CN209179503U - A kind of novel construction tool - Google Patents
A kind of novel construction tool Download PDFInfo
- Publication number
- CN209179503U CN209179503U CN201821952178.6U CN201821952178U CN209179503U CN 209179503 U CN209179503 U CN 209179503U CN 201821952178 U CN201821952178 U CN 201821952178U CN 209179503 U CN209179503 U CN 209179503U
- Authority
- CN
- China
- Prior art keywords
- telescopic segment
- section
- handrail
- construction tool
- telescopic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model belongs to technical field of construction, disclosing a kind of novel construction tool includes the first telescopic segment, handrail section and the second telescopic segment, second telescopic segment is parallel with the first telescopic segment, the bottom end of hinged second telescopic segment in one end of the handrail section, the other end of the handrail section hingedly passes through the top of first telescopic segment, and the top of first telescopic segment is hinged on the lower part of second telescopic segment by linkage section.The construction tool of the utility model is easy to operate, constructs laborsaving, belongs to non-lower section operation, and the dust that work progress generates is not easy to fall into the eyes of operator or sucking human body, and operator can stand directly on terrestrial operation, and there is no the risks of falling from high altitude.
Description
Technical field
The utility model belongs to technical field of construction, and in particular to a kind of novel construction tool.
Background technique
Carrying out construction and decoration, it is often necessary to drilled in wall top to cooperate the distribution and peace of water power and lamps and lanterns
Dress.Currently, people be generally adopted by scaffolding perhaps double ladder drill construction personnel need to stand in scaffold or
On double ladder, this mode, construction personnel needs to face up face and works in boring procedure, and the dust that work progress generates easily is fallen
Enter the eyes of operator or be directly sucked in human body, needs to carry out high altitude operation by means of ladder or scaffold, there are high-altitudes
The risk fallen.
Utility model content
In order to solve the above problems existing in the present technology, the utility model aim is to provide a kind of novel construction work
Tool.
The technology employed by the present utility model is
A kind of novel construction tool includes the first telescopic segment, handrail section and the second telescopic segment, second telescopic segment and the
One telescopic segment is parallel, the bottom end of hinged second telescopic segment in one end of the handrail section, and the other end of the handrail section is hinged
Across the top of first telescopic segment, the top of first telescopic segment is hinged on second telescopic segment by linkage section
Lower part.
Further, first telescopic segment and second telescopic segment include principal piece and secondary section, the secondary Duan Keshen
Contracting ground is arranged in the principal piece.
Further, first telescopic segment can be fixed on the ground by fixing piece.
Further, the fixing piece is earth anchor.
Further, the handrail section is equipped with handrail rubber mat far from one end of second telescopic segment.
The utility model has the following beneficial effects:
(1) construction tool of the utility model is easy to operate, constructs laborsaving, belongs to non-lower section operation, and work progress generates
Dust be not easy to fall into the eyes of operator or sucking human body, operator can stand directly on terrestrial operation, and there is no height
The risk that sky falls.
(2) drilling tool is driven to impact the drilling rotated at the top of progress wall, operator up and down by pushing or promotion handrail section
Member is located at side of the handrail section far from the second telescopic segment, using lever principle, operates more labor-saving.
Detailed description of the invention
Fig. 1 is the construction operation schematic diagram of traditional construction operation.
Fig. 2 is the structural schematic diagram of the utility model.
Fig. 3 is the construction operation schematic diagram of the construction tool of the utility model.
Fig. 4 is the using process diagram and schematic diagram of the construction tool of the utility model.
In figure: the first telescopic segment of 1-;The principal piece of the first telescopic segment of 11-;The secondary section of the first telescopic segment of 12-;2- second is flexible
Section;3- handrail section;4- linkage section;5- construction drilling tool;6- pin shaft.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is further elaborated the utility model.
As in Figure 2-4, a kind of novel construction tool of the present embodiment is stretched including the first telescopic segment 1, handrail section 3 and second
Contracting section 2, second telescopic segment is parallel with the first telescopic segment, and one end of the handrail section is hinged (can be by pin shaft 6 removably
Hingedly) the bottom end of second telescopic segment, the other end of the handrail section hinged (can be removably hinged by pin shaft 6) pass through
The top on the top of first telescopic segment, first telescopic segment hingedly (can be by pin shaft 6 removably by linkage section 4
Hingedly) in the lower part of second telescopic segment, the second telescopic segment can be driven to rise by the pushing of handrail section, drilling tool is mounted on the
The top of two telescopic segments drives drilling tool to impact the drilling at the top of rotation progress wall, behaviour up and down by pushing or being promoted handrail section
Making personnel and is located at side of the handrail section far from the second telescopic segment, operator is located at outside the fall area for the dust that drilling generates,
Belong to non-lower section operation, dust will not be made to fall into glasses or sucking dust because of drilling operation.
First telescopic segment and second telescopic segment include principal piece and secondary section, and the pair section is telescopically disposed in
In the principal piece, the secondary section 12 of such as the first telescopic segment is telescopically arranged in the principal piece 11 of the first telescopic segment, by construction drilling tool peace
Dress is fixed on the top of the second telescopic segment, the length of the first telescopic segment or the second telescopic segment can be adjusted as needed, to adjust
The height of integral construction tool and making drilling tool 5 of constructing contacts at the top of wall, in order to facilitate the operation of can lead to first telescopic segment
It crosses fixing piece to fix on the ground, specifically, the fixing piece is earth anchor.Then handrail section is operated, bore operation is carried out.
In order to facilitate depression, the handrail section is equipped with handrail rubber mat far from one end of second telescopic segment, convenient
Hand-held handrail section depression.
It is 2 meters or so with the maximum length of the first telescopic segment to be illustrated, the maximum length of the second telescopic segment is also 2 meters of left sides
The right side, the length that when construction adjusts the first telescopic segment or the second telescopic segment as needed make to construct at the top of drilling tool contact wall, not apply
Handrail section can be pressed to, gathering first telescopic segment and second telescopic segment parallel with the first telescopic segment by working hour, controllable after gathering
The length of integral construction tool is about 1 meter 3, easy to carry after gathering.
The construction operation of the construction tool of the utility model and the contrast table such as table 1 of traditional construction operation.
The construction tool of 1 the utility model of table and the contrast table of traditional construction operation
In short, the construction tool of the utility model is easy to operate, construct laborsaving, belong to non-lower section operation, work progress produces
Raw dust is not easy to fall into the eyes of operator or sucking human body, and operator can stand directly on terrestrial operation, be not present
The risk of falling from high altitude.
The utility model is not limited to above-mentioned optional embodiment, anyone can obtain under the enlightenment of the utility model
Other various forms of products, however, making any variation in its shape or structure, all the utility model rights that falls into are wanted
The technical solution in confining spectrum is sought, is all fallen within the protection scope of the utility model.
Claims (5)
1. a kind of novel construction tool, it is characterised in that: including the first telescopic segment, handrail section and the second telescopic segment, described second
Telescopic segment is parallel with the first telescopic segment, the bottom end of hinged second telescopic segment in one end of the handrail section, the handrail section
The other end hingedly passes through the top of first telescopic segment, and the top of first telescopic segment is hinged on described by linkage section
The lower part of two telescopic segments.
2. novel construction tool according to claim 1, it is characterised in that: first telescopic segment and described second flexible
Duan Jun includes principal piece and secondary section, and the pair section is telescopically disposed in the principal piece.
3. novel construction tool according to claim 2, it is characterised in that: first telescopic segment can be solid by fixing piece
Determine on the ground.
4. novel construction tool according to claim 3, it is characterised in that: the fixing piece is earth anchor.
5. novel construction tool described in any one of -4 claims according to claim 1, it is characterised in that: the handrail Duan Yuan
One end from second telescopic segment is equipped with handrail rubber mat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821952178.6U CN209179503U (en) | 2018-11-23 | 2018-11-23 | A kind of novel construction tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821952178.6U CN209179503U (en) | 2018-11-23 | 2018-11-23 | A kind of novel construction tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209179503U true CN209179503U (en) | 2019-07-30 |
Family
ID=67374156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821952178.6U Active CN209179503U (en) | 2018-11-23 | 2018-11-23 | A kind of novel construction tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209179503U (en) |
-
2018
- 2018-11-23 CN CN201821952178.6U patent/CN209179503U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209277816U (en) | A kind of reamer used for geological prospecting | |
CN205445099U (en) | Pole orthotic devices | |
CN209179503U (en) | A kind of novel construction tool | |
CN210610939U (en) | Bamboo shoots device of skinning | |
CN207055847U (en) | A kind of climbing device when being used for electric pole operation | |
CN106825682B (en) | High-altitude drilling automatic pilot | |
CN206542105U (en) | A kind of portable electric insulation retaining device | |
CN203132861U (en) | Electric geotome | |
CN116163649A (en) | Highway bridge construction drilling platform | |
CN212306088U (en) | Afforestation plants with digging device | |
CN204938126U (en) | A kind of ceramic tile conveyer | |
CN110014525A (en) | A kind of ceramic tile cutting clamper quickly accommodated | |
CN210959400U (en) | Planting and digging device for water and soil conservation | |
CN208135825U (en) | It is a kind of convenient for fixed street lamp more changing device | |
CN204377376U (en) | Soil drilling machine structure | |
CN208686427U (en) | A kind of emergency management and rescue forcible entry device | |
CN207314411U (en) | A kind of Road tooth cheats quick digging mechanism | |
CN208416007U (en) | Movable building engineering construction sunshade | |
CN111386798A (en) | Drilling equipment is planted in forestry | |
CN206458116U (en) | Portable electric collapsible multi-use cleaning plant for architectural plane | |
CN205557497U (en) | Novel double -end rammer compactor | |
CN212956662U (en) | Multi-energy shovel for garden pavement construction | |
CN212508035U (en) | Ladder for decoration | |
CN212660555U (en) | Gardens are with portable plantlet transplanting device | |
CN204952816U (en) | Production feeding device for fodder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |