equipped on gas nozzle.
Preferably, there are six the shell installations, and shell three are arranged for one group about sizing bar longitudinal center axial symmetry Show two groups.
Compared with prior art, the utility model has the beneficial effects that
1. by two chock flaps of installation, and installing inflatable explosion-proof air cushion outside chock flap, installed by chock flap After in pipeline, suitable nitrogen can be filled with into explosion-proof air cushion, to make explosion-proof air cushion be close to pipeline, to reach choke The choke effect of the device has been effectively ensured in purpose, two layers of chock flap.
2. can be protected when chock flap, which installs certain time, a little helium leak by installing heat keeper in chock flap Temperature pad can effectively keep the temperature of nitrogen, since nitrogen has the characteristic thermally expanded in advance, so that explosion-proof air cushion can be re-inflated, into And it is close to pipeline, and achieve the purpose that sealing, it is convenient and efficient without re-filling nitrogen.
3. by installation telescopic rod, at work, the position that can be installed as needed adjusts the flexible of telescopic rod, from And chock flap is installed effectively to position to be mounted is needed, convenient and efficient, use scope is wider.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the partial sectional view of the utility model sizing bar;
Fig. 3 is the top view of the utility model chock flap b;
Fig. 4 is the enlarged structure schematic diagram at the utility model A.
In figure: 1, rotational handle;2, telescopic rod;3, sizing bar;4, air seal piece;5, gas nozzle;6, gas pipeline;7, chock flap a;8, chock flap b;9, explosion-proof air cushion;10, heat keeper;11, inner cavity is installed;12, inflating port;13, spring;14, shell;15, it presses Press key.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out clearly the technical solution in utility model embodiment Chu is fully described by, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of resistance for natural gas line rapid rush-repair Device of air, including telescopic rod 2 and sizing bar 3, telescopic rod 2 is mounted on the inside of sizing bar 3, and one end of telescopic rod 2 extends to Be formed bar 3 top, be formed bar 3 two sides outer wall on be mounted on shell 14, be mounted on bullet on the two sides outer wall of telescopic rod 2 Spring 13 is formed on the outer wall of bar 3 and is separately installed with chock flap a7 and chock flap b8 in being arranged above and below, chock flap a7 and chock flap b8 Outer wall on be mounted on explosion-proof air cushion 9, by installing two chock flaps, and inflatable explosion-proof air cushion is installed outside chock flap 9, after installing chock flap to pipeline, it can be filled with suitable nitrogen into explosion-proof air cushion 9, so that explosion-proof air cushion be made to be close to pipe Road, to achieve the purpose that choke, the choke effect of the device, chock flap a7 and chock flap b8 has been effectively ensured in two layers of chock flap It is connected between the explosion-proof air cushion 9 of upper installation by gas pipeline 6, offers installation inner cavity in chock flap a7 and chock flap b8 11, it installs in inner cavity 11 and is placed with heat keeper 10, by installing heat keeper 10, can install certain time in chock flap has a little nitrogen When gas leakage, heat keeper 10 can effectively keep the temperature of nitrogen, since nitrogen has the characteristic thermally expanded in advance, thus explosion-proof air cushion It can be re-inflated, and then be close to pipeline, achieve the purpose that sealing, it is convenient and efficient without re-filling nitrogen.
The top of telescopic rod 2 is equipped with rotational handle 1, and when the position of telescopic rod 2 is fixed, 13 inlay card of spring enters shell 14 Interior, the inner wall of shell 14 is slidably fitted with pressing key 15 by sliding rail, and the one end for pressing key 15 is contacted with spring 13, gas transmission The inflating port 12 being arranged on pipeline 6 and explosion-proof air cushion 9 is connect, and one end of gas pipeline 6 is provided with gas nozzle 5, and installs on gas nozzle 5 There is air seal piece 4, there are six the installations of shell 14, and shell 14 3 have for one group about sizing 3 vertical central axis of bar symmetric arrays Two groups.
The working principle and process for using of the utility model: the position of choke according to demand adjusts the length of telescopic rod 2 To length is needed, in moving telescopic bar 2, the meeting inlay card of spring 13 installed on 2 outer wall of telescopic rod enters shell 14 to flexible The position of bar 2 is fixed, when needing to adjust again, pressing pressing 15 compressed spring 13 of key, so as to moving telescopic again Bar 2 is filled with appropriate nitrogen into gas nozzle 5 after the installation is completed, so that pipeline is close in the expansion of explosion-proof air cushion 9, to reach choke Purpose, when chock flap installation certain time has a little helium leak, heat keeper 10 can keep the temperature of nitrogen, since nitrogen has There is the characteristic of pre- thermal expansion, so that explosion-proof air cushion 9 can be re-inflated, and then be close to pipeline, achieve the purpose that reseal, is needing When taking out the device, air seal piece 4 is opened, nitrogen is released, to can be taken off the device, regularly replaces heat keeper 10.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of choke device for natural gas line rapid rush-repair, including telescopic rod (2) and sizing bar (3), feature exists In: the telescopic rod (2) is mounted on the inside of sizing bar (3), and one end of telescopic rod (2) extends to the top of sizing bar (3), It is mounted on shell (14) on the two sides outer wall of sizing bar (3), is mounted on bullet on the two sides outer wall of the telescopic rod (2) Spring (13), described be formed on the outer wall of bar (3) are separately installed with chock flap a (7) and chock flap b (8), the resistance in being arranged above and below It is mounted on explosion-proof air cushion (9) on gas plate a (7) and the outer wall of chock flap b (8), on the chock flap a (7) and chock flap b (8) It is connected between the explosion-proof air cushion (9) of installation by gas pipeline (6), is offered in the chock flap a (7) and chock flap b (8) It installs inner cavity (11), is placed with heat keeper (10) in the installation inner cavity (11).
2. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described Rotational handle (1) is installed at the top of telescopic rod (2).
3. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described When the position of telescopic rod (2) is fixed, spring (13) inlay card enters in shell (14).
4. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described The inner wall of shell (14) is slidably fitted with pressing key (15) by sliding rail, and the one end for pressing key (15) is contacted with spring (13).
5. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described The inflating port (12) being arranged on gas pipeline (6) and explosion-proof air cushion (9) is connect.
6. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described One end of gas pipeline (6) is provided with gas nozzle (5), and air seal piece (4) are equipped on gas nozzle (5).
7. a kind of choke device for natural gas line rapid rush-repair according to claim 1, it is characterised in that: described There are six shell (14) installations, and shell (14) three have two groups about sizing bar (3) vertical central axis symmetric arrays for one group.
CN201822100002.4U 2018-12-14 2018-12-14 A kind of choke device for natural gas line rapid rush-repair Active CN209196406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822100002.4U CN209196406U (en) 2018-12-14 2018-12-14 A kind of choke device for natural gas line rapid rush-repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822100002.4U CN209196406U (en) 2018-12-14 2018-12-14 A kind of choke device for natural gas line rapid rush-repair

Publications (1)

Publication Number Publication Date
CN209196406U true CN209196406U (en) 2019-08-02

Family

ID=67429167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822100002.4U Active CN209196406U (en) 2018-12-14 2018-12-14 A kind of choke device for natural gas line rapid rush-repair

Country Status (1)

Country Link
CN (1) CN209196406U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111017887A (en) * 2019-12-11 2020-04-17 宁夏泰富能源有限公司 Product oil production is with air compression nitrogen making device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111017887A (en) * 2019-12-11 2020-04-17 宁夏泰富能源有限公司 Product oil production is with air compression nitrogen making device

Similar Documents

Publication Publication Date Title
CN106939766B (en) Hot-cold impact three-stage coal breaking device and implementation method
CN204254248U (en) LNG entrucking is prized
CN103672394A (en) Pump-free LNG gas-filling system and liquefied natural gas processing method
CN209196406U (en) A kind of choke device for natural gas line rapid rush-repair
CN212251690U (en) Plugging device is used in pipeline construction
CN104594938A (en) Mine liquid nitrogen fireproof and fire extinguishing device and use method thereof
CN210714568U (en) Freezing temporary plugging device for water injection well mouth
CN104747226A (en) Mine liquid nitrogen fire preventing and extinguishing system and using method thereof
CN106906804A (en) A kind of construction method of self-closed sluice
CN107023728A (en) A kind of combustion gas PE manages plugging device of not stopping the supple of gas or steam
CN203718372U (en) Skid-mounted mobile CNG (compressed natural gas) supply device
CN203907205U (en) CNG (compressed natural gas) parallel type integrated preference automatic sequence control cabinet
CN205939928U (en) Retrieve LNG tank wagon BOG's sled dress formula liquefying plant
CN206247009U (en) A kind of vacuum heat-preservation thermal-insulation device
CN205115516U (en) Restoration structure that hot -blast branch pipe expansion joint gas blowby of blast furnace turns red
CN202546248U (en) Liquefied natural gas box-type filling station
CN103775028B (en) A kind of rig heat supply heat-insulation system
CN204138689U (en) A kind of blast furnace multistage connection inclosed recirculated cooling water system leak detection device
CN206169444U (en) Novel steam conduit welding device
CN204493929U (en) A kind of can the oil transport pipeline of heat oil
CN214149618U (en) Sealing device for air supply pipeline couple
CN105202272A (en) Reusable inflatable cable duct sealing device
CN204227046U (en) A kind of cryogenic pump sump
CN204187157U (en) A kind of abnormal shape can heat the oil transport pipeline of oil product
CN205243429U (en) Edge natural gas well well head protection and mining devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant