CN209184118U - A kind of preboarding tooling of cable channel cover plate installation - Google Patents
A kind of preboarding tooling of cable channel cover plate installation Download PDFInfo
- Publication number
- CN209184118U CN209184118U CN201920014272.5U CN201920014272U CN209184118U CN 209184118 U CN209184118 U CN 209184118U CN 201920014272 U CN201920014272 U CN 201920014272U CN 209184118 U CN209184118 U CN 209184118U
- Authority
- CN
- China
- Prior art keywords
- rack
- frame
- placement plate
- baffle
- preboarding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a kind of preboarding toolings of cable channel cover plate installation, including rack, the quadrangle of bottom of the frame is mounted on wheel, the side of frame top is equipped with placement plate, the two sides of placement plate are provided with baffle, the side of baffle is provided with support frame, first servo motor is provided on the inside of support frame, the support rod connecting with first servo motor is installed at the top of support frame, the outer sheath of support rod is equipped with fixed frame, rotation seat is installed, the side of rotation seat is provided with crossbeam, and the bottom of crossbeam is equipped with translation mechanism at the top of support rod.The utility model by being arranged placement plate and clamping device on the rack, when construction, multiple cover boards are placed in placement plate, successively the taking-up of each cover board is covered by clamping device, people only need to link up with to be connect with cover board, a large amount of manpower can be saved, and can effectively save the time of construction, improves working efficiency.
Description
Technical field
The utility model relates to technical field of electric power construction, specially a kind of preboarding tooling of cable channel cover plate installation.
Background technique
Buried cable refers to compared with common overhead line, is often embedded in the cable of underground, therefore also known as buried cable.Cable is
It is made of the conductor outsourcing insulation and protective layer of one or more mutually insulated, for electric power or information to be transmitted to from one
The conducting wire at another place.Into after modern society, due to urban land anxiety, traffic pressure is big, the reasons such as appearance of the city construction, big city
Generally use buried cable power transmission mode.Relative to overhead line, cable have take up little area, transmit electricity reliably, strong antijamming capability etc.
Advantage.
After cable burial, need to be arranged cover board, but efficiency is relatively low when people bury cover board at present, influences
The progress of construction.
Utility model content
The purpose of this utility model is to provide a kind of preboarding toolings of cable channel cover plate installation, and construction can be improved
Efficiency saves a large amount of time, and labor-saving can put into.
To achieve the above object, the utility model provides the following technical solutions: a kind of preboarding of cable channel cover plate installation
Tooling, including rack, the quadrangle of the bottom of the frame are mounted on wheel, and the side of the frame top is equipped with placement plate,
The two sides of the placement plate are provided with baffle, and the side of the baffle is provided with support frame, the inside setting of support frame as described above
There is first servo motor, the support rod connecting with first servo motor is installed at the top of support frame as described above, the support rod
Outer sheath is equipped with fixed frame, is equipped with rotation seat at the top of the support rod, the side of the rotation seat is provided with crossbeam, described
The bottom of crossbeam is equipped with translation mechanism, and there are two clamping devices, one end of the rack to install for installation on the translation mechanism
There is clump weight.
Preferably, the two sides of the rack are mounted on electric pushrod, and the bottom of the electric pushrod is equipped with sucker.
Preferably, the two sides of the placement plate offer link slot, and the inside bending in the bottom of the baffle simultaneously extends to
The inside of link slot, the surface of the placement plate offer several locating slots, and the baffle extends to the portion inside link slot
It is separately equipped with screw hole, the locating slot is internally provided with bolt, is bolted between the placement plate and baffle.
Preferably, the translation mechanism includes the cunning positioned at the second servo motor of cross rail top and positioned at crossbeam bottom
Rail is provided with screw rod on the downside of the sliding rail, and one end of the screw rod is connect by transmission mechanism with the second servo motor, and two
Clamping device is located at the both ends of screw rod, and the screw thread at screw rod both ends open up it is contrary.
