CN209180529U - A kind of oil exploration connecting line - Google Patents
A kind of oil exploration connecting line Download PDFInfo
- Publication number
- CN209180529U CN209180529U CN201821436947.7U CN201821436947U CN209180529U CN 209180529 U CN209180529 U CN 209180529U CN 201821436947 U CN201821436947 U CN 201821436947U CN 209180529 U CN209180529 U CN 209180529U
- Authority
- CN
- China
- Prior art keywords
- installation section
- installation
- sleeve
- collar flange
- sliding slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fluid-Damping Devices (AREA)
Abstract
The utility model discloses a kind of oil exploration connecting lines, including installation sleeve, connect sleeve and internal diameter and outer diameter the first installation section all the same and the second installation section, one end of connection sleeve is fixed on the first installation section, its other end is inserted into the second installation section, first installation section is provided with the first collar flange close to one end of connection sleeve, second installation section is provided with the second collar flange close to one end of connection sleeve, the side of second collar flange is provided with external screw thread, third collar flange is provided on the inner sidewall of one end of installation sleeve, internal screw thread is provided on the inner sidewall of its other end, installation sleeve is sleeved on the first installation section, third collar flange offsets with the first collar flange, the other end screw-type of installation sleeve is mounted on the second collar flange, and it fastens.Above-mentioned oil exploration is simple with connecting line structure, is installed and is fixed in the form of screw thread, and enhanced convenience when dismounting is convenient for safeguarding, has very high practicability.
Description
Technical field
The utility model relates to a kind of oil exploration connecting lines.
Background technique
Pipeline is the channel for transporting petroleum and other gases or liquid, since channel is longer, is needed different pipes
Road connection, so as to long-distance transportation.But the pipeline connecting mode of traditional approach generally welds, although welding is compared
Firm, still, when needing to safeguard pipeline, since pipeline is welding, maintenance is just highly difficult.
Utility model content
In view of the above technical problems, the utility model provides a kind of simple in construction, easy to disassemble and assemble, and petroleum convenient for safeguarding is surveyed
Spy connecting line.
In order to solve the above technical problems, technical solution adopted in the utility model is: providing a kind of oil exploration company
Take over road, including installation sleeve, connection sleeve and internal diameter and outer diameter the first installation section all the same and the second installation section, the company
One end of female connector cylinder is fixed on one end of the first installation section, and the other end is inserted into the cavity of described second installation section one end
In, first installation saves and is provided with the first collar flange on the lateral wall of one end of the connection sleeve, and described second
Installation section is provided with the second collar flange, the week of second collar flange on the lateral wall of one end of the connection sleeve
Side is provided with external screw thread, and third collar flange, the inside of the other end are provided on the inner sidewall of one end of the installation sleeve
Internal screw thread is provided on wall, the installation sleeve is sleeved on the outside of the first installation section and the second installation section, described
Third collar flange offsets with first collar flange, and the other end screw-type of the installation sleeve is fastened on second ring
On shape flange, the first installation section offsets with the second installation section.
The utility model uses above technical scheme, the technical effect reached are as follows: oil exploration provided by the utility model
It is fixed on the first installation section with one end of the connection sleeve of connecting line, the other end for connecting sleeve is inserted into the second installation section
Interior, installation sleeve is sleeved on the first installation section, first on the third collar flange of installation sleeve one end and the first installation section
Collar flange offsets, and the installation sleeve other end is mounted on the second collar flange on the second installation section in the form of screw thread, and
Fastening.Above-mentioned oil exploration is simple with connecting line structure, is installed and is fixed in the form of screw thread, enhanced convenience when dismounting, just
In maintenance, there is very high practicability.
Preferably, in the above-mentioned technical solutions, inside of the second installation section towards one end of the first installation section
On wall, it is provided with the groove for installing the connection sleeve, the thickness of the connection sleeve is identical as the depth of the groove.
Preferably, in the above-mentioned technical solutions, the side of the one end of the connection sleeve far from the first installation section is set
At least two fixed blocks are equipped with, are provided with the sliding slot to match with the fixed block, the fixed block on the second installation section
Slidingtype is inserted into the sliding slot.
