CN209195585U - A kind of system for handling power station removal of load - Google Patents

A kind of system for handling power station removal of load Download PDF

Info

Publication number
CN209195585U
CN209195585U CN201821597094.5U CN201821597094U CN209195585U CN 209195585 U CN209195585 U CN 209195585U CN 201821597094 U CN201821597094 U CN 201821597094U CN 209195585 U CN209195585 U CN 209195585U
Authority
CN
China
Prior art keywords
guide vane
load
gate
power station
draft tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821597094.5U
Other languages
Chinese (zh)
Inventor
陈洪春
张显羽
孙立昌
李书恒
华伟琪
游秋森
叶永进
黄文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xiamen Pumped Storage Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
Fujian Xiamen Pumped Storage Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Xiamen Pumped Storage Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical Fujian Xiamen Pumped Storage Co Ltd
Priority to CN201821597094.5U priority Critical patent/CN209195585U/en
Application granted granted Critical
Publication of CN209195585U publication Critical patent/CN209195585U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model provides a kind of system for handling power station removal of load, it is related to hydraulic engineering technical field, it includes two Hydropower Plants and delay controller parallel with one another being arranged between upper storage reservoir and lower storage reservoir, and every group of Hydropower Plant includes ball valve, the hydraulic turbine and the draft tube for being from upstream to downstream direction and setting gradually;Gate is equipped between the hydraulic turbine and draft tube, gate is connected with the guide vane of the hydraulic turbine by linkage, and two hydraulic turbines of two groups of Hydropower Plants are connected with delay controller, the successively opening and closing of guide vane of the delay controller to control two hydraulic turbines.The system for handling power station removal of load of the application reduces the current gradient of water flow in tail water pipeline by the time-delay closing between the linkage closing of gate and guide vane in advance, to improve the draft tube import minimum pressure due to caused by guide vane closing.The utility model is particularly suitable under successive load rejection operating condition, can largely improve draft tube import minimum pressure.

Description

A kind of system for handling power station removal of load
Technical field
The utility model relates to hydraulic engineering technical fields, in particular to a kind of for handling power station removal of load System.
Background technique
In power station or hydroenergy storage station, when accident, which occurs, for unit needs emergency shutdown removal of load, if unit guide vane Closing comparatively fast can then reduce generating unit speed climbing, but will increase spiral case end maximum water pressure and reduce draft tube import minimum Water pressure, and then to will lead to generating unit speed climbing larger when guide vane closes slower.Therefore generating unit speed climbing and spiral case end End maximum pressure and draft tube import minimum water pressure are a pair of conflicting amounts, can not be met simultaneously in some cases. If draft tube import internal water pressure is too small, which is easy to appear column separation phenomenon, produces to the safe and stable operation of unit Raw adverse effect.It is even more serious for an above-mentioned phenomenon of hole multi-unit electric power station, especially when successive load rejection occurs.For conventional electricity It stands, when successive load rejection accident occurs, the closing of first removal of load unit guide vane will lead to its inflow-rate of water turbine and be gradually reduced, and same It then can inflow-rate of water turbine increase in the Hydraulic unit non-removal of load unit short time.If also got rid of in a certain unit of unfavorable moment negative Lotus accident changes greatly current gradient in draft tube, causes draft tube import compared with low pressure since the unit inflow-rate of water turbine is larger The appearance of power threatens tail water discharge and unit safety.
Utility model content
The utility model discloses a kind of systems for handling power station removal of load, it is intended to improve draft tube import minimum pressure The problem of power.
The utility model uses following scheme:
A kind of system for handling power station removal of load, mutually simultaneously including be arranged between upper storage reservoir and lower storage reservoir two The Hydropower Plant and delay controller of connection, Hydropower Plant described in every group include being from upstream to downstream direction to set gradually Ball valve, the hydraulic turbine and draft tube;Gate, the gate and the water wheels are equipped between the hydraulic turbine and the draft tube The guide vane of machine is connected by linkage, and two hydraulic turbines of Hydropower Plant described in two groups are connected with delay controller It connects, the successively opening and closing of guide vane of the delay controller to control two hydraulic turbines.
As a further improvement, the linkage is respectively connected to the guide vane and the gate of the hydraulic turbine, it can While the guide vanes of water turbine is closed, close the gate linkage.
As a further improvement, the delay controller is set between two hydraulic turbines, and respectively with two institutes The guide vane connection of the hydraulic turbine is stated, the delay controller can be when the guide vane of the wherein hydraulic turbine be closed, and control is another The guide vane delay of one hydraulic turbine is closed after a certain period of time.
As a further improvement, the distributor closing law of two hydraulic turbines is 1/20s.
As a further improvement, the input end of the draft tube is connected to the gate.
As a further improvement, the distance of upper storage reservoir to the ball valve is 1000-1300m, the gate to lower storage reservoir Distance is 5000-5700m, and the distance of the draft tube import to the gate is 100-120m.
As a further improvement, the pressure regulation for reducing surge pressure is arranged between the Hydropower Plant and lower storage reservoir Room.
By using above-mentioned technical proposal, the utility model can obtain following technical effect:
The system for handling power station removal of load of the application closes co- controlling by guide vanes of water turbine and gate linkage The process of load rejection, while being connected between the guide vanes of water turbine of two groups of Hydropower Plants parallel with one another by delay controller It connects, and then controls the timing closing of guide vane.Time-delay closing between the linkage closing of gate and guide vane, reduces tail water pipeline in advance The current gradient of interior water flow, to improve the draft tube import minimum pressure due to caused by guide vane closing.The utility model is outstanding It is suitable for capable of largely improving draft tube import minimum pressure under successive load rejection operating condition.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the system for handling power station removal of load of the utility model embodiment;
Fig. 2 is the draft tube inlet pressure curve graph of wherein one group of Hydropower Plant;
Fig. 3 is the draft tube inlet pressure curve graph of another group of Hydropower Plant.
Icon: 1- Hydropower Plant;11- ball valve;The 12- hydraulic turbine;13- draft tube;14- gate;15- linkage;2- Delay controller;3- surge-chamber.
Specific embodiment
It is practical below in conjunction with this to keep the purposes, technical schemes and advantages of the utility model embodiment clearer The technical solution in the utility model embodiment is clearly and completely described in attached drawing in novel embodiment.It is aobvious So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.It is practical based on this Embodiment in novel, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment is fallen within the protection scope of the utility model.Therefore, the implementation to the utility model provided in the accompanying drawings below The detailed description of mode is not intended to limit the range of claimed invention, but is merely representative of the utility model Selected embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative labor Every other embodiment obtained under the premise of dynamic, fall within the protection scope of the utility model.
In conjunction with Fig. 1, present embodiments provide a kind of system for handling power station removal of load, including setting upper storage reservoir with Two Hydropower Plants 1 and delay controller 2 parallel with one another between lower storage reservoir.Every group of Hydropower Plant 1 include from On swim over to ball valve 11, the hydraulic turbine 12 and draft tube 13 that downstream direction is set gradually.
Further, gate 14,13 inlet communication of draft tube to gate 14 are equipped between the hydraulic turbine 12 and draft tube 13.Lock Door 14 is connected with the guide vane of the hydraulic turbine 12 by linkage 15.Linkage 15 be respectively connected to the guide vane of the hydraulic turbine 12 with Gate 14, can be while 12 guide vane of the hydraulic turbine be closed, so that the linkage of gate 14 is closed.Preferably, linkage 15 can be with It is existing linked switch, is connected between guide vane and gate 14.When guide vane is closed, triggering linked switch closure, so that lock Door 14 is closed after being powered, to realize that the linkage between guide vane and gate 14 is closed.The triggering of linked switch and linked switch Unlatching so that gate 14 closing belong to existing conventional technical means, details are not described herein.
Specifically, two hydraulic turbines 12 of two groups of Hydropower Plants 1 are connected with delay controller 2, delay controller 2 To control the successively opening and closing of the guide vane of two hydraulic turbines 12.Delay controller 2 is set between two hydraulic turbines 12, and respectively It is connect with the guide vane of two hydraulic turbines 12.Delay controller 2 can be when the guide vane of a wherein hydraulic turbine 12 be closed, and control is another The guide vane delay of one hydraulic turbine 12 is closed after a certain period of time.The delays time to control time of delay controller 2 is set as 8-10s, In the guide vane of hydraulic turbine 12 while close, delay controller 2 starts timing and controls another hydraulic turbine after 8-10s 12 guide vane is closed.It is understood that the optional existing model TB38809KC7S's on the market of delay controller 2 prolongs When time switch, to realize the time-delay closing between guide vane.In turn, it is closed by 12 guide vane of the hydraulic turbine and the linkage of gate 14 common The process of load rejection is controlled, while passing through delay between 12 guide vane of the hydraulic turbine of two groups of Hydropower Plants 1 parallel with one another Controller 2 connects, and then controls the timing closing of guide vane.Time-delay closing between the linkage closing of gate 14 and guide vane, in advance The current gradient of water flow in tail water pipeline is reduced, to improve the 13 import minimum pressure of draft tube due to caused by guide vane closing Power.The utility model is particularly suitable under successive load rejection operating condition, can largely improve 13 import minimum pressure of draft tube Power.
In detail, the distributor closing law of the hydraulic turbine is 1/20s.Wherein, total aperture indicates that maximum is opened with relative opening degree Degree is that 1,1/20s indicates that guide vane opening variation slope is 1/20.After wherein a guide vane closes 8-10s, another guide vane is with 1/20s's Closing Law is closed.
Further, in this embodiment the distance of upper storage reservoir to ball valve 11 is 1000-1300m, gate 14 to lower storage reservoir Distance is 5000-5700m, and the distance of 13 import of draft tube to gate 14 is 100-120m.It ensure that Hydropower Plant 1 and upper water Rational deployment setting between library and lower storage reservoir, realizes optimal water station electricity generation system.And between Hydropower Plant 1 and lower storage reservoir It is provided with the surge-chamber 3 for reducing surge pressure.Surge-chamber 3 has pressure penstock or underground powerhouse to run-of-river power station Reduce surge pressure compared with having with pressure tail water road, and improve the effect of unit service condition.
Fig. 2-3 is please referred to, the abscissa in figure is the time (s), and ordinate is the pressure (MPa) of draft tube import.Dotted line For the draft tube inlet pressure curve before improvement, solid line is that the guide vane that the utility model uses and gate linkage close and cooperate guide vane Between time-delay closing after draft tube inlet pressure curve graph.Fig. 2 and Fig. 3 be respectively draft tube in two groups of Hydropower Plants into Mouth pressure curve.It can be apparent from figure, the minimum pressure of block curve is higher than the minimum pressure of dashed curve.I.e. this is practical new Guide vane used by type and gate linkage close the time-delay closing between cooperation guide vane, and it is minimum to effectively raise draft tube import Pressure, practical application effect are significant.
Above are merely preferred embodiments of the utility model, the protection scope of the utility model is not limited merely to above-mentioned Embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.

Claims (7)

1. a kind of system for handling power station removal of load, which is characterized in that including being arranged between upper storage reservoir and lower storage reservoir Two Hydropower Plants and delay controller parallel with one another, Hydropower Plant described in every group includes being from upstream to downstream side To the ball valve, the hydraulic turbine and draft tube set gradually;Gate, the gate are equipped between the hydraulic turbine and the draft tube It is connected with the guide vane of the hydraulic turbine by linkage, two hydraulic turbines of Hydropower Plant described in two groups are controlled with delay Device processed is connected, the successively opening and closing of guide vane of the delay controller to control two hydraulic turbines.
2. the system according to claim 1 for handling power station removal of load, which is characterized in that the linkage difference It is connected to the guide vane and the gate of the hydraulic turbine, the gate can be made to join while the guide vanes of water turbine is closed It is dynamic to close.
3. the system according to claim 1 for handling power station removal of load, which is characterized in that the delay controller is set It is placed between two hydraulic turbines, and connect respectively with the guide vane of two hydraulic turbines, the delay controller can be When the guide vane of one of them hydraulic turbine is closed, the guide vane delay for controlling another hydraulic turbine is closed after a certain period of time.
4. the system according to claim 1 for handling power station removal of load, which is characterized in that two hydraulic turbines Distributor closing law is 1/20s.
5. the system according to claim 1 for handling power station removal of load, which is characterized in that the import of the draft tube End is connected to the gate.
6. the system according to claim 1 for handling power station removal of load, which is characterized in that upper storage reservoir to the ball valve Distance be 1000-1300m, the distance of the gate to lower storage reservoir is 5000-5700m, the draft tube import to the lock The distance of door is 100-120m.
7. the system according to claim 1 for handling power station removal of load, which is characterized in that the Hydropower Plant with Surge-chamber for reducing surge pressure is set between lower storage reservoir.
CN201821597094.5U 2018-09-28 2018-09-28 A kind of system for handling power station removal of load Expired - Fee Related CN209195585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821597094.5U CN209195585U (en) 2018-09-28 2018-09-28 A kind of system for handling power station removal of load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821597094.5U CN209195585U (en) 2018-09-28 2018-09-28 A kind of system for handling power station removal of load

Publications (1)

Publication Number Publication Date
CN209195585U true CN209195585U (en) 2019-08-02

Family

ID=67407012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821597094.5U Expired - Fee Related CN209195585U (en) 2018-09-28 2018-09-28 A kind of system for handling power station removal of load

Country Status (1)

Country Link
CN (1) CN209195585U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113464354A (en) * 2021-08-13 2021-10-01 西华大学 Water turbine control method applied to hydropower station with long pressure water diversion channel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113464354A (en) * 2021-08-13 2021-10-01 西华大学 Water turbine control method applied to hydropower station with long pressure water diversion channel
CN113464354B (en) * 2021-08-13 2023-06-23 西华大学 Water turbine control method applied to hydropower station with long pressurized water diversion channel

Similar Documents

Publication Publication Date Title
CN204419435U (en) For hydroelectric energy conserving system
CN206972325U (en) A kind of small turbine vapour source automatically switches and regulating system
CN209195585U (en) A kind of system for handling power station removal of load
CN203532152U (en) Pressure regulating device of hydropower station
CN111441896A (en) System and method for eliminating pressure rise in hydraulic transition process of hydropower station
CN113323791A (en) Pumped storage electricity storage system for dam
CN102878002A (en) Method for preventing surge pressure of water turbine water diversion system from rising
CN116085174A (en) Pumped storage power station
CN201599066U (en) Steam supplementing and condensing steam turbine adjusting device utilizing pure low-temperature waste heat
CN212454562U (en) Coal fired power plant feed pump steam turbine steam supply pipeline system with stable steam source switching
CN203847321U (en) Hydraulic control system of hydropower station pressure regulating valve
CN216077243U (en) Novel steam extraction control device of steam extraction type steam turbine
CN112727667B (en) Intelligent regulation type water delivery power generation device and monitoring feedback method thereof
CN205477763U (en) Utilize multistage three lobe rotor power generation system of well head high -pressure natural gas pressure energy
CN104564510A (en) Method and device using conical valve for realizing pressure adjusting and ecological drainage functions in hydropower station
CN108561670A (en) One kind being used for water delivery by gravity flow system water hammer guard system
CN209510513U (en) A kind of accident control device with guide vanes of water turbine hydraulic closing mechanism
CN113685800A (en) Automatic pump combination control system of steam feed pump based on speed self-adaption
CN206110099U (en) Hydropower that closely dams station
CN202899099U (en) Stream guidance pier set used for inflow forebay of hydropower station
CN101701532A (en) Pure-low temperature and afterheat-utilizing steam turbine control device of steam comprehending and condensing type and control method thereof
CN214035946U (en) Air cooling island condensate complementary energy recovery and liquid level regulation power generation device
CN201963462U (en) Segmented closing device for adjusting closing speed of water-pumping and energy-accumulating machine set
CN206889090U (en) A kind of electronic type charge air cooler de-watering apparatus
CN203383966U (en) Abrasion-resistant water turbine spiral case capable of reducing silt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190802

Termination date: 20210928

CF01 Termination of patent right due to non-payment of annual fee