Preferably, the clamping device includes attachment base, and the bottom of the attachment base is connected with frame, the frame it is interior
Side is provided with reel, and one end of the frame is equipped with the third servo motor connecting with reel, the surface wrap of the reel
There is connecting rope, the bottom of the connecting rope is equipped with hook.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model by being arranged placement plate and clamping device on the rack, when construction, by multiple cover boards
It is placed in placement plate, is successively covered the taking-up of each cover board by clamping device, people only need to link up with to be connected with cover board
It connects, a large amount of manpower can be saved, and can effectively save the time of construction, improve working efficiency.
2, the utility model is by being arranged electric pushrod and sucker in the two sides of rack, when construction, by rack
After position is stopped well, electric pushrod extends, and sucker and ground face contact are consolidated the position of rack by electric pushrod and sucker
It is fixed, the stabilization of rack is kept, rack during construction is avoided to shake.
Detailed description of the invention
Fig. 1 is the utility model front view;
Fig. 2 is the utility model frame side view;
Fig. 3 is the utility model placement plate sectional view.
In figure: 1 rack, 2 support frames, 3 fixed frames, 4 hooks, 5 connecting ropes, 6 frames, 7 transmission mechanisms, 8 second servos electricity
Machine, 9 attachment bases, 10 screw rods, 11 sliding rails, 12 crossbeams, 13 rotation seats, 14 support rods, 15 first servo motors, 16 placement plates, 17
Baffle, 18 clump weights, 19 electric pushrods, 20 suckers, 21 wheels, 22 third servo motors, 23 reels, 24 link slots, 25 positioning
Slot.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, a kind of preboarding tooling of cable channel cover plate installation, including rack 1, the quadrangle of 1 bottom of rack
It is mounted on wheel 21, the setting of wheel 21 keeps the movement of equipment more flexible and convenient, and the two sides of rack 1 are mounted on electronic push away
Bar 19, the bottom of electric pushrod 19 are equipped with sucker 20, by the way that electric pushrod 19 and sucker 20 is arranged in the two sides of rack 1,
When construction, after the position of rack 1 is stopped well, electric pushrod 19 extends, and sucker 20 and ground face contact pass through electric pushrod
19 and sucker 20 position of rack 1 is fixed, keep rack 1 stabilization, avoid the rack 1 during construction from shaking
Dynamic, the side at 1 top of rack is equipped with placement plate 16, and the two sides of placement plate 16 are provided with baffle 17, the two sides of placement plate 16
Link slot 24, the inside bending in the bottom of baffle 17 and the inside for extending to link slot 24 are offered, the surface of placement plate 16 is opened
Equipped with several locating slots 25, the part that baffle 17 extends to inside link slot 24 offers screw hole, and the inside of locating slot 25 is set
It is equipped with bolt, is bolted between placement plate 16 and baffle 17, when in use, is placed if necessary various sizes of
Cover board can put in the length inside link slot 24 by adjusting baffle 17 so as to adjust the distance between two baffles 17, adjust
It is whole finish after baffle 17 and placement plate 16 are fixed using bolt, it is more convenient to use to place different cover boards,
The side of baffle 17 is provided with support frame 2, and the inside of support frame 2 is provided with first servo motor 15, the top installation of support frame 2
There is the support rod 14 connecting with first servo motor 15, the outer sheath of support rod 14 is equipped with fixed frame 3, and the top of support rod 14 is pacified
Equipped with rotation seat 13, the side of rotation seat 13 is provided with crossbeam 12, and when construction, the rotation of first servo motor 15 drives branch
Strut 14 rotates, and support rod 14 drives crossbeam 12 to rotate by rotating seat 13, by the way that fixed frame is arranged in the outside of support rod 14
3, firm support rod 14 can be played the role of, the stabilization for keeping support rod 14 to rotate, the bottom of crossbeam 12 is equipped with translation machine
Structure, translation mechanism include the sliding rail 11 positioned at second servo motor 8 at 12 top of crossbeam and positioned at 12 bottom of crossbeam, sliding rail 11
Downside is provided with screw rod 10, and one end of screw rod 10 is connect by transmission mechanism 7 with the second servo motor 8, two clamping devices point
Not Wei Yu screw rod 10 both ends, and the screw thread at 10 both ends of screw rod open up it is contrary, on translation mechanism installation there are two clamping dress
It sets, clamping device includes attachment base 9, and the bottom of attachment base 9 is connected with frame 6, and the inside of frame 6 is provided with reel 23, frame 6
One end the third servo motor 22 connecting with reel 23 is installed, the surface wrap of reel 23 has connecting rope 5, connecting rope 5
Bottom is equipped with hook 4, and cover board is placed in placement plate 16, and when construction, first servo motor 15 drives 14 turns of support rod
Dynamic, support rod 14 drives crossbeam 12 to rotate by rotating seat 13, adjusts the position of clamping device, clamping device is moved to placement
The top of plate 16, then two clamping devices of the second servo motor 8 work drive move on to the both ends of screw rod 10 respectively, then third
Servo motor 22 works with movable reel 23, and connecting rope 5 is lengthened, and hooks the both ends of cover board respectively using hook 4, then third is watched
It takes motor 22 and is rotated backward with movable reel 23 and wind connecting rope 5, cover board is sling, first servo motor 15 drives support later
Bar 14 rotates backward, and cover board is moved to the side of rack 1, cover board is installed, and one end of rack 1 is equipped with clump weight
18, by the way that clump weight 18 is arranged in the side of rack 1, when construction, since crossbeam 12 and cover board are moved to rack 1
Side, clump weight 18 can turn on one's side to avoid rack 1, be conducive to the stabilization for keeping rack 1.
In summary: the preboarding tooling of cable channel cover plate installation, by the way that placement plate 16 and clamping are arranged in rack 1
Multiple cover boards are placed in placement plate 16 by device when construction, are successively taken out each cover board by clamping device and are carried out
Capping, people only need to link up with 4 and connect with cover board, can save a large amount of manpower, and can effectively save
The time of construction, improve working efficiency, solve current people bury cover board when efficiency it is relatively low, influence construction progress
The problem of.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of preboarding tooling of cable channel cover plate installation, including rack (1), it is characterised in that: rack (1) bottom
Quadrangle is mounted on wheel (21), and the side at the top of the rack (1) is equipped with placement plate (16), and the two of the placement plate (16)
Side is provided with baffle (17), and the side of the baffle (17) is provided with support frame (2), the inside setting of support frame as described above (2)
Have first servo motor (15), the support rod connecting with first servo motor (15) is installed at the top of support frame as described above (2)
(14), the outer sheath of the support rod (14) is equipped with fixed frame (3), is equipped with rotation seat at the top of the support rod (14)
(13), the side of the rotation seat (13) is provided with crossbeam (12), and the bottom of the crossbeam (12) is equipped with translation mechanism, described
There are two clamping devices for installation on translation mechanism, and one end of the rack (1) is equipped with clump weight (18).
2. a kind of preboarding tooling of cable channel cover plate installation according to claim 1, it is characterised in that: the rack
(1) two sides are mounted on electric pushrod (19), and the bottom of the electric pushrod (19) is equipped with sucker (20).
3. a kind of preboarding tooling of cable channel cover plate installation according to claim 1, it is characterised in that: the placement plate
(16) two sides offer link slot (24), and the inside bending in bottom of the baffle (17) simultaneously extends to the interior of link slot (24)
Portion, the surface of the placement plate (16) offer several locating slots (25), and the baffle (17) extends in link slot (24)
The part in portion offers screw hole, and the locating slot (25) is internally provided with bolt, the placement plate (16) and baffle (17) it
Between be bolted.
4. a kind of preboarding tooling of cable channel cover plate installation according to claim 1, it is characterised in that: the translation machine
Structure includes the second servo motor (8) at the top of crossbeam (12) and the sliding rail (11) positioned at crossbeam (12) bottom, the sliding rail
(11) it is provided on the downside of screw rod (10), one end of the screw rod (10) is connected by transmission mechanism (7) and the second servo motor (8)
Connect, two clamping devices are located at the both ends of screw rod (10), and the screw thread at screw rod (10) both ends open up it is contrary.
5. a kind of preboarding tooling of cable channel cover plate installation according to claim 1, it is characterised in that: the clamping dress
It sets including attachment base (9), the bottom of the attachment base (9) is connected with frame (6), is provided with reel on the inside of the frame (6)
(23), one end of the frame (6) is equipped with the third servo motor (22) connecting with reel (23), the table of the reel (23)
Face is wound with connecting rope (5), and the bottom of the connecting rope (5) is equipped with hook (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920014272.5U CN209184118U (en) | 2019-01-05 | 2019-01-05 | A kind of preboarding tooling of cable channel cover plate installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920014272.5U CN209184118U (en) | 2019-01-05 | 2019-01-05 | A kind of preboarding tooling of cable channel cover plate installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209184118U true CN209184118U (en) | 2019-07-30 |
Family
ID=67378380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920014272.5U Expired - Fee Related CN209184118U (en) | 2019-01-05 | 2019-01-05 | A kind of preboarding tooling of cable channel cover plate installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209184118U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113036678A (en) * | 2021-04-07 | 2021-06-25 | 吴亚秋 | Robot for detecting and repairing electric wire in factory building |
CN114336427A (en) * | 2021-12-24 | 2022-04-12 | 郑州科技学院 | Cable positioning device for electrical engineering for avoiding winding of cable body |
-
2019
- 2019-01-05 CN CN201920014272.5U patent/CN209184118U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113036678A (en) * | 2021-04-07 | 2021-06-25 | 吴亚秋 | Robot for detecting and repairing electric wire in factory building |
CN113036678B (en) * | 2021-04-07 | 2022-07-22 | 东台市高科技术创业园有限公司 | Robot for detecting and repairing electric wire in factory building |
CN114336427A (en) * | 2021-12-24 | 2022-04-12 | 郑州科技学院 | Cable positioning device for electrical engineering for avoiding winding of cable body |
CN114336427B (en) * | 2021-12-24 | 2023-08-29 | 郑州科技学院 | Cable positioning device for electrical engineering capable of avoiding winding of wire body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209184118U (en) | A kind of preboarding tooling of cable channel cover plate installation | |
CN115893100B (en) | Cable winding equipment for power maintenance | |
CN105048244B (en) | Secondary connection servicing unit | |
CN210490280U (en) | Cable tensioning device for laying power distribution network | |
CN210944262U (en) | Shaftless take-up device for cable production | |
CN214093814U (en) | Vertical lifting structure of monitoring underground comprehensive box | |
CN109809297A (en) | One kind being suitable for not co-orbital container door machine and its working method | |
CN207497846U (en) | A kind of electric power communication device rack | |
CN211018061U (en) | Multi-connected cable pulley block | |
CN210614729U (en) | Stretching device of stretch bender | |
CN210072162U (en) | Optical cable traction chuck for 5G communication engineering construction | |
CN208955596U (en) | A kind of angle steel tower adjustable cable holder | |
CN204030455U (en) | Intelligent multifunction is from traction wiring system | |
CN207434778U (en) | A kind of water-proof cable automatic winding apparatus | |
CN219918204U (en) | Vertical cable laying device | |
CN220356558U (en) | Cable tension monitoring device | |
CN220775204U (en) | Cable traction device for cable laying | |
CN217882603U (en) | Adjustable mounting bracket suitable for cable laying | |
CN218732976U (en) | Cable mounting bracket of scalable regulation | |
CN206778979U (en) | A kind of packed tower protection wiping device | |
CN218611459U (en) | Cutting treatment equipment for vertical cables | |
CN216355774U (en) | Special distribution frame of information technology engineering | |
CN219929266U (en) | Wire and cable processing equipment for multilayer package protection | |
CN216583599U (en) | Cable laying device for power engineering | |
CN217177885U (en) | Support hanger for semiconductor manufacturing process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190730 Termination date: 20220105 |
|