Preferably, in the above-mentioned technical solutions, the cross section of the sliding slot is L shape, and first including being interconnected is sliding
Slot and second sliding slot, the first sliding groove are arranged along the central axes direction of the second installation section, one end of the first sliding groove
One end end of the second installation section is extended to, the other end is connected to the second sliding slot, and the second sliding slot is described in
The circumferential setting of second installation section inner sidewall, and the central axes of plane where the second sliding slot and the second installation section are hung down
Directly, when the connection sleeve is inserted on the second installation section, the fixed block passes through the first sliding groove and and is installed on
In the second sliding slot.
Preferably, in the above-mentioned technical solutions, the extending direction of the second sliding slot and the installation sleeve are mounted on institute
Direction of rotation when stating on the second installation section is identical.
It preferably, in the above-mentioned technical solutions, further include seal rubber sleeve, the seal rubber sleeve is sleeved on first installation
On section, and between first collar flange and the third collar flange, the third collar flange passes through described close
Sealing set offsets with first collar flange.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is oil exploration connecting line schematic diagram provided by the utility model;
Fig. 2 is the sectional view of one embodiment of oil exploration connecting line in Fig. 1;
Fig. 3 is the sectional view of another embodiment of oil exploration connecting line in Fig. 1;
Fig. 4 is the top view of the second installation section in Fig. 3.
Specific embodiment
As shown in Figures 1 to 4, oil exploration connecting line disclosed by the utility model, including installation sleeve 140, company
Female connector cylinder 130 and internal diameter and outer diameter the first installation section 110 all the same and the second installation section 120, one end of connection sleeve 130 are solid
It is scheduled on one end of the first installation section 110, the other end is inserted into the cavity of 120 one end of the second installation section, the first installation section 110
The first collar flange 115 is provided on the lateral wall of one end of connection sleeve 130, the second installation section 120 is close to connector sleeve
It is provided with the second collar flange 125 on the lateral wall of one end of cylinder 130, the side of the second collar flange 125 is provided with external screw thread,
It is provided with third collar flange 145 on the inner sidewall of one end of installation sleeve 140, interior spiral shell is provided on the inner sidewall of the other end
Line, installation sleeve 140 are sleeved on the outside of the first installation section 110 and the second installation section 120, third collar flange 145 and first
Collar flange 115 offsets, and the other end screw-type of installation sleeve 140 is fastened on the second collar flange 125, the first installation section
110 offset with the second installation section 120.Further, connection sleeve 130 be inserted into the second installation section 120 completely so that
One end of first installation section 110 offsets with the second installation section 120, and connecting sleeve 130 primarily serves the first installation of connection section 110
With the effect of the second installation section 120.
As an embodiment, on the inner sidewall of one end that the second installation section 120 saves 110 towards the first installation, if
It is equipped with the groove for installing connection sleeve 130, the thickness for connecting sleeve 130 is identical as the depth of groove.The setting of groove, side
Connecting pipe box are inserted into the second installation section 120, connect sleeve 130 thickness it is identical as the depth of groove, it is ensured that
When connecting pipe box are inserted into the second installation section 120, the inner sidewall of connecting pipe box and the first installation section 110 and the second installation are saved
120 inner sidewall is interconnected, it is ensured that the transmission performance of connecting pipe.
As an embodiment, the side of the one end of connection sleeve 130 far from the first installation section 110 is provided at least
Two fixed blocks 135, the second installation save and are provided with the sliding slot 126 to match with fixed block 135,135 slidingtype of fixed block on 120
It is inserted into sliding slot 126.The setting of fixed block 135 and sliding slot 126, so that the first installation section 110 is merely able to be inserted into the second peace
In dress section 120, opposite rotation can't occur.So that installation sleeve 140 is when being installed on the second installation section 120, first
Installation section 110 and the second installation section 120 are opposite entirety, will not rotate, it is solid to facilitate the installation to installation sleeve 140
It is fixed, and install more firm.
As an embodiment, the cross section of sliding slot 126 is L shape, including interconnected first sliding groove and the
Two sliding slots, first sliding groove are arranged along the central axes direction of the second installation section 120, and one end of first sliding groove extends to the second installation section
120 one end end, the other end are connected to second sliding slot, and second sliding slot is arranged along the circumferential direction of the second installation 120 inner sidewalls of section,
And plane where second sliding slot is vertical with the central axes of the second installation section 120, and connection sleeve 130 is inserted into the second installation section
When on 120, fixed block 135 passes through the first sliding groove and is installed in second sliding slot.The setting of L shape sliding slot 126, so that fixed
It when block 135 is inserted into 126 end of sliding slot, can be installed in second sliding slot, fixed block 135 can not only be avoided in second sliding slot
Interior relative rotation also effectively avoids the occurrence of the first installation section 110 is deviate from out of second installation section 120, improves
The structural stability of connecting pipe entirety.
As an embodiment, the extending direction of second sliding slot and installation sleeve 140 are mounted on the second installation section 120
Direction of rotation when upper is identical.Fixed block 135 is inserted into sliding slot 126, and installation sleeve 140 is being installed to the second installation section
When on 120, the first installation section 110 can be rotated under the drive of installation sleeve 140 along the direction that installation sleeve 140 rotates, fixed
Block 135 snaps fitted in second sliding slot under the drive of the first installation section 110, it is ensured that the first installation section 110 will not be from the second peace
Abjection in dress section 120.
It as an embodiment, further include seal rubber sleeve 150, seal rubber sleeve 150 is sleeved on the first installation section 110
On, and between the first collar flange 115 and third collar flange 145, third collar flange 145 passes through seal rubber sleeve 150
It offsets with the first collar flange 115.The setting of seal rubber sleeve 150, it is ensured that the sealing between connecting pipe box and the first installation section 110
Performance, the first installation section 110, connecting pipe box and the second installation section 120 realize the secondary seal to connecting pipe, further
Ensure the sealing performance of pipeline.Further, the longitudinal section of seal rubber sleeve 150 is rectangle, on the lateral wall of seal rubber sleeve 150
It is provided with the groove of arc-shaped, the setting of arc-shaped groove, so that seal rubber sleeve 150 is more prone to produce deformation after being extruded,
It is in close contact with the lateral wall of installation pipe sleeve inner sidewall and the first installation section 110, further ensures the effect of sealing.
The utility model uses above technical scheme, the technical effect reached are as follows: oil exploration provided by the utility model
It is fixed on the first installation section with one end of the connection sleeve of connecting line, the other end for connecting sleeve is inserted into the second installation section
Interior, installation sleeve is sleeved on the first installation section, first on the third collar flange of installation sleeve one end and the first installation section
Collar flange offsets, and the installation sleeve other end is mounted on the second collar flange on the second installation section in the form of screw thread, and
Fastening.Above-mentioned oil exploration is simple with connecting line structure, is installed and is fixed in the form of screw thread, enhanced convenience when dismounting, just
In maintenance, there is very high practicability.
Above embodiment is intended to illustrate the utility model and can realize or use for professional and technical personnel in the field, right
Above embodiment, which is modified, will be readily apparent to those skilled in the art, therefore the utility model includes
But it is not limited to above embodiment, it is any to meet the claims or specification description, meet and principles disclosed herein
With novelty, the method for inventive features, technique, product, each fall within the protection scope of the utility model.
Claims (6)
1. a kind of oil exploration connecting line, it is characterised in that: sleeve (130) and interior including installation sleeve (140), connection
Diameter and outer diameter it is all the same first installation section (110) and second installation save (120), it is described connect sleeve (130) one end fix
In one end of the first installation section (110), the other end is inserted into the cavity of described second installation section (120) one end, institute
It states the first installation section (110) and is provided with the first collar flange on the lateral wall of one end of connection sleeve (130)
(115), the second ring-type is provided on the lateral wall of the one end of the second installation section (120) close to connection sleeve (130)
Flange (125), the side of second collar flange (125) are provided with external screw thread, one end of the installation sleeve (140) it is interior
It is provided on side wall third collar flange (145), internal screw thread, the installation sleeve is provided on the inner sidewall of the other end
(140) be sleeved on it is described first installation section (110) and second installation section (120) outside, the third collar flange (145) and
First collar flange (115) offsets, and it is cyclic annular convex that the other end screw-type of the installation sleeve (140) is fastened on described second
On edge (125), the first installation section (110) offsets with the second installation section (120).
2. oil exploration connecting line as described in claim 1, it is characterised in that: described second installation section (120) direction
One end of the first installation section (110), is provided with the groove for installing connection sleeve (130), the connection sleeve
(130) thickness is identical as the depth of the groove.
3. oil exploration connecting line as claimed in claim 2, it is characterised in that: the connection sleeve (130) is far from institute
The side for stating one end of the first installation section (110) is provided at least two fixed blocks (135), on the second installation section (120)
It is provided with the sliding slot (126) to match with the fixed block (135), fixed block (135) slidingtype is inserted into the sliding slot
(126) in.
4. oil exploration connecting line as claimed in claim 3, it is characterised in that: the cross section of the sliding slot (126) is
L shape, including interconnected first sliding groove and second sliding slot, the first sliding groove is along the second installation section (120)
Axis direction setting, one end of the first sliding groove extend to it is described second installation section (120) one end end, the other end with
Second sliding slot connection, the second sliding slot along described second installation section (120) inner sidewall circumferential setting, and described the
It is vertical that plane where two sliding slots and second installation save the central axes of (120), and the connection sleeve (130) is inserted into described the
When on two installation sections (120), the fixed block (135) passes through the first sliding groove and is installed in the second sliding slot.
5. oil exploration connecting line as claimed in claim 4, it is characterised in that: the extending direction of the second sliding slot with
The direction of rotation when installation sleeve (140) is mounted on the second installation section (120) is identical.
6. such as oil exploration connecting line described in any one of claim 1 to 5, it is characterised in that: further include seal rubber sleeve
(150), the seal rubber sleeve (150) is sleeved on the first installation section (110), and is located at first collar flange
(115) between the third collar flange (145), the third collar flange (145) by the seal rubber sleeve (150) with
First collar flange (115) offsets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821436947.7U CN209180529U (en) | 2018-09-03 | 2018-09-03 | A kind of oil exploration connecting line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821436947.7U CN209180529U (en) | 2018-09-03 | 2018-09-03 | A kind of oil exploration connecting line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209180529U true CN209180529U (en) | 2019-07-30 |
Family
ID=67359245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821436947.7U Expired - Fee Related CN209180529U (en) | 2018-09-03 | 2018-09-03 | A kind of oil exploration connecting line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209180529U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112539169A (en) * | 2020-11-25 | 2021-03-23 | 王锦霞 | Water pump suitable for hydraulic engineering |
-
2018
- 2018-09-03 CN CN201821436947.7U patent/CN209180529U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112539169A (en) * | 2020-11-25 | 2021-03-23 | 王锦霞 | Water pump suitable for hydraulic engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209180529U (en) | A kind of oil exploration connecting line | |
CN106322014A (en) | Clamp type reducing pipe connection device | |
CN202469307U (en) | Wedge-type seal rotary joint | |
CN204646482U (en) | A kind of induction system line | |
CN104455815B (en) | Tapered sealing pipe connector for excavator | |
CN206036442U (en) | Quick -operation joint that pipe is connected | |
CN202834476U (en) | Straight pipe joint | |
CN206965280U (en) | The two-way docking facilities of axle sleeve type based on metal filter bag | |
CN105298410B (en) | A kind of tool joint | |
CN204512729U (en) | A kind of vacuum heat insulating low-temperature pipe road flanged connecting structure | |
CN208252055U (en) | A kind of clean type tubing coupling component | |
CN109632213A (en) | A kind of sealing detection tooling for double tube | |
CN202612910U (en) | Movable connector for air pipe of wagon | |
CN206598420U (en) | A kind of plug for mold cooling system | |
CN206246866U (en) | A kind of petroleum pipeline box cupling | |
CN207093967U (en) | A kind of hard tube quick union | |
CN207905727U (en) | A kind of tubing coupling that leakproofness is strong | |
CN205503031U (en) | Adapter sleeve for oil drilling | |
CN207279132U (en) | Taper sealing connector | |
CN203803383U (en) | Reverse osmosis filter core pipe fitting | |
CN208885801U (en) | A kind of expansion set shaft coupling | |
CN203516504U (en) | Improved expansion-sleeve-type serpentine spring coupler | |
CN207229053U (en) | A kind of preventer easy to use | |
CN204284749U (en) | A kind of automobile engine oil pipe joint | |
CN203614051U (en) | Big-pitch casing thread joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190730 Termination date: 20200903 |